| Financier | Commitments | 
|---|---|
| Borrower/Recipient | 77.00 | 
| Borrower/Recipient | 77.00 | 
| IDA Credit | 294.13 | 
| IDA Credit | 294.13 | 
| Global Environment Facility (GEF) | 6.09 | 
| Global Environment Facility (GEF) | 6.09 | 
P153544
Closed
Phuong Hoang Ai Nguyen , Binh Thang Cao, Virak Chan
Socialist Republic of Viet Nam,Socialist Republic of Viet Nam
November 19, 2015
(as of board presentation)
June 10, 2016
November 23, 2016
US$ 387.00 million
Ministry of Planning and Investment,Ministry of Natural Resources and Environment, Vietnam,Ministry of Agriculture and Rural Development,Ministry of Planning and Investment,Ministry of Natural Resources and Environment, Vietnam,Ministry of Agriculture and Rural Development
2016
US$ 300.22 million
A
Not Applicable
June 30, 2025
Bank Approved
May 7, 2024
| Financier | Commitments | 
|---|---|
| Borrower/Recipient | 77.00 | 
| Borrower/Recipient | 77.00 | 
| IDA Credit | 294.13 | 
| IDA Credit | 294.13 | 
| Global Environment Facility (GEF) | 6.09 | 
| Global Environment Facility (GEF) | 6.09 | 
| Product Line | IBRD/IDA | 
|---|---|
| IBRD Commitment | N/A | 
| IDA Commitment | 294.13 | 
| IBRD + IDA Commitment | 294.13 | 
| Lending Instrument | |
|---|---|
| Grant Amount | 6.09 | 
| Total Project Cost** | 387.00 | 
| Period | Financier | Transaction Type | Amount (US$) | 
|---|---|---|---|
| Nov 1, 2018 | IDA-58450 | Int Charges | 29,634.73 | 
| Nov 1, 2018 | IDA-58450 | Int Charges | 64.68 | 
| Nov 1, 2018 | IDA-58450 | Int Charges | 21,082.54 | 
| Nov 1, 2018 | IDA-58450 | Int Charges | 21,082.54 | 
| Mar 7, 2023 | IDA-58450 | Loan Disb | -2,675.76 | 
| Mar 31, 2023 | IDA-58450 | Loan Disb | 300,000.00 | 
| May 1, 2023 | IDA-58450 | Loan Repay | 0.01 | 
| May 1, 2023 | IDA-58450 | Int Charges | -0.01 | 
| May 1, 2023 | IDA-58450 | Int Charges | -0.01 | 
| May 1, 2023 | IDA-58450 | Loan Repay | 9,619,813.00 | 
| May 1, 2023 | IDA-58450 | Int Charges | 0.01 | 
| May 1, 2023 | IDA-58450 | Int Charges | 684,826.00 | 
| May 1, 2023 | IDA-58450 | Int Charges | 684,826.00 | 
| May 1, 2023 | IDA-58450 | Int Charges | 1,022,530.80 | 
| May 31, 2023 | IDA-58450 | Loan Disb | 2,000,000.00 | 
| Jul 13, 2023 | IDA-58450 | Loan Disb | 2,060,000.00 | 
| Jun 21, 2023 | IDA-58450 | Loan Disb | 141,758.60 | 
| Sep 8, 2023 | IDA-58450 | Loan Disb | 1,833,000.00 | 
| Jul 24, 2023 | IDA-58450 | Loan Disb | 2,191,000.00 | 
| Jul 7, 2023 | IDA-58450 | Loan Disb | 450,000.00 | 
| Jun 16, 2023 | IDA-58450 | Loan Disb | 112,189.38 | 
| Jun 16, 2023 | IDA-58450 | Loan Disb | 602,064.90 | 
| Jun 6, 2023 | IDA-58450 | Loan Disb | 3,000,000.00 | 
| Sep 25, 2023 | IDA-58450 | Loan Disb | 1,166,000.00 | 
| Sep 1, 2023 | IDA-58450 | Loan Disb | 1,918,000.00 | 
| Dec 26, 2023 | IDA-58450 | Loan Disb | 660,000.00 | 
| Aug 22, 2022 | IDA-58450 | Loan Disb | 785,000.00 | 
| Mar 25, 2022 | IDA-58450 | Loan Disb | 2,000,000.00 | 
| Mar 4, 2022 | IDA-58450 | Loan Disb | 1,500,000.00 | 
| Jul 26, 2022 | IDA-58450 | Loan Disb | 1,097,000.00 | 
| Jul 19, 2022 | IDA-58450 | Loan Disb | 1,479,000.00 | 
| Dec 22, 2021 | IDA-58450 | Loan Disb | 1,810,000.00 | 
| May 10, 2022 | IDA-58450 | Loan Disb | 1,905,000.00 | 
| Apr 11, 2022 | IDA-58450 | Loan Disb | 1,620,000.00 | 
| Aug 30, 2022 | IDA-58450 | Loan Disb | 500,000.00 | 
| Dec 27, 2021 | IDA-58450 | Loan Disb | 31,973.93 | 
| Feb 28, 2022 | IDA-58450 | Loan Disb | 1,210,595.20 | 
| Jan 18, 2022 | IDA-58450 | Loan Disb | 765,000.00 | 
| Sep 1, 2022 | IDA-58450 | Loan Disb | 1,205,000.00 | 
| Jan 25, 2022 | IDA-58450 | Loan Disb | 873,317.25 | 
| Jan 25, 2022 | IDA-58450 | Loan Disb | 1,100,000.00 | 
| Dec 29, 2021 | IDA-58450 | Loan Disb | 1,170,000.00 | 
| Aug 10, 2022 | IDA-58450 | Loan Disb | 2,000,000.00 | 
| Dec 1, 2022 | IDA-58450 | Loan Disb | 1,042,000.00 | 
| Jan 19, 2021 | IDA-58450 | Loan Disb | 1,119,000.00 | 
| Dec 28, 2020 | IDA-58450 | Loan Disb | 169,999.98 | 
| Jan 6, 2021 | IDA-58450 | Loan Disb | 2,035,590.00 | 
| Jan 6, 2021 | IDA-58450 | Loan Disb | 463,000.00 | 
| Nov 30, 2020 | IDA-58450 | Loan Disb | 1,250,000.00 | 
| Dec 21, 2020 | IDA-58450 | Loan Disb | 1,400,000.00 | 
| Feb 8, 2021 | IDA-58450 | Loan Disb | 1,500,000.00 | 
| Feb 2, 2021 | IDA-58450 | Loan Disb | 200,000.02 | 
| Feb 2, 2021 | IDA-58450 | Loan Disb | 43,553.96 | 
| Feb 16, 2021 | IDA-58450 | Loan Disb | 520,000.00 | 
| Jan 20, 2021 | IDA-58450 | Loan Disb | 1,874,461.90 | 
| Jul 30, 2019 | IDA-58450 | Loan Disb | 1,049,000.00 | 
| Oct 22, 2019 | IDA-58450 | Loan Disb | 3,590,000.00 | 
| Dec 27, 2019 | IDA-58450 | Loan Disb | 2,767,000.00 | 
| Dec 11, 2019 | IDA-58450 | Loan Disb | 226,350.00 | 
| Dec 27, 2019 | IDA-58450 | Loan Disb | 1,100,000.00 | 
| Mar 24, 2020 | IDA-58450 | Loan Disb | 1,700,000.00 | 
| Mar 31, 2020 | IDA-58450 | Loan Disb | 1,456,298.00 | 
| Jan 22, 2020 | IDA-58450 | Loan Disb | 490,000.00 | 
| Nov 22, 2019 | IDA-58450 | Loan Disb | 3,330,000.00 | 
| Dec 27, 2019 | IDA-58450 | Loan Disb | 1,425,178.00 | 
| Jan 6, 2020 | IDA-58450 | Loan Disb | 443,369.06 | 
| Jan 24, 2020 | IDA-58450 | Loan Disb | 1,749,048.00 | 
| Dec 27, 2019 | IDA-58450 | Loan Disb | 2,485,000.00 | 
| Dec 27, 2019 | IDA-58450 | Loan Disb | 2,585,000.00 | 
| Mar 26, 2020 | IDA-58450 | Loan Disb | 400,000.00 | 
| Mar 26, 2020 | IDA-58450 | Loan Disb | 2,780,000.00 | 
| Jan 15, 2020 | IDA-58450 | Loan Disb | 87,199.99 | 
| Dec 19, 2019 | IDA-58450 | Loan Disb | 542,963.70 | 
| Jun 22, 2020 | IDA-58450 | Loan Disb | 1,031,916.06 | 
| Jun 17, 2020 | IDA-58450 | Loan Disb | 1,080,000.00 | 
| May 1, 2020 | IDA-58450 | Int Charges | 162,869.72 | 
| May 1, 2020 | IDA-58450 | Int Charges | 162,869.72 | 
| May 1, 2020 | IDA-58450 | Int Charges | 260,444.70 | 
| May 5, 2020 | IDA-58450 | Loan Disb | 5,600,000.00 | 
| May 1, 2020 | IDA-58450 | Int Charges | 10,998.60 | 
| May 1, 2020 | IDA-58450 | Loan Disb | 500,000.00 | 
| Nov 1, 2018 | IDA-58450 | Int Charges | 64.68 | 
| Oct 26, 2018 | IDA-58450 | Loan Disb | 1,341,000.00 | 
| Jan 16, 2019 | IDA-58450 | Loan Disb | 955,335.06 | 
| Nov 10, 2023 | IDA-58450 | Loan Disb | 1,200,000.00 | 
| Nov 29, 2023 | IDA-58450 | Loan Disb | 2,115,000.00 | 
| May 16, 2023 | IDA-58450 | Loan Cancel | 15,871,414.00 | 
| Jun 5, 2023 | IDA-58450 | Loan Disb | 2,117,000.00 | 
| Nov 1, 2023 | IDA-58450 | Int Charges | 115,444.53 | 
| Nov 1, 2023 | IDA-58450 | Loan Repay | 8,864,230.00 | 
| Nov 1, 2023 | IDA-58450 | Int Charges | 691,893.80 | 
| Nov 1, 2023 | IDA-58450 | Int Charges | 691,893.80 | 
| Nov 1, 2023 | IDA-58450 | Int Charges | 1,153,156.40 | 
| Dec 28, 2023 | IDA-58450 | Loan Disb | 990,000.00 | 
| Jan 16, 2024 | IDA-58450 | Loan Disb | 1,352,700.00 | 
| Sep 28, 2023 | IDA-58450 | Loan Disb | 350,000.00 | 
| Oct 5, 2023 | IDA-58450 | Loan Disb | 2,760,000.00 | 
| Mar 21, 2024 | IDA-58450 | Loan Disb | 2,920,000.00 | 
| Feb 23, 2024 | IDA-58450 | Loan Disb | 650,000.00 | 
| Feb 1, 2024 | IDA-58450 | Loan Disb | 2,000,000.00 | 
| Jan 23, 2024 | IDA-58450 | Loan Disb | 500,000.00 | 
| May 1, 2024 | IDA-58450 | Int Charges | 1,210,495.80 | 
| May 1, 2024 | IDA-58450 | Int Charges | 726,297.44 | 
| May 1, 2024 | IDA-58450 | Int Charges | 726,297.44 | 
| May 1, 2024 | IDA-58450 | Loan Repay | 154,096.30 | 
| Jan 22, 2024 | IDA-58450 | Loan Disb | 1,070,000.00 | 
| Jun 3, 2024 | IDA-58450 | Loan Disb | -206,791.64 | 
| May 1, 2024 | IDA-58450 | Loan Repay | 8,748,391.00 | 
| Mar 26, 2024 | IDA-58450 | Loan Disb | -443,102.56 | 
| May 6, 2024 | IDA-58450 | Loan Cancel | 21,984,024.00 | 
| Mar 26, 2024 | IDA-58450 | Loan Disb | -0.05 | 
| Jun 27, 2024 | IDA-58450 | Loan Disb | 1,087,374.60 | 
| May 6, 2024 | IDA-58450 | Loan Disb | -503,071.38 | 
| Jun 28, 2024 | IDA-58450 | Loan Disb | 740,818.00 | 
| Jun 12, 2024 | IDA-58450 | Loan Disb | -198,238.05 | 
| Jun 10, 2016 | IDA-58450 | Loan Commitment | 310,000,000.00 | 
| Apr 26, 2024 | IDA-58450 | Loan Disb | -187,689.95 | 
| Apr 2, 2024 | IDA-58450 | Loan Disb | 1,600,000.00 | 
| Oct 13, 2022 | IDA-58450 | Loan Disb | 2,000,000.00 | 
| May 1, 2023 | IDA-58450 | Loan Repay | 110,903.56 | 
| Jan 17, 2023 | IDA-58450 | Loan Disb | 953,000.00 | 
| Dec 1, 2022 | IDA-58450 | Loan Disb | 1,820,000.00 | 
| Dec 19, 2022 | IDA-58450 | Loan Disb | 928,000.00 | 
| Dec 21, 2022 | IDA-58450 | Loan Disb | 2,500,000.00 | 
| Dec 27, 2022 | IDA-58450 | Loan Disb | 3,000,000.00 | 
| Nov 23, 2022 | IDA-58450 | Loan Disb | 830,000.00 | 
| Dec 23, 2022 | IDA-58450 | Loan Disb | 2,800,000.00 | 
| Nov 22, 2022 | IDA-58450 | Loan Disb | 1,050,964.60 | 
| Sep 28, 2022 | IDA-58450 | Loan Disb | 104,210.00 | 
| Dec 21, 2021 | IDA-58450 | Loan Disb | 1,727,491.00 | 
| Dec 20, 2021 | IDA-58450 | Loan Disb | 1,761,000.00 | 
| Dec 20, 2021 | IDA-58450 | Loan Disb | 2,000,000.00 | 
| Feb 9, 2022 | IDA-58450 | Loan Disb | 490,774.20 | 
| Aug 26, 2022 | IDA-58450 | Loan Disb | 2,200,000.00 | 
| Sep 29, 2022 | IDA-58450 | Loan Disb | 2,072,000.00 | 
| Sep 7, 2022 | IDA-58450 | Loan Disb | 2,000,000.00 | 
| Sep 30, 2022 | IDA-58450 | Loan Disb | 2,500,000.00 | 
| Sep 13, 2022 | IDA-58450 | Loan Disb | 1,885,000.00 | 
| Nov 1, 2022 | IDA-58450 | Loan Repay | 396,380.20 | 
| Dec 22, 2022 | IDA-58450 | Loan Disb | 3,319,335.50 | 
| Dec 22, 2022 | IDA-58450 | Loan Disb | 3,000,000.00 | 
| Nov 1, 2022 | IDA-58450 | Int Charges | 961,491.70 | 
| Nov 1, 2022 | IDA-58450 | Loan Repay | 8,886,960.00 | 
| Nov 1, 2022 | IDA-58450 | Int Charges | 576,895.00 | 
| Nov 1, 2022 | IDA-58450 | Int Charges | 576,895.00 | 
| Nov 9, 2021 | IDA-58450 | Loan Disb | 1,500,000.00 | 
| Sep 17, 2021 | IDA-58450 | Loan Disb | 431,533.25 | 
| Sep 30, 2021 | IDA-58450 | Loan Disb | 1,204,611.10 | 
| Sep 30, 2021 | IDA-58450 | Loan Disb | 2,000,000.00 | 
| Sep 7, 2021 | IDA-58450 | Loan Disb | 1,800,000.00 | 
| Nov 19, 2021 | IDA-58450 | Loan Disb | 660,000.00 | 
| Sep 20, 2021 | IDA-58450 | Loan Disb | 1,035,000.00 | 
| Sep 20, 2021 | IDA-58450 | Loan Disb | 1,031,000.00 | 
| Sep 20, 2021 | IDA-58450 | Loan Disb | 2,000,000.00 | 
| Sep 20, 2021 | IDA-58450 | Loan Disb | 2,000,000.00 | 
| May 31, 2022 | IDA-58450 | Loan Disb | 1,672,000.00 | 
| Mar 16, 2022 | IDA-58450 | Loan Disb | 2,000,000.00 | 
| Aug 24, 2021 | IDA-58450 | Loan Disb | 1,800,000.00 | 
| Nov 29, 2021 | IDA-58450 | Loan Disb | 555,742.90 | 
| Nov 29, 2021 | IDA-58450 | Loan Disb | 2,049,000.00 | 
| Nov 29, 2021 | IDA-58450 | Loan Disb | 397,000.00 | 
| Dec 10, 2021 | IDA-58450 | Loan Disb | 424,000.00 | 
| Dec 10, 2021 | IDA-58450 | Loan Disb | 1,500,000.00 | 
| Jun 21, 2022 | IDA-58450 | Loan Disb | 1,373,000.00 | 
| Mar 28, 2022 | IDA-58450 | Loan Disb | 1,742,000.00 | 
| Mar 28, 2022 | IDA-58450 | Loan Disb | 986,000.00 | 
| Apr 21, 2022 | IDA-58450 | Loan Disb | 765,004.70 | 
| Jun 3, 2022 | IDA-58450 | Loan Disb | 626,500.00 | 
| May 1, 2022 | IDA-58450 | Loan Repay | 66,792.30 | 
| May 1, 2022 | IDA-58450 | Loan Repay | 9,639,591.00 | 
| May 1, 2022 | IDA-58450 | Int Charges | 535,942.75 | 
| May 1, 2022 | IDA-58450 | Int Charges | 535,942.75 | 
| May 1, 2022 | IDA-58450 | Int Charges | 893,237.94 | 
| Apr 29, 2022 | IDA-58450 | Loan Disb | 2,000,000.00 | 
| Dec 15, 2021 | IDA-58450 | Loan Disb | 1,020,000.00 | 
| Dec 15, 2021 | IDA-58450 | Loan Disb | 2,500,000.00 | 
| Jan 8, 2021 | IDA-58450 | Loan Disb | 2,351,710.00 | 
| Jul 21, 2021 | IDA-58450 | Loan Disb | 300,835.44 | 
| Jul 23, 2021 | IDA-58450 | Loan Disb | 1,920,000.00 | 
| Jul 13, 2021 | IDA-58450 | Loan Disb | 900,000.00 | 
| May 17, 2021 | IDA-58450 | Loan Disb | 960,000.00 | 
| Apr 6, 2021 | IDA-58450 | Loan Disb | 1,479,869.40 | 
| Jul 21, 2021 | IDA-58450 | Loan Disb | 1,347,546.60 | 
| Apr 8, 2021 | IDA-58450 | Loan Disb | 1,500,000.00 | 
| May 19, 2021 | IDA-58450 | Loan Disb | 633,162.80 | 
| May 19, 2021 | IDA-58450 | Loan Disb | 550,329.00 | 
| Mar 26, 2021 | IDA-58450 | Loan Disb | 1,750,000.00 | 
| May 7, 2021 | IDA-58450 | Loan Disb | 1,304,000.00 | 
| Apr 7, 2021 | IDA-58450 | Loan Disb | 1,278,000.00 | 
| Jun 1, 2021 | IDA-58450 | Loan Disb | 1,088,395.40 | 
| Jun 8, 2021 | IDA-58450 | Loan Disb | 1,900,000.00 | 
| May 1, 2021 | IDA-58450 | Int Charges | 6,260.77 | 
| May 1, 2021 | IDA-58450 | Int Charges | 326,620.30 | 
| May 1, 2021 | IDA-58450 | Int Charges | 326,620.30 | 
| May 1, 2021 | IDA-58450 | Int Charges | 530,332.56 | 
| Jun 23, 2021 | IDA-58450 | Loan Disb | 974,000.00 | 
| Jun 23, 2021 | IDA-58450 | Loan Disb | 1,081,000.00 | 
| Jun 18, 2021 | IDA-58450 | Loan Disb | 1,451,633.50 | 
| Jul 1, 2021 | IDA-58450 | Loan Disb | 350,000.00 | 
| May 14, 2021 | IDA-58450 | Loan Disb | 1,012,848.40 | 
| Apr 16, 2021 | IDA-58450 | Loan Disb | 500,000.00 | 
| Mar 4, 2019 | IDA-58450 | Loan Disb | 3,448,300.00 | 
| Nov 6, 2018 | IDA-58450 | Loan Disb | 483,000.00 | 
| Feb 1, 2019 | IDA-58450 | Loan Disb | 40,266.55 | 
| Oct 2, 2018 | IDA-58450 | Loan Disb | 3,607,893.00 | 
| May 1, 2019 | IDA-58450 | Int Charges | 87,803.55 | 
| May 1, 2019 | IDA-58450 | Int Charges | 5,616.09 | 
| May 1, 2019 | IDA-58450 | Int Charges | 58,752.98 | 
| May 1, 2019 | IDA-58450 | Int Charges | 58,752.98 | 
| Jun 14, 2019 | IDA-58450 | Loan Disb | 310,000.00 | 
| Jun 14, 2019 | IDA-58450 | Loan Disb | 2,585,000.00 | 
| Jun 20, 2019 | IDA-58450 | Loan Disb | 321,874.30 | 
| Sep 17, 2019 | IDA-58450 | Loan Disb | 2,974,730.00 | 
| Aug 5, 2019 | IDA-58450 | Loan Disb | 610,000.00 | 
| Nov 1, 2019 | IDA-58450 | Int Charges | 10,063.71 | 
| Nov 1, 2019 | IDA-58450 | Int Charges | 86,346.44 | 
| Nov 1, 2019 | IDA-58450 | Int Charges | 86,346.44 | 
| Nov 1, 2019 | IDA-58450 | Int Charges | 132,825.84 | 
| May 25, 2017 | IDA-58450 | Loan Disb | 223,180.02 | 
| Apr 26, 2017 | IDA-58450 | Loan Disb | 300,000.00 | 
| Jul 11, 2017 | IDA-58450 | Loan Disb | 118,043.00 | 
| Nov 1, 2017 | IDA-58450 | Int Charges | 2,166.23 | 
| Nov 1, 2017 | IDA-58450 | Int Charges | 2,166.23 | 
| Nov 1, 2017 | IDA-58450 | Int Charges | 3,610.39 | 
| Nov 1, 2017 | IDA-58450 | Int Charges | 32.09 | 
| Nov 1, 2017 | IDA-58450 | Int Charges | 32.09 | 
| Nov 1, 2017 | IDA-58450 | Int Charges | 53.48 | 
| Jan 9, 2018 | IDA-58450 | Loan Disb | 253,016.98 | 
| May 25, 2018 | IDA-58450 | Loan Disb | 362,000.00 | 
| Apr 23, 2018 | IDA-58450 | Loan Disb | 15,000.01 | 
| Jan 17, 2018 | IDA-58450 | Loan Disb | 543,363.00 | 
| Jun 6, 2018 | IDA-58450 | Loan Disb | 2,379,540.00 | 
| May 1, 2018 | IDA-58450 | Int Charges | 51.19 | 
| May 1, 2018 | IDA-58450 | Int Charges | 51.19 | 
| May 1, 2018 | IDA-58450 | Int Charges | 4,226.68 | 
| May 1, 2018 | IDA-58450 | Int Charges | 4,226.68 | 
| May 1, 2018 | IDA-58450 | Int Charges | 7,129.80 | 
| May 16, 2018 | IDA-58450 | Loan Disb | 957,000.00 | 
| Aug 21, 2018 | IDA-58450 | Loan Disb | 1,450,000.00 | 
| Nov 21, 2018 | IDA-58450 | Loan Disb | 800,329.00 | 
| Dec 13, 2018 | IDA-58450 | Loan Disb | 1,814,260.50 | 
| Sep 21, 2021 | IDA-58450 | Loan Disb | 1,090,000.00 | 
| Nov 1, 2021 | IDA-58450 | Int Charges | 452,008.62 | 
| Nov 1, 2021 | IDA-58450 | Int Charges | 452,008.62 | 
| Nov 1, 2021 | IDA-58450 | Int Charges | 753,347.75 | 
| Jul 26, 2021 | IDA-58450 | Loan Disb | -303,980.75 | 
| Nov 1, 2021 | IDA-58450 | Int Charges | 13,788.68 | 
| Nov 1, 2021 | IDA-58450 | Loan Repay | 10,186,685.00 | 
| Oct 8, 2021 | IDA-58450 | Loan Disb | 289,000.00 | 
| Oct 8, 2021 | IDA-58450 | Loan Disb | 1,000,000.00 | 
| Sep 21, 2021 | IDA-58450 | Loan Disb | 1,637,000.00 | 
| Mar 25, 2021 | IDA-58450 | Loan Disb | 225,420.83 | 
| Jul 8, 2021 | IDA-58450 | Loan Disb | 1,401,045.00 | 
| Jul 12, 2021 | IDA-58450 | Loan Disb | 1,500,000.00 | 
| Jul 20, 2021 | IDA-58450 | Loan Disb | 1,000,000.00 | 
| Apr 28, 2021 | IDA-58450 | Loan Disb | 1,455,693.40 | 
| Apr 28, 2021 | IDA-58450 | Loan Disb | 815,000.00 | 
| Mar 25, 2021 | IDA-58450 | Loan Disb | 338,205.97 | 
| Jun 28, 2021 | IDA-58450 | Loan Disb | 500,000.00 | 
| Jul 20, 2021 | IDA-58450 | Loan Disb | 1,000,000.00 | 
| Aug 26, 2021 | IDA-58450 | Loan Disb | 1,940,000.00 | 
| Sep 28, 2020 | IDA-58450 | Loan Disb | 190,000.00 | 
| Sep 28, 2020 | IDA-58450 | Loan Disb | 335,000.00 | 
| Sep 4, 2020 | IDA-58450 | Loan Disb | 1,315,000.00 | 
| Jun 23, 2020 | IDA-58450 | Loan Disb | 582,000.00 | 
| Oct 27, 2020 | IDA-58450 | Loan Disb | 3,447,384.20 | 
| Nov 1, 2020 | IDA-58450 | Int Charges | 242,573.16 | 
| Nov 1, 2020 | IDA-58450 | Int Charges | 242,573.16 | 
| Nov 1, 2020 | IDA-58450 | Int Charges | 398,133.97 | 
| Aug 14, 2020 | IDA-58450 | Loan Disb | 234,826.00 | 
| Nov 1, 2020 | IDA-58450 | Int Charges | 11,345.29 | 
| Oct 7, 2020 | IDA-58450 | Loan Disb | 919,000.00 | 
| Oct 9, 2020 | IDA-58450 | Loan Disb | 1,500,000.00 | 
| Sep 21, 2020 | IDA-58450 | Loan Disb | 1,200,000.00 | 
| Dec 3, 2020 | IDA-58450 | Loan Disb | 174,341.05 | 
| Mar 15, 2021 | IDA-58450 | Loan Disb | 1,308,615.00 | 
| Jan 26, 2021 | IDA-58450 | Loan Disb | 451,978.80 | 
| Dec 8, 2020 | IDA-58450 | Loan Disb | 743,000.00 | 
| Feb 17, 2021 | IDA-58450 | Loan Disb | 280,857.06 | 
| Dec 17, 2020 | IDA-58450 | Loan Disb | 1,734,000.00 | 
| Jan 29, 2021 | IDA-58450 | Loan Disb | 1,276,769.00 | 
| Name | Review | Date | 
|---|---|---|
| Counterpart Funding | Moderately Satisfactory | 2025-02-10 | 
| Monitoring and Evaluation | Moderately Satisfactory | 2025-02-10 | 
| Overall Implementation Progress (IP) | Satisfactory | 2025-02-10 | 
| Progress towards achievement of PDO | Moderately Satisfactory | 2025-02-10 | 
| Procurement | Satisfactory | 2025-02-10 | 
| Project Management | Moderately Satisfactory | 2025-02-10 | 
| Financial Management | Moderately Satisfactory | 2025-02-10 | 
| Procurement | Satisfactory | 2025-02-10 | 
| Progress towards achievement of PDO | Satisfactory | 2025-02-10 | 
| Financial Management | Moderately Satisfactory | 2025-02-10 | 
| Monitoring and Evaluation | Moderately Satisfactory | 2025-02-10 | 
| Project Management | Moderately Satisfactory | 2025-02-10 | 
| Overall Safeguards Rating | Moderately Satisfactory | 2025-02-10 | 
| Overall Implementation Progress (IP) | Moderately Satisfactory | 2025-02-10 | 
| Counterpart Funding | Moderately Satisfactory | 2025-02-10 | 
| Monitoring and Evaluation | Moderately Satisfactory | 2025-02-10 | 
| Overall Implementation Progress (IP) | Satisfactory | 2025-02-10 | 
| Progress towards achievement of PDO | Moderately Satisfactory | 2025-02-10 | 
| Procurement | Satisfactory | 2025-02-10 | 
| Project Management | Moderately Satisfactory | 2025-02-10 | 
| Financial Management | Moderately Satisfactory | 2025-02-10 | 
| Procurement | Satisfactory | 2025-02-10 | 
| Progress towards achievement of PDO | Satisfactory | 2025-02-10 | 
| Financial Management | Moderately Satisfactory | 2025-02-10 | 
| Monitoring and Evaluation | Moderately Satisfactory | 2025-02-10 | 
| Project Management | Moderately Satisfactory | 2025-02-10 | 
| Overall Safeguards Rating | Moderately Satisfactory | 2025-02-10 | 
| Overall Implementation Progress (IP) | Moderately Satisfactory | 2025-02-10 | 
| INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: | 
|---|---|
| Outcomes | Satisfactory | 
| Risk to Development Outcome | |
| Bank Performance | Satisfactory | 
| Borrower Performance | |
| Government Performance | |
| Implementing Agency | 
| INDICATOR | BASELINE | CURRENT | TARGET | 
|---|
| PDO Indicator 1. Access to relevant data and information on key parameters from MONRE for informing climate resilient planning | Value | 0.00 | 1.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| PDO Indicator 3. Area with climate resilient land and water management practices supported by the project | Value | 0.00 | 172364.00 | 150000.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| PDO Indicator 2. Provincial and central stakeholders engagement informed the formulation of the Mekong Integrated Regional Master Plan | Value | 0.00 | 1889.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| PDO Indicator 4. Project supported farm households who have adopted climate resilient land and water management practices | Value | 0.00 | 85.00 | 50.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| PDO Indicator 5. Direct project beneficiaries, (of which female) | Value | 0.00 | 787885.00 | 900000.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Percent of female beneficiaries | Value | 0.00 | 49.00 | 0.00 | 
| Date | ||||
| Comment | 
| PDO Indicator 1. Access to relevant data and information on key parameters from MONRE for informing climate resilient planning | Value | 0.00 | 1.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| PDO Indicator 3. Area with climate resilient land and water management practices supported by the project | Value | 0.00 | 172364.00 | 150000.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| PDO Indicator 2. Provincial and central stakeholders engagement informed the formulation of the Mekong Integrated Regional Master Plan | Value | 0.00 | 1889.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| PDO Indicator 4. Project supported farm households who have adopted climate resilient land and water management practices | Value | 0.00 | 85.00 | 50.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| PDO Indicator 5. Direct project beneficiaries, (of which female) | Value | 0.00 | 787885.00 | 900000.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Percent of female beneficiaries | Value | 0.00 | 49.00 | 0.00 | 
| Date | ||||
| Comment | 
| INDICATOR | BASELINE | CURRENT | TARGET | 
|---|
| Intermediate Results Indicator 4.1. Coastal sluice gates constructed and operational through project support | Value | 0.00 | 9.00 | 6.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 1.1. Mekong Delta Center established | Value | No | No | |
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Intermediate Results Indicator 2.1. Project supported farm households in selected provinces transitioned to third rice crop alternatives | Value | 0.00 | 100.00 | 75.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 3.1. Farm households in selected provinces who have transitioned to climate resilient alternatives livelihoods supported by the project disaggregated by: | Value | 0.00 | 86.10 | 50.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 4.2. River bank and coast line protection supported by the project: | Value | 0.00 | 79.61 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Intermediate Results Indicator 1.2. Specialized studies supported by the project to facilitate climate resilient decision making | Value | 0.00 | 2.00 | 2.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 2.2. Flood retention areas with water management infrastructure supported by the project | Value | 0.00 | 18209.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Estuary Provinces | Value | 0.00 | 86.10 | 50.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 1.3. Monitoring stations established or upgraded through project support, and fully operational | Value | 0.00 | 67.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Intermediate Results Indicator 2.3. August dikes rehabilitated and operational supported by the project | Value | 0.00 | 107.20 | 45.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Peninsula Provinces | Value | 0.00 | 86.10 | 50.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Coastal line | Value | 0.00 | 28.99 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Intermediate Results Indicator 2.4. August dike sluice gates constructed and operational supported by the project | Value | 0.00 | 39.00 | 15.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 3.2. Brackish water aquaculture area in estuary provinces and peninsula provinces with sustainable and climate resilient infrastructure supported by the project | Value | 0.00 | 60190.00 | 60000.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| River bank | Value | 0.00 | 50.62 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Estuary Provinces | Value | 0.00 | 5033.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Peninsula Provinces | Value | 0.00 | 55157.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Intermediate Results Indicator 4.3. Operational manuals for systems completed and adopted | Value | 0.00 | 1.00 | 1.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 3.3. River bank and coast line protection supported by the project | Value | 0.00 | 58.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Coastal line | Value | 0.00 | 22.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| River bank | Value | 0.00 | 36.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Intermediate Results Indicator 3.4. River Bank and coastal sluicegates constructed and operational through project support | Value | 0.00 | 4.00 | 4.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 3.5. Operational manuals for systems completed and adopted | Value | 0.00 | 1.00 | 1.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 4.1. Coastal sluice gates constructed and operational through project support | Value | 0.00 | 9.00 | 6.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 1.1. Mekong Delta Center established | Value | No | No | |
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Intermediate Results Indicator 2.1. Project supported farm households in selected provinces transitioned to third rice crop alternatives | Value | 0.00 | 100.00 | 75.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 3.1. Farm households in selected provinces who have transitioned to climate resilient alternatives livelihoods supported by the project disaggregated by: | Value | 0.00 | 86.10 | 50.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 4.2. River bank and coast line protection supported by the project: | Value | 0.00 | 79.61 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Intermediate Results Indicator 1.2. Specialized studies supported by the project to facilitate climate resilient decision making | Value | 0.00 | 2.00 | 2.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 2.2. Flood retention areas with water management infrastructure supported by the project | Value | 0.00 | 18209.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Estuary Provinces | Value | 0.00 | 86.10 | 50.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 1.3. Monitoring stations established or upgraded through project support, and fully operational | Value | 0.00 | 67.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Intermediate Results Indicator 2.3. August dikes rehabilitated and operational supported by the project | Value | 0.00 | 107.20 | 45.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Peninsula Provinces | Value | 0.00 | 86.10 | 50.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Coastal line | Value | 0.00 | 28.99 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Intermediate Results Indicator 2.4. August dike sluice gates constructed and operational supported by the project | Value | 0.00 | 39.00 | 15.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 3.2. Brackish water aquaculture area in estuary provinces and peninsula provinces with sustainable and climate resilient infrastructure supported by the project | Value | 0.00 | 60190.00 | 60000.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| River bank | Value | 0.00 | 50.62 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Estuary Provinces | Value | 0.00 | 5033.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Peninsula Provinces | Value | 0.00 | 55157.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Intermediate Results Indicator 4.3. Operational manuals for systems completed and adopted | Value | 0.00 | 1.00 | 1.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 3.3. River bank and coast line protection supported by the project | Value | 0.00 | 58.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Coastal line | Value | 0.00 | 22.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| River bank | Value | 0.00 | 36.00 | 0.00 | 
| Date | March 1, 2016 | September 29, 2023 | ||
| Comment | 
| Intermediate Results Indicator 3.4. River Bank and coastal sluicegates constructed and operational through project support | Value | 0.00 | 4.00 | 4.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment | 
| Intermediate Results Indicator 3.5. Operational manuals for systems completed and adopted | Value | 0.00 | 1.00 | 1.00 | 
| Date | March 1, 2016 | September 29, 2023 | December 31, 2021 | |
| Comment |