Resumo*

The objective of the Enhancing Waterway Connectivity and Water Service Provision in Pazcifico Project for Colombia is to improve: (a) waterway transport; and (b) coverage and quality of water supply and sanitation services, in the Participating Municipalities. There are four components to the project, the first component being improving waterway transport in participating municipalities. This component includes two subcomponents: improving waterway...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

The Project Development Objective (PDO) is to (i) improve waterway transport; (ii) improve coverage of water supply services and (iii) improve readiness for the future improvement of basic sanitation services, in the Participating Municipalities.

Chave Detalhes

Projeto Detalhes

  • P156880

  • Active

  • Linda Ivarsson Molina , Veronique Verdeil

  • FTSP, represented by its Fiduciary Agent and Trustee FIDUCIARIA LA PREVISORA, S.A. (FIDUPREVISORA)

  • Colômbia

  • 4 de outubro de 2017

  • (conforme apresentação da Diretoria Executiva)

    14 de dezembro de 2017

  • 8 de novembro de 2019

  • US$ 41.90 milhões

  • Ministry of Equality and Equity (Ministerio de Igualdad y Equidad - MIE)

  • América Latina e Caribe

  • 2018

  • US$ 41.90 milhões

  • B

  • 15 de dezembro de 2023

  • 15 de outubro de 2025

  • Yes

  • BANK APPROVED

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
International Bank for Reconstruction and Development 41.90

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD 41.90
Compromissos da AID N/A
Compromisso do BIRD + AID 41.90
Instrumento de empréstimo
Montante do subsídio N/A
Custo total do projeto** 41.90

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 31 de março de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 31 de março de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Progress towards achievement of PDO Unsatisfactory 2025-01-08
Procurement Moderately Unsatisfactory 2025-01-08
Project Management Unsatisfactory 2025-01-08
Financial Management Moderately Satisfactory 2025-01-08
Monitoring and Evaluation Moderately Satisfactory 2025-01-08
Overall Implementation Progress (IP) Unsatisfactory 2025-01-08

CLASSIFICAÇÕES DAS CONCLUSÕES

Não há dados disponíveis

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

Não há dados disponíveis

Estrutura de Resultados

INDICADORES DO OBJETIVO DE DESENVOLVIMENTO DO PROJETO

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • People provided with access to improved water sourcesValor0.000.0013078.00
    Data19 de outubro de 201727 de novembro de 202315 de outubro de 2025
    Comentário
  • Female beneficiariesValor0.000.0050.00
    Data19 de outubro de 201715 de dezembro de 2023
    Comentário
  • Direct project beneficiaries with access to docks that incorporate universal accessibility standards, safe operation and resilient infrastructureValor0.000.0092000.00
    Data15 de dezembro de 202315 de dezembro de 202315 de outubro de 2025
    Comentário
  • People in urban areas provided with access to “improved sanitation facilities” under the Project, of which women (% coverage)Valor0.000.007350.00
    Data19 de outubro de 201727 de novembro de 202315 de outubro de 2025
    Comentário
  • Satisfaction of the users using the docksValor0.000.0080.00
    Data15 de dezembro de 202327 de dezembro de 202315 de outubro de 2025
    Comentário
  • Female beneficiariesValor0.000.0050.00
    Data19 de outubro de 201715 de dezembro de 2023
    Comentário
  • Satisfaction of women using the passenger docksValor0.000.000.00
    Data
    Comentário
  • Satisfaction of the users using the cargo docksValor0.000.000.00
    Data
    Comentário
  • Change in the average cargo transfer times at the docks (%)Valor0.000.00-15.00
    Data15 de dezembro de 202315 de dezembro de 202315 de outubro de 2025
    Comentário

INDICADORES DE RESULTADOS INTERMEDIÁRIOS

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Number of beneficiary municipalities with docks built, of which include gender based violence prevention environmental design and the specific needs of the elders and people with disabilitiesValor0.000.005.00
    Data19 de outubro de 201727 de novembro de 202315 de dezembro de 2023
    Comentário
  • Number of waterway operators with license (formalization)Valor0.000.00240.00
    Data19 de outubro de 201727 de novembro de 202315 de dezembro de 2023
    Comentário
  • New piped household water connections that are resulting from Project interventionValor0.000.004117.00
    Data19 de outubro de 201727 de novembro de 202315 de outubro de 2025
    Comentário
  • Number of women waterway operators with license (formalization)Valor0.000.0036.00
    Data15 de dezembro de 202327 de novembro de 202315 de outubro de 2025
    Comentário
  • Feasibility/design studies for the Francisco Pizarro water system have been validated by MVCTValorNoNoYes
    Data20 de junho de 202327 de novembro de 202315 de outubro de 2025
    Comentário
  • Water supply continuity in project areas (hours per day)Valor2 hour per day2 hours per day22 hours per day
    Data19 de outubro de 201727 de novembro de 202315 de outubro de 2025
    Comentário
  • Indicative and informative signals implementedValor0.000.00100.00
    Data19 de outubro de 201727 de novembro de 202315 de dezembro de 2023
    Comentário
  • Number of transport operators trained (safety transport operation and docks management which incorporate a gender approach)Valor0.000.0080.00
    Data19 de outubro de 201718 de maio de 202315 de outubro de 2025
    Comentário
  • Level of non-revenue water in project areas (%)ValorNo Datano data< 30 %
    Data19 de outubro de 201727 de novembro de 202315 de outubro de 2025
    Comentário
  • Beneficiaries that attended meetings on the design construction and maintenance of the infrastructure (docks and WSS)Valor60.0080.0090.00
    Data7 de outubro de 202027 de novembro de 202315 de outubro de 2025
    Comentário
  • Share of complaints that were attended to in a timely manner according to the Grievance Redress MechanismValor0.000.00100.00
    Data15 de dezembro de 202327 de novembro de 202315 de outubro de 2025
    Comentário
  • New household sewer connections constructed under the ProjectValor0.000.00740.00
    Data19 de outubro de 201727 de novembro de 202315 de dezembro de 2023
    Comentário
  • Number of municipalities with administration, operation and maintenance models for the river docksValor0.001.005.00
    Data15 de dezembro de 202315 de agosto de 202315 de outubro de 2025
    Comentário
  • Feasibility/design studies for the sewerage systems of Timbiqui and Francisco Pizarro have been validated by MVCTValorNoNoYes
    Data20 de junho de 202327 de novembro de 202315 de outubro de 2025
    Comentário
  • WSS Institutional and Operational Management Model for Timbiqui developed and in implementation (Yes/No)ValorNoNoYes
    Data19 de outubro de 201727 de novembro de 202315 de outubro de 2025
    Comentário
  • Activities of the Gender-Based Violence Plan implemented in each municipalityValor0.0010.0080.00
    Data15 de dezembro de 202327 de novembro de 202315 de outubro de 2025
    Comentário
  • Percentage of women employed through the projectValor0.0028.0020.00
    Data19 de outubro de 201727 de novembro de 202315 de outubro de 2025
    Comentário