Abstract*

The Xiaolangdi Multipurpose Project will (a) introduce flood control in the lower reaches of the Yellow River Basin to protect major infrastructure and 103 million people; (b) control siltation in the 800 km downstream channel of the river and prevent further aggradation so that levee heights need not be raised further during a period of 20 years; (c) provide water for assured irrigation for 2 million hectares and more stable water supplies for downstream...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

MAJOR WATER CONTROL PROJECT (XIAOLANGDI DAM) ON YELLOW RIVER TOCONTROL FLOODING, FLUSH SEDIMENT, IRRIGATE ONE MILLION HA, GENERATEPOWER AT 1550 MW CAPACITY, AND PROVIDE DRINKING & INDUSTRIAL WATERTHROUGHOUT NORTH CHINA PLAIN.

Key Details

Project Details

  • P003562

  • Closed

  • Daniel Gunaratnam

  • N/A

  • China

  • October 31, 1994

  • (as of board presentation)

    April 14, 1994

  • September 22, 1994

  • US$ 460.00 million

  • A

  • Not Applicable

  • December 31, 2000

  • BANK APPROVED

  • January 15, 2013

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 460.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 460.00
IDA Commitment N/A
IBRD + IDA Commitment 460.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 2248.40

Summary Status of World Bank Financing (US$ Millions) as of July 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of July 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Apr 14, 1994 IBRD-37270 Loan Commitment 460,000,000.00
Jul 1, 2014 IBRD-37270 Int Charges 637,871.20
Jul 1, 2014 IBRD-37270 Int Charges 77,202.33
Jul 1, 2014 IBRD-37270 Loan Repay 18,630,480.00
Jan 1, 2015 IBRD-37270 Int Charges 7,825.53
Jan 1, 2015 IBRD-37270 Loan Repay 203,885.62
Jul 1, 2013 IBRD-37270 Int Charges 152,503.69
Jul 1, 2013 IBRD-37270 Loan Repay 986,629.44
Jul 1, 2013 IBRD-37270 Int Charges 2,003,876.00
Jul 1, 2013 IBRD-37270 Loan Repay 18,583,792.00
Jan 1, 2014 IBRD-37270 Int Charges 3,833.36
Jan 1, 2014 IBRD-37270 Loan Repay 35,550.17
Jan 1, 2014 IBRD-37270 Int Charges 1,511,536.90
Jan 1, 2014 IBRD-37270 Loan Repay 18,615,360.00

Footnotes

Ratings

IMPLEMENTATION RATINGS

No data available.

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 08-20-2001PROJECT PERFORMANCE ASSESSMENT REPORT: 10-04-2007
Outcome RatingHighly Satisfactory Highly Satisfactory
Risk To Development OutcomeNot RatedSignificant
Bank PerformanceHighly SatisfactoryHighly Satisfactory
Borrower PerformanceHighly SatisfactoryHighly Satisfactory
Government PerformanceSatisfactorySatisfactory
Implementing AgencyHighly SatisfactoryNot Rated
Icr QualityExemplaryNot Rated
M&e QualityNot RatedModest

Results Framework

No data available.