Water Management Improvement Project

Abstract*

The primary development objective of the Water Management Improvement Project of Bangladesh is to improve national water resources management by involving the local communities to play an expanded role in all stages of the participatory scheme cycle management. The secondary objective is to enhance institutional performance of the Country's principal water institutions, particularly Bangladesh Water Development Board (BWDB) and Water Resources Planning...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The Project Development Objective (PDO) is to improve water resources management by improving infrastructure and institutions through rehabilitating damaged water infrastructure, piloting the role of local communities and enhancing the institutional performance of the Country's principal water institutions, particularly BWDB and WARPO.

Key Details

Project Details

  • P040712

  • Closed

  • Tahira Syed

  • Economic Relations Division, Ministry of Finance

  • Bangladesh

  • September 21, 1998

  • (as of board presentation)

    September 18, 2007

  • November 26, 2007

  • US$ 123.26 million

  • Water Resources Planning Organization,Bangladesh Water Development Board (BWDB)

  • South Asia

  • 2008

  • US$ 122.26 million

  • B

  • Not Applicable

  • June 30, 2016

  • BANK APPROVED

  • October 11, 2022

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Borrower/Recipient 1.00
NETHERLANDS: Min. of Foreign Affairs / Min. of Dev. Coop. 20.00
IDA Credit 102.26

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 102.26
IBRD + IDA Commitment 102.26
Lending Instrument
Grant Amount 20.00
Total Project Cost** 123.26

Summary Status of World Bank Financing (US$ Millions) as of July 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of July 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jan 27, 2014 IDA-43590 Loan Disb 4,740.41
Apr 3, 2014 IDA-43590 Loan Disb 515,028.56
Apr 29, 2014 IDA-43590 Loan Disb 78,829.73
Mar 20, 2014 IDA-43590 Loan Disb 552,332.40
Dec 4, 2013 IDA-43590 Loan Disb 409,396.97
Nov 20, 2013 IDA-43590 Loan Disb 951.77
Feb 12, 2014 IDA-43590 Loan Disb 216,252.48
Jan 30, 2014 IDA-43590 Loan Disb 867,623.25
Feb 1, 2014 IDA-43590 Int Charges 3,950.47
Feb 1, 2014 IDA-43590 Int Charges 3,950.47
Feb 5, 2014 IDA-43590 Loan Disb 612,029.50
Sep 18, 2013 IDA-43590 Loan Disb 666,266.06
Feb 1, 2014 IDA-43590 Int Charges 197,860.84
Feb 1, 2014 IDA-43590 Int Charges 197,860.84
Sep 25, 2013 IDA-43590 Loan Disb 1,597,505.50
Feb 26, 2014 IDA-43590 Loan Disb 1,441,686.20
Dec 18, 2013 IDA-43590 Loan Disb 1,748,169.10
Mar 31, 2016 IDA-43590 Loan Disb -369,799.47
Nov 3, 2015 IDA-43590 Loan Disb 718,650.40
Nov 9, 2015 IDA-43590 Loan Disb 337,017.70
Sep 16, 2015 IDA-43590 Loan Disb 1,424,639.60
Feb 1, 2016 IDA-43590 Int Charges 1,547.71
Feb 1, 2016 IDA-43590 Int Charges 1,547.71
Feb 1, 2016 IDA-43590 Int Charges 299,901.44
Feb 1, 2016 IDA-43590 Int Charges 299,901.44
Dec 1, 2015 IDA-43590 Loan Disb 107,565.01
Jun 17, 2015 IDA-43590 Loan Disb 242,370.56
Aug 1, 2015 IDA-43590 Int Charges 280,142.72
Aug 1, 2015 IDA-43590 Int Charges 280,142.72
Aug 1, 2022 IDA-43590 Loan Repay 785,000.30
Feb 1, 2022 IDA-43590 Loan Repay 13,102.60
Feb 1, 2022 IDA-43590 Loan Repay 816,576.60
Feb 1, 2022 IDA-43590 Int Charges 286,239.88
Feb 1, 2022 IDA-43590 Int Charges 286,239.88
Aug 1, 2021 IDA-43590 Loan Repay 847,964.75
Aug 1, 2021 IDA-43590 Int Charges 2,013.84
Aug 1, 2021 IDA-43590 Int Charges 2,013.84
Aug 1, 2021 IDA-43590 Int Charges 293,714.38
Aug 1, 2021 IDA-43590 Int Charges 293,714.38
Aug 1, 2021 IDA-43590 Int Charges 7,636.36
Aug 1, 2021 IDA-43590 Int Charges 7,636.36
Feb 1, 2021 IDA-43590 Int Charges 293,214.50
Feb 1, 2021 IDA-43590 Int Charges 34,364.05
Sep 18, 2007 IDA-43590 Loan Commitment 102,260,000.00
Aug 1, 2024 IDA-43590 Int Charges 254,997.60
Feb 1, 2024 IDA-43590 Int Charges 7,813.76
Feb 1, 2024 IDA-43590 Int Charges 7,813.76
Feb 1, 2024 IDA-43590 Loan Repay 788,692.60
Feb 1, 2024 IDA-43590 Int Charges 260,269.08
Feb 1, 2024 IDA-43590 Int Charges 260,269.08
Aug 1, 2024 IDA-43590 Loan Repay 2,671.95
Aug 1, 2024 IDA-43590 Loan Repay 784,115.56
Aug 1, 2024 IDA-43590 Int Charges 254,997.60
Aug 1, 2023 IDA-43590 Int Charges 24,140.53
Aug 1, 2023 IDA-43590 Int Charges 24,140.53
Aug 1, 2023 IDA-43590 Loan Repay 795,108.25
Aug 1, 2023 IDA-43590 Int Charges 257,490.56
Aug 1, 2023 IDA-43590 Int Charges 257,490.56
Feb 1, 2023 IDA-43590 Loan Repay 782,714.30
Feb 1, 2023 IDA-43590 Loan Repay 19,414.99
Feb 1, 2023 IDA-43590 Int Charges 246,365.40
Feb 1, 2023 IDA-43590 Int Charges 246,365.40
May 27, 2015 IDA-43590 Loan Disb 950,373.20
Aug 1, 2015 IDA-43590 Int Charges 9,142.04
Aug 1, 2015 IDA-43590 Int Charges 9,142.04
Jul 21, 2015 IDA-43590 Loan Disb 122,518.37
May 7, 2015 IDA-43590 Loan Disb 1,028,128.10
Apr 6, 2015 IDA-43590 Loan Disb 1,076,059.00
Feb 1, 2015 IDA-43590 Int Charges 270,040.28
Feb 1, 2015 IDA-43590 Int Charges 270,040.28
Sep 23, 2014 IDA-43590 Loan Disb 182,848.06
Sep 23, 2014 IDA-43590 Loan Disb 561,885.06
Sep 23, 2014 IDA-43590 Loan Disb 593,842.30
Sep 9, 2014 IDA-43590 Loan Disb 395,672.25
Sep 10, 2014 IDA-43590 Loan Disb 2,566,666.20
Sep 10, 2014 IDA-43590 Loan Disb 77,491.28
Feb 1, 2015 IDA-43590 Int Charges 3,013.91
Feb 1, 2015 IDA-43590 Int Charges 3,013.91
Aug 1, 2014 IDA-43590 Int Charges 243,843.61
Aug 1, 2014 IDA-43590 Int Charges 243,843.61
Aug 1, 2017 IDA-43590 Int Charges 308,158.00
Aug 1, 2017 IDA-43590 Int Charges 2,021.84
Aug 1, 2017 IDA-43590 Int Charges 2,021.84
Aug 1, 2017 IDA-43590 Int Charges 308,158.00
Jun 16, 2016 IDA-43590 Loan Disb 98,964.03
Aug 18, 2016 IDA-43590 Loan Disb 70,784.78
Jun 22, 2016 IDA-43590 Loan Disb 376,251.28
Dec 29, 2016 IDA-43590 Loan Cancel 3,730,741.00
Aug 1, 2016 IDA-43590 Int Charges 1,004.29
Aug 1, 2016 IDA-43590 Int Charges 1,004.29
Jun 16, 2016 IDA-43590 Loan Disb 153,061.20
Aug 1, 2016 IDA-43590 Int Charges 309,314.38
Aug 1, 2016 IDA-43590 Int Charges 309,314.38
May 16, 2016 IDA-43590 Loan Disb 471,938.78
Dec 29, 2016 IDA-43590 Loan Disb -304,106.75
Feb 1, 2017 IDA-43590 Int Charges 765.63
Feb 1, 2017 IDA-43590 Int Charges 765.63
Feb 1, 2017 IDA-43590 Int Charges 301,559.22
Feb 1, 2017 IDA-43590 Int Charges 301,559.22
Apr 6, 2016 IDA-43590 Loan Disb 69,397.23
Apr 20, 2016 IDA-43590 Loan Disb 31,887.76
Feb 1, 2019 IDA-43590 Loan Repay 12,110.16
Feb 1, 2019 IDA-43590 Loan Repay 817,859.90
Feb 1, 2019 IDA-43590 Int Charges 292,661.94
Feb 1, 2019 IDA-43590 Int Charges 292,661.94
Aug 1, 2018 IDA-43590 Int Charges 309,151.44
Aug 1, 2018 IDA-43590 Int Charges 309,151.44
Aug 1, 2018 IDA-43590 Int Charges 29,157.91
Aug 1, 2018 IDA-43590 Int Charges 29,157.91
Aug 1, 2018 IDA-43590 Loan Repay 832,729.75
Feb 1, 2018 IDA-43590 Loan Repay 315,569.56
Feb 1, 2018 IDA-43590 Int Charges 6,266.73
Feb 1, 2018 IDA-43590 Int Charges 6,266.73
Feb 1, 2018 IDA-43590 Loan Repay 548,253.30
Feb 1, 2018 IDA-43590 Int Charges 293,687.47
Feb 1, 2018 IDA-43590 Int Charges 293,687.47
Feb 1, 2021 IDA-43590 Int Charges 34,364.05
Feb 1, 2021 IDA-43590 Loan Repay 853,620.75
Feb 1, 2021 IDA-43590 Int Charges 293,214.50
Aug 1, 2020 IDA-43590 Int Charges 265,007.25
Aug 1, 2020 IDA-43590 Int Charges 265,007.25
Aug 1, 2020 IDA-43590 Loan Repay 838,646.90
Aug 1, 2020 IDA-43590 Int Charges 3,354.73
Aug 1, 2020 IDA-43590 Int Charges 3,354.73
Feb 1, 2020 IDA-43590 Loan Repay 810,672.44
Feb 1, 2020 IDA-43590 Int Charges 290,927.10
Sep 5, 2013 IDA-43590 Loan Disb 1,676,106.00
Oct 23, 2013 IDA-43590 Loan Disb 694,957.40
Oct 23, 2013 IDA-43590 Loan Disb 121,984.03
Sep 12, 2013 IDA-43590 Loan Disb 686,064.00
Aug 1, 2013 IDA-43590 Int Charges 156,375.40
Aug 1, 2013 IDA-43590 Int Charges 156,375.40
Mar 4, 2014 IDA-43590 Loan Disb 2,462,151.50
Aug 29, 2013 IDA-43590 Loan Disb 95,789.43
Dec 17, 2014 IDA-43590 Loan Disb 124,809.56
Sep 5, 2013 IDA-43590 Loan Disb 190,413.28
Aug 1, 2013 IDA-43590 Int Charges 872.17
Aug 1, 2013 IDA-43590 Int Charges 872.17
Jul 2, 2013 IDA-43590 Loan Disb 1,610,992.40
Feb 25, 2015 IDA-43590 Loan Disb 872,084.25
Oct 8, 2014 IDA-43590 Loan Disb 821,413.06
Nov 5, 2014 IDA-43590 Loan Disb 766,934.25
Nov 5, 2014 IDA-43590 Loan Disb 79,872.76
Jan 6, 2015 IDA-43590 Loan Disb 1,376,558.10
Jan 6, 2015 IDA-43590 Loan Disb 793,183.44
Aug 1, 2014 IDA-43590 Int Charges 1,927.34
Aug 1, 2014 IDA-43590 Int Charges 1,927.34
Jul 27, 2014 IDA-43590 Loan Cancel 409,717.94
Mar 10, 2015 IDA-43590 Loan Disb 442,984.25
Aug 27, 2014 IDA-43590 Loan Disb 504,708.97
Jun 25, 2014 IDA-43590 Loan Disb 69,078.32
Jun 25, 2014 IDA-43590 Loan Disb 3,166.29
May 21, 2014 IDA-43590 Loan Disb 27,680.00
May 21, 2014 IDA-43590 Loan Disb 1,509,304.10
Jun 12, 2014 IDA-43590 Loan Disb 1,066,606.40
Jun 2, 2014 IDA-43590 Loan Disb 1,940,644.60
Jun 25, 2014 IDA-43590 Loan Disb 360,823.03
Jun 25, 2014 IDA-43590 Loan Disb 1,338,632.00
May 7, 2014 IDA-43590 Loan Disb 1,156,285.20
Apr 17, 2014 IDA-43590 Loan Disb 1,636,863.20
Apr 17, 2014 IDA-43590 Loan Disb 1,027,614.75
Feb 1, 2020 IDA-43590 Int Charges 290,927.10
Feb 1, 2020 IDA-43590 Loan Repay 6,537.48
Aug 1, 2019 IDA-43590 Loan Repay 812,865.56
Aug 1, 2019 IDA-43590 Int Charges 12,098.02
Aug 1, 2019 IDA-43590 Int Charges 12,098.02
Aug 1, 2019 IDA-43590 Int Charges 295,680.34
Aug 1, 2019 IDA-43590 Int Charges 295,680.34
Aug 1, 2022 IDA-43590 Loan Repay 1,229.30
Aug 1, 2022 IDA-43590 Int Charges 268,301.30
Aug 1, 2022 IDA-43590 Int Charges 268,301.30
Aug 1, 2022 IDA-43590 Loan Repay 0.01
Aug 1, 2022 IDA-43590 Int Charges -0.01
Aug 1, 2022 IDA-43590 Int Charges -0.01

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Satisfactory 2016-11-15
Procurement Satisfactory 2016-11-15
Monitoring and Evaluation Satisfactory 2016-11-15
Project Management Satisfactory 2016-11-15
Financial Management Satisfactory 2016-11-15
Overall Implementation Progress (IP) Satisfactory 2016-11-15
Counterpart Funding Satisfactory 2016-11-15

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 02-15-2017
OutcomesSubstantial
Risk to Development OutcomeSubstantial
Bank PerformanceModerately Satisfactory
Borrower PerformanceModerately Satisfactory
Government PerformanceModerately Satisfactory
Implementing AgencyModerately Satisfactory

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 06-23-2017PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingSatisfactory N/a
Risk To Development OutcomeSubstantialN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceModerately SatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualitySubstantialN/a
M&e QualitySubstantialN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • A reduction in the level of damage to property and assets that is to the satisfaction of the communities in 60% of completed project schemesValueBDT 79.9 Billion in total damage, 2007 BDT 4.9 Bmore than 60% of completed project schemes have acLess than baseline in 60% of completed project sch
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment
  • About 60% reduction in crop area damaged by floods/cyclones in 60% of project schemes starting 2014-15ValueTotal of 186,883 ha fully damaged and 498,645 ha pmore than 60% of completed project schemes have WM60% lesser than baseline in crop area in 60% of co
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment
  • About 60% of completed project schemes have WMOs functioning in accordance with their roles and responsibilities agreed upon in the management planValue22% of WMIP sample project schemes with WMOs785 WMOs formed in 100% of completed schemesWMOs in 60% of completed project schemes
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Updated NWRD database with enhanced data layers completed and disseminatedValueNWRD prepared in 2001 with 421 data layers and cur100% progress reported100% completion
    DateMarch 31, 2008April 28, 2016June 30, 2016
    Comment
  • WARPO’s institutional reform plan completed by June 2011 and approved by December 2011ValueNot applicableCompletedCompletion by December 2011
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment
  • Compliance to participatory monitoring system in 100% of completed project schemesValueWMO compliance to participatory monitoring system100% of WMOs in completed project schemes80% of WMOs in completed project schemes
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment
  • Successful completion of rehabilitation and improvement in 100% of targetValueNA100% of targeted works100% of targeted project schemes completed
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment
  • Signed agreement between BWDB and WMOs completed in 100% of project schemesValueNA100% schemes have WMOs100% of completed project schemes
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment
  • Timely completion of need-based O&M assessment and allocation of BWDB’s O&M budget for 100% of completed project schemesValueCompliance to need-based O&M assessment and allocaNeed based O&M assessment completed100% of project schemes completed
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment
  • Following Intermediate Indicator (5) and (6), HRD plan completed by December 2011ValueNAHRD plan completed and under implementation100% of target
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment
  • BWDB’s institutional reform plan completed by June 2011 and approved by December 2011ValueNot applicableInstitutional reform plan completed and approvedBWDB’s institutional reform plan completed by June
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment
  • Following BWDB’s approved institutional reform plan, new staffing plan completed and approved by June 2012ValueNot applicableNew staffing plan completed and approvedHRD plan completed by December 2012
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment
  • Successful completion of rehabilitation and improvements in 100% of targeted project schemesValueNot applicable100% of targeted project schemes completed100% of targeted project schemes completed
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment
  • Operational water user associations created and/or strengthened (number)Value0.00785.00785.00
    DateJuly 1, 2011April 28, 2016June 30, 2016
    Comment