Financier | Commitments |
---|---|
Borrower/Recipient | 10.25 |
IDA Credit | 88.58 |
P079344
Closed
Deepak Bhatia
N/A
July 15, 2003
(as of board presentation)
September 15, 2005
September 29, 2006
US$ 98.83 million
N/A
2006
US$ 88.58 million
C
March 11, 2021
December 31, 2013
BANK APPROVED
Financier | Commitments |
---|---|
Borrower/Recipient | 10.25 |
IDA Credit | 88.58 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 88.58 |
IBRD + IDA Commitment | 88.58 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 98.83 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Sep 1, 2020 | IDA-41160 | Int Charges | 203,302.47 |
Sep 1, 2021 | IDA-41160 | Int Charges | 228,052.40 |
Sep 1, 2021 | IDA-41160 | Int Charges | 228,052.40 |
Sep 1, 2021 | IDA-41160 | Loan Repay | 1,364,245.40 |
Sep 1, 2021 | IDA-41160 | Loan Repay | 2,360.86 |
Sep 1, 2022 | IDA-41160 | Loan Repay | 5,416.67 |
Sep 1, 2022 | IDA-41160 | Loan Repay | 1,244,687.50 |
Sep 1, 2022 | IDA-41160 | Int Charges | 199,235.34 |
Sep 1, 2022 | IDA-41160 | Int Charges | 199,235.34 |
Mar 1, 2022 | IDA-41160 | Loan Repay | 1,338,467.10 |
Mar 1, 2022 | IDA-41160 | Int Charges | 218,463.56 |
Mar 1, 2022 | IDA-41160 | Int Charges | 218,463.56 |
Mar 1, 2022 | IDA-41160 | Loan Repay | 773.10 |
Sep 1, 2023 | IDA-41160 | Int Charges | 3,352.51 |
Sep 1, 2023 | IDA-41160 | Int Charges | 3,352.51 |
Sep 1, 2023 | IDA-41160 | Loan Repay | 1,277,095.60 |
Sep 1, 2023 | IDA-41160 | Int Charges | 193,958.89 |
Sep 1, 2023 | IDA-41160 | Int Charges | 193,958.89 |
Mar 1, 2023 | IDA-41160 | Loan Repay | 1,249,644.00 |
Mar 1, 2023 | IDA-41160 | Int Charges | 195,961.10 |
Mar 1, 2023 | IDA-41160 | Int Charges | 195,961.10 |
Mar 1, 2023 | IDA-41160 | Loan Repay | 31,148.47 |
Sep 15, 2005 | IDA-41160 | Loan Commitment | 93,720,000.00 |
Mar 1, 2024 | IDA-41160 | Loan Repay | 55.44 |
Mar 1, 2024 | IDA-41160 | Loan Repay | 1,273,804.20 |
Mar 1, 2024 | IDA-41160 | Int Charges | 188,690.45 |
Mar 1, 2024 | IDA-41160 | Int Charges | 188,690.45 |
Mar 1, 2015 | IDA-41160 | Int Charges | 6,358.93 |
Mar 1, 2015 | IDA-41160 | Int Charges | 6,358.93 |
Sep 4, 2014 | IDA-41160 | Int Charges | 6,041.12 |
Sep 4, 2014 | IDA-41160 | Int Charges | 6,041.12 |
Sep 4, 2014 | IDA-41160 | Int Charges | 267,793.25 |
Sep 4, 2014 | IDA-41160 | Int Charges | 267,793.25 |
Mar 17, 2015 | IDA-41160 | Int Charges | 240,905.67 |
Jul 3, 2014 | IDA-41160 | Loan Cancel | 6,238,428.00 |
Mar 1, 2016 | IDA-41160 | Int Charges | 1,007.45 |
Mar 1, 2016 | IDA-41160 | Int Charges | 1,007.45 |
Mar 1, 2016 | IDA-41160 | Loan Repay | 663,561.25 |
Mar 1, 2016 | IDA-41160 | Int Charges | 248,835.42 |
Mar 1, 2016 | IDA-41160 | Int Charges | 248,835.42 |
Sep 1, 2015 | IDA-41160 | Int Charges | 13,577.63 |
Sep 1, 2015 | IDA-41160 | Int Charges | 13,577.63 |
Sep 1, 2015 | IDA-41160 | Int Charges | 238,865.78 |
Sep 1, 2015 | IDA-41160 | Int Charges | 238,865.78 |
Sep 1, 2017 | IDA-41160 | Loan Repay | 680,484.90 |
Sep 1, 2017 | IDA-41160 | Int Charges | 230,463.94 |
Sep 1, 2017 | IDA-41160 | Int Charges | 230,463.94 |
Mar 1, 2017 | IDA-41160 | Int Charges | 235,208.30 |
Mar 1, 2017 | IDA-41160 | Loan Repay | 355.49 |
Mar 1, 2017 | IDA-41160 | Loan Repay | 647,045.44 |
Mar 1, 2017 | IDA-41160 | Int Charges | 235,208.30 |
Sep 1, 2016 | IDA-41160 | Int Charges | 248,717.69 |
Sep 1, 2016 | IDA-41160 | Int Charges | 248,717.69 |
Sep 1, 2016 | IDA-41160 | Loan Repay | 2,385.75 |
Sep 1, 2016 | IDA-41160 | Loan Repay | 667,560.90 |
Sep 1, 2018 | IDA-41160 | Int Charges | 239,689.56 |
Sep 1, 2018 | IDA-41160 | Int Charges | 239,689.56 |
Sep 1, 2018 | IDA-41160 | Int Charges | 12,568.58 |
Sep 1, 2018 | IDA-41160 | Int Charges | 12,568.58 |
Sep 1, 2018 | IDA-41160 | Loan Repay | 672,812.80 |
Mar 1, 2018 | IDA-41160 | Loan Repay | 693,078.00 |
Mar 1, 2018 | IDA-41160 | Int Charges | 236,560.90 |
Mar 1, 2018 | IDA-41160 | Int Charges | 236,560.90 |
Mar 1, 2018 | IDA-41160 | Int Charges | 17,378.20 |
Mar 1, 2018 | IDA-41160 | Int Charges | 17,378.20 |
Sep 1, 2017 | IDA-41160 | Int Charges | 2,850.08 |
Sep 1, 2017 | IDA-41160 | Int Charges | 2,850.08 |
Mar 1, 2019 | IDA-41160 | Int Charges | 233,600.98 |
Mar 1, 2019 | IDA-41160 | Int Charges | 233,600.98 |
Mar 1, 2019 | IDA-41160 | Loan Repay | 3,419.36 |
Mar 1, 2019 | IDA-41160 | Loan Repay | 666,075.94 |
Mar 1, 2020 | IDA-41160 | Loan Repay | 12,822.86 |
Mar 1, 2020 | IDA-41160 | Loan Repay | 646,494.25 |
Mar 1, 2020 | IDA-41160 | Int Charges | 227,464.36 |
Mar 1, 2020 | IDA-41160 | Int Charges | 227,464.36 |
Sep 1, 2019 | IDA-41160 | Loan Repay | 656,945.40 |
Sep 1, 2019 | IDA-41160 | Int Charges | 229,109.70 |
Sep 1, 2019 | IDA-41160 | Int Charges | 229,109.70 |
Sep 1, 2019 | IDA-41160 | Int Charges | 2,351.15 |
Sep 1, 2019 | IDA-41160 | Int Charges | 2,351.15 |
Sep 1, 2019 | IDA-41160 | Loan Repay | 0.01 |
Sep 1, 2019 | IDA-41160 | Int Charges | -0.01 |
Sep 1, 2019 | IDA-41160 | Int Charges | -0.01 |
Mar 1, 2021 | IDA-41160 | Int Charges | 30,200.71 |
Mar 1, 2021 | IDA-41160 | Int Charges | 30,200.71 |
Mar 1, 2021 | IDA-41160 | Loan Repay | 689,770.06 |
Mar 1, 2021 | IDA-41160 | Int Charges | 232,797.36 |
Mar 1, 2021 | IDA-41160 | Int Charges | 232,797.36 |
Sep 1, 2020 | IDA-41160 | Loan Repay | 6,166.82 |
Sep 1, 2020 | IDA-41160 | Loan Repay | 677,280.30 |
Sep 1, 2020 | IDA-41160 | Int Charges | 203,302.47 |
Jan 2, 2014 | IDA-41160 | Loan Disb | 342,090.80 |
Mar 1, 2014 | IDA-41160 | Int Charges | 222,816.98 |
Mar 1, 2014 | IDA-41160 | Int Charges | 222,816.98 |
Jan 23, 2014 | IDA-41160 | Loan Disb | 1,390,563.80 |
Jan 23, 2014 | IDA-41160 | Loan Disb | 1,080,426.90 |
Mar 1, 2014 | IDA-41160 | Int Charges | 4,585.97 |
Mar 1, 2014 | IDA-41160 | Int Charges | 4,585.97 |
Sep 3, 2013 | IDA-41160 | Loan Disb | 775,778.56 |
Aug 21, 2013 | IDA-41160 | Loan Disb | -1,903.18 |
Aug 5, 2013 | IDA-41160 | Loan Disb | 118,925.43 |
Aug 12, 2013 | IDA-41160 | Loan Disb | 1,473,732.80 |
Nov 13, 2013 | IDA-41160 | Loan Disb | 131,792.44 |
Jul 26, 2013 | IDA-41160 | Loan Disb | 1,369,650.50 |
Sep 1, 2013 | IDA-41160 | Int Charges | 584.47 |
Sep 1, 2013 | IDA-41160 | Int Charges | 584.47 |
Sep 1, 2013 | IDA-41160 | Int Charges | 155,982.64 |
Sep 1, 2013 | IDA-41160 | Int Charges | 155,982.64 |
Sep 5, 2013 | IDA-41160 | Loan Disb | 281,753.84 |
Aug 21, 2013 | IDA-41160 | Loan Disb | 374,618.38 |
Jul 26, 2013 | IDA-41160 | Loan Disb | 125,057.16 |
Jul 26, 2013 | IDA-41160 | Loan Disb | 450,002.90 |
Jul 26, 2013 | IDA-41160 | Loan Disb | 159,622.64 |
Jul 29, 2013 | IDA-41160 | Loan Disb | 20,150.44 |
Jul 12, 2013 | IDA-41160 | Loan Disb | 580,776.00 |
Aug 29, 2013 | IDA-41160 | Loan Disb | 351,811.66 |
Jul 2, 2013 | IDA-41160 | Loan Disb | 195,577.84 |
Sep 3, 2013 | IDA-41160 | Loan Disb | 304,204.30 |
Jun 17, 2014 | IDA-41160 | Loan Disb | -107,526.31 |
Jun 10, 2014 | IDA-41160 | Loan Disb | -29,780.11 |
May 16, 2014 | IDA-41160 | Loan Disb | -413.07 |
Apr 22, 2014 | IDA-41160 | Loan Disb | 1,041,487.40 |
Apr 17, 2014 | IDA-41160 | Loan Disb | 78,517.85 |
May 5, 2014 | IDA-41160 | Loan Disb | 1,263,823.50 |
May 5, 2014 | IDA-41160 | Loan Disb | 114,954.41 |
May 6, 2014 | IDA-41160 | Loan Disb | -11,735.11 |
Apr 15, 2014 | IDA-41160 | Loan Disb | 236,400.00 |
Apr 15, 2014 | IDA-41160 | Loan Disb | 198,222.80 |
Apr 30, 2014 | IDA-41160 | Loan Disb | 119,019.21 |
Apr 11, 2014 | IDA-41160 | Loan Disb | 461,332.38 |
May 7, 2014 | IDA-41160 | Loan Disb | 71,966.04 |
May 7, 2014 | IDA-41160 | Loan Disb | 92,412.62 |
May 7, 2014 | IDA-41160 | Loan Disb | 101,048.40 |
Apr 18, 2014 | IDA-41160 | Loan Disb | 782,676.90 |
Dec 2, 2013 | IDA-41160 | Loan Disb | 380,062.70 |
Jan 27, 2014 | IDA-41160 | Loan Disb | 774,558.44 |
Feb 18, 2014 | IDA-41160 | Loan Disb | 649,250.44 |
Feb 21, 2014 | IDA-41160 | Loan Disb | 1,381,676.80 |
Feb 21, 2014 | IDA-41160 | Loan Disb | 604,598.25 |
Dec 13, 2013 | IDA-41160 | Loan Disb | 826,781.00 |
Dec 4, 2013 | IDA-41160 | Loan Disb | 550,203.70 |
Nov 19, 2013 | IDA-41160 | Loan Disb | 404,003.56 |
Sep 19, 2013 | IDA-41160 | Loan Disb | 372,167.47 |
Oct 15, 2013 | IDA-41160 | Loan Disb | 1,560,973.40 |
Sep 4, 2013 | IDA-41160 | Loan Cancel | 7,543,022.00 |
Sep 27, 2013 | IDA-41160 | Loan Disb | 458,422.75 |
Jan 21, 2014 | IDA-41160 | Loan Disb | 12,000.00 |
Sep 19, 2013 | IDA-41160 | Loan Disb | 312,420.97 |
Dec 26, 2013 | IDA-41160 | Loan Disb | 553,971.06 |
Jan 6, 2014 | IDA-41160 | Loan Disb | 1,330,753.80 |
Dec 9, 2013 | IDA-41160 | Loan Disb | 420,421.56 |
Oct 18, 2013 | IDA-41160 | Loan Disb | 71,219.36 |
Nov 22, 2013 | IDA-41160 | Loan Disb | 22,436.43 |
Nov 13, 2013 | IDA-41160 | Loan Disb | 574,489.06 |
Mar 17, 2015 | IDA-41160 | Int Charges | 240,905.67 |
Name | Review | Date |
---|---|---|
Progress towards achievement of PDO | Moderately Unsatisfactory | 2014-01-13 |
Procurement | Moderately Satisfactory | 2014-01-13 |
Counterpart Funding | Satisfactory | 2014-01-13 |
Project Management | Moderately Unsatisfactory | 2014-01-13 |
Financial Management | Moderately Satisfactory | 2014-01-13 |
Monitoring and Evaluation | Moderately Satisfactory | 2014-01-13 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2014-01-13 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 06-26-2014 |
---|---|
Outcomes | Moderately Unsatisfactory |
Risk to Development Outcome | Substantial |
Bank Performance | Moderately Unsatisfactory |
Borrower Performance | Moderately Unsatisfactory |
Government Performance | Moderately Unsatisfactory |
Implementing Agency | Moderately Unsatisfactory |
INDICATOR | ICR REVIEW: 09-29-2015 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Unsatisfactory | N/a |
Risk To Development Outcome | Significant | N/a |
Bank Performance | Moderately Unsatisfactory | N/a |
Borrower Performance | Moderately Unsatisfactory | N/a |
Government Performance | Moderately Unsatisfactory | N/a |
Implementing Agency | Moderately Unsatisfactory | N/a |
Icr Quality | Satisfactory | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Formulation and implementation of ICT policies and common standards in MIC | Value | Limited capacity to formulate policies and guide i | EnterpriseArchitecture (EA) andinteroperability | The following three standards are formulated:Ente |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | 2 out of 4 targets were completed (EA and Interoperability standard). E-Govt Framework and security are in the final stage, o befully completed by December 2013. |
Reduced transaction costs, increased transparency and users' satisfaction of selected government services through e-applications (Hanoi, Danang) | Value | 0 | Transaction time will be reduced by one and a half | |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | E-services are under implementation. So far, 1 G2B service isoperational (Businessregistration servicein Danang.), but costreduction rate and user satisfaction rate have not yet measured (just finished development phase).At Hanoi:Currently, there are 3level public services implemented online by Hanoi DIC. And the time of online transactions is reduced in comparison with thetraditionalway. They are: + Issuing license for publishing documents without business (transition time is reduced to 4 days from10 days)+ Issuing license for organization of press conferences (transition time is reduced to 2 days from 5 days)As of October2013, time saving and cost reduction survey has not yet done, but by the end of the project, the full survey willbe completed.Probability of achieve the project end target will be around 80-90%. |
Number of G2B services available online (Hanoi and Danang) | Value | 0 | 1 | 3 |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | 1 G2B service is operational (business registration service in Danang).Note: Public Procurement service in Danang was canceledand implemented by own govt funding. Business registration system is under implementation in Hanoi.33 % target achieved. | The project targeted 3 G2B service available online, namely: business registration service (Hanoi, Danang), and public procurementservice (Danang). |
Increase number of private firms using ICT and e-services | Value | n/a | Danang:• SMEs are well-informed about the current | 500 managers of SMEs trained how to apply IT in th |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment |
Upgrading ICT infrastructure to support eGovernment technical capacity in MIC, GSO, MOFA, Hanoi, and Danang | Value | 0 | Completed in MIC DICs. Almost completed in Danang | Total 5.Completion of 5 internal ICT network (LAN |
Date | August 26, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | 80% achievement.GSO, MOFA, and Danang are at the final stage of completion (user acceptance stage) of ICT infrastructureupgrading. There has been some delay in Hanoi. Hanoi cancelled packages in June 2013 due to accumulated implementation delays,which would affect the PDO achievement, but the impact would be relatively small compared to other locations. |
Number of e-services and socio-economic information available through eGateway (MIC), portal sites (GSO, Hanoi, and Danang) | Value | 0.00 | 5.00 | 6.00 |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | 5• 3 licensing e-services of MIC available online (launched in May 2013).(Radio transmitter permission, registration ofpublications by Publishing Houses, Registration of imported publication portfolio), and application process was completelyconverted to e-transaction (no more paper-based application accepted.) • Danang: 1-gate service is implemented, up and running.•GSO portal is completed, up and running• Hanoi one-gate services portal are under implementation.As of October 2013, 5 out of 6targeted e-services were implemented and operational. Hanoi one-gate service portal is delayed. Hopefully it will be all completedby Dec 15, 2013. |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
MIC: Design and implementation of e-Government framework, common IT standards and ICT policies | Value | There are no guideline and framework to develop th | + TA on e-government Framework and IT applications | • E-government framework is in place to guide all |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | Project fully completed the project end target, and nothing more expected. |
MIC, Hanoi and Danang: Improved ICT awareness and management capacity through training | Value | Lack of IO and CIO awareness and knoledge of how I | MIC: • 497 CIOs/IOs trained (277 CIOs/IOs from mi | • 400 CIOs/IOs trained in which 260 CIOs/IOs from |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | This indicator almost achieved the target.3 trainings are planned before the project closing. |
GSO: Number of survey database available trhough GSO portal | Value | Data disseminated in hard copy format, very limite | GSO portal and centralized data warehouse is now u | More than 60 percent of databases are integrated t |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | The project will fully achieve the target by the end of project. |
Hanoi: Number of public services available through City Portal | Value | City government services are provided and processe | Data center to host the City Portal is completed | The one stop software for government agencies has |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | It is still under implementation. Current achievement rate is around 70 % of the project end target. It will likely achieve thetarget. |
Danang: Number of participants from SMEs take IT training to enhance IT skills for their business and activities in e-commerce, e-procurement, and e-services | Value | Only 20 percent of SMEs use ICT, and only 5 percen | + SMEs are well-informed about the current service | 1000 participants from SMEs trained in e-commerce, |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | Waiting for more detail information from PIU. |
GSO: Time saving of survey data collection and processing through new system (data scanning, capture, and processing) | Value | Previous census data collection and processing pro | Census 2009 data collection and processing took 8 | • Form Scanning Infrastructure to support future l |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | As a result of successful implementation of SSIS, GSO estimates that data collection and processing for CPI survey will be reducedfrom 15 days to 10 days. The project end target will be most likely fully achieved. |
MIC: Completion of ICT infrastructure upgrade to enhance communications between MIC and DICs, and MOFA | Value | Limited access to ICT infrastructure | + MIC completed the audio and video conference sy | • Improved ICT infrastructure for MIC and MOFA (co |
Date | March 17, 2010 | October 31, 2013 | December 31, 2013 | |
Comment | Completion rate 90%. |
MIC: Quality and security assurance for ICT services in Vietnam improved through core MIC service | Value | Vietnamese telecoms policies do not yet meet inter | N/A(under implementation –MIC1.2: finished instal | Upgrade of root certification authority (CA) to pe |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | This indicator will be achieved by Nov 30, 2013. |
MIC: Completion of 3 licensing e-services and the visa online service offered to businesses and citizens available online | Value | There are lengthy transaction times and high costs | - 3 licensing e-services launched in May 3, 2013 ( | 3 licensing e-services available online (1. radio |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | Current achievement rate is 90%. |
GSO: Design and implementation of GSO IT architecture | Value | No IT architecture to connect the various departme | GSO Enterprise Architecture is in place and all of | - GSO Enterprise Architecture in Place - EA artif |
Date | February 9, 2010 | October 31, 2013 | December 31, 2013 | |
Comment | The project fully achieved the project end target. |
GSO: Time saving of new data management and report generation through database integration | Value | Limited number of stand alone databases some of wh | Three out of nine sector databases (population, SM | Common SSIC system setup to support GSO for new st |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | The project completed all activities related to this indicator. We are still waiting for the actual time saving data from CPIpilotsurvey planned in Nov, but the project end target is more likely to be fully achieved. |
GSO: Improved data transfer through local area network (LAN) connection between GSO and Provincial Statistical Offices (PSOs) | Value | Many of the PSOs are not connected to GSO and dat | All PSOs and 3 ITCs havebeen connected with GSOH | Communications between GSO and PSO greatly enhance |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | The project fully achieved the project end target. |
GSO: Improved capacity of staff in performing streamlined and IT-enable GSO processes | Value | Lack of awareness and knowledge of how ICT can pla | 122 CIOs trained and certified; 83 GSO staff and I | 670 GSO and PSO staff trained and/or accredited |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | The project fully achieved the project target |
Hanoi: Design and implementation of city-level government IT architecture | Value | No IT architecture to connect the various departme | under implementation | A Master plan Design for EA of three level of gov |
Date | February 2, 2010 | October 31, 2013 | December 31, 2013 | |
Comment | + The main task (Task 3) - Design for EA of three level of government - is under implemented. Acceptance Committee gave commentsfor this report and Consultants is revising. Draft of Task 4 – develop this designed EA for a selected Department, Ward - is beingrevising under PIU comments. Task 5 training is underway.+ nearly 50% is completed. + It is expected to have this assignment(contract) completed by the end of November. |
Hanoi: Reduction of time required for one transaction of selected government services through City Portal compared to the traditional way | Value | Hanoi:It takes 14 days for an enterprise to comple | No data available(City Portal is under implementa | Transaction time through the one-gate system will |
Date | August 28, 2006 | October 31, 2013 | June 30, 2013 | |
Comment | This indicator may fail to fully achieve due to the delays of City Portal implementation. |
Danang: Improved transparency and reduced transaction costs (i.e. time) for vehicle registration and drivers license | Value | drivers license was procedded offline | No survey has been conducted yet.•Driving Licens | • The Driving License System launched and integrat |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | Beneficiary survey is planned in end-Nov to December. The final survey results will be ready by the end of December, 2013. |
Danang: Improved ICT infrastructure of the city government | Value | No significant ICT infrastructure developed in the | •Danang Metro Area Network is completed.•Develop | Danang Metro Area Network prividing fiber connecti |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | This indicator is fully achieved |
Hanoi: Improved ICT awareness and managment capacity through training | Value | Lack of IO and CIO awareness and knowledge of how | 30 leaders were trained in Singapore in 2011. | + 340 leaders and key official receive CIO traini |
Date | April 28, 2006 | October 31, 2013 | June 30, 2013 | |
Comment | Training for SME was initially planned by the project fund, but implemented by the local fund. As a result, more than 100 SMEstrained by local fund. |
MIC: Time savings of new systems (3 licensing e-services and visa online service) | Value | There are lengthytransaction times andhigh costs | - Radio spectrum: Processing time shortened from 2 | Radio spectrum:Processing time shortened from 20 |
Date | August 26, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | Current achievement rate is 85%. (Time saving by new visa online service will be monitored by the end of the project.) |
Danang: Number of city officials take training and IT training courses | Value | City officials have limited awareness of ICT use a | •27 leaders and officials have received CIO traini | • At least 27 leaders have received CIO training• |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | This indicator is fully achieved. |
Danang: Design and implementation of city-level government IT architecture | Value | No IT architecture to connect the various departme | + Danang E-government Enterprise Architecture in p | 91 authority units are aligned to IT architecture |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | Highly achieved than the project end target |
Danang: Improved transparency and reduced transaction costs (i.e. time) for business registration and investment licenses | Value | Business registration and license processing done | Business Registration System and Investment Projec | • The e-Business Registration System launched and |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | Beneficiary survey is planned in end-Nov to December. The final survey results will be ready by the end of December, 2013.] |
Danang: Better access to government services through different channels | Value | City government services are provided and processe | Contact Center in place (via number 881888) to pro | Danang Public Wifi with its coverage over public a |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | Fully achieved the project end target. |
Danang: Improved transparency and reduced transaction costs (i.e. time) for Construction Permits | Value | 0 | The system is completed development phase and unde | • The Construction Permits System launched and int |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | no system exists. | This indicators will be fully achieved by the project closing. |
Danang: Enhance the efficiency in Public Transport Management | Value | 0 | •The system is under commissioning with 100/100 bu | • The Public Transportation Management launched. |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | no system exists. | Fully achieved the project end target. |
Danang: Enhance the efficiency in Management of Water Source’s Quality | Value | 0 | •The system is in operation•Raw water is monitore | • The Water Monitoring System launched.• Raw wat |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | no system exists. | Fully achieved the project end target. |
Danang: More efficient Government administration | Value | 0 | + 90 departments/ agencies provided video phones ( | • 7 Districts and 56 Wards/ Communes use e-Distric |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | Fully achieved the project end target.] |
Danang: Enhance and develop the ICT Human Resources in Danang City | Value | n.a. | •Danang’s ICT HR Development Master Plan was devel | • Danang’s ICT HR Development Master Plan is appro |
Date | August 28, 2006 | October 31, 2013 | December 31, 2013 | |
Comment | The project will most likely achieve the project end target. |