Financier | Commitments |
---|---|
Borrower/Recipient | 35.00 |
IDA Credit | 150.00 |
P096648
Closed
Sheu Salau , Elhadji Toure
The Federal Republic of Nigeria
October 23, 2006
(as of board presentation)
January 15, 2009
July 30, 2009
US$ 185.00 million
Federal Ministry of Agriculture
2009
US$ 150.00 million
B
September 11, 2023
May 31, 2017
BANK APPROVED
Financier | Commitments |
---|---|
Borrower/Recipient | 35.00 |
IDA Credit | 150.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 150.00 |
IBRD + IDA Commitment | 150.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 185.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Jan 10, 2014 | IDA-45390 | Loan Disb | 153,243.48 |
Feb 21, 2014 | IDA-45390 | Loan Disb | 471,414.22 |
Dec 20, 2013 | IDA-45390 | Loan Disb | 38,225.60 |
Feb 28, 2014 | IDA-45390 | Loan Disb | 159,749.00 |
Dec 20, 2013 | IDA-45390 | Loan Disb | 472,059.22 |
Dec 2, 2013 | IDA-45390 | Loan Disb | 140,243.22 |
Mar 28, 2014 | IDA-45390 | Loan Disb | 386,811.16 |
Dec 4, 2013 | IDA-45390 | Loan Disb | 227,948.20 |
Nov 25, 2013 | IDA-45390 | Loan Disb | 256,740.12 |
Feb 28, 2014 | IDA-45390 | Loan Disb | 276,155.06 |
Jan 27, 2014 | IDA-45390 | Loan Disb | 336,241.06 |
Jan 24, 2014 | IDA-45390 | Loan Disb | 414,138.72 |
Nov 21, 2013 | IDA-45390 | Loan Disb | 301,707.72 |
Jan 24, 2014 | IDA-45390 | Loan Disb | 202,605.17 |
Feb 14, 2014 | IDA-45390 | Loan Disb | 419,538.94 |
Sep 18, 2013 | IDA-45390 | Loan Disb | 414,024.78 |
Oct 1, 2013 | IDA-45390 | Int Charges | 3,008.84 |
Oct 1, 2013 | IDA-45390 | Int Charges | 3,008.84 |
Nov 5, 2013 | IDA-45390 | Loan Disb | 366,207.72 |
Sep 26, 2013 | IDA-45390 | Loan Disb | 92,515.14 |
Oct 10, 2013 | IDA-45390 | Loan Disb | 158,588.40 |
Oct 2, 2013 | IDA-45390 | Loan Disb | 456,260.60 |
Oct 22, 2015 | IDA-45390 | Loan Disb | 516,070.66 |
Dec 1, 2015 | IDA-45390 | Loan Disb | 354,246.40 |
Jan 15, 2016 | IDA-45390 | Loan Disb | 393,563.94 |
Dec 1, 2015 | IDA-45390 | Loan Disb | 154,357.86 |
Oct 22, 2015 | IDA-45390 | Loan Disb | 324,551.88 |
Oct 20, 2015 | IDA-45390 | Loan Disb | 125,512.31 |
Aug 5, 2015 | IDA-45390 | Loan Disb | 39,700.64 |
Apr 7, 2015 | IDA-45390 | Loan Disb | 111,418.65 |
May 28, 2015 | IDA-45390 | Loan Disb | 65,154.12 |
Jul 24, 2015 | IDA-45390 | Loan Disb | 830,247.60 |
Jun 17, 2015 | IDA-45390 | Loan Disb | 188,705.27 |
Apr 1, 2015 | IDA-45390 | Int Charges | 8,503.53 |
Apr 1, 2015 | IDA-45390 | Int Charges | 8,503.53 |
Jul 8, 2015 | IDA-45390 | Loan Disb | 496,868.06 |
May 8, 2015 | IDA-45390 | Loan Disb | 140,430.77 |
Apr 1, 2015 | IDA-45390 | Int Charges | 271,999.10 |
Apr 1, 2015 | IDA-45390 | Int Charges | 271,999.10 |
Jun 11, 2015 | IDA-45390 | Loan Disb | 80,267.53 |
May 22, 2017 | IDA-45390 | Loan Disb | 296,978.50 |
Mar 31, 2017 | IDA-45390 | Loan Disb | 153,053.27 |
Mar 2, 2017 | IDA-45390 | Loan Disb | 251,108.39 |
Apr 28, 2017 | IDA-45390 | Loan Disb | 639,157.94 |
Apr 28, 2017 | IDA-45390 | Loan Disb | 110,094.65 |
May 22, 2017 | IDA-45390 | Loan Disb | 250,847.36 |
Feb 21, 2017 | IDA-45390 | Loan Disb | 224,531.98 |
May 26, 2017 | IDA-45390 | Loan Disb | 1,196,933.90 |
May 23, 2017 | IDA-45390 | Loan Disb | 149,833.25 |
May 26, 2017 | IDA-45390 | Loan Disb | 587,870.80 |
Mar 21, 2017 | IDA-45390 | Loan Disb | 33,802.80 |
Feb 21, 2017 | IDA-45390 | Loan Disb | 453,973.60 |
May 23, 2017 | IDA-45390 | Loan Disb | 615,420.30 |
Apr 1, 2017 | IDA-45390 | Int Charges | 1,658.59 |
Apr 1, 2017 | IDA-45390 | Int Charges | 1,658.59 |
May 12, 2017 | IDA-45390 | Loan Disb | 254,571.67 |
May 15, 2017 | IDA-45390 | Loan Disb | 114,202.14 |
May 5, 2017 | IDA-45390 | Loan Disb | 471,528.97 |
Apr 27, 2017 | IDA-45390 | Loan Disb | 241,479.62 |
May 24, 2017 | IDA-45390 | Loan Disb | 342,472.88 |
May 24, 2017 | IDA-45390 | Loan Disb | 981,162.90 |
May 5, 2017 | IDA-45390 | Loan Disb | 157,837.80 |
May 18, 2017 | IDA-45390 | Loan Disb | 218,698.27 |
May 24, 2017 | IDA-45390 | Loan Disb | 609,555.20 |
Apr 27, 2017 | IDA-45390 | Loan Disb | 119,742.40 |
May 3, 2017 | IDA-45390 | Loan Disb | 424,801.47 |
May 5, 2017 | IDA-45390 | Loan Disb | 498,155.88 |
May 31, 2017 | IDA-45390 | Loan Disb | 246,757.20 |
May 31, 2017 | IDA-45390 | Loan Disb | 952,663.40 |
Apr 7, 2017 | IDA-45390 | Loan Disb | 307,648.47 |
Apr 27, 2017 | IDA-45390 | Loan Disb | 486,655.84 |
May 31, 2017 | IDA-45390 | Loan Disb | 232,686.55 |
May 31, 2017 | IDA-45390 | Loan Disb | 335,320.30 |
Apr 27, 2017 | IDA-45390 | Loan Disb | 180,344.00 |
Apr 13, 2017 | IDA-45390 | Loan Disb | 194,156.03 |
Mar 24, 2017 | IDA-45390 | Loan Disb | 83,421.60 |
Mar 8, 2017 | IDA-45390 | Loan Disb | 106,149.41 |
May 30, 2017 | IDA-45390 | Loan Disb | 1,192,654.60 |
May 30, 2017 | IDA-45390 | Loan Disb | 301,765.22 |
Apr 20, 2017 | IDA-45390 | Loan Disb | 50,664.28 |
Aug 3, 2016 | IDA-45390 | Loan Disb | 73,557.21 |
Jun 16, 2016 | IDA-45390 | Loan Disb | 620,471.50 |
Nov 28, 2016 | IDA-45390 | Loan Disb | 276,193.56 |
Nov 28, 2016 | IDA-45390 | Loan Disb | 381,084.47 |
Nov 28, 2016 | IDA-45390 | Loan Disb | 248,055.45 |
Oct 25, 2016 | IDA-45390 | Loan Disb | 84,086.80 |
Nov 28, 2016 | IDA-45390 | Loan Disb | 68,363.73 |
Jan 12, 2017 | IDA-45390 | Loan Disb | 469,195.70 |
Feb 8, 2017 | IDA-45390 | Loan Disb | 532,477.94 |
Sep 23, 2016 | IDA-45390 | Loan Disb | 600,000.00 |
Nov 19, 2016 | IDA-45390 | Loan Cancel | 2,949,444.20 |
Sep 6, 2016 | IDA-45390 | Loan Disb | 102,022.39 |
Dec 2, 2016 | IDA-45390 | Loan Disb | 283,024.94 |
Sep 23, 2016 | IDA-45390 | Loan Disb | 466,839.53 |
Dec 2, 2016 | IDA-45390 | Loan Disb | 249,432.81 |
Sep 23, 2016 | IDA-45390 | Loan Disb | 248,738.42 |
May 31, 2016 | IDA-45390 | Loan Disb | 503,220.70 |
May 5, 2016 | IDA-45390 | Loan Disb | 433,349.20 |
May 17, 2016 | IDA-45390 | Loan Disb | 262,042.44 |
Mar 13, 2017 | IDA-45390 | Loan Disb | 321,008.30 |
Feb 22, 2017 | IDA-45390 | Loan Disb | 196,150.52 |
Nov 17, 2017 | IDA-45390 | Loan Disb | -69,850.50 |
Nov 17, 2017 | IDA-45390 | Loan Disb | -3,288.70 |
Oct 1, 2017 | IDA-45390 | Int Charges | 918.07 |
Oct 1, 2017 | IDA-45390 | Int Charges | 918.07 |
Mar 21, 2017 | IDA-45390 | Loan Disb | 73,482.54 |
Apr 1, 2017 | IDA-45390 | Int Charges | 367,290.16 |
Apr 1, 2017 | IDA-45390 | Int Charges | 367,290.16 |
Apr 14, 2017 | IDA-45390 | Loan Disb | 70,989.07 |
Apr 6, 2017 | IDA-45390 | Loan Disb | 226,117.80 |
May 16, 2017 | IDA-45390 | Loan Disb | 1,001,636.70 |
Jun 1, 2017 | IDA-45390 | Loan Disb | 1,027,110.44 |
May 19, 2017 | IDA-45390 | Loan Disb | 1,008,092.94 |
Jun 1, 2017 | IDA-45390 | Loan Disb | 203,242.94 |
May 4, 2017 | IDA-45390 | Loan Disb | 699,913.00 |
Apr 6, 2017 | IDA-45390 | Loan Disb | 136,362.94 |
May 19, 2017 | IDA-45390 | Loan Disb | 753,730.80 |
Apr 6, 2017 | IDA-45390 | Loan Disb | 147,494.10 |
May 22, 2017 | IDA-45390 | Loan Disb | 348,276.28 |
Mar 31, 2017 | IDA-45390 | Loan Disb | 166,381.73 |
Oct 1, 2013 | IDA-45390 | Int Charges | 220,238.52 |
Oct 1, 2013 | IDA-45390 | Int Charges | 220,238.52 |
Dec 19, 2013 | IDA-45390 | Loan Disb | 35,024.08 |
Dec 19, 2013 | IDA-45390 | Loan Disb | 64,562.40 |
Dec 10, 2013 | IDA-45390 | Loan Disb | 130,695.61 |
Oct 11, 2013 | IDA-45390 | Loan Disb | 220,531.62 |
Dec 16, 2013 | IDA-45390 | Loan Disb | 166,016.77 |
Oct 30, 2013 | IDA-45390 | Loan Disb | 343,423.47 |
Sep 10, 2013 | IDA-45390 | Loan Disb | 414,296.40 |
Oct 31, 2013 | IDA-45390 | Loan Disb | 122,369.82 |
Jan 14, 2014 | IDA-45390 | Loan Disb | 302,602.88 |
Jan 2, 2014 | IDA-45390 | Loan Disb | 154,665.88 |
Jan 22, 2014 | IDA-45390 | Loan Disb | 23,721.87 |
Aug 26, 2013 | IDA-45390 | Loan Disb | 143,691.64 |
Sep 3, 2013 | IDA-45390 | Loan Disb | 284,674.66 |
Apr 1, 2020 | IDA-45390 | Int Charges | 479,025.53 |
Apr 1, 2020 | IDA-45390 | Loan Repay | 9,958.34 |
Oct 1, 2019 | IDA-45390 | Loan Repay | 16,345.26 |
Oct 1, 2019 | IDA-45390 | Loan Repay | 1,283,413.40 |
Oct 1, 2019 | IDA-45390 | Int Charges | 27.02 |
Oct 1, 2019 | IDA-45390 | Int Charges | 27.02 |
Oct 1, 2019 | IDA-45390 | Int Charges | 482,535.40 |
Oct 1, 2019 | IDA-45390 | Int Charges | 482,535.40 |
Apr 1, 2019 | IDA-45390 | Loan Repay | 2,619.51 |
Apr 1, 2019 | IDA-45390 | Int Charges | -12,295.75 |
Apr 1, 2019 | IDA-45390 | Int Charges | 12,295.75 |
Jan 15, 2009 | IDA-45390 | Loan Commitment | 150,000,000.00 |
Apr 1, 2024 | IDA-45390 | Loan Repay | 31,652.86 |
May 2, 2024 | IDA-45390 | Int Charges | 424,532.78 |
May 2, 2024 | IDA-45390 | Int Charges | 424,532.78 |
May 2, 2024 | IDA-45390 | Loan Repay | 1,226,354.90 |
Oct 1, 2023 | IDA-45390 | Int Charges | 428,224.03 |
Oct 1, 2023 | IDA-45390 | Int Charges | 428,224.03 |
Oct 1, 2023 | IDA-45390 | Loan Repay | 8,099.00 |
Oct 1, 2023 | IDA-45390 | Loan Repay | 1,246,770.00 |
Oct 1, 2022 | IDA-45390 | Int Charges | 425,954.00 |
Oct 1, 2022 | IDA-45390 | Int Charges | 425,954.00 |
Oct 1, 2022 | IDA-45390 | Loan Repay | 22,690.05 |
Oct 1, 2022 | IDA-45390 | Loan Repay | 1,198,683.40 |
Apr 1, 2023 | IDA-45390 | Loan Repay | 57,751.97 |
Apr 1, 2023 | IDA-45390 | Loan Repay | 1,225,984.10 |
Apr 1, 2023 | IDA-45390 | Int Charges | 442,888.97 |
Apr 1, 2023 | IDA-45390 | Int Charges | 442,888.97 |
Apr 1, 2023 | IDA-45390 | Loan Repay | 0.01 |
Apr 1, 2023 | IDA-45390 | Int Charges | -0.01 |
Apr 1, 2023 | IDA-45390 | Int Charges | -0.01 |
Apr 1, 2022 | IDA-45390 | Loan Repay | 22,118.77 |
Apr 1, 2022 | IDA-45390 | Loan Repay | 1,295,160.60 |
Apr 1, 2022 | IDA-45390 | Int Charges | 464,340.97 |
Apr 1, 2022 | IDA-45390 | Int Charges | 464,340.97 |
Oct 1, 2021 | IDA-45390 | Loan Repay | 28,136.97 |
Oct 1, 2021 | IDA-45390 | Loan Repay | 1,319,011.60 |
Oct 1, 2021 | IDA-45390 | Int Charges | 479,921.70 |
Apr 2, 2019 | IDA-45390 | Loan Repay | 1,320,017.50 |
Apr 2, 2019 | IDA-45390 | Int Charges | 495,987.38 |
Apr 2, 2019 | IDA-45390 | Int Charges | 495,987.38 |
Oct 1, 2018 | IDA-45390 | Int Charges | 587.43 |
Oct 1, 2018 | IDA-45390 | Int Charges | 587.43 |
Mar 5, 2018 | IDA-45390 | Loan Cancel | 4,489,109.00 |
Oct 1, 2018 | IDA-45390 | Int Charges | 498,903.38 |
Oct 1, 2018 | IDA-45390 | Int Charges | 498,903.38 |
Nov 17, 2017 | IDA-45390 | Loan Disb | -340,782.12 |
Jan 17, 2018 | IDA-45390 | Loan Disb | -9,687.83 |
Mar 5, 2018 | IDA-45390 | Loan Disb | -823.99 |
Nov 30, 2017 | IDA-45390 | Loan Disb | -473,936.94 |
Nov 29, 2017 | IDA-45390 | Loan Disb | -29,685.14 |
Apr 1, 2018 | IDA-45390 | Int Charges | 2,201.68 |
Apr 1, 2018 | IDA-45390 | Int Charges | 2,201.68 |
Apr 1, 2018 | IDA-45390 | Int Charges | 521,343.34 |
Apr 1, 2018 | IDA-45390 | Int Charges | 521,343.34 |
Aug 11, 2017 | IDA-45390 | Loan Disb | 253,965.48 |
Aug 11, 2017 | IDA-45390 | Loan Disb | 258,815.20 |
Aug 11, 2017 | IDA-45390 | Loan Disb | 260,592.00 |
Aug 2, 2017 | IDA-45390 | Loan Disb | 290,404.12 |
Aug 2, 2017 | IDA-45390 | Loan Disb | 412,315.10 |
Oct 1, 2017 | IDA-45390 | Int Charges | 478,584.06 |
Oct 1, 2017 | IDA-45390 | Int Charges | 478,584.06 |
May 22, 2017 | IDA-45390 | Loan Disb | 1,184,947.20 |
May 22, 2017 | IDA-45390 | Loan Disb | 356,289.44 |
Feb 28, 2017 | IDA-45390 | Loan Disb | 325,346.75 |
Feb 28, 2017 | IDA-45390 | Loan Disb | 502,156.70 |
Oct 1, 2021 | IDA-45390 | Int Charges | 479,921.70 |
Apr 1, 2021 | IDA-45390 | Int Charges | 486,670.60 |
Apr 1, 2021 | IDA-45390 | Loan Repay | 3,318.60 |
Apr 1, 2021 | IDA-45390 | Loan Repay | 1,348,544.10 |
Apr 1, 2021 | IDA-45390 | Int Charges | 486,670.60 |
Oct 1, 2020 | IDA-45390 | Loan Repay | 14,407.07 |
Oct 1, 2020 | IDA-45390 | Loan Repay | 1,331,634.50 |
Oct 1, 2020 | IDA-45390 | Int Charges | 489,622.62 |
Oct 1, 2020 | IDA-45390 | Int Charges | 489,622.62 |
Apr 1, 2020 | IDA-45390 | Loan Repay | 1,293,512.50 |
Apr 1, 2020 | IDA-45390 | Int Charges | 479,025.53 |
Sep 3, 2013 | IDA-45390 | Loan Disb | 185,998.45 |
Sep 5, 2013 | IDA-45390 | Loan Disb | 297,871.16 |
Sep 3, 2013 | IDA-45390 | Loan Disb | 139,956.05 |
Jul 16, 2013 | IDA-45390 | Loan Disb | 151,241.23 |
Jun 25, 2015 | IDA-45390 | Loan Disb | 40,144.54 |
May 26, 2015 | IDA-45390 | Loan Disb | 142,572.22 |
May 28, 2015 | IDA-45390 | Loan Disb | 112,082.32 |
Jun 25, 2015 | IDA-45390 | Loan Disb | 305,564.00 |
Jun 18, 2015 | IDA-45390 | Loan Disb | 111,683.74 |
Apr 14, 2015 | IDA-45390 | Loan Disb | 20,653.94 |
Jun 24, 2015 | IDA-45390 | Loan Disb | 442,697.12 |
Jun 24, 2015 | IDA-45390 | Loan Disb | 72,073.52 |
Jun 1, 2015 | IDA-45390 | Loan Disb | 312,491.70 |
Sep 3, 2014 | IDA-45390 | Loan Disb | 632,403.50 |
Mar 5, 2015 | IDA-45390 | Loan Disb | 116,823.54 |
Sep 12, 2014 | IDA-45390 | Loan Disb | 39,143.34 |
Jan 27, 2015 | IDA-45390 | Loan Disb | 275,104.53 |
Mar 19, 2015 | IDA-45390 | Loan Disb | 527,153.30 |
Jan 27, 2015 | IDA-45390 | Loan Disb | 132,726.60 |
Sep 5, 2014 | IDA-45390 | Loan Disb | 188,213.53 |
Mar 6, 2015 | IDA-45390 | Loan Disb | 318,428.53 |
Aug 12, 2014 | IDA-45390 | Loan Disb | 173,203.78 |
Sep 2, 2014 | IDA-45390 | Loan Disb | 214,282.40 |
May 23, 2014 | IDA-45390 | Loan Disb | 808,951.06 |
Jun 13, 2014 | IDA-45390 | Loan Disb | 238,304.39 |
May 30, 2014 | IDA-45390 | Loan Disb | 220,745.78 |
Jun 20, 2014 | IDA-45390 | Loan Disb | 217,697.14 |
Jun 20, 2014 | IDA-45390 | Loan Disb | 119,584.30 |
Jun 16, 2014 | IDA-45390 | Loan Disb | 239,697.61 |
Jun 20, 2014 | IDA-45390 | Loan Disb | 88,557.50 |
Jun 16, 2014 | IDA-45390 | Loan Disb | 414,406.00 |
Jun 16, 2014 | IDA-45390 | Loan Disb | 762,354.94 |
Jul 9, 2014 | IDA-45390 | Loan Disb | 157,924.22 |
Jul 9, 2014 | IDA-45390 | Loan Disb | 125,590.70 |
May 17, 2016 | IDA-45390 | Loan Disb | 175,782.38 |
Jan 23, 2017 | IDA-45390 | Loan Disb | 94,563.60 |
Jan 31, 2017 | IDA-45390 | Loan Disb | 94,944.77 |
Dec 12, 2016 | IDA-45390 | Loan Disb | 196,100.10 |
Jan 17, 2017 | IDA-45390 | Loan Disb | 361,611.06 |
Jun 23, 2016 | IDA-45390 | Loan Disb | 64,901.15 |
Oct 19, 2016 | IDA-45390 | Loan Disb | 96,413.62 |
Oct 19, 2016 | IDA-45390 | Loan Disb | 162,390.27 |
Jan 12, 2017 | IDA-45390 | Loan Disb | 159,479.36 |
Aug 2, 2016 | IDA-45390 | Loan Disb | 312,267.38 |
Jun 28, 2016 | IDA-45390 | Loan Disb | 197,590.44 |
Sep 30, 2016 | IDA-45390 | Loan Disb | 703,947.56 |
May 10, 2016 | IDA-45390 | Loan Disb | 148,126.77 |
Oct 19, 2016 | IDA-45390 | Loan Cancel | 3,000,000.00 |
Oct 11, 2016 | IDA-45390 | Loan Disb | 600,000.00 |
Oct 11, 2016 | IDA-45390 | Loan Disb | 600,000.00 |
Jun 21, 2016 | IDA-45390 | Loan Disb | 77,290.46 |
Aug 17, 2016 | IDA-45390 | Loan Disb | 179,852.78 |
Oct 7, 2016 | IDA-45390 | Loan Disb | 681,014.60 |
Oct 7, 2016 | IDA-45390 | Loan Disb | 354,892.53 |
Apr 1, 2016 | IDA-45390 | Int Charges | 3,230.68 |
Apr 1, 2016 | IDA-45390 | Int Charges | 3,230.68 |
Apr 1, 2016 | IDA-45390 | Int Charges | 315,560.66 |
Apr 1, 2016 | IDA-45390 | Int Charges | 315,560.66 |
Aug 30, 2016 | IDA-45390 | Loan Disb | 229,517.94 |
Aug 8, 2016 | IDA-45390 | Loan Disb | 209,455.94 |
Nov 19, 2016 | IDA-45390 | Loan Cancel | -2,949,444.20 |
Feb 22, 2016 | IDA-45390 | Loan Disb | 547,982.44 |
Feb 22, 2016 | IDA-45390 | Loan Disb | 68,441.53 |
Mar 7, 2016 | IDA-45390 | Loan Disb | 312,964.60 |
Mar 14, 2016 | IDA-45390 | Loan Disb | 126,855.64 |
Feb 10, 2016 | IDA-45390 | Loan Disb | 124,301.89 |
Feb 3, 2016 | IDA-45390 | Loan Disb | 119,996.13 |
Feb 12, 2016 | IDA-45390 | Loan Disb | 152,685.88 |
Nov 5, 2015 | IDA-45390 | Loan Disb | 699,414.10 |
Nov 5, 2015 | IDA-45390 | Loan Disb | 190,331.66 |
Dec 21, 2015 | IDA-45390 | Loan Disb | 249,691.60 |
Oct 13, 2015 | IDA-45390 | Loan Disb | 87,832.75 |
Oct 8, 2015 | IDA-45390 | Int Charges | 292,085.47 |
Oct 8, 2015 | IDA-45390 | Int Charges | 292,085.47 |
Oct 2, 2015 | IDA-45390 | Loan Disb | 272,643.10 |
Dec 18, 2015 | IDA-45390 | Loan Disb | 347,342.80 |
Dec 18, 2015 | IDA-45390 | Loan Disb | 238,449.47 |
Oct 7, 2015 | IDA-45390 | Loan Disb | 266,332.40 |
Dec 8, 2015 | IDA-45390 | Loan Disb | 168,598.66 |
Nov 19, 2015 | IDA-45390 | Loan Disb | 289,299.03 |
Dec 11, 2015 | IDA-45390 | Loan Disb | 256,797.61 |
Nov 19, 2015 | IDA-45390 | Loan Disb | 172,822.31 |
Dec 8, 2015 | IDA-45390 | Loan Disb | 95,627.20 |
Sep 2, 2015 | IDA-45390 | Loan Disb | 263,141.00 |
Oct 1, 2015 | IDA-45390 | Int Charges | 5,740.44 |
Oct 1, 2015 | IDA-45390 | Int Charges | 5,740.44 |
Oct 5, 2015 | IDA-45390 | Loan Disb | 70,049.68 |
May 17, 2017 | IDA-45390 | Loan Disb | 672,325.56 |
Apr 20, 2017 | IDA-45390 | Loan Disb | 156,876.48 |
Apr 20, 2017 | IDA-45390 | Loan Disb | 308,825.30 |
May 30, 2017 | IDA-45390 | Loan Disb | 896,867.00 |
May 12, 2017 | IDA-45390 | Loan Disb | 789,983.90 |
May 15, 2017 | IDA-45390 | Loan Disb | 381,831.66 |
May 30, 2017 | IDA-45390 | Loan Disb | 60,949.11 |
May 12, 2017 | IDA-45390 | Loan Disb | 424,801.47 |
May 30, 2017 | IDA-45390 | Loan Disb | 113,668.20 |
May 15, 2017 | IDA-45390 | Loan Disb | 465,484.40 |
May 25, 2017 | IDA-45390 | Loan Disb | 444,341.56 |
May 12, 2017 | IDA-45390 | Loan Disb | 556,873.60 |
Jun 16, 2016 | IDA-45390 | Loan Disb | 584,955.70 |
Aug 26, 2016 | IDA-45390 | Loan Disb | 47,149.66 |
Aug 26, 2016 | IDA-45390 | Loan Disb | 287,732.62 |
Jan 4, 2017 | IDA-45390 | Loan Disb | 175,709.66 |
Jan 26, 2017 | IDA-45390 | Loan Disb | 776,845.06 |
Jan 4, 2017 | IDA-45390 | Loan Disb | 141,236.40 |
Oct 1, 2016 | IDA-45390 | Int Charges | 8,313.51 |
Oct 1, 2016 | IDA-45390 | Int Charges | 8,313.51 |
Oct 1, 2016 | IDA-45390 | Int Charges | 338,630.03 |
Oct 1, 2016 | IDA-45390 | Int Charges | 338,630.03 |
Mar 13, 2017 | IDA-45390 | Loan Disb | 342,529.12 |
Mar 8, 2017 | IDA-45390 | Loan Disb | 213,271.10 |
Mar 24, 2017 | IDA-45390 | Loan Disb | 402,757.84 |
Dec 8, 2016 | IDA-45390 | Loan Disb | 150,917.34 |
Aug 24, 2016 | IDA-45390 | Loan Disb | 261,239.89 |
Aug 24, 2016 | IDA-45390 | Loan Disb | 109,218.90 |
Sep 15, 2016 | IDA-45390 | Loan Disb | 112,364.74 |
Dec 16, 2016 | IDA-45390 | Loan Disb | 268,533.30 |
Jun 27, 2016 | IDA-45390 | Loan Disb | 164,205.45 |
Aug 19, 2016 | IDA-45390 | Loan Disb | 136,199.62 |
Jun 27, 2016 | IDA-45390 | Loan Disb | 62,969.10 |
Aug 30, 2013 | IDA-45390 | Loan Disb | 139,254.22 |
Jul 2, 2013 | IDA-45390 | Loan Disb | 151,105.52 |
Aug 29, 2013 | IDA-45390 | Loan Disb | 373,667.28 |
Jul 1, 2013 | IDA-45390 | Loan Disb | 22,495.35 |
Jul 25, 2013 | IDA-45390 | Loan Disb | 377,266.62 |
Jul 2, 2013 | IDA-45390 | Loan Disb | 116,179.54 |
Jul 2, 2013 | IDA-45390 | Loan Disb | 333,592.60 |
Dec 11, 2014 | IDA-45390 | Loan Disb | 207,699.34 |
Nov 5, 2014 | IDA-45390 | Loan Disb | 306,728.44 |
Dec 23, 2014 | IDA-45390 | Loan Disb | 225,460.11 |
Dec 16, 2014 | IDA-45390 | Loan Disb | 420,065.70 |
Nov 20, 2014 | IDA-45390 | Loan Disb | 515,776.47 |
Nov 21, 2014 | IDA-45390 | Loan Disb | 400,079.25 |
Nov 19, 2014 | IDA-45390 | Loan Disb | 140,552.95 |
Nov 19, 2014 | IDA-45390 | Loan Disb | 177,133.12 |
Oct 1, 2014 | IDA-45390 | Int Charges | 3,230.71 |
Oct 1, 2014 | IDA-45390 | Int Charges | 3,230.71 |
Oct 1, 2014 | IDA-45390 | Int Charges | 281,849.22 |
Oct 1, 2014 | IDA-45390 | Int Charges | 281,849.22 |
Oct 31, 2014 | IDA-45390 | Loan Disb | 371,519.94 |
Oct 23, 2014 | IDA-45390 | Loan Disb | 163,839.55 |
Jul 1, 2014 | IDA-45390 | Loan Disb | 165,548.44 |
Jul 10, 2014 | IDA-45390 | Loan Disb | 91,922.53 |
Apr 7, 2014 | IDA-45390 | Loan Disb | 119,918.44 |
Apr 11, 2014 | IDA-45390 | Loan Disb | 113,371.13 |
Apr 7, 2014 | IDA-45390 | Loan Disb | 238,647.88 |
Apr 24, 2014 | IDA-45390 | Loan Disb | 593,696.80 |
Apr 1, 2014 | IDA-45390 | Int Charges | 259,581.48 |
Apr 1, 2014 | IDA-45390 | Int Charges | 259,581.48 |
May 12, 2014 | IDA-45390 | Loan Disb | 178,351.88 |
Mar 31, 2014 | IDA-45390 | Loan Disb | 64,534.50 |
Jun 3, 2014 | IDA-45390 | Loan Disb | 312,325.56 |
May 23, 2014 | IDA-45390 | Loan Disb | 179,610.60 |
Mar 19, 2014 | IDA-45390 | Loan Disb | 241,853.81 |
May 15, 2014 | IDA-45390 | Loan Disb | 320,749.97 |
May 15, 2014 | IDA-45390 | Loan Disb | 279,190.40 |
Apr 1, 2014 | IDA-45390 | Int Charges | 5,207.71 |
Apr 1, 2014 | IDA-45390 | Int Charges | 5,207.71 |
Jan 10, 2014 | IDA-45390 | Loan Disb | 269,379.25 |
Feb 21, 2014 | IDA-45390 | Loan Disb | 326,049.22 |
Name | Review | Date |
---|---|---|
Progress towards achievement of PDO | Satisfactory | 2017-06-28 |
Counterpart Funding | Moderately Satisfactory | 2017-06-28 |
Project Management | Satisfactory | 2017-06-28 |
Monitoring and Evaluation | Satisfactory | 2017-06-28 |
Overall Implementation Progress (IP) | Satisfactory | 2017-06-28 |
Procurement | Satisfactory | 2017-06-28 |
Financial Management | Moderately Satisfactory | 2017-06-28 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 11-30-2017 |
---|---|
Outcomes | |
Risk to Development Outcome | Substantial |
Bank Performance | |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 03-22-2018 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | Not Rated | N/a |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Total Production of targeted Value Chains (Rice, Maize and Poultry) (Disaggregated by Gender) relative to baseline | Value | 0.00 | 0.00 | 0.00 |
Date | June 25, 2010 | May 31, 2017 | May 31, 2017 | |
Comment |
Volume of sales by value of agricultural products under the targeted value chains relative to baseline (disaggregated by gender) (Rice, Maize and Poultry) | Value | 0.00 | 0.00 | 0.00 |
Date | June 25, 2010 | May 31, 2017 | May 31, 2017 | |
Comment |
Increase in yield in the targeted value chains (Rice, Maize and Poultry) | Value | 0.00 | 0.00 | 0.00 |
Date | June 25, 2010 | May 31, 2017 | May 31, 2017 | |
Comment |
Increase in total production of Rice relative to baseline (CRS, LA, KN) | Value | 3353 | 65% | 69.15% |
Date | June 25, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Increase in total production of Maize relative to baseline (EN, KD,KN) | Value | 11,547mt | 80% | 82.88% |
Date | June 25, 2010 | May 31, 2017 | May 31, 2017 | |
Comment |
Increase in total production of Poultry(eggs) relative to baseline (EN,LA) | Value | 1,830,000 crates of eggs/yr | 55% | 70.03% |
Date | June 25, 2012 | May 31, 2017 | May 15, 2017 | |
Comment |
Increase in volume of sales for rice (CRS, LA,KN) | Value | 594.1mt | 65% | 76.55% |
Date | June 25, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Increase in volume of sales for maize (EN, KD,KN) | Value | 1225mt | 50% | 56.50% |
Date | June 25, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Increase in volume of sales for poultry(eggs) (EN, LA) | Value | 68,000 crates | 33% | 52.46% |
Date | June 25, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Increase in yield of maize among project supported beneficiaries (EN, KD,KN) | Value | 2.41mt/ha | 30% | 53.05% |
Date | June 25, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Increase in yield of poultry(eggs) among project supported beneficiaries (EN, LA) | Value | 65.6 eggs /100 layers/day | 15 % | 18.91% |
Date | June 25, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Increase in yield of rice among project supported beneficiaries (CRS,LA,KN) | Value | 1.62 mt/ha | 68% | 119.5% |
Date | June 25, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Beneficiaries linked to Service (Agro Dealers, financial, market information and technical services) | Value | 0.00 | 25000.00 | 23912.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Number of aggregation/post harvest handling centers established and functional (Disaggregated into Paddy, Cashew and others) | Value | 0.00 | 15.00 | 5.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Number of commercial agriculture entrepreneurs trained in management skills (disagregated by Youth and Women) | Value | 0.00 | 18000.00 | 19681.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Matching Grants: Approved business plans prepared by beneficiaries | Value | 0.00 | 1500.00 | 1828.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Reduction in Travel time from farm to markets | Value | 0.00 | 50.00 | 50.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Business plans with at least 75% of the activities implemented | Value | 0.00 | 95% | 1,828 BPs (100%) |
Date | July 21, 2014 | May 31, 2017 | May 15, 2017 | |
Comment |
Clients (beneficairies) who have adopted an improved agricultural technology promoted by the project (disaggregated by gender) | Value | 0.00 | 16000.00 | 19664.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Roads constructed and/or rehabilitated (Disaggregated by constructed and rehabilitated roads) | Value | 0.00 | 308.00 | 319.54 |
Date | July 21, 2014 | May 31, 2017 | May 15, 2017 | |
Comment |
Total Number of Beneficiaries Supported by the Project (of at least % of women) | Value | 0.00 | 45000.00 | 45062.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Technologies demonstrated in project areas | Value | 0.00 | 100.00 | 91.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Number of women and youth | Value | 0.00 | 5300.00 | 7354.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Clients who have adopted an improved agricultural technology promoted by the project - Female | Value | 0.00 | 5600.00 | 6882.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Clients who have adopted an improved agricultural technology promoted by the project - Male | Value | 0.00 | 11400.00 | 12782.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Number of Male Beneficiaries | Value | 0.00 | 29250.00 | 31742.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |
Number of Female Beneficiaries | Value | 0.00 | 15750.00 | 13320.00 |
Date | June 30, 2010 | May 31, 2017 | May 15, 2017 | |
Comment |