Ethiopia Flood Management Project

Resumo*

The project was originally approved as an Investment Project Financing (IPF) for an International Development Association (IDA) grant of US$300 million. At the request of the GoE, US$100 million are being cancelled from the project. The project development objective and development outcomes remain the same. The project will end as per the original scheduled end date of March 31, 2028.

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

The Project Development Objective (PDO) is to strengthen Ethiopia’s institutional capacity for disaster risk management, and flood risk management in selected basins.

Chave Detalhes

Projeto Detalhes

  • P176327

  • Active

  • Saurabh Dani , Dinkneh Tefera, Si Gou

  • Federal Democratic Republic of Ethiopia

  • Etiópia

  • 17 de junho de 2021

  • (conforme apresentação da Diretoria Executiva)

    13 de dezembro de 2022

  • 14 de abril de 2023

  • US$ 300.00 milhões

  • Ministry of Water and Energy,Ethiopian Meteorology Institute,Ethiopian Disaster Risk Management Commission

  • Eastern and Southern Africa

  • 2023

  • US$ 300.00 milhões

  • N/A

  • 8 de fevereiro de 2024

  • 31 de março de 2028

  • No

  • BANK APPROVED

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
IDA Grant 300.00

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD N/A
Compromissos da AID 300.00
Compromisso do BIRD + AID 300.00
Instrumento de empréstimo
Montante do subsídio N/A
Custo total do projeto** 300.00

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 31 de março de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 31 de março de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Financial Management Moderately Satisfactory 2025-03-18
Monitoring and Evaluation Moderately Satisfactory 2025-03-18
Overall Implementation Progress (IP) Moderately Satisfactory 2025-03-18
Procurement Moderately Satisfactory 2025-03-18
Project Management Moderately Satisfactory 2025-03-18
Progress towards achievement of PDO Satisfactory 2025-03-18

CLASSIFICAÇÕES DAS CONCLUSÕES

Não há dados disponíveis

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

Não há dados disponíveis

Estrutura de Resultados

INDICADORES DO OBJETIVO DE DESENVOLVIMENTO DO PROJETO

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • 1.1 Strengthened institutional and coordination capacity for disaster risk managementValor- DRM is neither mainstreamed into sectors, nor moNone- DRM is mainstreamed into selected sectoral instr
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • 1.2 People benefiting from reduced risks from floodsValor0.000.00635.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • 1.2.1 Of which womenValor0.000.000.00
    Data
    Comentário
  • 1.3 Land area benefiting from reduced risks from floodsValor0.000.00800.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • 1.4 People benefitting from impact-based flood early warningsValor0.000.00410.00
    Data31 de janeiro de 202217 de fevereiro de 202330 de novembro de 2027
    Comentário
  • 1.4.1 Of which womenValor0.000.000.00
    Data
    Comentário

INDICADORES DE RESULTADOS INTERMEDIÁRIOS

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • IR Indicator 4.1a Grievances raised by women stakeholders addressed within the time specified in the project operations manualValor0.000.000.00
    Data
    Comentário
  • IR Indicator 2.1.3 Beneficiaries of capacity building activities for flood risk managementValor0.000.00100.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • IR Indicator 1.3 Disaster risk awareness and communication strategy formulated, approved and disseminatedValorNoNoYes
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • IR Indicator 1.4 Revised Guideline for Gender Mainstreaming in DRM formulated, approved and disseminatedValorNoNoYes
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • IR Indicator 2.1.3a Female Beneficiaries of capacity building activities for flood risk managementValor0.000.003.00
    Data
    Comentário
  • IR Indicator 2.2.1 Priority basins with impact-based flood early warning system establishedValor0.000.003.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • IR Indicator 2.2.2 Increase in satisfaction of users on early warning and hydromet services developed or improved under the ProjectValor0.000.0015.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • IR Indicator 2.2.2a Increase in satisfaction of female users on early warning and hydromet services developed or improved under the ProjectValor0.000.000.00
    Data
    Comentário
  • IR Indicator 2.3.1 Sub-project sites where community-level flood preparedness activities are conductedValor0.000.009.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • IR Indicator 2.3.2 Flood hazard maps produced through community participationValor0.000.009.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2022
    Comentário
  • IR Indicator 2.4 Diagnostic and strategic studies completedValor0.000.0010.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • IR Indicator 2.5 Increase in beneficiaries who feel they are better prepared to respond to floodsValor0.000.0015.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • IR Indicator 2.5a Increase in female beneficiaries who feel they are better prepared to respond to floodsValor0.000.000.00
    Data
    Comentário
  • IR Indicator 2.1.1 Length of embankment improved or constructedValor0.000.00170.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • IR Indicator 1.1 Hazard / risk assessments to inform disaster risk reduction policies and investments for priority areas completedValor0.000.002.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • IR Indicator 4.1: Grievances raised by stakeholders addressed within the time specified in the project operations manualValor0.000.00100.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • IR Indicator 2.1.2 Retention facilities for flood attenuation improved or constructedValor0.000.005.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário
  • IR Indicator 1.2 Sectoral instruments and tools that incorporate DRM developed or updatedValor0.000.005.00
    Data31 de janeiro de 202220 de outubro de 202330 de novembro de 2027
    Comentário