Financier | Commitments |
---|---|
Local Beneficiaries | 1.26 |
Global Environment Facility (GEF) | 13.40 |
Borrower/Recipient | 12.10 |
P068121
Closed
Douglas C. Olson
N/A
Latin America and Caribbean
March 23, 2001
(as of board presentation)
June 13, 2002
February 26, 2003
US$ 26.76 million
N/A
2002
US$ 13.40 million
B
January 15, 2013
January 31, 2009
BANK APPROVED
Financier | Commitments |
---|---|
Local Beneficiaries | 1.26 |
Global Environment Facility (GEF) | 13.40 |
Borrower/Recipient | 12.10 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | N/A |
IBRD + IDA Commitment | N/A |
Lending Instrument | |
---|---|
Grant Amount | 13.40 |
Total Project Cost** | 26.76 |
Name | Review | Date |
---|---|---|
Procurement | Satisfactory | 2008-12-17 |
Overall Safeguards Rating | Satisfactory | 2008-12-17 |
Counterpart Funding | Satisfactory | 2008-12-17 |
Overall Implementation Progress (IP) | Satisfactory | 2008-12-17 |
Summary Global Objective Rating | Satisfactory | 2008-12-17 |
Financial Management | Satisfactory | 2008-12-17 |
Monitoring and Evaluation | Satisfactory | 2008-12-17 |
Project Management | Satisfactory | 2008-12-17 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 07-30-2009 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | Negligible |
Bank Performance | Substantial |
Borrower Performance | Substantial |
Government Performance | Highly Satisfactory |
Implementing Agency | Substantial |
INDICATOR | ICR REVIEW: 05-24-2010 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | Moderate | N/a |
Bank Performance | Satisfactory | N/a |
Borrower Performance | Satisfactory | N/a |
Government Performance | Satisfactory | N/a |
Implementing Agency | Satisfactory | N/a |
Icr Quality | Satisfactory | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Well inventory carried out in all four countries | Value | ----------- | 7733 | 2000 |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
At least 70% of all wells assessed in terms fo use and water availability, quantity and quality | Value | ----- | 733 | 1400 |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
A preliminary conceptual model is available | Value | ------ | Conceputal model completed and discussed with prof | Conceptual model prepared |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Geological and hydrological maps of priority areas | Value | ----- | Thematic maps for the four priority areas prepared | Maps for priority areas prepared |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Water quality assessed and pollution patterns distinguised | Value | 346 wells assessed evaluated | 338 | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Isotope studies carried out | Value | ----- | 608 | 250 |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
water uses assessed | Value | The general use determined but did not quantify w | Level of total and economic extraction determined | |
Date | April 16, 2003 | January 23, 2009 | January 30, 2009 | |
Comment |
Maps showing present development and abstraction, uses, geographic distribution, productivity | Value | -------------- | Map of land use change; 3 maps for the pilot regio | Descriptive maps developed |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Development of regional technical rules and legal instruments developed to control well design, construction.... | Value | ---------- | 6 manual developed | 5 manuals developed |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Assessment of aquifer vulnerability and associated risks | Value | Not available | A regional and 4 additional for pilot regions that | Regonal map that shows vulnerable areas developed |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Permanent monitoring network selected | Value | Not applicable | 180 wells selected for the monitoring network | 184 wells selected for the monitoring network |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
monitoring network and equipment | Value | Not applicable. | No equipment was installed | Monitoring network and equipment adequately mainta |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Establishment of regional information and documentation system | Value | Not available | Hydrology Data Base and Guarani aqufier base map d | Web page developed and provides relevant informati |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Establishment of Guaran Aquifer Information System | Value | Not available | Guarani Aquifer Information System (SISAG) establi | Establishment of SISAG with 5 nodes |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Workshops on sustainable technical, scientific, legal, institutional, political and diplomatic agreements | Value | NA | 9 Workshops and 4 additional meetings were conduct | 8 workshops and 4 local meetings |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Technical consensus proposal for a Legal Framework to manage the GAS | Value | The countries agreed on institutional, financing a | Existence of an agreement | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Multi-country agreement on an institutional, financial, and technical framework to jointly manage the Guarani Aquifer System existsand is under implementation | Value | The 4 countries agreed on an institutional, financ | Multi-country agreement on an institutional, finan | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Number of staff benefiting from twinning (staff exchange) arrangements | Value | 44 staff from the 4 countries benefited from combi | Technical Assistance on demand, technical exchange | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
# of events held to benefits organizations active in groundwater field | Value | 13 events -- seminars, meetings, workshops # held | At least 8 events # seminars, meetings, workshops | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Preparation of TDA | Value | TDA prepared, approved by Steering Committee and w | TDA documentation produced and disseminated | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Formulation of Communication plan | Value | Public Communication plan prepared for implemented | Regional Public Communication and Participation Pl | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Provision of information through the Guarani Aquifer Geographic Information System | Value | The Guarani Aquifer Geographic Information System | Information and document dissemination is continuo | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Establishment of Guarani Citizens' Fund | Value | Guarani Citizens' Fund established. 24 subprojects | Guarani Citizens' Fund established with US$ 240,00 | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Coummunity-level activities carried out by CSOs to enhance public participation, communication and education | Value | 2,300,000 people reached directly by CSO financed | Coummunity-level activities carried out by CSOs to | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Information dissemination campaigns in each country carried out at local level | Value | One regional TV spot and 4 campaigns (1 per pilot | Information dissemination campaigns in each countr | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Scoping study carried out, with emphasis on indigenous peoples' rights to water and natural resources | Value | Study completed; 2 in Brazil and one each in Argen | Scoping study carried out, with emphasis on indige | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Dissemination of relevant project documentation | Value | Only 1 document translated and disseminated throug | Relevant project documentation has been translated | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Project monitoring and evaluation system | Value | An M&E system established and 16 periodic reports | Project monitoring and evaluation system is implem | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Technical discussions, consultations and project progress information and feedback | Value | 13 workshops and technical meetings conducted | At least bi-annual workshops (by country) held for | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Preparation of progress reports | Value | 71 reports prepared and disseminated to appropriat | Progress reports, together with project result and | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Project/country stakeholders participation in relevant international events | Value | Relevant staff participated in at least 8 events; | Project/country stakeholders participate in at lea | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Project webpage | Value | A total of 634,397 visits hosted by the web page | Project webpage well maintained | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Socio-economic participatory stakeholder assessments | Value | A total of 4 socio-economic assessments carried ou | Socio-economic participatory stakeholder assessmen | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Raising of local awareness | Value | 162,000 people in Concordia/Salto and 147,000 in R | In Concordia/Salto and Rivera/Santana, local aware | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Conduct scientific studies -- geological, hydrogeological, and hydrogeochemical | Value | Concordia/Salto and Rivera/Santana a total of 4 Hy | Scientific studies executed and geological, hydrog | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Data bases on wells, water uses, and aquifer parameters are available via SISAG and local information networks | Value | In both Concordia/Salto and Rivera/Santana hydrolo | In Concordia/Salto and Rivera/Santana, data bases | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Availability of specific subregional digital hydrogeological models | Value | For both Concordia/Salto and Rivera/Santana 2 Hydr | Specific subregional digital hydrogeological model | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
For Concordia/Salto and Rivera/SantanaLocal elaboration of aquifer management plan, | Value | Local management plans elaborated that included ar | Local aquifer management plan elaborated, includin | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Development of transboundary management framework \ | Value | Specific transboundary management issues identifie | Specific transboundary management framework develo | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Documentation of experiences in Concordia/Salto and Rivera/Santana | Value | Several documentations available including lessons | Institutional, legal, managerial, social, and envi | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Itapua, Paraguay, enhancing geohydrological knowledge | Value | A complete analysis of the Characterstics of the A | Geohydrological knowledge of area increased, esp. | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Socio-economic assessment (Itapua) | Value | 2 socio-economic assessments conducted. Water usag | Socio-economic assessment, including water usage a | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Public information campaign (Itapua) | Value | In Itapua an estimated 66,000 people reached throu | Public information campaign carried out | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Elaboration of management priority actions and localities | Value | Local Strategic Action Plan developed | Management needs identified and proposal, includin | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Participatory social assessment (Riberao Preto) | Value | A total of 5 studies in social assessment and soci | Participatory social assessment, consultations and | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Technical assistance for local aquifer management planning (Ribeirao Preto) | Value | A total of 22 events, missions, and visits were co | Technical assistance for local aquifer management | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Elaboration of local aquifer management plan | Value | Local Strategic Action Plan developed | Local aquifer management plan elaborated | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Updating of geothermal data and pertinent information and developement of new thematic maps | Value | Geothermal data and relevant information updated a | Geothermal data and pertinent information updated | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Analyses of feasibility of possible future geothermal activities | Value | Task force established; Analyses of socio-economic | Analyses of socio-economic, financial, and environ | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Identification of possible pilot projects | Value | Possible pilot projects identified (drying wood an | Conceptual identification of possible pilot projec | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Project well managed | Value | Through several layers of management (from local t | Project well managed and objective reached | |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Pollution risk diminshed or controlled | Value | Huge potential pollution risk due to treatment of | In general pollution risk was found out to be mini | Pollution risks diminished or controlled |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Inter-country groundwater conflicts diminished | Value | Multi-country inter-ministerial forum established. | i) the inter-ministerial group established as a pe | Risk of inter-country groundwater conflicts dimini |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Overdraft risks diminished or stablized | Value | Not applicable. | In general no overdarft risk. At specific localit | Overdraft risks diminished or stabilized. |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |
Reduction of cost of mitigation and stablization | Value | Not applicable since there were no stablization an | Project is preventive. In general the resource is | Future mitigation and stablization costs reduced |
Date | April 16, 2003 | January 23, 2009 | January 31, 2009 | |
Comment |