India - Capacity Building for Industrial Pollution Management

Abstract*

The objective of the Capacity Building for Industrial Pollution Management Project for India is: (i) to build tangible human and technical capacity in selected state agencies for undertaking environmentally sound remediation of polluted sites; and (ii) to support the development of a policy, institutional and methodological framework for the establishment of a National Program for Rehabilitation of Polluted Sites (NPRPS). There are three components...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

To strengthen the capacity of selected state pollution control agencies in the remediation of polluted sites and to support development of a framework to establish a national program for the remediation of polluted sites.

Key Details

Project Details

  • P091031

  • Closed

  • Harinath Appalarajugari

  • Ministry of Environment, Forests & Climate Change

  • India

  • May 18, 2006

  • (as of board presentation)

    June 3, 2010

  • October 13, 2010

  • US$ 65.42 million

  • Telangana State Pollution Control Board,West Bengal Pollution Control Board,Andhra Pradesh Pollution Control Board

  • South Asia

  • 2010

  • US$ 54.18 million

  • A

  • July 8, 2024

  • March 31, 2018

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Borrower/Recipient 11.24
International Bank for Reconstruction and Development 25.21
IDA Credit 28.97

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 25.21
IDA Commitment 28.97
IBRD + IDA Commitment 54.18
Lending Instrument
Grant Amount N/A
Total Project Cost** 65.42

Summary Status of World Bank Financing (US$ Millions) as of February 28, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of February 28, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Dec 1, 2013 IBRD-79240 Int Charges 217.83
Feb 21, 2014 IDA-47550 Loan Disb 44,165.00
Mar 13, 2014 IDA-47550 Loan Disb 4,498.00
May 21, 2014 IDA-47550 Loan Disb 36,798.01
Apr 4, 2014 IDA-47550 Loan Disb 20,698.00
Jun 1, 2014 IBRD-79240 Int Charges 197.56
Jun 1, 2014 IDA-47550 Int Charges 37.26
Jun 1, 2014 IDA-47550 Int Charges 37.26
Dec 5, 2013 IDA-47550 Loan Cancel 9,965,510.00
Dec 26, 2013 IDA-47550 Loan Disb 30,487.78
Dec 1, 2014 IBRD-79240 Int Charges 189.03
Dec 1, 2014 IDA-47550 Int Charges 77.06
Dec 1, 2014 IDA-47550 Int Charges 77.06
Dec 1, 2014 IDA-47550 Int Charges 33,866.85
Dec 1, 2014 IDA-47550 Int Charges 33,866.85
Jul 11, 2013 IDA-47550 Loan Disb 130,205.74
Jul 11, 2013 IDA-47550 Loan Disb 726,600.44
Feb 2, 2015 IDA-47550 Loan Disb 31,620.00
Jun 29, 2015 IDA-47550 Loan Disb 49,070.00
May 8, 2015 IDA-47550 Loan Disb 123,645.35
Jun 1, 2014 IDA-47550 Int Charges 35,296.67
Jun 1, 2014 IDA-47550 Int Charges 35,296.67
Jul 3, 2014 IDA-47550 Loan Disb 36,518.01
Dec 1, 2013 IDA-47550 Int Charges 74.47
Dec 1, 2013 IDA-47550 Int Charges 74.47
Dec 1, 2013 IDA-47550 Int Charges 34,179.65
Dec 1, 2013 IDA-47550 Int Charges 34,179.65
Dec 1, 2016 IBRD-79240 Int Charges 2,152.55
Dec 1, 2016 IBRD-79240 Loan Repay 7,517.86
Nov 22, 2016 IDA-47550 Loan Disb 54,211.00
Dec 1, 2016 IDA-47550 Int Charges 28,275.07
Dec 1, 2016 IDA-47550 Int Charges 28,275.07
Jun 1, 2016 IBRD-79240 Int Charges 313.98
Jun 1, 2016 IDA-47550 Loan Repay 660,285.90
Jun 1, 2016 IDA-47550 Int Charges 31,127.28
Jun 1, 2016 IDA-47550 Int Charges 31,127.28
Jun 1, 2016 IDA-47550 Loan Repay 13,286.09
Jun 1, 2016 IBRD-79240 Loan Repay 1,260.50
May 24, 2016 IBRD-79240 Loan Cancel 10,500,000.00
Nov 19, 2015 IDA-47550 Loan Disb 66,846.00
Dec 1, 2015 IBRD-79240 Int Charges 240.27
Dec 1, 2015 IBRD-79240 Loan Repay 1,260.50
Dec 1, 2015 IDA-47550 Int Charges 255.87
Dec 1, 2015 IDA-47550 Int Charges 255.87
Dec 1, 2015 IDA-47550 Loan Repay 659,704.90
Dec 1, 2015 IDA-47550 Int Charges 32,624.12
Dec 1, 2015 IDA-47550 Int Charges 32,624.12
Feb 10, 2016 IDA-47550 Loan Disb 33,296.00
Jun 30, 2016 IBRD-79240 Loan Disb 300,834.62
Jun 1, 2015 IDA-47550 Int Charges 31,655.59
Jun 1, 2015 IDA-47550 Int Charges 31,655.59
Jun 1, 2015 IDA-47550 Int Charges 443.46
Jun 1, 2015 IDA-47550 Int Charges 443.46
Jun 1, 2015 IBRD-79240 Int Charges 200.73
Oct 27, 2017 IDA-47550 Loan Disb 1,342,424.10
Aug 10, 2017 IDA-47550 Loan Disb 422,027.25
Aug 16, 2017 IBRD-79240 Loan Cancel 14,346,140.00
Aug 16, 2017 IDA-47550 Loan Cancel 2,889,999.50
Dec 1, 2017 IDA-47550 Int Charges 14,502.48
Dec 1, 2017 IDA-47550 Int Charges 14,502.48
Dec 1, 2017 IDA-47550 Int Charges 55.00
Dec 1, 2017 IDA-47550 Int Charges 55.00
Feb 20, 2018 IDA-47550 Loan Disb 1,515,642.80
Dec 1, 2017 IBRD-79240 Int Charges 3,274.29
Dec 1, 2017 IBRD-79240 Loan Repay 7,517.86
Dec 1, 2017 IDA-47550 Loan Repay 681,168.10
Dec 1, 2017 IDA-47550 Int Charges 27,914.88
Dec 1, 2017 IDA-47550 Int Charges 27,914.88
Sep 27, 2016 IDA-47550 Loan Disb 84,702.00
Jun 1, 2017 IBRD-79240 Int Charges 3,040.88
Jun 1, 2017 IBRD-79240 Loan Repay 7,517.86
Jun 1, 2017 IDA-47550 Loan Repay 643,645.06
Jun 1, 2017 IDA-47550 Int Charges 13,181.58
Jun 1, 2017 IDA-47550 Int Charges 13,181.58
Jun 1, 2017 IDA-47550 Loan Repay 21,274.38
May 23, 2017 IDA-47550 Loan Disb 347,764.78
May 22, 2017 IDA-47550 Loan Disb 746,789.90
Feb 22, 2017 IDA-47550 Loan Disb 142,369.98
Jun 1, 2016 IDA-47550 Loan Disb 142,857.00
Dec 1, 2016 IDA-47550 Loan Repay 406,136.44
Dec 1, 2016 IDA-47550 Loan Repay 3,179.87
Dec 1, 2016 IDA-47550 Loan Repay 240,502.02
Dec 1, 2018 IDA-47550 Loan Repay 566,557.80
Dec 1, 2018 IDA-47550 Int Charges 56,667.35
Dec 1, 2018 IDA-47550 Int Charges 56,667.35
Dec 1, 2018 IBRD-79240 Int Charges 4,950.78
Jun 1, 2024 IBRD-79240 Loan Repay 7,517.86
Jun 3, 2010 IDA-47550 Loan Commitment 38,940,000.00
Jun 1, 2023 IDA-47550 Int Charges 47,782.32
Jun 1, 2023 IBRD-79240 Loan Repay 7,517.86
Jun 1, 2023 IDA-47550 Int Charges 16,122.74
Jun 1, 2023 IDA-47550 Int Charges 16,122.74
Jun 1, 2023 IDA-47550 Loan Repay 470,119.62
Jun 1, 2023 IBRD-79240 Int Charges 424.07
Jun 1, 2023 IBRD-79240 Int Charges 6,731.24
Jun 1, 2023 IDA-47550 Int Charges 47,782.32
Dec 1, 2023 IBRD-79240 Int Charges 168.84
Dec 1, 2023 IBRD-79240 Int Charges 7,683.95
Dec 1, 2023 IBRD-79240 Loan Repay 7,517.86
Dec 1, 2023 IDA-47550 Loan Repay 6,123.31
Dec 1, 2023 IDA-47550 Loan Repay 464,802.25
Dec 1, 2023 IDA-47550 Int Charges 39,392.26
Dec 1, 2023 IDA-47550 Int Charges 39,392.26
Dec 1, 2018 IBRD-79240 Loan Repay 7,517.86
Dec 1, 2018 IBRD-79240 Loan Repay 55.00
Dec 1, 2018 IDA-47550 Loan Repay 16,313.81
Jun 1, 2018 IDA-47550 Int Charges 5.00
Jun 1, 2018 IDA-47550 Int Charges 5.00
Jun 1, 2018 IDA-47550 Int Charges 3,678.50
Jun 1, 2018 IDA-47550 Int Charges 3,678.50
Jun 1, 2018 IDA-47550 Loan Repay 446,386.88
Jun 1, 2018 IBRD-79240 Int Charges 3,631.02
Jun 1, 2018 IBRD-79240 Loan Repay 7,462.86
Jun 1, 2018 IDA-47550 Loan Repay 150,971.94
Jun 1, 2018 IDA-47550 Int Charges 36,933.89
Jun 1, 2018 IDA-47550 Int Charges 36,933.89
Jun 1, 2018 IDA-47550 Loan Disb 4,371,588.50
Sep 7, 2018 IDA-47550 Loan Disb 1,694,540.60
Dec 1, 2019 IDA-47550 Int Charges 53,927.53
Dec 1, 2019 IDA-47550 Int Charges 53,927.53
Dec 1, 2019 IDA-47550 Loan Repay 4,182.75
Dec 1, 2019 IDA-47550 Loan Repay 481,108.20
Dec 1, 2019 IBRD-79240 Int Charges 4,886.82
Dec 1, 2019 IBRD-79240 Loan Repay 7,517.86
Jun 1, 2019 IDA-47550 Loan Repay 481,156.84
Jun 1, 2019 IDA-47550 Int Charges 60,261.23
Jun 1, 2019 IDA-47550 Int Charges 60,261.23
Jun 1, 2019 IDA-47550 Loan Repay 5,802.51
Jun 1, 2019 IBRD-79240 Int Charges 5,532.15
Jun 1, 2019 IBRD-79240 Loan Repay 7,517.86
Sep 30, 2018 IDA-47550 Loan Cancel 3,126,600.50
Sep 26, 2018 IDA-47550 Loan Disb 1,133,250.80
Jun 1, 2020 IBRD-79240 Loan Repay 7,517.86
Jun 1, 2020 IBRD-79240 Int Charges 3,750.61
Jun 1, 2020 IDA-47550 Int Charges 54,223.50
Jun 1, 2020 IDA-47550 Int Charges 54,223.50
Jun 1, 2020 IDA-47550 Int Charges 4,302.17
Jun 1, 2020 IDA-47550 Int Charges 4,302.17
Jun 1, 2020 IDA-47550 Loan Repay 484,707.70
Jun 1, 2021 IBRD-79240 Loan Repay 30.00
Jun 1, 2021 IBRD-79240 Int Charges 0.01
Jun 1, 2021 IBRD-79240 Int Charges 1,128.40
Jun 1, 2021 IBRD-79240 Loan Repay 7,517.86
Jun 1, 2021 IDA-47550 Int Charges 3,903.69
Jun 1, 2021 IDA-47550 Int Charges 3,903.69
Jun 1, 2021 IDA-47550 Loan Repay 242,158.27
Jun 1, 2021 IDA-47550 Int Charges 50,605.89
Jun 1, 2021 IDA-47550 Int Charges 50,605.89
Dec 1, 2021 IDA-47550 Loan Repay 234,528.34
Dec 1, 2021 IDA-47550 Int Charges 53,894.05
Dec 1, 2021 IDA-47550 Int Charges 53,894.05
Dec 1, 2021 IBRD-79240 Loan Repay 7,517.86
Dec 1, 2021 IBRD-79240 Int Charges 1,018.26
Dec 1, 2021 IDA-47550 Int Charges 5,762.15
Dec 1, 2021 IDA-47550 Int Charges 5,762.15
Dec 1, 2020 IBRD-79240 Loan Repay 7,487.86
Dec 1, 2020 IDA-47550 Int Charges 2,213.21
Dec 1, 2020 IDA-47550 Int Charges 2,213.21
Dec 1, 2020 IDA-47550 Loan Repay 239,471.95
Dec 1, 2020 IDA-47550 Int Charges 52,965.77
Dec 1, 2020 IDA-47550 Int Charges 52,965.77
Dec 1, 2020 IBRD-79240 Int Charges 1,546.41
Dec 1, 2022 IBRD-79240 Int Charges 4,351.35
Dec 1, 2022 IBRD-79240 Loan Repay 7,517.86
Dec 1, 2022 IDA-47550 Loan Repay 460,477.28
Dec 1, 2022 IDA-47550 Int Charges 33,193.40
Dec 1, 2022 IDA-47550 Int Charges 33,193.40
Dec 1, 2022 IDA-47550 Loan Repay 6,418.60
Jun 1, 2022 IDA-47550 Loan Repay 2,560.30
Jun 1, 2022 IDA-47550 Loan Repay 223,528.70
Jun 1, 2022 IDA-47550 Int Charges 51,106.85
Jun 1, 2022 IDA-47550 Int Charges 51,106.85
Jun 1, 2022 IBRD-79240 Int Charges 1,098.76
Jun 1, 2022 IBRD-79240 Loan Repay 7,517.86
Jun 3, 2010 IBRD-79240 Loan Commitment 25,210,000.00
Jun 1, 2024 IBRD-79240 Int Charges 50.16
Jun 1, 2024 IBRD-79240 Int Charges 7,953.13
Jun 1, 2024 IDA-47550 Int Charges 6,662.14
Jun 1, 2024 IDA-47550 Int Charges 6,662.14
Jun 1, 2024 IDA-47550 Loan Repay 467,843.22
Jun 1, 2024 IDA-47550 Int Charges 44,042.12
Jun 1, 2024 IDA-47550 Int Charges 44,042.12

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Project Management Moderately Unsatisfactory 2018-03-29
Financial Management Satisfactory 2018-03-29
Monitoring and Evaluation Satisfactory 2018-03-29
Overall Implementation Progress (IP) Moderately Unsatisfactory 2018-03-29
Progress towards achievement of PDO Moderately Unsatisfactory 2018-03-29
Procurement Moderately Unsatisfactory 2018-03-29
Counterpart Funding Satisfactory 2018-03-29

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 12-28-2018
OutcomesModerately Satisfactory
Risk to Development Outcome
Bank PerformanceModerately Satisfactory
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 02-27-2019PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceNot RatedN/a
Implementing AgencyN/a
Icr QualitySubstantialN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Frame work for the establishment of NPRPS comprising inventory of polluted sites, remediation methodologies and policy and regulatory reviews developedValueNo Framework for Remediation of polluted sitesYes - Final Framework DevelopedYes - Final Framework Developed and the Technical
    DateJune 3, 2010March 31, 2018March 31, 2018
    Comment
  • Contaminated land managed or dump sites closed under the projectValue0.0016.3016.30
    DateJune 3, 2010March 31, 2018March 31, 2018
    Comment
  • Capacity of technical staff of the participating agencies strengthened to prepare, implement and monitor remediation plansValueNo Capacity on remediation of polluted sites3-Implementation and Monitoring Capacity Developed3 - Implementation and Monitoring capacity develop
    DateJune 3, 2010March 31, 2018March 31, 2018
    Comment
  • Direct project beneficiariesValue0.00157362.00157362.00
    DateJune 3, 2010March 31, 2018March 31, 2018
    Comment
  • Female beneficiariesValue0.0045.3445.34
    DateJune 3, 2010March 31, 2018March 31, 2018
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • National guidelines for the remediation of polluted sites developedValueNoYes - Guidelines integrated in the remediation fraYes - Guidelines integrated in the remediation fra
    DateJune 3, 2010March 31, 2018March 31, 2018
    Comment
  • Remediation plans prepared based on risk based approach and ready for implementation in all the three participating statesValue0.00100.00100.00
    DateJune 3, 2010September 15, 2017March 31, 2018
    Comment
  • Online network of State Pollution Control Boards for remediation establishedValueNo NetworkOnline network establishedOnline network establishment
    DateJune 3, 2010March 31, 2018March 31, 2018
    Comment
  • Methodologies for remediation of polluted Sites in India developedValueNoYes-Methodology DevelopedYes - Methodologies Developed
    DateJune 3, 2010March 31, 2018March 31, 2018
    Comment
  • Policy options for remediation of polluted sites developed based on a review of existing legislations and international experiencesValueNoYes- Policy options report finalizedYes - Policy options report finalized
    DateJune 3, 2010March 31, 2018March 31, 2018
    Comment
  • Post-remediation monitoring system with appropriate infrastructure and approved indicators established for all the three remediation sites by the completion of remediation worksValueNoPost remediation monitoring infrastructure establiPost remediation monitoring infrastructure establi
    DateJune 3, 2010March 31, 2018March 31, 2018
    Comment
  • Inventory of Polluted Sites in India developedValueNoYes- Inventory DevelopedYes - Inventory Developed
    DateJune 3, 2010September 15, 2017March 31, 2018
    Comment
  • Number of parameters that can be analyzed by the laboratories of Andhra Pradesh, Telangana and West Bengal Pollution Control Boards, increasedValue26.0076.0076.00
    DateJune 3, 2010March 31, 2018March 31, 2018
    Comment
  • People with reduced direct exposure to pollution from sites remediated by the projectValue0.0017238.0017238.00
    DateJune 3, 2010March 31, 2018March 31, 2018
    Comment