Skip to Main Navigation

Ho Chi Minh City Environmental Sanitation (Nhieu Loc-Thi Nghe Basin) Project

Abstract*

The Ho Chi Minh City Environmental Sanitation Project will lead to sustainable improvements in public health, and the well-being of the city's population, through improved reductions in wastewater pollution, and in flood occurrences, as a result of institutional efficiency in the management of drainage, and wastewater services. The two components are: 1) Construction of the Nghie Loc Thi Nghe wastewater interceptor, to divert dry weather wastewater...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

Reduce the incidence of flooding and increase the collection of wastewater in the Nhieu Loc Thi Nghe (NLTN) Basin in HCMC, in an environmentally and financially sustainable manner.

Key Details

Project Details

  • P052037

  • Closed

  • Dean Cira

  • N/A

  • Viet Nam

  • January 4, 2000

  • (as of board presentation)

    March 20, 2001

  • February 3, 2002

  • US$ 166.34 million

  • A

  • January 15, 2013

  • June 30, 2012

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Credit 166.34
Borrower/Recipient 33.62

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 166.34
IBRD + IDA Commitment 166.34
Lending Instrument
Grant Amount N/A
Total Project Cost** 199.96

Summary Status of World Bank Financing (US$ Millions) as of February 28, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of February 28, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jan 15, 2014 IDA-34750 Int Charges 15,215.62
Jan 15, 2014 IDA-34750 Int Charges 15,215.62
Jan 15, 2014 IDA-34750 Loan Repay 1,954,135.40
Jan 15, 2014 IDA-34750 Int Charges 684,903.56
Sep 15, 2015 IDA-47080 Int Charges 7,121.92
Sep 15, 2015 IDA-47080 Int Charges 168,646.28
Sep 15, 2015 IDA-47080 Int Charges 168,646.28
Mar 15, 2015 IDA-47080 Int Charges 5,762.24
Mar 15, 2015 IDA-47080 Int Charges 5,762.24
Jul 15, 2015 IDA-34750 Loan Repay 1,681,584.60
Jul 15, 2015 IDA-34750 Int Charges 444.49
Jul 15, 2015 IDA-34750 Int Charges 444.49
Mar 15, 2018 IDA-47080 Int Charges 4,279.74
Mar 15, 2018 IDA-47080 Int Charges 4,279.74
Sep 15, 2017 IDA-47080 Int Charges 174,660.55
Sep 15, 2017 IDA-47080 Int Charges 174,660.55
Sep 15, 2017 IDA-47080 Int Charges 208.46
Sep 15, 2017 IDA-47080 Int Charges 208.46
Jul 15, 2017 IDA-34750 Loan Repay 20,893.29
Jul 15, 2017 IDA-34750 Loan Repay 1,749,986.20
Jul 15, 2017 IDA-34750 Int Charges 550,326.60
Jul 15, 2017 IDA-34750 Int Charges 550,326.60
Jan 15, 2017 IDA-34750 Loan Repay 1,691,886.20
Jan 15, 2017 IDA-34750 Loan Repay 29,043.25
Jan 15, 2017 IDA-34750 Int Charges 574,360.25
Jan 15, 2017 IDA-34750 Int Charges 574,360.25
Mar 15, 2017 IDA-47080 Int Charges 780.24
Mar 15, 2017 IDA-47080 Int Charges 780.24
Mar 15, 2017 IDA-47080 Int Charges 169,729.10
Mar 15, 2017 IDA-47080 Int Charges 169,729.10
Mar 15, 2016 IDA-47080 Int Charges 173,987.03
Mar 15, 2016 IDA-47080 Int Charges 173,987.03
Mar 15, 2016 IDA-47080 Int Charges 1,600.58
Mar 15, 2016 IDA-47080 Int Charges 1,600.58
Sep 15, 2016 IDA-47080 Int Charges 1,299.32
Sep 15, 2016 IDA-47080 Int Charges 1,299.32
Sep 15, 2016 IDA-47080 Int Charges 175,296.95
Sep 15, 2016 IDA-47080 Int Charges 175,296.95
Jul 15, 2016 IDA-34750 Loan Repay 1,774,368.00
Jul 15, 2016 IDA-34750 Loan Repay 905.32
Jul 15, 2016 IDA-34750 Int Charges 599,154.75
Jul 15, 2016 IDA-34750 Int Charges 599,154.75
Sep 15, 2019 IDA-47080 Int Charges 372.27
Mar 15, 2020 IDA-47080 Int Charges 171,865.80
Mar 15, 2020 IDA-47080 Int Charges 171,865.80
Mar 15, 2020 IDA-47080 Int Charges 1,455.08
Mar 15, 2020 IDA-47080 Int Charges 1,455.08
Jan 15, 2020 IDA-34750 Loan Repay 1,522.06
Jan 15, 2020 IDA-34750 Loan Repay 1,757,882.40
Jan 15, 2020 IDA-34750 Int Charges 109.96
Jan 15, 2020 IDA-34750 Int Charges 109.96
Jan 15, 2020 IDA-34750 Int Charges 536,007.75
Jan 15, 2020 IDA-34750 Int Charges 536,007.75
Sep 15, 2019 IDA-47080 Int Charges 172,321.05
Sep 15, 2019 IDA-47080 Int Charges 172,321.05
Jul 18, 2019 IDA-34750 Int Charges 22,697.48
Jul 18, 2019 IDA-34750 Int Charges 22,697.48
Jul 18, 2019 IDA-34750 Loan Repay 1,759,366.20
Jan 15, 2019 IDA-34750 Int Charges 543,511.00
Jan 15, 2019 IDA-34750 Int Charges 543,511.00
Mar 15, 2019 IDA-47080 Int Charges 89.31
Mar 15, 2019 IDA-47080 Int Charges 89.31
Mar 15, 2019 IDA-47080 Int Charges 175,017.40
Mar 15, 2019 IDA-47080 Int Charges 175,017.40
Sep 18, 2018 IDA-47080 Int Charges 2,524.24
Sep 18, 2018 IDA-47080 Int Charges 2,524.24
Jul 15, 2018 IDA-34750 Int Charges 575,840.25
Jul 15, 2018 IDA-34750 Int Charges 575,840.25
Jan 15, 2019 IDA-34750 Loan Repay 44,807.21
Jan 15, 2019 IDA-34750 Loan Repay 1,732,249.10
Jan 15, 2018 IDA-34750 Int Charges 561,111.30
Jan 15, 2018 IDA-34750 Int Charges 561,111.30
Jan 15, 2018 IDA-34750 Int Charges 35,104.32
Jan 15, 2018 IDA-34750 Int Charges 35,104.32
Jan 15, 2018 IDA-34750 Loan Repay 1,824,981.20
Sep 18, 2018 IDA-47080 Int Charges 176,229.77
Sep 18, 2018 IDA-47080 Int Charges 176,229.77
Jul 15, 2018 IDA-34750 Int Charges 33,548.05
Jul 15, 2018 IDA-34750 Int Charges 33,548.05
Jul 15, 2018 IDA-34750 Loan Repay 1,785,551.10
Mar 15, 2018 IDA-47080 Int Charges 180,151.50
Mar 15, 2018 IDA-47080 Int Charges 180,151.50
Jan 15, 2022 IDA-34750 Loan Repay 7,094,643.00
Jan 15, 2022 IDA-34750 Int Charges 494,819.03
Jan 15, 2022 IDA-34750 Int Charges 494,819.03
Mar 15, 2022 IDA-47080 Loan Repay 1,156,453.20
Mar 15, 2022 IDA-47080 Int Charges 1,320.01
Mar 15, 2022 IDA-47080 Int Charges 1,320.01
Mar 15, 2022 IDA-47080 Int Charges 164,794.60
Mar 15, 2022 IDA-47080 Int Charges 164,794.60
Jul 15, 2022 IDA-34750 Int Charges 15,073.20
Jul 15, 2022 IDA-34750 Loan Repay 6,670,062.00
Jul 15, 2022 IDA-34750 Int Charges 450,229.16
Jul 15, 2022 IDA-34750 Int Charges 450,229.16
Jul 15, 2022 IDA-34750 Int Charges 15,073.20
Sep 15, 2021 IDA-47080 Loan Repay 1,188,984.40
Sep 15, 2021 IDA-47080 Int Charges 173,489.27
Sep 15, 2021 IDA-47080 Int Charges 173,489.27
Sep 15, 2021 IDA-47080 Loan Repay 6,597.73
Jul 15, 2021 IDA-34750 Int Charges 544,296.44
Jul 15, 2021 IDA-34750 Int Charges 544,296.44
Mar 15, 2021 IDA-47080 Int Charges 14,430.55
Mar 15, 2021 IDA-47080 Loan Repay 598,830.70
Jan 15, 2021 IDA-34750 Int Charges 522,280.70
Jan 15, 2021 IDA-34750 Int Charges 522,280.70
Mar 15, 2021 IDA-47080 Int Charges 14,430.55
Jul 15, 2021 IDA-34750 Int Charges 34,555.70
Jul 15, 2021 IDA-34750 Int Charges 34,555.70
Jul 15, 2021 IDA-34750 Loan Repay 7,257,285.50
Jul 15, 2020 IDA-34750 Int Charges 11,681.89
Jul 15, 2020 IDA-34750 Int Charges 11,681.89
Jul 15, 2020 IDA-34750 Loan Repay 1,770,764.90
Jul 15, 2020 IDA-34750 Int Charges 492,644.97
Jul 15, 2020 IDA-34750 Int Charges 492,644.97
Mar 15, 2021 IDA-47080 Int Charges 177,403.60
Mar 15, 2021 IDA-47080 Int Charges 177,403.60
Jan 15, 2021 IDA-34750 Int Charges 53,731.13
Jan 15, 2021 IDA-34750 Int Charges 53,731.13
Jan 15, 2021 IDA-34750 Loan Repay 1,834,469.50
Sep 15, 2020 IDA-47080 Loan Repay 415.00
Sep 15, 2020 IDA-47080 Loan Repay 593,452.25
Jan 15, 2014 IDA-34750 Int Charges 684,903.56
Mar 15, 2014 IDA-47080 Int Charges 2,587.25
Sep 15, 2013 IDA-47080 Int Charges 3,481.43
Sep 15, 2013 IDA-47080 Int Charges 3,481.43
Sep 15, 2013 IDA-47080 Int Charges 185,017.72
Sep 15, 2013 IDA-47080 Int Charges 185,017.72
Jul 15, 2013 IDA-34750 Loan Repay 1,908,910.50
Jul 15, 2013 IDA-34750 Int Charges 672,344.25
Jul 15, 2013 IDA-34750 Int Charges 672,344.25
Jul 15, 2013 IDA-34750 Int Charges 24,838.69
Jul 15, 2013 IDA-34750 Int Charges 24,838.69
Jul 15, 2015 IDA-34750 Int Charges 614,095.00
Jul 15, 2015 IDA-34750 Int Charges 614,095.00
Jul 15, 2015 IDA-34750 Loan Repay 98,400.97
Jan 27, 2015 IDA-34750 Loan Repay 1,789,614.40
Sep 15, 2014 IDA-47080 Int Charges 2,032.09
Sep 15, 2014 IDA-47080 Int Charges 2,032.09
Sep 15, 2014 IDA-47080 Int Charges 188,611.08
Sep 15, 2014 IDA-47080 Int Charges 188,611.08
Jan 15, 2015 IDA-34750 Loan Repay 2,093.13
Jul 18, 2014 IDA-34750 Int Charges 11,306.88
Jul 18, 2014 IDA-34750 Int Charges 11,306.88
Jul 18, 2014 IDA-34750 Loan Repay 1,962,770.20
Jul 18, 2014 IDA-34750 Int Charges 691,876.50
Jul 18, 2014 IDA-34750 Int Charges 691,876.50
Mar 15, 2015 IDA-47080 Int Charges 166,646.86
Mar 15, 2015 IDA-47080 Int Charges 166,646.86
Jan 27, 2015 IDA-34750 Int Charges 111.98
Jan 27, 2015 IDA-34750 Int Charges 111.98
Jan 27, 2015 IDA-34750 Int Charges 624,847.40
Jan 27, 2015 IDA-34750 Int Charges 624,847.40
Mar 15, 2014 IDA-47080 Int Charges 2,587.25
Mar 15, 2014 IDA-47080 Int Charges 192,937.45
Mar 15, 2014 IDA-47080 Int Charges 192,937.45
Jan 15, 2016 IDA-34750 Loan Repay 31,455.96
Jan 15, 2016 IDA-34750 Loan Repay 1,730,610.40
Jan 15, 2016 IDA-34750 Int Charges 601,305.10
Jan 15, 2016 IDA-34750 Int Charges 601,305.10
Sep 15, 2015 IDA-47080 Int Charges 7,121.92
Sep 15, 2022 IDA-47080 Loan Repay 27,394.27
Sep 15, 2022 IDA-47080 Loan Repay 1,058,279.90
Jan 15, 2022 IDA-34750 Loan Repay 77,669.39
Sep 15, 2020 IDA-47080 Int Charges 163,849.28
Sep 15, 2020 IDA-47080 Int Charges 163,849.28
Jul 18, 2019 IDA-34750 Int Charges 554,200.40
Jul 18, 2019 IDA-34750 Int Charges 554,200.40
Sep 15, 2019 IDA-47080 Int Charges 372.27
Apr 6, 2010 IDA-47080 Loan Commitment 90,000,000.00
Mar 15, 2024 IDA-47080 Loan Repay 1,082,490.20
Mar 15, 2024 IDA-47080 Int Charges 142,345.55
Mar 15, 2024 IDA-47080 Int Charges 142,345.55
Jul 15, 2024 IDA-34750 Int Charges 52,317.46
Jul 15, 2024 IDA-34750 Int Charges 52,317.46
Jul 15, 2024 IDA-34750 Loan Repay 6,761,505.00
Jul 15, 2024 IDA-34750 Int Charges 333,698.28
Jul 15, 2024 IDA-34750 Int Charges 333,698.28
Mar 20, 2001 IDA-34750 Loan Commitment 166,340,000.00
Jan 15, 2024 IDA-34750 Loan Repay 6,806,284.50
Jan 15, 2024 IDA-34750 Int Charges 330,189.60
Jan 15, 2024 IDA-34750 Int Charges 330,189.60
Jan 15, 2024 IDA-34750 Int Charges 64,641.69
Jan 15, 2024 IDA-34750 Int Charges 64,641.69
Mar 15, 2024 IDA-47080 Loan Repay 33,945.35
Jul 15, 2023 IDA-34750 Int Charges 176,590.80
Jul 15, 2023 IDA-34750 Int Charges 176,590.80
Jul 15, 2023 IDA-34750 Loan Repay 6,900,325.50
Jul 15, 2023 IDA-34750 Int Charges 348,484.75
Jul 15, 2023 IDA-34750 Int Charges 348,484.75
Sep 15, 2023 IDA-47080 Loan Repay 1,089,297.80
Sep 15, 2023 IDA-47080 Int Charges 145,114.81
Sep 15, 2023 IDA-47080 Int Charges 145,114.81
Sep 15, 2023 IDA-47080 Loan Repay 16,339.02
Jan 15, 2023 IDA-34750 Loan Repay 6,752,299.50
Jan 15, 2023 IDA-34750 Int Charges 262,119.16
Jan 15, 2023 IDA-34750 Int Charges 262,119.16
Mar 15, 2023 IDA-47080 Loan Repay 13,748.35
Mar 15, 2023 IDA-47080 Loan Repay 1,102,385.40
Mar 15, 2023 IDA-47080 Int Charges 150,678.02
Mar 15, 2023 IDA-47080 Int Charges 150,678.02
Jan 15, 2023 IDA-34750 Loan Repay 116,950.84
Sep 15, 2022 IDA-47080 Int Charges 150,637.30
Sep 15, 2022 IDA-47080 Int Charges 150,637.30

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Counterpart Funding Satisfactory 2012-07-08
Project Management Moderately Satisfactory 2012-07-08
Procurement Moderately Satisfactory 2012-07-08
Overall Implementation Progress (IP) Moderately Satisfactory 2012-07-08
Progress towards achievement of PDO Moderately Satisfactory 2012-07-08
Financial Management Moderately Satisfactory 2012-07-08
Monitoring and Evaluation Moderately Satisfactory 2012-07-08

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 12-30-2012
OutcomesModerately Satisfactory
Risk to Development OutcomeModest
Bank PerformanceModerately Satisfactory
Borrower PerformanceModerately Satisfactory
Government PerformanceModerately Unsatisfactory
Implementing AgencyModerately Satisfactory

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 08-19-2013PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeSignificantN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceModerately UnsatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualityUnsatisfactoryN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Reduction in the number of households affected by two year return period stormValue0.0096000.0096000.00
    DateJanuary 1, 2007June 19, 2012June 1, 2012
    CommentChanged during restructuringData from the Steering Committee for Flood Control indicates reduced flooding in the NLTN catchment area since 2007, despiteincreased rainfall. Over 1.2 million people benefit from the reduced flooding, and thus the target of 96000 households has beenexceeded.This target has been reached or exceeded based on the overall population of the catchment area.
  • Increase in the number of households whose wastewater is collected and disposed of safelyValue0.00200000.00240000.00
    DateJanuary 1, 2007June 19, 2012June 30, 2012
    CommentChanged during restructuringEstimate is based on actual works progress to date. Actual numbers will be assessed only after the project closing when thesurveyof level three and four sewers is completed.This is expected to have been reached, but the actual survey will only be completed after project closes. and the survey iscompleted.
  • Improvement in the water quality of the NLTN Canal measured by the average level of dissolved oxygen (DO)Value0.052.004.00
    DateJanuary 4, 2010May 31, 2012June 30, 2012
    CommentTaken at low tideLow tide average in the NLTN canal was 2.0, already much improved from the baseline. Though this is less than the target value,itshows strong improvement over the baseline. Once operational, this should improve further.Target is a value of at least 4 measured as Mg/l. Water quality is already much improved from the baseline samples. The resultsindicate the dredging is serving to improve water quality. Once the interceptor is commissioned the water quality is expected toimprove further. The ICR will include further water quality monitoring results.
  • Implementation of the agreed tariif schedule by the People's Committee of Ho Chi Minh CityValue250.00450.00450.00
    DateJanuary 1, 2007October 26, 2011June 1, 2012
    CommentValue is Vietnam Dong (VND) per cubic meterChanged during restructuringBased on the approved tariff decreesThe actual tariff is now higher than the target of VND450 as the water tariff has continued to increase. The road map to 2015expects to increase the waste water tariff the 15% of the water tariff by 2015.

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • KM of wastewater interceptor constructedValue5.009.008.40
    DateJanuary 11, 2007June 20, 2012June 1, 2012
    CommentThe interceptor has been 100% completed.100% complete.
  • KM of combined primary and secondary sewers replaced and constructed.Value2.0052.0059.50
    DateJanuary 11, 2007June 20, 2012June 1, 2012
    CommentAdded as part of 2009 restructuring.Final amount is less than earlier projection due to design change. But Target is considered met.Target met as of final mission.
  • KM of sheet piles installed for canal embankmentsValue1.0016.3018.00
    DateJanuary 11, 2007June 20, 2012June 1, 2012
    CommentAdded at restructuring in 2009.The canal improve was complete at time of last mission. Design changes resulted in fewer KM of piles required.Target met
  • Cubic Meters of sludge and excavated material dredeged.Value0.00946069.001029000.00
    DateJanuary 11, 2007June 13, 2012June 1, 2012
    CommentAdded as part of restructuring in 2009Independent hydrographic survey confirmed this amount.Target met as of last mission. Some minor dredging is still required at certain bridges.