Urban Resilience and Solid Waste Management Project

Resumo*

The proposed project components are: 1) Flood risk mitigation infrastructure and services: i) urban drainage and associated roadworks; ii) nature-based solutions for erosion and landslide control; 2) Improvement of solid waste management infrastructure and services: i) strengthening solid waste management capacities in the District of Abidjan and two selected inter-communal groups of secondary cities and ii) Strengthening sector governance, institutional...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

The development objectives of the project are to reduce vulnerability to flooding in selected urban areas and improve solid waste management in targeted municipalities.

Chave Detalhes

Projeto Detalhes

  • P168308

  • Active

  • Vivien Deparday , Laurence Ahiba

  • Republic of Cote d'Ivoire

  • Costa do Marfim

  • 23 de maio de 2019

  • (conforme apresentação da Diretoria Executiva)

    12 de junho de 2020

  • 28 de outubro de 2020

  • US$ 315.00 milhões

  • Ministry of Sanitation

  • Western and Central Africa

  • 2020

  • US$ 315.00 milhões

  • N/A

  • 18 de março de 2024

  • 31 de outubro de 2026

  • Yes

  • BANK APPROVED

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
IDA Credit 315.00

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD N/A
Compromissos da AID 315.00
Compromisso do BIRD + AID 315.00
Instrumento de empréstimo
Montante do subsídio N/A
Custo total do projeto** 315.00

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 31 de março de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 31 de março de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Financial Management Satisfactory 2024-11-20
Progress towards achievement of PDO Moderately Unsatisfactory 2024-11-20
Project Management Moderately Unsatisfactory 2024-11-20
Monitoring and Evaluation Moderately Satisfactory 2024-11-20
Overall Implementation Progress (IP) Moderately Unsatisfactory 2024-11-20
Procurement Unsatisfactory 2024-11-20

CLASSIFICAÇÕES DAS CONCLUSÕES

Não há dados disponíveis

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

Não há dados disponíveis

Estrutura de Resultados

INDICADORES DO OBJETIVO DE DESENVOLVIMENTO DO PROJETO

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Number of residents protected against floodingValor0.00281422.00800000.00
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Number of people provided with access to improved solid waste services (number)Valor001350000
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Of which women (percentage)Valor0050%
    Data24 de janeiro de 202020 de outubro de 202230 de junho de 2026
    Comentário
  • Of which women (percentageValor0050%
    Data24 de janeiro de 202020 de outubro de 202230 de junho de 2026
    Comentário

INDICADORES DE RESULTADOS INTERMEDIÁRIOS

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Hectares of Green spaces and leisure areas created including NBS for erosion controlValor0.000.0015.00
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Number of signed delegation contract to the private sector in the waste management sector for the District of AbidjanValor0.000.001.00
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Number of additionnal secondary cities provided with Sanitation and Storm Water Master Plans through the projectValor0.000.005.00
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Number of people trained on solid waste management (number)Valor00TBD
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Operational Drainage Operation and Maintenance strategyValorNoNoYes
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Of which women (percentage)Valor0050%
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Number of studies supporting urban planning for municipalitiesValor1.000.005.00
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Number of women in small and medium enterprises completing the support program to enhance their chances to enter the SWM marketValor00TBD
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Number of people covered by an early warning system (number)Valor00TBD
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • A system monitoring the number of women economically active in the SWM sector is in placeValorNoNoYes
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Number of digital information systems for solid waste management created by the projectValor0.000.001.00
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Of which women (percentage)Valor0050%
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Percentage of designated Disaster Risk Reduction committees’ focal points who are womenValor0.000.0090.00
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Number of beneficiaries consulted during project implementationValor0.001066.00200.00
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Number of cities covered by a digital information system for urban planning created by the projectValor0.000.002.00
    Data24 de janeiro de 202011 de julho de 202315 de junho de 2026
    Comentário
  • Of which women (percentage)Valor06350%
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Grievances registered related to project that are actually addressedValor0.0093.50100.00
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Percentage of workers recruited under the project who signed a Code of ConductValor0.00100.00100.00
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Primary/secondary drainage network and associated roadworks rehabilitated/builtValor0.007.2075.00
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário
  • Number of Solid waste management infrastructure built and functionalValor0.000.007.00
    Data24 de janeiro de 202011 de julho de 202330 de junho de 2026
    Comentário