Decentralized Community Driven Services Project

Abstract*

The objective of the Decentralized Community Driven Services Project (APL Phase I) for Benin is to improve access to decentralized basic social services and to mainstream the Community Driven Development (CDD) approach for such services. The project has three components. (1) Service delivery grants to local governments' component will strengthen the delivery of basic services at the decentralized level. Eligible expenditures will include investment...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

To improve access to decentralized basic social services and to mainstream the CDD approach for such services.

Key Details

Project Details

  • P117764

  • Closed

  • John Van Dyck

  • Republic of Benin

  • Benin

  • June 24, 2011

  • (as of board presentation)

    May 3, 2012

  • January 24, 2013

  • US$ 46.00 million

  • Secretariat for Decentralized Community Driven Services (SSDCC)

  • Western and Central Africa

  • 2012

  • US$ 46.00 million

  • B

  • Not Applicable

  • December 31, 2017

  • Yes

  • BANK APPROVED

  • January 17, 2024

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Credit 46.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 46.00
IBRD + IDA Commitment 46.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 46.00

Summary Status of World Bank Financing (US$ Millions) as of June 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of June 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
May 11, 2015 IDA-51110 Int Charges 3,461.16
May 11, 2015 IDA-51110 Int Charges 3,461.16
May 11, 2015 IDA-51110 Int Charges 140,525.16
May 11, 2015 IDA-51110 Int Charges 140,525.16
Aug 12, 2015 IDA-53800 Loan Disb 10,542,499.00
Oct 15, 2015 IDA-53800 Loan Disb 11,575,047.00
Nov 12, 2015 IDA-51110 Int Charges 5,815.00
Nov 12, 2015 IDA-51110 Int Charges 5,815.00
Nov 12, 2015 IDA-51110 Int Charges 149,256.16
Nov 12, 2015 IDA-51110 Int Charges 149,256.16
Nov 12, 2015 IDA-53800 Int Charges 70.68
Nov 12, 2015 IDA-53800 Int Charges 70.68
Nov 12, 2015 IDA-53800 Int Charges 22,787.31
Nov 12, 2015 IDA-53800 Int Charges 22,787.31
Oct 15, 2016 IDA-51110 Int Charges 1,561.36
Oct 15, 2016 IDA-51110 Int Charges 1,561.36
Oct 15, 2016 IDA-53800 Int Charges 89,718.06
Oct 15, 2016 IDA-53800 Int Charges 89,718.06
Oct 15, 2016 IDA-53800 Int Charges 909.23
Oct 15, 2016 IDA-53800 Int Charges 909.23
Oct 15, 2016 IDA-51110 Int Charges 151,138.45
Oct 15, 2016 IDA-51110 Int Charges 151,138.45
May 13, 2016 IDA-53800 Int Charges 593.14
May 13, 2016 IDA-53800 Int Charges 593.14
May 13, 2016 IDA-51110 Int Charges 4,023.90
May 13, 2016 IDA-51110 Int Charges 4,023.90
Oct 15, 2014 IDA-51110 Int Charges 412.23
Oct 15, 2014 IDA-51110 Int Charges 412.23
Nov 3, 2014 IDA-51110 Int Charges 117,459.73
Nov 3, 2014 IDA-51110 Int Charges 117,459.73
Jan 20, 2015 IDA-53800 Loan Disb 2,673,230.50
Oct 15, 2013 IDA-51110 Int Charges 19,373.69
Oct 15, 2013 IDA-51110 Int Charges 19,373.69
Sep 6, 2013 IDA-51110 Loan Disb 13,859,818.00
Oct 15, 2013 IDA-51110 Int Charges 785.89
Oct 15, 2013 IDA-51110 Int Charges 785.89
Apr 25, 2014 IDA-51110 Int Charges 11,422.19
Apr 25, 2014 IDA-51110 Int Charges 11,422.19
Apr 25, 2014 IDA-51110 Int Charges 75,367.35
Apr 25, 2014 IDA-51110 Int Charges 75,367.35
Jun 20, 2014 IDA-51110 Loan Disb 21,818,948.00
Feb 24, 2015 IDA-51110 Loan Disb 3,453,493.50
Mar 31, 2015 IDA-51110 Loan Disb 64,975.97
Apr 15, 2023 IDA-51110 Int Charges 148,852.56
Apr 15, 2023 IDA-51110 Int Charges 148,852.56
Apr 15, 2019 IDA-53800 Int Charges 1,409.63
Apr 15, 2019 IDA-51110 Int Charges 2,140.43
Apr 15, 2019 IDA-51110 Int Charges 2,140.43
Oct 15, 2019 IDA-53800 Int Charges 219.30
Oct 15, 2019 IDA-53800 Int Charges 219.30
Oct 15, 2019 IDA-53800 Int Charges 99,219.40
Oct 15, 2019 IDA-53800 Int Charges 99,219.40
Oct 15, 2019 IDA-51110 Int Charges 333.02
Oct 15, 2019 IDA-51110 Int Charges 333.02
Oct 15, 2019 IDA-51110 Int Charges 150,663.23
Oct 15, 2019 IDA-51110 Int Charges 150,663.23
Apr 16, 2020 IDA-53800 Int Charges 973.37
Apr 16, 2020 IDA-53800 Int Charges 973.37
Apr 16, 2020 IDA-53800 Int Charges 99,767.15
Apr 16, 2020 IDA-53800 Int Charges 99,767.15
Apr 16, 2020 IDA-51110 Int Charges 1,478.05
Apr 16, 2020 IDA-51110 Int Charges 1,478.05
Apr 16, 2020 IDA-51110 Int Charges 151,494.98
Apr 16, 2020 IDA-51110 Int Charges 151,494.98
Oct 15, 2020 IDA-51110 Int Charges 953.31
Oct 15, 2020 IDA-51110 Int Charges 953.31
Oct 15, 2020 IDA-51110 Int Charges 154,305.36
Oct 15, 2020 IDA-51110 Int Charges 154,305.36
Oct 15, 2020 IDA-53800 Int Charges 627.80
Oct 15, 2020 IDA-53800 Int Charges 627.80
Oct 15, 2020 IDA-53800 Int Charges 101,617.92
Oct 15, 2020 IDA-53800 Int Charges 101,617.92
Apr 17, 2018 IDA-51110 Int Charges 160,149.94
Apr 17, 2018 IDA-53800 Int Charges 606.31
Apr 17, 2018 IDA-53800 Int Charges 606.31
Apr 17, 2018 IDA-53800 Int Charges 105,631.27
Apr 17, 2018 IDA-53800 Int Charges 105,631.27
May 3, 2018 IDA-53800 Loan Cancel 10,480.30
Nov 8, 2023 IDA-51110 Int Charges 131,128.06
Apr 19, 2024 IDA-51110 Loan Repay 389,334.94
Apr 19, 2024 IDA-51110 Int Charges 86.87
Apr 19, 2024 IDA-51110 Int Charges 86.87
Apr 19, 2024 IDA-51110 Int Charges 140,209.84
Apr 19, 2024 IDA-51110 Int Charges 140,209.84
Apr 19, 2024 IDA-51110 Int Charges 9,262.18
Apr 19, 2024 IDA-53800 Int Charges 1,152.42
Apr 19, 2024 IDA-53800 Int Charges 1,152.42
Apr 19, 2024 IDA-53800 Loan Repay 256,396.95
Apr 19, 2024 IDA-53800 Int Charges 95,225.32
Apr 19, 2024 IDA-53800 Int Charges 95,225.32
Apr 19, 2024 IDA-51110 Int Charges 9,262.18
Apr 15, 2021 IDA-53800 Int Charges 944.18
Apr 15, 2021 IDA-53800 Int Charges 944.18
Apr 15, 2021 IDA-51110 Int Charges 1,433.71
Apr 15, 2021 IDA-51110 Int Charges 1,433.71
Apr 15, 2021 IDA-51110 Int Charges 157,690.90
Apr 15, 2021 IDA-51110 Int Charges 157,690.90
Apr 15, 2021 IDA-53800 Int Charges 103,847.46
Apr 15, 2021 IDA-53800 Int Charges 103,847.46
Oct 15, 2021 IDA-53800 Int Charges 102,605.70
Oct 15, 2021 IDA-53800 Int Charges 102,605.70
Oct 15, 2021 IDA-51110 Int Charges 869.89
Oct 15, 2021 IDA-51110 Int Charges 869.89
Oct 15, 2021 IDA-51110 Int Charges 155,805.28
Oct 15, 2021 IDA-51110 Int Charges 155,805.28
Oct 15, 2021 IDA-53800 Int Charges 572.87
Oct 15, 2021 IDA-53800 Int Charges 572.87
Apr 15, 2022 IDA-51110 Int Charges 880.62
Apr 15, 2022 IDA-51110 Int Charges 880.62
Apr 15, 2022 IDA-53800 Int Charges 97,537.98
Apr 15, 2022 IDA-53800 Int Charges 97,537.98
Apr 15, 2022 IDA-53800 Int Charges 579.93
Apr 15, 2022 IDA-53800 Int Charges 579.93
Apr 15, 2022 IDA-51110 Int Charges 148,110.02
Apr 15, 2022 IDA-51110 Int Charges 148,110.02
Oct 15, 2022 IDA-51110 Int Charges 134,807.90
Oct 15, 2022 IDA-51110 Int Charges 134,807.90
May 2, 2018 IDA-51110 Loan Cancel 942.09
Oct 15, 2018 IDA-51110 Int Charges 1,140.00
Oct 15, 2018 IDA-51110 Int Charges 1,140.00
Oct 15, 2018 IDA-51110 Int Charges 155,157.90
Oct 15, 2018 IDA-51110 Int Charges 155,157.90
Oct 15, 2018 IDA-53800 Int Charges 753.66
Oct 15, 2018 IDA-53800 Int Charges 753.66
Oct 15, 2018 IDA-53800 Int Charges 102,179.37
Oct 15, 2018 IDA-53800 Int Charges 102,179.37
Apr 23, 2019 IDA-53800 Int Charges 99,772.67
Apr 23, 2019 IDA-53800 Int Charges 99,772.67
Apr 23, 2019 IDA-51110 Int Charges 151,503.44
Apr 23, 2019 IDA-51110 Int Charges 151,503.44
Apr 15, 2019 IDA-53800 Int Charges 1,409.63
Aug 30, 2017 IDA-53800 Loan Disb 910,884.50
Oct 26, 2017 IDA-53800 Int Charges 96,757.37
Oct 26, 2017 IDA-53800 Int Charges 96,757.37
Dec 13, 2017 IDA-53800 Loan Disb 96,953.59
Apr 15, 2018 IDA-51110 Int Charges 437.21
Apr 15, 2018 IDA-51110 Int Charges 437.21
Apr 17, 2018 IDA-51110 Int Charges 160,149.94
May 13, 2016 IDA-51110 Int Charges 156,614.20
May 13, 2016 IDA-51110 Int Charges 156,614.20
May 13, 2016 IDA-53800 Int Charges 92,950.44
May 13, 2016 IDA-53800 Int Charges 92,950.44
Mar 20, 2017 IDA-53800 Loan Disb 157,219.70
Apr 26, 2017 IDA-51110 Int Charges 323.41
Apr 26, 2017 IDA-51110 Int Charges 323.41
Apr 26, 2017 IDA-51110 Int Charges 151,892.36
May 3, 2012 IDA-51110 Loan Commitment 46,000,000.00
Feb 27, 2014 IDA-53800 Loan Commitment 30,000,000.00
Oct 15, 2023 IDA-53800 Int Charges 1,844.60
Oct 26, 2023 IDA-51110 Loan Repay 377,268.25
Oct 26, 2023 IDA-51110 Int Charges 2,797.65
Oct 26, 2023 IDA-51110 Int Charges 2,797.65
Oct 15, 2023 IDA-51110 Loan Repay 10,240.43
Oct 15, 2023 IDA-53800 Int Charges 1,844.60
Nov 8, 2023 IDA-53800 Int Charges 93,229.84
Nov 8, 2023 IDA-53800 Int Charges 93,229.84
Nov 8, 2023 IDA-51110 Int Charges 131,128.06
Oct 15, 2022 IDA-53800 Int Charges 2,188.36
Oct 15, 2022 IDA-53800 Int Charges 2,188.36
Oct 15, 2022 IDA-51110 Int Charges 3,323.00
Oct 15, 2022 IDA-51110 Int Charges 3,323.00
Oct 15, 2022 IDA-51110 Loan Repay 377,835.60
Oct 15, 2022 IDA-53800 Int Charges 92,052.27
Oct 15, 2022 IDA-53800 Int Charges 92,052.27
Apr 15, 2023 IDA-53800 Int Charges 1,333.59
Apr 15, 2023 IDA-53800 Int Charges 1,333.59
Apr 15, 2023 IDA-53800 Int Charges 99,017.17
Apr 15, 2023 IDA-53800 Int Charges 99,017.17
Apr 15, 2023 IDA-51110 Int Charges 7,301.36
Apr 15, 2023 IDA-51110 Int Charges 7,301.36
Apr 15, 2023 IDA-51110 Loan Repay 400,949.72
Apr 26, 2017 IDA-51110 Int Charges 151,892.36
Apr 24, 2017 IDA-53800 Int Charges 191.91
Apr 24, 2017 IDA-53800 Int Charges 191.91
Apr 24, 2017 IDA-53800 Int Charges 90,223.97
Apr 24, 2017 IDA-53800 Int Charges 90,223.97
Jun 2, 2017 IDA-53800 Loan Disb 1,519,776.50
Oct 15, 2017 IDA-53800 Int Charges 1,371.42
Oct 15, 2017 IDA-53800 Int Charges 1,371.42
Oct 15, 2017 IDA-51110 Int Charges 2,959.84
Oct 15, 2017 IDA-51110 Int Charges 2,959.84
Oct 26, 2017 IDA-51110 Int Charges 153,668.84
Oct 26, 2017 IDA-51110 Int Charges 153,668.84
May 11, 2015 IDA-53800 Int Charges 4,610.57
May 11, 2015 IDA-53800 Int Charges 4,610.57

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Procurement Moderately Satisfactory 2017-10-31
Progress towards achievement of PDO Satisfactory 2017-10-31
Financial Management Satisfactory 2017-10-31
Monitoring and Evaluation Highly Satisfactory 2017-10-31
Overall Implementation Progress (IP) Satisfactory 2017-10-31
Project Management Satisfactory 2017-10-31

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 06-29-2018
OutcomesSubstantial
Risk to Development Outcome
Bank PerformanceSubstantial
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 12-10-2018PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingSatisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceSatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceNot RatedN/a
Implementing AgencyN/a
Icr QualitySubstantialN/a
M&e QualitySubstantialN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Direct project beneficiariesValue0.00270000.00389766.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Timeliness of FADeC transfers to communes (average number of days’ variation from the published transfer schedule)Value16.0015.005.00
    DateDecember 31, 2011June 30, 2017December 31, 2017
    Comment
  • Students enrolled in schools constructed/rehabilitated under the projectValue0.0058000.0064475.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Temporary employment created in labor intensive public works sub-projects (number of person-days)Value0.001296000.001515528.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Resources transferred through FADeC that are executed by communities for basic social infrastructure through delegation of responsibility from communesValue0.0015.0017.66
    DateDecember 31, 2011June 30, 2017December 31, 2017
    Comment
  • Number of people in rural areas provided with access to Improved Water Sources under the projectValue0.0050000.0092500.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Female beneficiariesValue0.0040.0049.30
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.Value0.001160.001367.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Percent of domestic revenues transferred by Government to communes through the FADeCValue3.303.404.62
    DateDecember 31, 2011June 30, 2017December 31, 2017
    Comment
  • Community subprojects for basic infrastructure completedValue0.001000.001245.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Communes having executed at least one multi-village subprojectValue0.0077.0077.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Communes with second generation Community Development Plans (PDCs) which were prepared in a participatory processValue79.0090.00100.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Health facilities constructed, renovated, and/or equipped (number)Value0.0050.0061.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Improved community water points constructed or rehabilitated under the projectValue0.00200.00370.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Proportion of total cost of public works subprojects allocated to wagesValue0.0070.0083.52
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Communities implementing safety nets programValue0.00120.00125.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Beneficiaries of Safety Nets programs (number)Value0.0012000.0012933.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Students enrolled in schools constructed/rehabiltated under the APL seriesValue0.0058000.0064475.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Public works schemes completed with satisfactory technical qualityValue0.0090.00100.00
    DateDecember 31, 2016December 31, 2017December 31, 2017
    Comment
  • Communities that have received Grassroots Management Training (refresher or full GMT)Value0.001000.001001.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Transfer payments made within 5 days of when they are due, according to the annual payment calendarValue0.0080.0094.68
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Beneficiiaries of Grassroots - Management TrainingValue0.00100000.00213758.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Percent of total cost of transferred competencies transferred by Government to communes through the FADeCValue0.000.000.00
    DateDecember 31, 2011June 30, 2017March 22, 2013
    Comment
  • Resources transferred through FADeC that are executed by communities for basic social infrastructure through delegation of responsibility from communiesValue0.0015.0017.66
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Proportion of total safety nets transfers received by households in the bottom two quintiles on the national consumption distributionValue0.0070.0099.60
    DateDecember 31, 2011June 30, 2017December 31, 2017
    Comment
  • Communes with up to date financial audits with published action plans to correct any revealed deficienciesValue0.0090.00100.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Communes with scalable decentralized safety net program in operationValue0.0012.0016.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Beneficiaries of Safety Nets programs - Female (number)Value0.006000.006803.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Beneficiaries of Safety Nets programs - Unconditional cash transfers (number)Value0.0012000.0012933.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment
  • Beneficiaries of Safety Nets programs - Cash-for-work, food-for-work and public works (number)Value0.0010800.0012063.00
    DateDecember 31, 2011December 31, 2017December 31, 2017
    Comment