Urban Development Project

Abstract*

The proposed project on the Chad - Urban Development Project will finance priority infrastructure (water, drainage, and economic infrastructure) in N'Djamena, Moundou, Sarh, Abeche, and Doba to address partially the significant infrastructure gaps these cities are facing. By packaging public works appropriately and using labor-intensive methods whenever possible, the project will create employment opportunities for unskilled and semi-skilled labor...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The project development objective is to increase sustainable access to municipal services for residents in targeted project cities(N'Djamena, Moundou, Sarh, Abeche, and Doba).

Key Details

Project Details

  • P072030

  • Closed

  • Madio Fall

  • The Government of Chad

  • Chad

  • November 29, 2004

  • (as of board presentation)

    March 6, 2007

  • May 1, 2007

  • US$ 27.00 million

  • Cellule de Coordination du PADUR

  • Western and Central Africa

  • 2007

  • US$ 15.00 million

  • B

  • Not Applicable

  • June 30, 2015

  • BANK APPROVED

  • October 17, 2023

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Grant 15.00
Borrower/Recipient 12.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 15.00
IBRD + IDA Commitment 15.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 27.00

Summary Status of World Bank Financing (US$ Millions) as of April 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of April 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jan 29, 2014 IDA-49520 Loan Disb 35,966.58
Jan 29, 2014 IDA-H6880 Loan Disb 29,225.70
Dec 5, 2013 IDA-H6880 Loan Disb 71,086.89
Dec 5, 2013 IDA-H6880 Loan Disb 602,938.20
Jan 2, 2014 IDA-49520 Loan Disb 55,877.47
Jan 2, 2014 IDA-H6880 Loan Disb 45,404.88
Jan 24, 2014 IDA-H2770 Loan Disb 2,574.13
Jan 14, 2014 IDA-H6880 Loan Disb 76,308.95
Jan 14, 2014 IDA-49520 Loan Disb -76,308.95
Jul 24, 2013 IDA-49520 Loan Disb 166,986.84
Dec 8, 2014 IDA-49520 Loan Disb 43,853.92
Sep 4, 2013 IDA-H2770 Loan Disb 248,577.98
Sep 15, 2016 IDA-49520 Int Charges 469.78
Sep 15, 2016 IDA-49520 Int Charges 469.78
Mar 15, 2016 IDA-49520 Int Charges 201.74
Mar 15, 2016 IDA-49520 Int Charges 201.74
Apr 7, 2016 IDA-49520 Int Charges 19,481.69
Apr 7, 2016 IDA-49520 Int Charges 19,481.69
Nov 5, 2015 IDA-H6880 Loan Disb 148,109.38
Nov 5, 2015 IDA-49520 Loan Disb 182,270.67
Oct 2, 2015 IDA-49520 Int Charges 741.98
Oct 2, 2015 IDA-49520 Int Charges 741.98
Oct 2, 2015 IDA-49520 Int Charges 18,816.80
Oct 2, 2015 IDA-49520 Int Charges 18,816.80
Apr 8, 2015 IDA-49520 Loan Cancel 7,702,989.50
Apr 8, 2015 IDA-H6880 Loan Cancel 6,371,362.50
May 19, 2015 IDA-49520 Loan Disb 194,922.94
May 19, 2015 IDA-H6880 Loan Disb 160,877.92
Sep 15, 2014 IDA-49520 Int Charges 7.30
Sep 15, 2014 IDA-49520 Int Charges 7.30
Mar 24, 2015 IDA-49520 Int Charges 479.85
Mar 24, 2015 IDA-49520 Int Charges 479.85
Jun 7, 2011 IDA-49520 Loan Commitment 15,100,000.00
Jun 7, 2011 IDA-H6880 Loan Commitment 12,300,000.00
Mar 6, 2007 IDA-H2770 Loan Commitment 15,000,000.00
Apr 2, 2024 IDA-49520 Int Charges 16,578.34
Apr 2, 2024 IDA-49520 Int Charges 16,578.34
Apr 2, 2024 IDA-49520 Loan Repay 47,956.62
Apr 2, 2024 IDA-49520 Int Charges 1,612.19
Apr 2, 2024 IDA-49520 Int Charges 1,612.19
Sep 15, 2023 IDA-49520 Int Charges 299.84
Sep 15, 2023 IDA-49520 Int Charges 299.84
Sep 15, 2023 IDA-49520 Loan Repay 47,861.53
Sep 15, 2023 IDA-49520 Int Charges 15,621.19
Sep 15, 2023 IDA-49520 Int Charges 15,621.19
Mar 15, 2023 IDA-49520 Int Charges 6.04
Mar 15, 2023 IDA-49520 Int Charges 17,272.24
Mar 15, 2023 IDA-49520 Int Charges 17,272.24
Mar 15, 2023 IDA-49520 Loan Repay 76.88
Mar 15, 2023 IDA-49520 Loan Repay 48,239.05
Mar 15, 2023 IDA-49520 Int Charges 6.04
Sep 21, 2022 IDA-49520 Int Charges 1,295.52
Sep 21, 2022 IDA-49520 Int Charges 1,295.52
Mar 24, 2015 IDA-49520 Int Charges 16,592.87
Mar 24, 2015 IDA-49520 Int Charges 16,592.87
Aug 26, 2014 IDA-49520 Loan Disb 13,463.73
Sep 15, 2018 IDA-49520 Int Charges 19,091.06
Sep 15, 2018 IDA-49520 Int Charges 19,091.06
Apr 5, 2018 IDA-49520 Int Charges 19,100.75
Apr 5, 2018 IDA-49520 Int Charges 19,100.75
Mar 15, 2018 IDA-49520 Int Charges 442.92
Mar 15, 2018 IDA-49520 Int Charges 442.92
Sep 15, 2017 IDA-49520 Int Charges 207.82
Sep 15, 2017 IDA-49520 Int Charges 207.82
Sep 15, 2017 IDA-49520 Int Charges -364.69
Sep 15, 2017 IDA-49520 Int Charges 364.69
Sep 15, 2017 IDA-49520 Int Charges 18,914.73
Sep 15, 2017 IDA-49520 Int Charges 18,914.73
May 10, 2017 IDA-49520 Int Charges 57.82
May 10, 2017 IDA-49520 Int Charges 57.82
May 10, 2017 IDA-49520 Int Charges 19,271.45
May 10, 2017 IDA-49520 Int Charges 19,271.45
Jan 10, 2017 IDA-H6880 Loan Cancel 548,849.06
Jan 10, 2017 IDA-H2770 Loan Cancel 72,711.07
Jan 10, 2017 IDA-49520 Loan Cancel 560,445.20
Jan 10, 2017 IDA-49520 Loan Disb -178,580.27
Jan 10, 2017 IDA-H6880 Loan Disb -145,110.62
Jan 10, 2017 IDA-H2770 Loan Disb -72,711.07
Oct 20, 2016 IDA-49520 Int Charges 18,918.61
Oct 20, 2016 IDA-49520 Int Charges 18,918.61
Sep 15, 2020 IDA-49520 Int Charges 19,214.33
Sep 15, 2020 IDA-49520 Int Charges 66.45
Sep 15, 2020 IDA-49520 Int Charges 66.45
Mar 15, 2021 IDA-49520 Int Charges 401.07
Mar 15, 2021 IDA-49520 Int Charges 401.07
Mar 15, 2020 IDA-49520 Int Charges 157.70
Mar 15, 2020 IDA-49520 Int Charges 157.70
Mar 15, 2020 IDA-49520 Int Charges 18,757.06
Mar 15, 2020 IDA-49520 Int Charges 18,757.06
Sep 15, 2019 IDA-49520 Int Charges 156.50
Sep 15, 2019 IDA-49520 Int Charges 156.50
Sep 15, 2019 IDA-49520 Int Charges 18,532.01
Sep 15, 2019 IDA-49520 Int Charges 18,532.01
Mar 15, 2019 IDA-49520 Int Charges 112.42
Mar 15, 2019 IDA-49520 Int Charges 112.42
Apr 15, 2019 IDA-49520 Int Charges 18,654.40
Apr 15, 2019 IDA-49520 Int Charges 18,654.40
Sep 15, 2018 IDA-49520 Int Charges 201.16
Sep 15, 2018 IDA-49520 Int Charges 201.16
Sep 21, 2022 IDA-49520 Loan Repay 46,821.35
Sep 21, 2022 IDA-49520 Int Charges 17,206.82
Sep 21, 2022 IDA-49520 Int Charges 17,206.82
Mar 15, 2022 IDA-49520 Int Charges 609.72
Mar 15, 2022 IDA-49520 Int Charges 609.72
Mar 15, 2022 IDA-49520 Int Charges 19.82
Mar 15, 2022 IDA-49520 Int Charges 19.82
Mar 15, 2022 IDA-49520 Int Charges 17,200.12
Mar 15, 2022 IDA-49520 Int Charges 17,200.12
Oct 4, 2021 IDA-49520 Int Charges 150.84
Oct 4, 2021 IDA-49520 Int Charges 150.84
Oct 4, 2021 IDA-49520 Loan Repay 51,293.85
Oct 4, 2021 IDA-49520 Int Charges 18,610.46
Oct 4, 2021 IDA-49520 Int Charges 18,610.46
Mar 15, 2022 IDA-49520 Loan Repay 50,061.31
Mar 15, 2021 IDA-49520 Int Charges 18,888.39
Mar 15, 2021 IDA-49520 Int Charges 18,888.39
Sep 15, 2020 IDA-49520 Int Charges 19,214.33
Sep 29, 2014 IDA-49520 Int Charges 15,622.63
Sep 29, 2014 IDA-49520 Int Charges 15,622.63
Oct 7, 2014 IDA-49520 Loan Disb 4,199.36
Oct 7, 2014 IDA-H6880 Loan Disb 20,292.73
Dec 8, 2014 IDA-H6880 Loan Disb 48,681.05
Jun 19, 2014 IDA-H6880 Loan Disb 247,112.97
Jun 19, 2014 IDA-49520 Loan Disb 216,032.90
Jul 7, 2014 IDA-H6880 Loan Disb 415,031.50
Jul 7, 2014 IDA-49520 Loan Disb 474,620.47
Feb 23, 2015 IDA-49520 Loan Disb 218,019.38
Feb 23, 2015 IDA-H6880 Loan Disb 27,620.11
Feb 23, 2015 IDA-H6880 Loan Disb 171,401.52
Feb 23, 2015 IDA-49520 Loan Disb 33,985.01
Aug 27, 2014 IDA-H6880 Loan Disb 39,041.18
Jun 12, 2014 IDA-49520 Loan Disb 358,219.16
Jun 12, 2014 IDA-H6880 Loan Disb 320,818.75
May 30, 2014 IDA-H2770 Loan Disb 25.91
Dec 11, 2013 IDA-49520 Loan Disb 88,648.47
Mar 10, 2014 IDA-49520 Loan Disb 123,480.98
Mar 10, 2014 IDA-H6880 Loan Disb 100,338.09
Mar 21, 2014 IDA-49520 Int Charges 53.29
Mar 21, 2014 IDA-49520 Int Charges 53.29
Mar 21, 2014 IDA-49520 Int Charges 12,668.38
Mar 21, 2014 IDA-49520 Int Charges 12,668.38
Mar 21, 2014 IDA-49520 Loan Disb 73,958.13
Mar 21, 2014 IDA-H6880 Loan Disb 60,726.82
Sep 27, 2013 IDA-49520 Int Charges 97.74
Sep 27, 2013 IDA-49520 Int Charges 97.74
Nov 4, 2013 IDA-49520 Loan Disb 168,354.30
Sep 27, 2013 IDA-49520 Int Charges 9,204.22
Sep 27, 2013 IDA-49520 Int Charges 9,204.22
Dec 5, 2013 IDA-49520 Loan Disb 742,004.80

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Project Management Moderately Satisfactory 2015-06-14
Progress towards achievement of PDO Moderately Unsatisfactory 2015-06-14
Overall Implementation Progress (IP) Moderately Unsatisfactory 2015-06-14
Procurement Moderately Unsatisfactory 2015-06-14
Overall Safeguards Rating Moderately Satisfactory 2015-06-14
Counterpart Funding Moderately Unsatisfactory 2015-06-14
Financial Management Moderately Satisfactory 2015-06-14
Monitoring and Evaluation Moderately Satisfactory 2015-06-14
Overall Safeguards Rating Moderately Satisfactory 2015-06-14

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 06-23-2016
OutcomesModerately Unsatisfactory
Risk to Development OutcomeHigh
Bank PerformanceModerately Unsatisfactory
Borrower PerformanceModerately Unsatisfactory
Government PerformanceModerately Unsatisfactory
Implementing AgencyModerately Unsatisfactory

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 09-06-2016PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Unsatisfactory N/a
Risk To Development OutcomeHighN/a
Bank PerformanceModerately UnsatisfactoryN/a
Borrower PerformanceModerately UnsatisfactoryN/a
Government PerformanceModerately UnsatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualityModestN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • DobaValue236428
    DateMay 20, 2015June 30, 2015
    Comment
  • SarhValue3548141
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Female beneficiariesValue0.0051.0051.00
    DateMay 11, 2011May 20, 2015June 30, 2015
    Comment
  • Number of people in targeted cities protected from periodic floodingValue253878.00470826.00366850.00
    DateMay 11, 2011May 20, 2015June 30, 2015
    Comment
  • Number of people in urban areas provided with access to Improved Water Sources under the projectValue44520.0072648.00216240.00
    DateMay 11, 2011May 20, 2015June 30, 2015
    Comment
  • Number of people in urban areas provided with access to all-season roads within a 500 meter range under the projectValue0.0023428.0010056.00
    DateMay 20, 2015June 30, 2015
    Comment
  • Annual increase in municipalities' own revenue (municipal taxes and revenue from municipal assets) (CFAF millions)Value
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Performance targets being achieved by the private operator under the Service ContractValue0.000.0085.00
    DateMarch 23, 2011May 20, 2015June 30, 2015
    Comment
  • Direct project beneficiariesValue298398.00520846.00593146.00
    DateMay 11, 2011May 20, 2015June 30, 2015
    Comment
  • N'DjamenaValue983Not yet available1147
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • MoundouValue42124549
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • AbecheValue57398
    DateMay 20, 2015
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • MoundouValue0.0064.0064.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • SarhValue0.0038.0039.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • AbecheValue0.000.0024.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Annual budget allocation and expenditure on routine road and drainage maintenance within appropriate range (% of total annual budget)Value0.000.000.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Budget management and administrative procedures manual developed and adopted by municipalities in targeted citiesValue0.005.005.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Service satisfaction surveys carried out and published in targeted citiesValue0.008.0010.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Urban development and investment plans developed and adopted by key local stakeholders in targeted citiesValue0.0015.0016.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Man-days of work cumulatedValue0.00613800.001135000.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Kilometers of newly constructed/rehabilitated drainage works (km)Value0.0014.6015.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Kilometers of newly constructed/rehabilitated water supply network (km)Value0.0024.6080.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • New piped household water connections that are resulting from the project interventionValue0.00314.0013600.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Improved community water points constructed or rehabilitated under the projectValue0.00102.00127.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Roads rehabilitated, Non-ruralValue0.004.906.50
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Slaughterhouses rehabilitated in AbecheValue0.001.001.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • Investment Plan for the 9 STE water supply systems approved by the STEValueNoNoYes
    DateMarch 23, 2011May 20, 2015June 30, 2015
    Comment
  • Meters replaced under the projectValue0.000.0024000.00
    DateMarch 23, 2011May 20, 2015June 30, 2015
    Comment
  • Households visited under customer censusValue0.0051541.0070000.00
    DateMarch 23, 2011May 20, 2015June 30, 2015
    Comment
  • Mechanism for the payment of the water bills from public institutions establishedValueNoNoYes
    DateMarch 23, 2011May 20, 2015June 30, 2015
    Comment
  • Study on water tariff and connection fee completed and results of the study implementedValueNoNoYes
    DateMarch 23, 2011May 20, 2015June 30, 2015
    Comment
  • Report card published and discussed at the Board of STEValue0.000.004.00
    DateMarch 23, 2011May 20, 2015June 30, 2015
    Comment
  • Audited annual performance data published and disseminated within four months after the end of the calendar year in the local pressto the customers and line MinistriesValue0.000.004.00
    DateMarch 23, 2011December 29, 2014June 30, 2015
    Comment
  • N'DjamenaValue3.005.805.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • SarhValue2.004.675.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • MoundouValue2.005.755.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • AbecheValue2.005.335.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment
  • DobaValue2.005.375.00
    DateJanuary 3, 2007May 20, 2015June 30, 2015
    Comment