Skip to Main Navigation

PORTO COLOMBIA HYDRO

Abstract*

The Porto Colombia Hydroelectric Project consists of the construction on the Rio Grande River of the Porto Colombia hydroelectric station to be equipped with four 90-MW units. The unit cost for this 360-MW installation (excluding interest during construction) would be about US$175 per kw, which is considered to be low cost hydro. The generated energy would be delivered to the interconnected system over 345-kv and 138-kv transmission lines. This transmission...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Key Details

Project Details

  • P006237

  • Closed

  • N/A

  • Brazil

  • N/A

  • (as of board presentation)

    October 15, 1968

  • February 18, 1969

  • US$ 0.00 million

  • N/A

  • Not Applicable

  • N/A

  • BANK APPROVED

  • N/A

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment N/A
IBRD + IDA Commitment N/A
Lending Instrument
Grant Amount N/A
Total Project Cost** N/A

Summary Status of World Bank Financing (US$ Millions) as of July 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of July 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)

Footnotes

Ratings

IMPLEMENTATION RATINGS

No data available.

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 02-12-1979PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingSatisfactory N/a
Risk To Development OutcomeNot RatedN/a
Bank PerformanceNot RatedN/a
Borrower PerformanceNot RatedN/a
Government PerformanceNot RatedN/a
Implementing AgencyNot RatedN/a
Icr QualityNot RatedN/a
M&e QualityNot RatedN/a

Results Framework

No data available.