Pacific Aviation Investment - Tuvalu

Abstract*

The objective of the Pacific Aviation Investment Project for East Asia and Pacific is to improve operational safety and oversight of international air transport infrastructure. This regional project was prepared covering the Republic of Kiribati, Kingdom of Tonga, and Tuvalu. The components for Republic of Kiribati are: (1) International airport infrastructure investments component which will invest in the aviation infrastructure at Kiribati‘s international...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The project development objective is to improve the safety and security of air transport and associated infrastructure.

Key Details

Project Details

  • P128940

  • Closed

  • Satoshi Ogita , Dung Hoang

  • Tuvalu

  • Tuvalu

  • November 16, 2011

  • (as of board presentation)

    December 13, 2011

  • March 20, 2012

  • US$ 33.72 million

  • Ministry of Transport, Energy and Tourism,Ministry of Finance

  • East Asia and Pacific

  • 2012

  • US$ 29.71 million

  • B

  • March 27, 2024

  • June 15, 2023

  • Yes

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Grant 29.54
Pacific Regional Infrastructure Facility Trust Fund 0.17
Borrower/Recipient 4.01

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 29.54
IBRD + IDA Commitment 29.54
Lending Instrument
Grant Amount 0.17
Total Project Cost** 33.72

Summary Status of World Bank Financing (US$ Millions) as of February 28, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of February 28, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jan 8, 2014 IDA-H7490 Loan Disb 85,591.84
Jun 6, 2014 IDA-H7490 Loan Disb 90,605.71
Apr 8, 2014 IDA-H7490 Loan Disb 153,221.60
Mar 19, 2014 IDA-H7490 Loan Disb 9,814.04
Mar 19, 2014 IDA-H7490 Loan Disb 98,154.90
Mar 19, 2014 IDA-H7490 Loan Disb 123,631.74
May 16, 2014 IDA-H7490 Loan Disb 89,961.69
Nov 15, 2013 IDA-H7490 Loan Disb 99,388.38
Aug 8, 2014 IDA-H7490 Loan Disb 107,666.52
Oct 4, 2018 IDA-D2410 Loan Disb 192,147.31
Jan 30, 2019 IDA-D2410 Loan Disb 148,368.14
Nov 27, 2018 IDA-D2410 Loan Disb 182,108.02
Oct 23, 2018 IDA-D2410 Loan Disb 43,616.17
Oct 23, 2018 IDA-D1090 Loan Disb 88,307.91
Oct 23, 2018 IDA-D1090 Loan Disb 9,220.66
Nov 27, 2018 IDA-D2410 Loan Disb 31,858.00
Dec 22, 2017 IDA-D1090 Loan Disb 300,880.28
Jul 9, 2018 IDA-D1090 Loan Disb 31,120.01
Jul 6, 2018 IDA-D2410 Loan Disb 180,821.06
Jul 6, 2018 IDA-D1090 Loan Disb 107,123.93
May 3, 2018 IDA-H8960 Loan Disb 13.27
Nov 30, 2018 IDA-D1090 Loan Disb 143,163.25
Sep 25, 2017 IDA-D1090 Loan Disb 172,960.00
Sep 28, 2017 IDA-H8960 Loan Disb 10,645.05
Oct 26, 2017 IDA-H8960 Loan Disb 153,698.23
Sep 28, 2017 IDA-H8960 Loan Disb 65,460.71
Oct 26, 2017 IDA-H8960 Loan Disb 15,723.42
Aug 28, 2017 IDA-H8960 Loan Disb 140,147.80
Apr 4, 2018 IDA-D1090 Loan Disb 120,742.09
Jan 29, 2018 IDA-H8960 Loan Disb 31,650.11
Mar 15, 2018 IDA-D1090 Loan Disb 85,990.54
Mar 15, 2018 IDA-H8960 Loan Disb 4,510.74
Dec 22, 2017 IDA-H8960 Loan Disb 70,222.49
Jan 25, 2018 IDA-D1090 Loan Disb 590,395.90
May 3, 2018 IDA-D1090 Loan Disb 98,909.71
May 3, 2018 IDA-D2410 Loan Disb 300,080.00
Jan 30, 2018 IDA-D1090 Loan Disb 76,426.36
Dec 9, 2016 IDA-H8960 Loan Disb 53,320.17
Nov 1, 2013 IDA-H8960 Loan Commitment 6,060,000.00
Nov 8, 2023 IDA-D2410 Loan Disb -13,897.96
Jun 23, 2023 IDA-D2410 Loan Disb 101,156.78
Nov 8, 2023 IDA-D2410 Loan Cancel 55,530.17
Oct 15, 2023 IDA-D1090 Loan Cancel 92,273.99
Nov 8, 2023 IDA-D2410 Loan Disb -22,920.52
Jan 18, 2022 IDA-D2410 Loan Disb 33,214.40
Sep 6, 2022 IDA-D1090 Loan Disb 20.47
Sep 6, 2022 IDA-D1090 Loan Disb 22,114.26
Sep 6, 2022 IDA-D1090 Loan Disb 46,863.45
Dec 30, 2022 IDA-D1090 Loan Disb 59,370.02
Sep 9, 2022 IDA-D2410 Loan Disb 42,371.24
Sep 21, 2022 IDA-D1090 Loan Disb -45,863.65
Dec 7, 2022 IDA-D1090 Loan Disb 46,777.52
Dec 14, 2022 IDA-D2410 Loan Disb 37,309.04
Dec 12, 2022 IDA-D1090 Loan Disb 26,020.32
Dec 16, 2022 IDA-D2410 Loan Disb 37,863.47
Mar 29, 2023 IDA-D9050 Loan Cancel 5,650,680.00
Mar 29, 2023 IDA-D2410 Loan Cancel 5,516,140.00
Aug 9, 2021 IDA-D2410 Loan Disb 27,133.64
Aug 9, 2021 IDA-D2410 Loan Disb 82,982.08
Aug 9, 2021 IDA-D2410 Loan Disb 20,110.74
Aug 9, 2021 IDA-D2410 Loan Disb 67,534.52
Nov 16, 2021 IDA-D1090 Loan Disb 10.94
Nov 16, 2021 IDA-D2410 Loan Disb 66,858.57
Dec 10, 2021 IDA-D2410 Loan Disb 47,444.05
Mar 22, 2022 IDA-D2410 Loan Disb 5.22
Mar 22, 2022 IDA-D2410 Loan Disb 108,848.39
Mar 21, 2022 IDA-D2410 Loan Disb 63,495.19
Mar 4, 2022 IDA-D2410 Loan Disb 49,505.14
Mar 4, 2022 IDA-D2410 Loan Disb 44,875.84
Mar 21, 2022 IDA-D1090 Loan Disb 18,073.84
Aug 27, 2020 IDA-D2410 Loan Disb 70,202.49
Nov 4, 2020 IDA-D2410 Loan Disb 40,475.72
Nov 4, 2020 IDA-D2410 Loan Disb 27,255.30
Nov 19, 2021 IDA-D2410 Loan Disb -81,058.25
Nov 16, 2021 IDA-D1090 Loan Disb 100,963.19
Jan 21, 2020 IDA-D2410 Loan Disb 51,235.27
Dec 9, 2016 IDA-H7490 Loan Disb 108,374.03
Jul 11, 2017 IDA-H8960 Loan Disb 250,530.19
Jun 13, 2017 IDA-H8960 Loan Disb 111,874.74
Apr 24, 2017 IDA-H8960 Loan Disb 234,341.40
Jun 2, 2017 IDA-H8960 Loan Disb 127,048.70
Apr 18, 2017 IDA-H7490 Loan Disb 29,601.70
Jul 26, 2017 IDA-H8960 Loan Disb 306,866.72
Sep 15, 2017 IDA-H8960 Loan Disb 149,846.27
Nov 30, 2017 IDA-D1090 Loan Disb 179,550.73
Oct 26, 2017 IDA-H8960 Loan Disb 206,628.55
Aug 17, 2017 IDA-H8960 Loan Disb 71,679.29
Sep 20, 2017 IDA-H8960 Loan Disb 196,819.40
Oct 25, 2016 IDA-H7490 Loan Disb 222,531.88
Oct 25, 2016 IDA-H7490 Loan Disb 20,175.31
Oct 25, 2016 IDA-H7490 Loan Disb 121,222.71
Dec 15, 2016 IDA-H7490 Loan Disb 110,910.07
Sep 19, 2016 IDA-H7490 Loan Disb 65,832.70
Sep 19, 2016 IDA-H7490 Loan Disb 302,252.90
Sep 19, 2016 IDA-H7490 Loan Disb 64,391.60
Jul 27, 2016 IDA-H8960 Loan Disb 217,682.42
Jul 27, 2016 IDA-H8960 Loan Disb 49,481.04
Jan 26, 2017 IDA-H8960 Loan Disb 417,442.12
Jan 6, 2017 IDA-H8960 Loan Disb 240,338.48
Oct 27, 2016 IDA-H8960 Loan Disb 65,347.42
Apr 20, 2017 IDA-D1090 Loan Disb 158,445.00
Dec 9, 2016 IDA-H7490 Loan Disb 207,737.78
Feb 17, 2016 IDA-H7490 Loan Disb 172,463.23
Feb 19, 2016 IDA-H8960 Loan Disb 112,017.47
Feb 17, 2016 IDA-H7490 Loan Disb 98,674.05
May 3, 2016 IDA-H7490 Loan Disb 774,316.06
Jun 28, 2016 IDA-H7490 Loan Disb 18,982.82
Jul 15, 2016 IDA-H7490 Loan Disb 462,721.62
Jun 30, 2016 IDA-H7490 Loan Disb 363,467.40
Sep 16, 2016 IDA-H8960 Loan Disb 19,025.25
Jan 3, 2017 IDA-H8960 Loan Disb 273,522.44
Nov 16, 2017 IDA-D2410 Loan Commitment 8,750,000.00
Sep 29, 2021 IDA-D9050 Loan Commitment 6,000,000.00
Mar 31, 2016 IDA-D1090 Loan Commitment 2,880,000.00
Dec 13, 2011 IDA-H7490 Loan Commitment 11,850,000.00
Jan 21, 2020 IDA-D2410 Loan Disb 4,373.06
Jan 2, 2020 IDA-D1090 Loan Disb 114,090.82
May 8, 2020 IDA-D1090 Loan Disb 94,618.19
Feb 14, 2020 IDA-D2410 Loan Disb 115,004.68
May 15, 2020 IDA-D2410 Loan Disb 48,644.45
Nov 5, 2020 IDA-D2410 Loan Disb 68,028.99
Oct 28, 2020 IDA-D2410 Loan Disb 17,384.60
Nov 9, 2020 IDA-D1090 Loan Disb 54,563.52
Nov 17, 2020 IDA-D2410 Loan Disb 26,095.28
May 28, 2019 IDA-D2410 Loan Disb 53,230.24
Apr 1, 2019 IDA-D2410 Loan Disb 118,171.43
Oct 10, 2019 IDA-D2410 Loan Disb 2,327.20
Oct 10, 2019 IDA-D1090 Loan Disb 40,308.51
Oct 30, 2019 IDA-D2410 Loan Disb 98,359.18
Oct 30, 2019 IDA-D1090 Loan Disb 43,041.25
Jul 25, 2019 IDA-D1090 Loan Disb 54,673.36
Oct 16, 2019 IDA-D2410 Loan Disb 9,076.19
Jul 25, 2019 IDA-D2410 Loan Disb 165,789.60
Jul 25, 2019 IDA-D2410 Loan Disb 82,980.43
Jul 25, 2019 IDA-D1090 Loan Disb 24,447.51
Nov 30, 2018 IDA-H7490 Loan Disb 188.41
Feb 11, 2019 IDA-D2410 Loan Disb 73,003.32
May 6, 2016 IDA-H7490 Loan Disb 22,581.35
May 6, 2016 IDA-H7490 Loan Disb 102,400.57
May 27, 2016 IDA-H7490 Loan Disb 404,486.22
May 11, 2016 IDA-H7490 Loan Disb 141,480.44
May 6, 2016 IDA-H7490 Loan Disb 11,178.86
May 9, 2016 IDA-H7490 Loan Disb 129,422.65
Aug 21, 2015 IDA-H7490 Loan Disb 285,767.25
Jun 3, 2015 IDA-H8960 Loan Disb 8,465.26
Apr 13, 2015 IDA-H7490 Loan Disb 132,511.12
Apr 13, 2015 IDA-H8960 Loan Disb 37,471.99
Apr 13, 2015 IDA-H8960 Loan Disb 40,334.97
Aug 28, 2015 IDA-H8960 Loan Disb 478,203.12
Aug 24, 2015 IDA-H7490 Loan Disb 74,790.41
Aug 25, 2015 IDA-H8960 Loan Disb 320,740.56
Aug 24, 2015 IDA-H7490 Loan Disb 370,222.00
Oct 6, 2015 IDA-H7490 Loan Disb 53,121.01
Oct 6, 2015 IDA-H8960 Loan Disb 77,257.69
Oct 2, 2015 IDA-H7490 Loan Disb 275,116.10
Oct 13, 2015 IDA-H8960 Loan Disb 136,453.58
Oct 8, 2015 IDA-H7490 Loan Disb 156,346.83
Nov 10, 2015 IDA-H8960 Loan Disb 42,348.93
Nov 10, 2015 IDA-H7490 Loan Disb 36,088.40
Jan 30, 2015 IDA-H7490 Loan Disb 319,309.25
Dec 17, 2014 IDA-H7490 Loan Disb 381,269.62
Dec 12, 2014 IDA-H7490 Loan Disb 241,573.10
Mar 4, 2015 IDA-H7490 Loan Disb 165,285.16
Mar 9, 2015 IDA-H7490 Loan Disb 252,823.34
Aug 8, 2014 IDA-H7490 Loan Disb 30,744.42
Jan 27, 2015 IDA-H7490 Loan Disb 209,896.28
Mar 18, 2015 IDA-H7490 Loan Disb 12,645.04
Mar 18, 2015 IDA-H7490 Loan Disb 59,190.99
Feb 2, 2015 IDA-H8960 Loan Disb 128,324.95
Feb 2, 2015 IDA-H7490 Loan Disb 79,217.34
Apr 13, 2015 IDA-H7490 Loan Disb 79,995.48
Jun 9, 2015 IDA-H7490 Loan Disb 100,026.40
Aug 18, 2015 IDA-H7490 Loan Disb 411,058.60
Aug 18, 2015 IDA-H8960 Loan Disb 273,941.16
Jun 26, 2015 IDA-H7490 Loan Disb 277,093.03
Jun 26, 2015 IDA-H7490 Loan Disb 116,861.60
Jun 26, 2015 IDA-H7490 Loan Disb 78,318.50
Jun 3, 2015 IDA-H7490 Loan Disb 249,079.97
May 28, 2015 IDA-H7490 Loan Disb 183,009.30
Jul 17, 2015 IDA-H8960 Loan Disb 74,014.03
Dec 16, 2014 IDA-H8960 Loan Disb 183,285.55
Oct 9, 2014 IDA-H8960 Loan Disb 193,204.00
Oct 7, 2014 IDA-H7490 Loan Disb 9,003.00
Oct 7, 2014 IDA-H7490 Loan Disb 188,949.33
Sep 10, 2013 IDA-H7490 Loan Disb 51,177.43
Jul 30, 2013 IDA-H7490 Loan Disb 202,666.44
Jan 14, 2015 IDA-H7490 Loan Disb 34,941.21
Oct 22, 2013 IDA-H7490 Loan Disb 74,858.74

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Moderately Unsatisfactory 2023-06-12
Counterpart Funding Satisfactory 2023-06-12
Procurement Satisfactory 2023-06-12
Project Management Satisfactory 2023-06-12
Monitoring and Evaluation Satisfactory 2023-06-12
Financial Management Moderately Satisfactory 2023-06-12
Overall Implementation Progress (IP) Moderately Unsatisfactory 2023-06-12

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 03-26-2024
OutcomesModerately Unsatisfactory
Risk to Development Outcome
Bank PerformanceModerately Satisfactory
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 06-07-2024PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Unsatisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceN/a
Implementing AgencyN/a
Icr QualitySubstantialN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Indicator One: Certification of safety and security at project airportsValueFUN currently not certifiedFUN currently not certified.Certification of airports in accordance with agree
    DateDecember 13, 2011December 15, 2022June 15, 2023
    Comment
  • Roads rehabilitated, RuralValue0.008.008.00
    DateMay 23, 2013December 15, 2022June 30, 2015
    Comment
  • Indicator Two: Resolution of safety concerns at participating airports reaches global ICAO averageValue95.0095.0040.00
    DateDecember 13, 2011December 15, 2022June 15, 2023
    Comment
  • Indicator Three: Modernization of air traffic managementValueNo VSAT or ADS-BADS-B operational. VSAT equipment not functional.VSAT and ADS-B operational
    DateDecember 13, 2011December 15, 2022June 15, 2023
    Comment
  • Roads rehabilitated, Non-ruralValue0.007.407.40
    DateMay 23, 2013December 15, 2022June 30, 2015
    Comment
  • Indicator Four: Implementation of a regional safety levy for international passengersValueNo levyLevy being collected. Funds now being received by AU$5 collected from each departing international p
    DateDecember 13, 2011December 15, 2022June 30, 2014
    Comment
  • Roads in good and fair condition as a share of total classified roadsValue50.00100.00100.00
    DateMay 23, 2013December 15, 2022June 30, 2015
    Comment
  • Size of the total classified networkValue15.4015.400.00
    DateMay 23, 2013April 17, 2018
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Component A: Intermediate Result indicator One: Navigation and safety aids fully operationalValue0.0010.00100.00
    DateDecember 13, 2011December 15, 2022June 15, 2023
    Comment
  • Component B: Intermediate Result indicator One: Successful implementation of agreed training planValueNo training planTraining for the runway contractor not yet complet
    DateDecember 13, 2011December 15, 2022
    Comment
  • Component C: Intermediate Results Indicator Six - Successful implementation of the GBV and VAC Prevention Action Plan by the runwaycivil works contractorValueNoYesYes
    DateJune 19, 2017December 15, 2022December 15, 2022
    Comment
  • Component A: Intermediate Result indicator Two: Rehabilitation of Funafuti runwayValue0.000.00100.00
    DateDecember 13, 2011December 15, 2022June 15, 2023
    Comment
  • Component C: Intermediate Results Indicator 7 - Successful implementation of GBV and VAC counselling programValueNoYesYes
    DateAugust 14, 2017December 15, 2022December 15, 2020
    Comment
  • Component A: Intermediate Result indicator Three: Achievement of Fire StandardsValueN/ACategory 5Category 5
    DateDecember 13, 2011December 15, 2022September 30, 2017
    Comment
  • Grievances registered related to delivery of project benefits that are addressedValue100.00100.00100.00
    DateApril 19, 2018December 15, 2022December 15, 2022
    Comment
  • Component A: Intermediate Result indicator Four: Funafuti terminal and control tower upgradeValue0.00100.00100.00
    DateDecember 13, 2011December 15, 2022December 31, 2017
    Comment
  • Project-supported organization(s) publishing periodic reports on GRM and how issues were resolvedValueYesYesYes
    DateApril 19, 2018December 15, 2022December 15, 2022
    Comment
  • Component A - Intermediate Result indicator Five: Number of kilometers of paved roads improvedValue0.0015.4015.40
    DateMay 23, 2013December 15, 2022May 23, 2013
    Comment
  • Grievances responded and/or resolved within the stipulated service standards for response timesValue75.00100.00100.00
    DateApril 19, 2018December 15, 2022December 15, 2022
    Comment
  • Component A - Intermediate Indicator Seven: Implementation of repair and resiliency works for FUN runwayValue0.0010.00100.00
    DateJune 19, 2017December 15, 2022June 15, 2023
    Comment
  • Component A: Intermediate Results Indicator Six: Construction of storage facility under the terminal for water runoff to prevent flooding during heavy rainfall exacerbated by climate changeValueNoYesYes
    DateDecember 15, 2011December 15, 2022December 15, 2022
    Comment