SURALAYA THERMAL POWER

Abstract*

The project includes: (1) the construction of three coal-fired units each at Suralaya, including associated works and a transmission line from Cilegon to Cibinong, with associated substations; (2) consulting services for engineering, design and construction supervision of the units; (3) a feasibility study for a high voltage submarine cable link between Java and Sumatra; (4) engineering and design of a thermal power plant at Banjarmasin in South Kalimantan;...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

EXPANSION OF SURALAYA THERMAL POWER PROJECT BY THE ADDITION OF 3 X 600MW GENERATING UNITS TO MEET EXPECTED GROWTH IN DEMAND FOR ELECTRICPOWER IN JAVA.

Key Details

Project Details

  • P003916

  • Closed

  • Kurt F. Schenk

  • N/A

  • Indonesia

  • June 30, 1992

  • (as of board presentation)

    June 30, 1992

  • December 23, 1992

  • US$ 811.00 million

  • A

  • Not Applicable

  • September 30, 1999

  • BANK APPROVED

  • January 15, 2013

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 423.60
Asian Development Bank 350.00
GERMANY: Kreditanstalt Fur Wiederaufau - Exp. Cr 32.30
Export Credit (unidentified) 693.40
GERMANY: KREDITANSTALT FUR WIEDERAUFBAU (KFW) 37.40

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 423.60
IDA Commitment N/A
IBRD + IDA Commitment 423.60
Lending Instrument
Grant Amount 387.40
Total Project Cost** 323.60

Summary Status of World Bank Financing (US$ Millions) as of April 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of April 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jun 30, 1992 IBRD-3501A Loan Commitment 88,174,272.00
Jun 30, 1992 IBRD-35010 Loan Commitment 100,000,000.00
Jun 30, 1992 IBRD-3501S Loan Commitment 235,425,728.00

Footnotes

Ratings

IMPLEMENTATION RATINGS

No data available.

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 07-12-2000PROJECT PERFORMANCE ASSESSMENT REPORT: 05-21-2003
Outcome RatingModerately Unsatisfactory Moderately Satisfactory
Risk To Development OutcomeNot RatedNot Rated
Bank PerformanceSatisfactorySatisfactory
Borrower PerformanceSatisfactorySatisfactory
Government PerformanceUnsatisfactorySatisfactory
Implementing AgencySatisfactoryNot Rated
Icr QualitySatisfactoryNot Rated
M&e QualityNot RatedNot Rated