The Songo Songo Gas Development and Power Generation Project aims at developing Tanzania's natural gas reserves, to produce least-cost power generation for domestic, and industrial use, in an environmentally sustainable manner. Components include: 1) developing the Songo Songo natural gas field, to supply gas to about 112MW at the Ubungo Power Plant - to be converted to gas firing under the project - and, to the Twiga cement plant. Works include construction...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The main development objective of the project is to develop Tanzania's natural gas reserves to produce least-cost power generation for domestic and industrial use in an environmentally sustainable and efficient manner. The project will promote private sector ownership and management of generation in the gas and power sectors. In addition, it will encourage increased access of the poor by developing financially sustainable rural energy schemes to presently unserved areas along the pipeline corridor.

Key Details

Project Details

  • P002797

  • Closed

  • Robert Schlotterer

  • N/A

  • Tanzania

  • October 31, 1994

  • (as of board presentation)

    October 9, 2001

  • November 27, 2001

  • US$ 290.37 million

  • A

  • Not Applicable

  • December 31, 2010

  • BANK APPROVED

  • January 15, 2013

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Foreign Private Commercial Sources (unidentified) 50.00
IDA Credit 227.37
EC: European Investment Bank 41.00
UK: Commonwealth Development Corporation 22.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 227.37
IBRD + IDA Commitment 227.37
Lending Instrument
Grant Amount 63.00
Total Project Cost** 340.37

Summary Status of World Bank Financing (US$ Millions) as of April 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of April 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Apr 15, 2019 IDA-35690 Int Charges 327,682.38
Apr 15, 2019 IDA-35690 Int Charges 43.24
Apr 15, 2019 IDA-35690 Int Charges 43.24
Oct 15, 2018 IDA-35690 Loan Repay 2,443.30
Oct 17, 2018 IDA-35690 Loan Repay 1,041,113.56
Oct 17, 2018 IDA-35690 Int Charges 325,210.53
Oct 17, 2018 IDA-35690 Int Charges 65.22
Oct 17, 2018 IDA-35690 Int Charges 65.22
Oct 17, 2018 IDA-35690 Int Charges 325,210.53
Oct 15, 2020 IDA-35690 Loan Repay 882.92
Oct 16, 2020 IDA-35690 Loan Repay 1,055,043.20
Oct 16, 2020 IDA-35690 Int Charges 323,044.00
Oct 16, 2020 IDA-35690 Int Charges 323,044.00
Apr 15, 2020 IDA-35690 Loan Repay 3,611.12
Apr 15, 2020 IDA-35690 Loan Repay 1,018,827.50
Apr 15, 2020 IDA-35690 Int Charges 318,234.06
Apr 15, 2020 IDA-35690 Int Charges 318,234.06
Oct 15, 2019 IDA-35690 Int Charges 3,863.70
Oct 15, 2019 IDA-35690 Int Charges 3,863.70
Oct 15, 2019 IDA-35690 Loan Repay 1,025,521.00
Oct 15, 2019 IDA-35690 Int Charges 323,039.10
Apr 22, 2022 IDA-35690 Int Charges 297,636.53
Apr 22, 2022 IDA-35690 Int Charges 297,636.53
Apr 22, 2022 IDA-35690 Loan Repay 2,020,613.50
Apr 15, 2022 IDA-35690 Loan Repay 14,574.98
Oct 15, 2021 IDA-35690 Loan Repay 2,102,165.80
Oct 15, 2021 IDA-35690 Int Charges 22.01
Oct 15, 2021 IDA-35690 Int Charges 22.01
Oct 15, 2021 IDA-35690 Int Charges 316,892.28
Oct 15, 2021 IDA-35690 Int Charges 316,892.28
Oct 15, 2021 IDA-35690 Loan Repay 10,449.59
Apr 16, 2021 IDA-35690 Int Charges 324,982.62
Apr 16, 2021 IDA-35690 Int Charges 324,982.62
Apr 16, 2021 IDA-35690 Int Charges 1,675.17
Apr 16, 2021 IDA-35690 Int Charges 1,675.17
Apr 16, 2021 IDA-35690 Loan Repay 1,069,901.60
Apr 16, 2021 IDA-35690 Int Charges 22.28
Apr 16, 2021 IDA-35690 Int Charges 22.28
Apr 15, 2023 IDA-35690 Loan Repay 75,041.14
Oct 9, 2001 IDA-35690 Loan Commitment 117,126,256.00
Oct 9, 2001 IDA-3569A Loan Commitment 65,873,748.00
Apr 15, 2024 IDA-35690 Loan Repay 38,578.80
Apr 16, 2024 IDA-35690 Int Charges 258,103.16
Apr 16, 2024 IDA-35690 Int Charges 258,103.16
Apr 16, 2024 IDA-35690 Loan Repay 1,927,984.20
Oct 15, 2023 IDA-35690 Int Charges 28,357.55
Oct 15, 2023 IDA-35690 Int Charges 28,357.55
Oct 15, 2023 IDA-35690 Loan Repay 1,960,051.10
Oct 15, 2023 IDA-35690 Int Charges 264,606.90
Oct 15, 2023 IDA-35690 Int Charges 264,606.90
Oct 23, 2013 IDA-35690 Int Charges 433.40
Oct 23, 2013 IDA-35690 Int Charges 433.40
Oct 23, 2013 IDA-35690 Loan Repay 1,139,491.10
Oct 15, 2013 IDA-35690 Loan Repay 16,069.46
Oct 23, 2013 IDA-35690 Int Charges 389,139.40
Oct 23, 2013 IDA-35690 Int Charges 389,139.40
Oct 17, 2014 IDA-35690 Int Charges 5,891.68
Oct 17, 2014 IDA-35690 Int Charges 5,891.68
Oct 17, 2014 IDA-35690 Loan Repay 1,118,075.50
Oct 17, 2014 IDA-35690 Int Charges 23.30
Oct 17, 2014 IDA-35690 Int Charges 23.30
Oct 17, 2014 IDA-35690 Int Charges 394,121.62
Oct 17, 2014 IDA-35690 Int Charges 394,121.62
Apr 15, 2015 IDA-35690 Loan Repay 35,130.22
Apr 16, 2014 IDA-35690 Int Charges 27,010.09
Apr 16, 2014 IDA-35690 Int Charges 27,010.09
Apr 16, 2014 IDA-35690 Loan Repay 1,159,665.50
Apr 16, 2014 IDA-35690 Int Charges 190.55
Apr 16, 2014 IDA-35690 Int Charges 190.55
Apr 16, 2014 IDA-35690 Int Charges 407,020.00
Apr 16, 2014 IDA-35690 Int Charges 407,020.00
Apr 15, 2016 IDA-35690 Loan Repay 2,795.11
Oct 23, 2015 IDA-35690 Int Charges 361,463.00
Oct 23, 2015 IDA-35690 Int Charges 361,463.00
Oct 23, 2015 IDA-35690 Loan Repay 1,010,509.70
Oct 23, 2015 IDA-35690 Int Charges 126.48
Oct 23, 2015 IDA-35690 Int Charges 126.48
Apr 21, 2015 IDA-35690 Int Charges 359,628.22
Apr 21, 2015 IDA-35690 Int Charges 359,628.22
Apr 15, 2023 IDA-35690 Loan Repay 1,951,850.40
Apr 15, 2023 IDA-35690 Int Charges 251,906.60
Apr 15, 2023 IDA-35690 Int Charges 251,906.60
Oct 15, 2022 IDA-35690 Loan Repay 1,840,219.40
Oct 15, 2022 IDA-35690 Int Charges 276.57
Oct 15, 2022 IDA-35690 Int Charges 276.57
Oct 15, 2022 IDA-35690 Loan Repay 69,825.04
Oct 15, 2022 IDA-35690 Int Charges 272,181.34
Oct 15, 2022 IDA-35690 Int Charges 272,181.34
Apr 21, 2015 IDA-35690 Loan Repay 995,915.94
Apr 21, 2015 IDA-35690 Int Charges 42.96
Apr 21, 2015 IDA-35690 Int Charges 42.96
Oct 15, 2015 IDA-35690 Loan Repay 37,674.62
Oct 24, 2017 IDA-35690 Int Charges 8,979.76
Oct 24, 2017 IDA-35690 Int Charges 8,979.76
Oct 24, 2017 IDA-35690 Loan Repay 1,053,801.40
Oct 24, 2017 IDA-35690 Int Charges 346,582.78
Oct 24, 2017 IDA-35690 Int Charges 346,582.78
Apr 15, 2017 IDA-35690 Loan Repay 999,362.56
Apr 15, 2017 IDA-35690 Int Charges 330,574.90
Apr 15, 2017 IDA-35690 Int Charges 330,574.90
Apr 15, 2017 IDA-35690 Loan Repay 17,075.82
Oct 15, 2016 IDA-35690 Int Charges 348,110.62
Oct 15, 2016 IDA-35690 Loan Repay 1,031,438.94
Oct 15, 2016 IDA-35690 Int Charges 428.62
Oct 15, 2016 IDA-35690 Int Charges 428.62
Oct 15, 2016 IDA-35690 Int Charges 348,110.62
Oct 15, 2016 IDA-35690 Int Charges 10,536.45
Oct 15, 2016 IDA-35690 Int Charges 10,536.45
May 5, 2016 IDA-35690 Int Charges 170.36
May 5, 2016 IDA-35690 Int Charges 170.36
May 5, 2016 IDA-35690 Int Charges 350,850.90
May 5, 2016 IDA-35690 Int Charges 350,850.90
May 5, 2016 IDA-35690 Loan Repay 1,057,044.40
Apr 18, 2018 IDA-35690 Int Charges 204.27
Apr 18, 2018 IDA-35690 Int Charges 204.27
Apr 18, 2018 IDA-35690 Int Charges 1,211.27
Apr 18, 2018 IDA-35690 Int Charges 1,211.27
Apr 18, 2018 IDA-35690 Loan Repay 1,089,413.60
Apr 18, 2018 IDA-35690 Int Charges 355,421.22
Apr 18, 2018 IDA-35690 Int Charges 355,421.22
Oct 15, 2019 IDA-35690 Int Charges 323,039.10
Apr 15, 2019 IDA-35690 Int Charges 11,299.76
Apr 15, 2019 IDA-35690 Int Charges 11,299.76
Apr 15, 2019 IDA-35690 Loan Repay 1,040,319.56
Apr 15, 2019 IDA-35690 Int Charges 327,682.38

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Satisfactory 2011-03-16
Counterpart Funding Moderately Satisfactory 2011-03-16
Project Management Satisfactory 2011-03-16
Financial Management Satisfactory 2011-03-16
Monitoring and Evaluation Satisfactory 2011-03-16
Procurement Satisfactory 2011-03-16
Overall Implementation Progress (IP) Satisfactory 2011-03-16

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 09-29-2011
OutcomesSubstantial
Risk to Development OutcomeNegligible
Bank PerformanceModerately Satisfactory
Borrower PerformanceModerately Satisfactory
Government PerformanceModerately Satisfactory
Implementing AgencyModerately Satisfactory

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 09-24-2012PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeNegligible To LowN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceModerately UnsatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualitySatisfactoryN/a
M&e QualitySubstantialN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Weighted average energy cost for power generated in Ubungo for domestic and industrial use (US$/kWh)ValueUS$0.13/kWhUEP Capacity charges have been significantly reduc- UEP capacity charges significantly reduced - IP
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentAchieved. Original Targets Achieved and exceeded with a current average cost value of US$ 0.064/kWh which is way below theoriginally targeted US$ 0.092 /kWh.Original Targets Achieved and exceeded with a current average cost value of US$ 0.064/kWh which is way below the originallytargeted US$ 0.092 /kWh.
  • Volume of domestic gas consumption for electricity & production (Mmcf/d)ValueNIL75 Total(Electricity 65&Production 20)30
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentTargets achieved since 2007 and currently exceeded as actual processing volume is 80mcf/dTargets achieved since 2007 and currentlyexceeded as actual processing volume is 85mcf/dTargets achieved since 2007 and currently exceeded as actual processing volume is 80mcf/dTargets achieved since 2007 and currentlyexceeded as actual processing volume is 85mcf/d
  • New Private Entities invest capital and own and operate project in the gas and power sectorsValueLimited contractual engagement with Private SectorNew Private Entities have invested capital and ownNew Private Entities invested capital and own and
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentSongas 2002, expanded in 2004. Songas and PanAfrican JV with TPDC have further expansion plans. Other private operators includeIPTL and various Small Power Producers. Next power projects are expected to be on a PPP basis.Target achieved since 2007.
  • Percentage of electrification in unserved areas along the corridor of the gas pipeline.ValueNILResettlement infrastructure component (RIDS) ComplResettlement infrastructure component (RIDS) and
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentOverall Achieved: Target of 100% completion for Resettlement Infrastructure Development Scheme achieved in 2008. Wayleavesinfrastructure about 99% completed to date. Awaiting completion of 1 km of Transmission line stringing.Target for RIDS achieved and Target for Wayleaves will be achieved by Closing Date.

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Gas processing plant and ancillary infrastructure constructedValue0Gas plant and infrastructure completedGas plant and infrastructure completed
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentTarget achieved since Nov 2007. Gas Plant and infrastructure completed and operational.Target achieved since 2007
  • Pipeline from Songo Songo Island to Dar es Salaam constructed (km)Value0232 km landline and 25 km undersea pipeline constr207 km landline and 25 km undersea pipeline constr
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentTarget achieved in 2005Target achieved since 2005
  • Volume of gas production for power generation (mmcf/day) in Songas facility.Value06530
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentTarget of 30mmcf/d achieved in 2006. Target currently exceeded.Target achieved in 2006
  • No#s of gas turbines rehabilitated and converted to gas firingValue044
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentTarget achieved in 2007.Target achieved in 2007.
  • Generation capacity, additional Bank (MW)Value07.57.5
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentSomanga Power station was commissioned in August 2010. At Comissioning, all three units were running for a short period. Howeverhowever a repair on alternator genset 2 has to be done next year, due to damage after commissioning. Target is overall achieved,although plant is currently not fully operational.Target achieved since Aug 2010.
  • Electricity transmission lines, additional Bank (km)Value0315.6254.37
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentTarget Achieved in 2009 and exceeded. The various indicators in the RF of the PAD have been accumulated to one number measuredhere. This number can be broken down as follows:-Gas based Total: 280km-Grid extension Total: 30.6km- SS Island Total: 5kmThe various indicators in the RF of the PAD have been accumulated to one number measured here. This Target number can be brokendown as follows:-Gas based Total: 220km-Grid extension Total: 29.37km- SS Island Total: 5km
  • Households with electricity, additional Bank (number)Value0710897
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentBy December 16, 2010, TANESCO has connected 710 Households which comprises:- 113 HH on Songo Songo Island- 300 HH on the GridExtension part; and- 297 HH on the Wayleaves.Therefore Target is closed to being achieved.This Indicator was further reviewed in the light of the recent discussions on energy core indicators. In the review it wasclarified that this indicator as currently worded refers to Households. One household is equivalent to one TANESCO Customerconnection. However the current Results framework of the Project has several indicators, partially referring to Customers (i.e. =Households) but also to "Consumer" which are individuals within a Household. Thus within this ISR this indicator target value washarmonized in line with the Indicators wording referring to Households. Consequently the Target value was updated as follows:- RFrefers to 2.759 new consumers, which represents 484 Households in TZ (on average a HH counts 5.7 persons).- RF also refers toadditional 300 new customers (HH Connections) on Grid Extension part, and- 113 new Customers (HH Connections) on Songo SogoIsland.Thus the new and harmonizedHousehold target value should be 897 Households.
  • Water points built, Bank (number)Value08888
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentTarget achieved since Nov 2007.Target Achieved since 2007.
  • Water piping rehabilitated, Bank (km)Value033
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentTarget achieved since Nov 2007Target achieved since 2007
  • Improved water supply, Bank (number of additional people)Value040004000
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentTarget achieved since Nov 2007Target achieved since 2007
  • Roads constructed, Bank (km)Value012.812.8
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentTarget achieved since Nov 2007. This relates to the roads on the RIDS.Target achieved since 2007
  • Telecommunication lines, additional Bank (km)Value01.21.2
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentTarget achieved since Nov 2007. This has been part of the RIDS.Target achieved since 2007.
  • Wellhead SS#6 closed and decommissionedValueNot doneWellhead # 6 Closed and DecommissionedClosing and Decommissioning of Wellhead # 6 comple
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentWellhead was closed and thereby target Achieved since April 2008.Target achieved since 2008.
  • Power System Master PlanValueConcept in 2004CompletedPower System Master Plan completed
    DateNovember 27, 2001May 31, 2010December 31, 2010
    CommentPSMP Final report was delivered and approved by GoT in September 2008Target achieved since 2008
  • Technical Studies for improving operational efficiencies of TANESCOValueNew activity 2007Studies close to completionStudies completed
    DateDecember 21, 2007December 16, 2010December 31, 2010
    CommentAll draft final deliverables submitted to Bank for No Objection and few No Objections outstandingMost studies completed and all studies will be completed by closing date.
  • Financial and Tariff Advisory to TANESCOValueNew activity 2007Advisory support providedAdvisory support provided
    DateDecember 21, 2007December 16, 2010December 31, 2010
    CommentTariff application submitted on May 28, 2010. Follow up work completed. Target Achieved.Target achieved in December 2010
  • Advisory support to TANESCO for preparation of public/private G, T & D projects; Bidding documents for next Gas IPPValueNew activity 2007Advisory support providedAdvisory support provided
    DateNovember 27, 2001December 16, 2010December 31, 2010
    Commentdraft Final Report submitted to Bank for No Objection.Target will be achieved by Closing date.
  • Feasibility study for LPG extractValueNew activity 2007Feasibility study completedFeasibility study completed
    DateDecember 21, 2007December 16, 2010December 31, 2010
    CommentTarget AchievedTarget achieved since 2009
  • TPDC PSA database developedValueNew activity 2007Database for PSAs functionalDatabase for PSAs functional
    DateDecember 21, 2007December 16, 2010December 31, 2010
    CommentTarget AchievedTarget achieved since 2009
  • Amount of capacity charges to TANESCO for buying electricity from SongasValueNew activity 2007US$ 15 millionUS$ 11million
    DateNovember 27, 2001December 16, 2010December 31, 2010
    CommentTarget Achieved and exceeded.Reduction of capacity charges as reflection of amt and timing of payment to Songas per Provision 5.5(r) of the Songas PPA ($11mreduction in yr 1 expected based on $43 m payment made on 01/01/08)