Skip to Main Navigation

Tanzania Food Systems Resilience Program

Resumo*

The proposed PforR operation will support the Ministry of Agriculture (MoA) in the Mainland in delivering ASDP II and by expanding access to knowledge, services, inputs, and key infrastructure. The program's strategic focus will be on strengthening delivery systems which have been a bottleneck to enabling access to services. Transforming these systems will contribute to building the resilience and competitiveness of the agri-food sector and enhancing...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

To support food systems resilience by strengthening agricultural service delivery, the adoption of climate resilient technologies and fiscal performance in the agricultural sector.

Chave Detalhes

Projeto Detalhes

  • P179818

  • Active

  • Ernest Ruzindaza , Timothy Robertson

  • United Republic of Tanzania

  • Tanzânia

  • 7 de novembro de 2022

  • (conforme apresentação da Diretoria Executiva)

    31 de maio de 2023

  • 5 de setembro de 2023

  • US$ 200.00 milhões

  • Ministry of Agriculture, Irrigation, Natural Resources and Livestock,Ministry of Agriculture

  • Eastern and Southern Africa

  • 2023

  • US$ 300.00 milhões

  • N/A

  • 27 de junho de 2024

  • 31 de julho de 2028

  • No

  • BANK APPROVED

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
IDA Credit 300.00

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD N/A
Compromissos da AID 300.00
Compromisso do BIRD + AID 300.00
Instrumento de empréstimo
Montante do subsídio N/A
Custo total do projeto** 200.00

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 28 de fevereiro de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 28 de fevereiro de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Monitoring and Evaluation Moderately Satisfactory 2024-12-05
Overall Implementation Progress (IP) Moderately Satisfactory 2024-12-05
Progress towards achievement of PDO Satisfactory 2024-12-05

CLASSIFICAÇÕES DAS CONCLUSÕES

Não há dados disponíveis

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

Não há dados disponíveis

Estrutura de Resultados

INDICADORES DO OBJETIVO DE DESENVOLVIMENTO DO PROJETO

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Tanzania’s CAADP BR score on “Intra-African Trade in Agriculture Commodities and services”Valor4.213.268.50
    Data1 de junho de 202324 de abril de 20241 de junho de 2028
    Comentário
  • - Number of policy products adopted with project support related to agriculture, natural resource management, and food/nutrition securityValor0.000.005.00
    Data1 de setembro de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Area provided with new/improved irrigation or drainage servicesValor0.000.0037000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Of which female farmersValor0.000.00120000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Of which femaleValor0.000.0072000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Of which youthValor0.000.0036000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • # of farmers adopting resilience enhancing technologies and practicesValor0.000.00300000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Number of farmer beneficiaries reached with assets and services of which women, % - Youth, %Valor0.000.001800000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário

INDICADORES DE RESULTADOS INTERMEDIÁRIOS

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Number of ZARI Labs rehabilitated (soil, tissue culture and entomology etc)Valor0.000.003.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • TARI research strategic plan 2025-2030 approved, including mid-term expenditure frameworkValorNoNoYes
    Data1 de junho de 202324 de abril de 20241 de junho de 2028
    Comentário
  • # of performance-based OMM contracts signedValor0.000.0023.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • ASDP II M&E system in place and fully operationalValorNoNoYes
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • % change in budget outturn of MoA and its line agenciesValor60.0060.0080.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Ratio of TARI’s budget received to budget committed in its medium-term expenditure framework (in %)Valor30.0030.0075.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Area (ha) operated under performance-based OMM contracts/constitutionsValor0.000.0037000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • MoA budget documents and data are open, transparent and accessibleValorNoNoYes
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Number of additional professional staff with a post-graduate degree (Master's and PhD) at ZARIValor0.000.008.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • of which femaleValor0.000.004.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Curriculum for the training of extensionists on (i) CSA and (ii) E-agriculture solutions prepared and rolled outValor0.000.002.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • # of climate resilient crop varieties released (total since 2022)Valor0.000.0025.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Share of farmers satisfied (% women) with water accessibility as per agreed timesValor0.000.0080.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Number of climate resilience enhancing technologies developed and released in ZanzibarValor0.000.005.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Of which femaleValor0.000.0032.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Number of NIRC staff, district engineers and scheme level staff trained on the new Guidelines on Irrigation Design Innovations for Improved Water ProductivityValor0.000.00100.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • # of technologies developed, transferred to and absorbed by extension services since 2022Valor0.000.0050.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Seed certification system establishedValorNoNoYes
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Of which gender-sensitive technologiesValor0.000.0010.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Soil Map established and publishedValorNoNoYes
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Performance recording system for public irrigation schemes in place.ValorNoNoYes
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Number of warehouses leased by the private sector, operated by cooperatives and SOEs/NFRA in compliance with guidelines (for new management model)Valor0.000.0079.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Of which biofortified varieties (e.g., orange flesh sweet potato, beans)Valor0.000.005.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Number of extension staff trained by the project in climate smart practices and e-agric solutionsValor0.000.0029.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Total annual turnover of commodities stored in warehouses managed using new management modelValor0.000.0056000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Percentage of project-related grievances received that have been addressed and communicated within 30 daysValor0.000.0095.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Of which femaleValor0.000.0014.00
    Data24 de abril de 202424 de abril de 202431 de julho de 2028
    Comentário
  • Number of farmers reached with tailored soil management adviceValor0.000.0040000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • # of extension staff trained on climate smart practices and e-agric solutionsValor0.000.004000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Of which femalesValor0.000.001200.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Number of farmers that completed a farmer field school program supported by the projectValor0.00500.005000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • WomenValor0.000.002000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Total # of Farmer reached with e-extension servicesValor1500000.0050000.003000000.00
    Data30 de abril de 202624 de abril de 202431 de julho de 2028
    Comentário
  • YouthValor0.000.001000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Of which femaleValor10000.0010000.00600000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Share of farmers accessing e-agriculture platform that are satisfied with the advice received (%)Valor0.000.0070.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Area provided with new/improved irrigation or drainage servicesValor0.000.00800.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Number of women vegetable producing/marketing groups established or strengthenValor0.000.0030.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • of which femaleValor0.000.0040.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Increase in score of Women's Empowerment in Agriculture Index (WEAI)Valor0.000.0020.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • # of Farmer's Service Centers rehabilitated (incl. drying area)Valor0.000.004.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Amount of pre-basic seed distributed (in tons ) by TARIValor200.00200.00300.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • # of boreholes for irrigation rehabilitatedValor0.000.004.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Amount of certified seeds produced (in tons ) by ASAValor3000.006110.0020000.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • farm roads rehabilitated within irrigation schemes (in km)Valor0.000.0010.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Number of TOSCI authorized seed inspectorsValor90.0090.00187.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário
  • Of which femaleValor10.0010.0037.00
    Data17 de maio de 202324 de abril de 202431 de julho de 2028
    Comentário