Financier | Commitments |
---|---|
IDA Grant | 15.00 |
Borrower/Recipient | 12.00 |
P072030
Closed
Madio Fall
The Government of Chad
November 29, 2004
(as of board presentation)
March 6, 2007
May 1, 2007
US$ 27.00 million
Cellule de Coordination du PADUR
2007
US$ 15.00 million
B
Not Applicable
June 30, 2015
BANK APPROVED
October 17, 2023
Financier | Commitments |
---|---|
IDA Grant | 15.00 |
Borrower/Recipient | 12.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 15.00 |
IBRD + IDA Commitment | 15.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 27.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Jan 29, 2014 | IDA-49520 | Loan Disb | 35,966.58 |
Jan 29, 2014 | IDA-H6880 | Loan Disb | 29,225.70 |
Dec 5, 2013 | IDA-H6880 | Loan Disb | 71,086.89 |
Dec 5, 2013 | IDA-H6880 | Loan Disb | 602,938.20 |
Jan 2, 2014 | IDA-49520 | Loan Disb | 55,877.47 |
Jan 2, 2014 | IDA-H6880 | Loan Disb | 45,404.88 |
Jan 24, 2014 | IDA-H2770 | Loan Disb | 2,574.13 |
Jan 14, 2014 | IDA-H6880 | Loan Disb | 76,308.95 |
Jan 14, 2014 | IDA-49520 | Loan Disb | -76,308.95 |
Jul 24, 2013 | IDA-49520 | Loan Disb | 166,986.84 |
Dec 8, 2014 | IDA-49520 | Loan Disb | 43,853.92 |
Sep 4, 2013 | IDA-H2770 | Loan Disb | 248,577.98 |
Sep 15, 2016 | IDA-49520 | Int Charges | 469.78 |
Sep 15, 2016 | IDA-49520 | Int Charges | 469.78 |
Mar 15, 2016 | IDA-49520 | Int Charges | 201.74 |
Mar 15, 2016 | IDA-49520 | Int Charges | 201.74 |
Apr 7, 2016 | IDA-49520 | Int Charges | 19,481.69 |
Apr 7, 2016 | IDA-49520 | Int Charges | 19,481.69 |
Nov 5, 2015 | IDA-H6880 | Loan Disb | 148,109.38 |
Nov 5, 2015 | IDA-49520 | Loan Disb | 182,270.67 |
Oct 2, 2015 | IDA-49520 | Int Charges | 741.98 |
Oct 2, 2015 | IDA-49520 | Int Charges | 741.98 |
Oct 2, 2015 | IDA-49520 | Int Charges | 18,816.80 |
Oct 2, 2015 | IDA-49520 | Int Charges | 18,816.80 |
Apr 8, 2015 | IDA-49520 | Loan Cancel | 7,702,989.50 |
Apr 8, 2015 | IDA-H6880 | Loan Cancel | 6,371,362.50 |
May 19, 2015 | IDA-49520 | Loan Disb | 194,922.94 |
May 19, 2015 | IDA-H6880 | Loan Disb | 160,877.92 |
Sep 15, 2014 | IDA-49520 | Int Charges | 7.30 |
Sep 15, 2014 | IDA-49520 | Int Charges | 7.30 |
Mar 24, 2015 | IDA-49520 | Int Charges | 479.85 |
Mar 24, 2015 | IDA-49520 | Int Charges | 479.85 |
Jun 7, 2011 | IDA-49520 | Loan Commitment | 15,100,000.00 |
Jun 7, 2011 | IDA-H6880 | Loan Commitment | 12,300,000.00 |
Mar 6, 2007 | IDA-H2770 | Loan Commitment | 15,000,000.00 |
Apr 2, 2024 | IDA-49520 | Int Charges | 16,578.34 |
Apr 2, 2024 | IDA-49520 | Int Charges | 16,578.34 |
Apr 2, 2024 | IDA-49520 | Loan Repay | 47,956.62 |
Apr 2, 2024 | IDA-49520 | Int Charges | 1,612.19 |
Apr 2, 2024 | IDA-49520 | Int Charges | 1,612.19 |
Sep 15, 2023 | IDA-49520 | Int Charges | 299.84 |
Sep 15, 2023 | IDA-49520 | Int Charges | 299.84 |
Sep 15, 2023 | IDA-49520 | Loan Repay | 47,861.53 |
Sep 15, 2023 | IDA-49520 | Int Charges | 15,621.19 |
Sep 15, 2023 | IDA-49520 | Int Charges | 15,621.19 |
Mar 15, 2023 | IDA-49520 | Int Charges | 6.04 |
Mar 15, 2023 | IDA-49520 | Int Charges | 17,272.24 |
Mar 15, 2023 | IDA-49520 | Int Charges | 17,272.24 |
Mar 15, 2023 | IDA-49520 | Loan Repay | 76.88 |
Mar 15, 2023 | IDA-49520 | Loan Repay | 48,239.05 |
Mar 15, 2023 | IDA-49520 | Int Charges | 6.04 |
Sep 21, 2022 | IDA-49520 | Int Charges | 1,295.52 |
Sep 21, 2022 | IDA-49520 | Int Charges | 1,295.52 |
Mar 24, 2015 | IDA-49520 | Int Charges | 16,592.87 |
Mar 24, 2015 | IDA-49520 | Int Charges | 16,592.87 |
Aug 26, 2014 | IDA-49520 | Loan Disb | 13,463.73 |
Sep 15, 2018 | IDA-49520 | Int Charges | 19,091.06 |
Sep 15, 2018 | IDA-49520 | Int Charges | 19,091.06 |
Apr 5, 2018 | IDA-49520 | Int Charges | 19,100.75 |
Apr 5, 2018 | IDA-49520 | Int Charges | 19,100.75 |
Mar 15, 2018 | IDA-49520 | Int Charges | 442.92 |
Mar 15, 2018 | IDA-49520 | Int Charges | 442.92 |
Sep 15, 2017 | IDA-49520 | Int Charges | 207.82 |
Sep 15, 2017 | IDA-49520 | Int Charges | 207.82 |
Sep 15, 2017 | IDA-49520 | Int Charges | -364.69 |
Sep 15, 2017 | IDA-49520 | Int Charges | 364.69 |
Sep 15, 2017 | IDA-49520 | Int Charges | 18,914.73 |
Sep 15, 2017 | IDA-49520 | Int Charges | 18,914.73 |
May 10, 2017 | IDA-49520 | Int Charges | 57.82 |
May 10, 2017 | IDA-49520 | Int Charges | 57.82 |
May 10, 2017 | IDA-49520 | Int Charges | 19,271.45 |
May 10, 2017 | IDA-49520 | Int Charges | 19,271.45 |
Jan 10, 2017 | IDA-H6880 | Loan Cancel | 548,849.06 |
Jan 10, 2017 | IDA-H2770 | Loan Cancel | 72,711.07 |
Jan 10, 2017 | IDA-49520 | Loan Cancel | 560,445.20 |
Jan 10, 2017 | IDA-49520 | Loan Disb | -178,580.27 |
Jan 10, 2017 | IDA-H6880 | Loan Disb | -145,110.62 |
Jan 10, 2017 | IDA-H2770 | Loan Disb | -72,711.07 |
Oct 20, 2016 | IDA-49520 | Int Charges | 18,918.61 |
Oct 20, 2016 | IDA-49520 | Int Charges | 18,918.61 |
Sep 15, 2020 | IDA-49520 | Int Charges | 19,214.33 |
Sep 15, 2020 | IDA-49520 | Int Charges | 66.45 |
Sep 15, 2020 | IDA-49520 | Int Charges | 66.45 |
Mar 15, 2021 | IDA-49520 | Int Charges | 401.07 |
Mar 15, 2021 | IDA-49520 | Int Charges | 401.07 |
Mar 15, 2020 | IDA-49520 | Int Charges | 157.70 |
Mar 15, 2020 | IDA-49520 | Int Charges | 157.70 |
Mar 15, 2020 | IDA-49520 | Int Charges | 18,757.06 |
Mar 15, 2020 | IDA-49520 | Int Charges | 18,757.06 |
Sep 15, 2019 | IDA-49520 | Int Charges | 156.50 |
Sep 15, 2019 | IDA-49520 | Int Charges | 156.50 |
Sep 15, 2019 | IDA-49520 | Int Charges | 18,532.01 |
Sep 15, 2019 | IDA-49520 | Int Charges | 18,532.01 |
Mar 15, 2019 | IDA-49520 | Int Charges | 112.42 |
Mar 15, 2019 | IDA-49520 | Int Charges | 112.42 |
Apr 15, 2019 | IDA-49520 | Int Charges | 18,654.40 |
Apr 15, 2019 | IDA-49520 | Int Charges | 18,654.40 |
Sep 15, 2018 | IDA-49520 | Int Charges | 201.16 |
Sep 15, 2018 | IDA-49520 | Int Charges | 201.16 |
Sep 21, 2022 | IDA-49520 | Loan Repay | 46,821.35 |
Sep 21, 2022 | IDA-49520 | Int Charges | 17,206.82 |
Sep 21, 2022 | IDA-49520 | Int Charges | 17,206.82 |
Mar 15, 2022 | IDA-49520 | Int Charges | 609.72 |
Mar 15, 2022 | IDA-49520 | Int Charges | 609.72 |
Mar 15, 2022 | IDA-49520 | Int Charges | 19.82 |
Mar 15, 2022 | IDA-49520 | Int Charges | 19.82 |
Mar 15, 2022 | IDA-49520 | Int Charges | 17,200.12 |
Mar 15, 2022 | IDA-49520 | Int Charges | 17,200.12 |
Oct 4, 2021 | IDA-49520 | Int Charges | 150.84 |
Oct 4, 2021 | IDA-49520 | Int Charges | 150.84 |
Oct 4, 2021 | IDA-49520 | Loan Repay | 51,293.85 |
Oct 4, 2021 | IDA-49520 | Int Charges | 18,610.46 |
Oct 4, 2021 | IDA-49520 | Int Charges | 18,610.46 |
Mar 15, 2022 | IDA-49520 | Loan Repay | 50,061.31 |
Mar 15, 2021 | IDA-49520 | Int Charges | 18,888.39 |
Mar 15, 2021 | IDA-49520 | Int Charges | 18,888.39 |
Sep 15, 2020 | IDA-49520 | Int Charges | 19,214.33 |
Sep 29, 2014 | IDA-49520 | Int Charges | 15,622.63 |
Sep 29, 2014 | IDA-49520 | Int Charges | 15,622.63 |
Oct 7, 2014 | IDA-49520 | Loan Disb | 4,199.36 |
Oct 7, 2014 | IDA-H6880 | Loan Disb | 20,292.73 |
Dec 8, 2014 | IDA-H6880 | Loan Disb | 48,681.05 |
Jun 19, 2014 | IDA-H6880 | Loan Disb | 247,112.97 |
Jun 19, 2014 | IDA-49520 | Loan Disb | 216,032.90 |
Jul 7, 2014 | IDA-H6880 | Loan Disb | 415,031.50 |
Jul 7, 2014 | IDA-49520 | Loan Disb | 474,620.47 |
Feb 23, 2015 | IDA-49520 | Loan Disb | 218,019.38 |
Feb 23, 2015 | IDA-H6880 | Loan Disb | 27,620.11 |
Feb 23, 2015 | IDA-H6880 | Loan Disb | 171,401.52 |
Feb 23, 2015 | IDA-49520 | Loan Disb | 33,985.01 |
Aug 27, 2014 | IDA-H6880 | Loan Disb | 39,041.18 |
Jun 12, 2014 | IDA-49520 | Loan Disb | 358,219.16 |
Jun 12, 2014 | IDA-H6880 | Loan Disb | 320,818.75 |
May 30, 2014 | IDA-H2770 | Loan Disb | 25.91 |
Dec 11, 2013 | IDA-49520 | Loan Disb | 88,648.47 |
Mar 10, 2014 | IDA-49520 | Loan Disb | 123,480.98 |
Mar 10, 2014 | IDA-H6880 | Loan Disb | 100,338.09 |
Mar 21, 2014 | IDA-49520 | Int Charges | 53.29 |
Mar 21, 2014 | IDA-49520 | Int Charges | 53.29 |
Mar 21, 2014 | IDA-49520 | Int Charges | 12,668.38 |
Mar 21, 2014 | IDA-49520 | Int Charges | 12,668.38 |
Mar 21, 2014 | IDA-49520 | Loan Disb | 73,958.13 |
Mar 21, 2014 | IDA-H6880 | Loan Disb | 60,726.82 |
Sep 27, 2013 | IDA-49520 | Int Charges | 97.74 |
Sep 27, 2013 | IDA-49520 | Int Charges | 97.74 |
Nov 4, 2013 | IDA-49520 | Loan Disb | 168,354.30 |
Sep 27, 2013 | IDA-49520 | Int Charges | 9,204.22 |
Sep 27, 2013 | IDA-49520 | Int Charges | 9,204.22 |
Dec 5, 2013 | IDA-49520 | Loan Disb | 742,004.80 |
Name | Review | Date |
---|---|---|
Project Management | Moderately Satisfactory | 2015-06-14 |
Progress towards achievement of PDO | Moderately Unsatisfactory | 2015-06-14 |
Overall Implementation Progress (IP) | Moderately Unsatisfactory | 2015-06-14 |
Procurement | Moderately Unsatisfactory | 2015-06-14 |
Overall Safeguards Rating | Moderately Satisfactory | 2015-06-14 |
Counterpart Funding | Moderately Unsatisfactory | 2015-06-14 |
Financial Management | Moderately Satisfactory | 2015-06-14 |
Monitoring and Evaluation | Moderately Satisfactory | 2015-06-14 |
Overall Safeguards Rating | Moderately Satisfactory | 2015-06-14 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 06-23-2016 |
---|---|
Outcomes | Moderately Unsatisfactory |
Risk to Development Outcome | High |
Bank Performance | Moderately Unsatisfactory |
Borrower Performance | Moderately Unsatisfactory |
Government Performance | Moderately Unsatisfactory |
Implementing Agency | Moderately Unsatisfactory |
INDICATOR | ICR REVIEW: 09-06-2016 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Unsatisfactory | N/a |
Risk To Development Outcome | High | N/a |
Bank Performance | Moderately Unsatisfactory | N/a |
Borrower Performance | Moderately Unsatisfactory | N/a |
Government Performance | Moderately Unsatisfactory | N/a |
Implementing Agency | Moderately Satisfactory | N/a |
Icr Quality | Modest | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Doba | Value | 23 | 64 | 28 |
Date | May 20, 2015 | June 30, 2015 | ||
Comment |
Sarh | Value | 35 | 481 | 41 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Female beneficiaries | Value | 0.00 | 51.00 | 51.00 |
Date | May 11, 2011 | May 20, 2015 | June 30, 2015 | |
Comment |
Number of people in targeted cities protected from periodic flooding | Value | 253878.00 | 470826.00 | 366850.00 |
Date | May 11, 2011 | May 20, 2015 | June 30, 2015 | |
Comment |
Number of people in urban areas provided with access to Improved Water Sources under the project | Value | 44520.00 | 72648.00 | 216240.00 |
Date | May 11, 2011 | May 20, 2015 | June 30, 2015 | |
Comment |
Number of people in urban areas provided with access to all-season roads within a 500 meter range under the project | Value | 0.00 | 23428.00 | 10056.00 |
Date | May 20, 2015 | June 30, 2015 | ||
Comment |
Annual increase in municipalities' own revenue (municipal taxes and revenue from municipal assets) (CFAF millions) | Value | |||
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Performance targets being achieved by the private operator under the Service Contract | Value | 0.00 | 0.00 | 85.00 |
Date | March 23, 2011 | May 20, 2015 | June 30, 2015 | |
Comment |
Direct project beneficiaries | Value | 298398.00 | 520846.00 | 593146.00 |
Date | May 11, 2011 | May 20, 2015 | June 30, 2015 | |
Comment |
N'Djamena | Value | 983 | Not yet available | 1147 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Moundou | Value | 42 | 1245 | 49 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Abeche | Value | 57 | 398 | |
Date | May 20, 2015 | |||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Moundou | Value | 0.00 | 64.00 | 64.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Sarh | Value | 0.00 | 38.00 | 39.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Abeche | Value | 0.00 | 0.00 | 24.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Annual budget allocation and expenditure on routine road and drainage maintenance within appropriate range (% of total annual budget) | Value | 0.00 | 0.00 | 0.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Budget management and administrative procedures manual developed and adopted by municipalities in targeted cities | Value | 0.00 | 5.00 | 5.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Service satisfaction surveys carried out and published in targeted cities | Value | 0.00 | 8.00 | 10.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Urban development and investment plans developed and adopted by key local stakeholders in targeted cities | Value | 0.00 | 15.00 | 16.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Man-days of work cumulated | Value | 0.00 | 613800.00 | 1135000.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Kilometers of newly constructed/rehabilitated drainage works (km) | Value | 0.00 | 14.60 | 15.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Kilometers of newly constructed/rehabilitated water supply network (km) | Value | 0.00 | 24.60 | 80.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
New piped household water connections that are resulting from the project intervention | Value | 0.00 | 314.00 | 13600.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Improved community water points constructed or rehabilitated under the project | Value | 0.00 | 102.00 | 127.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Roads rehabilitated, Non-rural | Value | 0.00 | 4.90 | 6.50 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Slaughterhouses rehabilitated in Abeche | Value | 0.00 | 1.00 | 1.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Investment Plan for the 9 STE water supply systems approved by the STE | Value | No | No | Yes |
Date | March 23, 2011 | May 20, 2015 | June 30, 2015 | |
Comment |
Meters replaced under the project | Value | 0.00 | 0.00 | 24000.00 |
Date | March 23, 2011 | May 20, 2015 | June 30, 2015 | |
Comment |
Households visited under customer census | Value | 0.00 | 51541.00 | 70000.00 |
Date | March 23, 2011 | May 20, 2015 | June 30, 2015 | |
Comment |
Mechanism for the payment of the water bills from public institutions established | Value | No | No | Yes |
Date | March 23, 2011 | May 20, 2015 | June 30, 2015 | |
Comment |
Study on water tariff and connection fee completed and results of the study implemented | Value | No | No | Yes |
Date | March 23, 2011 | May 20, 2015 | June 30, 2015 | |
Comment |
Report card published and discussed at the Board of STE | Value | 0.00 | 0.00 | 4.00 |
Date | March 23, 2011 | May 20, 2015 | June 30, 2015 | |
Comment |
Audited annual performance data published and disseminated within four months after the end of the calendar year in the local pressto the customers and line Ministries | Value | 0.00 | 0.00 | 4.00 |
Date | March 23, 2011 | December 29, 2014 | June 30, 2015 | |
Comment |
N'Djamena | Value | 3.00 | 5.80 | 5.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Sarh | Value | 2.00 | 4.67 | 5.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Moundou | Value | 2.00 | 5.75 | 5.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Abeche | Value | 2.00 | 5.33 | 5.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |
Doba | Value | 2.00 | 5.37 | 5.00 |
Date | January 3, 2007 | May 20, 2015 | June 30, 2015 | |
Comment |