Financier | Commitments |
---|---|
IDA Credit | 110.83 |
Borrower/Recipient | 20.76 |
P075058
Closed
Bushra Alam
Government of India
January 28, 2004
(as of board presentation)
December 16, 2004
January 27, 2005
US$ 131.59 million
Tamil Nadu Health Systems Project
2005
US$ 110.83 million
B
September 14, 2023
September 15, 2015
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 110.83 |
Borrower/Recipient | 20.76 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 110.83 |
IBRD + IDA Commitment | 110.83 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 131.59 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Dec 15, 2021 | IDA-40180 | Int Charges | 214,347.90 |
Dec 15, 2021 | IDA-40180 | Int Charges | 9,553.70 |
Dec 15, 2021 | IDA-40180 | Int Charges | 9,553.70 |
Dec 15, 2021 | IDA-40180 | Loan Repay | 1,058,506.10 |
Dec 16, 2004 | IDA-40180 | Loan Commitment | 110,830,000.00 |
Apr 29, 2010 | IDA-47560 | Loan Commitment | 117,700,000.00 |
Jun 15, 2024 | IDA-40180 | Int Charges | 170,168.31 |
Jun 15, 2024 | IDA-40180 | Int Charges | 170,168.31 |
Jun 15, 2024 | IDA-40180 | Int Charges | 50,125.94 |
Jun 15, 2024 | IDA-40180 | Int Charges | 50,125.94 |
Jun 15, 2024 | IDA-40180 | Loan Repay | 1,997,377.50 |
Apr 15, 2024 | IDA-47560 | Loan Repay | 2,169,743.80 |
Apr 15, 2024 | IDA-47560 | Int Charges | 237,826.38 |
Apr 15, 2024 | IDA-47560 | Int Charges | 237,826.38 |
Apr 15, 2024 | IDA-47560 | Loan Repay | 319,026.20 |
Apr 15, 2024 | IDA-47560 | Loan Repay | 48,044.77 |
Oct 15, 2023 | IDA-47560 | Int Charges | 35,319.50 |
Oct 15, 2023 | IDA-47560 | Int Charges | 35,319.50 |
Oct 15, 2023 | IDA-47560 | Loan Repay | 2,524,384.50 |
Oct 15, 2023 | IDA-47560 | Int Charges | 246,127.47 |
Oct 15, 2023 | IDA-47560 | Int Charges | 246,127.47 |
Dec 15, 2023 | IDA-40180 | Loan Repay | 1,998,051.80 |
Dec 15, 2023 | IDA-40180 | Int Charges | 131,918.10 |
Dec 15, 2023 | IDA-40180 | Int Charges | 131,918.10 |
Apr 15, 2020 | IDA-47560 | Loan Repay | 2,625,711.20 |
Apr 15, 2020 | IDA-47560 | Int Charges | 306,159.88 |
Apr 15, 2020 | IDA-47560 | Int Charges | 306,159.88 |
Dec 15, 2019 | IDA-40180 | Loan Repay | 12,149.42 |
Dec 15, 2019 | IDA-40180 | Loan Repay | 2,085,989.90 |
Dec 15, 2019 | IDA-40180 | Int Charges | 213,510.30 |
Dec 15, 2019 | IDA-40180 | Int Charges | 213,510.30 |
Oct 15, 2019 | IDA-47560 | Int Charges | 8,498.48 |
Oct 15, 2019 | IDA-47560 | Int Charges | 8,498.48 |
Oct 15, 2019 | IDA-47560 | Loan Repay | 2,641,573.20 |
Oct 15, 2019 | IDA-47560 | Int Charges | 316,988.80 |
Oct 15, 2019 | IDA-47560 | Int Charges | 316,988.80 |
Oct 15, 2021 | IDA-47560 | Int Charges | 295,895.12 |
Oct 15, 2021 | IDA-47560 | Loan Repay | 14,316.25 |
Oct 15, 2021 | IDA-47560 | Loan Repay | 1,346,121.10 |
Apr 15, 2021 | IDA-47560 | Int Charges | 2,198.16 |
Apr 15, 2021 | IDA-47560 | Int Charges | 2,198.16 |
Apr 15, 2021 | IDA-47560 | Loan Repay | 1,376,548.10 |
Apr 15, 2021 | IDA-47560 | Int Charges | 0.01 |
Apr 15, 2021 | IDA-47560 | Int Charges | 0.01 |
Jun 15, 2017 | IDA-40180 | Int Charges | 234,517.31 |
Jun 15, 2017 | IDA-40180 | Loan Repay | 66,889.92 |
Apr 15, 2017 | IDA-47560 | Loan Repay | 20,865.50 |
Jun 15, 2019 | IDA-40180 | Loan Repay | 2,064,966.60 |
Jun 15, 2019 | IDA-40180 | Loan Repay | 32,020.60 |
Jun 15, 2019 | IDA-40180 | Int Charges | 243,775.17 |
Jun 15, 2019 | IDA-40180 | Int Charges | 243,775.17 |
Apr 15, 2019 | IDA-47560 | Int Charges | 322,990.75 |
Apr 15, 2019 | IDA-47560 | Int Charges | 322,990.75 |
Apr 15, 2019 | IDA-47560 | Int Charges | 31,275.88 |
Apr 15, 2019 | IDA-47560 | Int Charges | 31,275.88 |
Apr 15, 2019 | IDA-47560 | Loan Repay | 2,679,692.00 |
Oct 15, 2018 | IDA-47560 | Loan Repay | 9,138.95 |
Oct 15, 2018 | IDA-47560 | Loan Repay | 2,684,698.00 |
Oct 15, 2018 | IDA-47560 | Int Charges | 312,023.25 |
Oct 15, 2018 | IDA-47560 | Int Charges | 312,023.25 |
Dec 15, 2018 | IDA-40180 | Loan Repay | 73,880.40 |
Dec 15, 2018 | IDA-40180 | Loan Repay | 2,016,527.80 |
Dec 15, 2018 | IDA-40180 | Int Charges | 250,849.40 |
Dec 15, 2018 | IDA-40180 | Int Charges | 250,849.40 |
Jun 15, 2018 | IDA-40180 | Loan Repay | 1,234.32 |
Jun 15, 2018 | IDA-40180 | Loan Repay | 2,137,773.50 |
Jun 15, 2018 | IDA-40180 | Int Charges | 264,702.66 |
Jun 15, 2018 | IDA-40180 | Int Charges | 264,702.66 |
Jun 15, 2020 | IDA-40180 | Int Charges | 205,771.47 |
Jun 15, 2020 | IDA-40180 | Int Charges | 205,771.47 |
Jun 15, 2020 | IDA-40180 | Loan Repay | 2,090,953.90 |
Jun 15, 2020 | IDA-40180 | Int Charges | 22,453.64 |
Jun 15, 2020 | IDA-40180 | Int Charges | 22,453.64 |
Apr 15, 2020 | IDA-47560 | Loan Repay | 7,922.39 |
Feb 20, 2014 | IDA-47560 | Loan Disb | 2,238,952.50 |
Dec 15, 2013 | IDA-40180 | Int Charges | 3,945.53 |
Dec 15, 2013 | IDA-40180 | Int Charges | 3,945.53 |
Dec 15, 2013 | IDA-40180 | Int Charges | 347,883.47 |
Dec 15, 2013 | IDA-40180 | Int Charges | 347,883.47 |
Oct 15, 2013 | IDA-47560 | Int Charges | 133.83 |
Oct 15, 2013 | IDA-47560 | Int Charges | 278,589.62 |
Oct 15, 2013 | IDA-47560 | Int Charges | 278,589.62 |
Feb 11, 2014 | IDA-47560 | Loan Disb | 4,479,365.50 |
Oct 8, 2013 | IDA-47560 | Loan Disb | 3,297,540.20 |
Oct 15, 2013 | IDA-47560 | Int Charges | 133.83 |
Jul 8, 2013 | IDA-47560 | Loan Disb | 4,661,321.50 |
Nov 17, 2014 | IDA-47560 | Loan Disb | 8,027,283.00 |
Nov 3, 2014 | IDA-47560 | Loan Disb | 536,514.00 |
Oct 15, 2014 | IDA-47560 | Int Charges | 3,257.81 |
Oct 15, 2014 | IDA-47560 | Int Charges | 3,257.81 |
Oct 15, 2014 | IDA-47560 | Int Charges | 336,206.75 |
Oct 15, 2014 | IDA-47560 | Int Charges | 336,206.75 |
Mar 9, 2015 | IDA-47560 | Loan Disb | 4,117,589.50 |
Dec 15, 2014 | IDA-40180 | Loan Repay | 1,947.32 |
Dec 15, 2014 | IDA-40180 | Loan Repay | 2,213,370.80 |
Dec 15, 2014 | IDA-40180 | Int Charges | 332,298.16 |
Dec 15, 2014 | IDA-40180 | Int Charges | 332,298.16 |
Jun 30, 2014 | IDA-47560 | Loan Disb | 842,902.00 |
Jun 15, 2014 | IDA-40180 | Int Charges | 1,807.04 |
Jun 15, 2014 | IDA-40180 | Int Charges | 1,807.04 |
Jun 15, 2014 | IDA-40180 | Int Charges | 350,063.75 |
Jun 15, 2014 | IDA-40180 | Int Charges | 350,063.75 |
Apr 23, 2014 | IDA-47560 | Loan Disb | 800,000.00 |
May 28, 2014 | IDA-47560 | Loan Disb | 360,837.00 |
Apr 15, 2014 | IDA-47560 | Int Charges | 2,689.19 |
Apr 15, 2014 | IDA-47560 | Int Charges | 2,689.19 |
Apr 15, 2014 | IDA-47560 | Int Charges | 320,925.56 |
Apr 15, 2014 | IDA-47560 | Int Charges | 320,925.56 |
Dec 2, 2013 | IDA-47560 | Loan Disb | 3,868,293.50 |
Apr 15, 2016 | IDA-47560 | Int Charges | 35,634.50 |
Apr 15, 2016 | IDA-47560 | Int Charges | 35,634.50 |
Apr 15, 2016 | IDA-47560 | Loan Repay | 2,726,844.50 |
Apr 15, 2016 | IDA-47560 | Int Charges | 387,586.62 |
Apr 15, 2016 | IDA-47560 | Int Charges | 387,586.62 |
Mar 11, 2016 | IDA-47560 | Loan Disb | 761,876.25 |
Mar 11, 2016 | IDA-47560 | Loan Disb | 1,050,223.40 |
Mar 11, 2016 | IDA-47560 | Loan Disb | 609,676.90 |
Oct 15, 2015 | IDA-47560 | Loan Repay | 7,484.70 |
Dec 15, 2015 | IDA-40180 | Int Charges | 301,089.28 |
Dec 15, 2015 | IDA-40180 | Int Charges | 301,089.28 |
Dec 15, 2015 | IDA-40180 | Int Charges | 54,822.51 |
Dec 15, 2015 | IDA-40180 | Int Charges | 54,822.51 |
Dec 15, 2015 | IDA-40180 | Loan Repay | 2,112,904.00 |
Oct 15, 2015 | IDA-47560 | Int Charges | 346,939.53 |
Oct 15, 2015 | IDA-47560 | Int Charges | 346,939.53 |
Oct 15, 2015 | IDA-47560 | Loan Repay | 2,743,280.00 |
Jul 8, 2015 | IDA-47560 | Loan Disb | 4,300,000.00 |
Aug 21, 2015 | IDA-47560 | Loan Disb | 3,919,468.50 |
Apr 15, 2015 | IDA-47560 | Int Charges | 10,225.07 |
Apr 15, 2015 | IDA-47560 | Int Charges | 10,225.07 |
Apr 15, 2015 | IDA-47560 | Int Charges | 330,167.94 |
Apr 15, 2015 | IDA-47560 | Int Charges | 330,167.94 |
Jun 15, 2015 | IDA-40180 | Loan Repay | 40,008.34 |
Jun 15, 2015 | IDA-40180 | Loan Repay | 2,088,918.80 |
Jun 15, 2015 | IDA-40180 | Int Charges | 256,117.73 |
Jun 15, 2015 | IDA-40180 | Int Charges | 256,117.73 |
Dec 15, 2016 | IDA-40180 | Int Charges | 274,181.28 |
Dec 15, 2016 | IDA-40180 | Int Charges | 274,181.28 |
Apr 15, 2021 | IDA-47560 | Int Charges | 304,561.28 |
Apr 15, 2021 | IDA-47560 | Int Charges | 304,561.28 |
Jun 15, 2021 | IDA-40180 | Int Charges | 24,702.12 |
Jun 15, 2021 | IDA-40180 | Int Charges | 24,702.12 |
Jun 15, 2021 | IDA-40180 | Loan Repay | 1,090,817.50 |
Jun 15, 2021 | IDA-40180 | Int Charges | 215,136.23 |
Jun 15, 2021 | IDA-40180 | Int Charges | 215,136.23 |
Dec 15, 2020 | IDA-40180 | Int Charges | 204,200.98 |
Dec 15, 2020 | IDA-40180 | Int Charges | 204,200.98 |
Dec 15, 2020 | IDA-40180 | Int Charges | 22,539.14 |
Dec 15, 2020 | IDA-40180 | Int Charges | 22,539.14 |
Dec 15, 2020 | IDA-40180 | Loan Repay | 1,089,915.50 |
Oct 15, 2020 | IDA-47560 | Int Charges | 303,848.50 |
Oct 15, 2020 | IDA-47560 | Int Charges | 303,848.50 |
Oct 15, 2020 | IDA-47560 | Loan Repay | 1,936.04 |
Oct 15, 2020 | IDA-47560 | Loan Repay | 1,358,154.40 |
Apr 15, 2022 | IDA-47560 | Loan Repay | 9,936.50 |
Apr 15, 2022 | IDA-47560 | Loan Repay | 1,306,677.90 |
Apr 15, 2022 | IDA-47560 | Int Charges | 281,426.30 |
Apr 15, 2022 | IDA-47560 | Int Charges | 281,426.30 |
Jun 15, 2022 | IDA-40180 | Loan Repay | 995,365.30 |
Jun 15, 2022 | IDA-40180 | Int Charges | 200,628.90 |
Jun 15, 2022 | IDA-40180 | Int Charges | 200,628.90 |
Jun 15, 2022 | IDA-40180 | Loan Repay | 14,086.34 |
Oct 15, 2021 | IDA-47560 | Int Charges | 295,895.12 |
Dec 15, 2023 | IDA-40180 | Loan Repay | 34,449.15 |
Jun 15, 2023 | IDA-40180 | Int Charges | 189,671.95 |
Jun 15, 2023 | IDA-40180 | Int Charges | 189,671.95 |
Jun 15, 2023 | IDA-40180 | Int Charges | 90,614.81 |
Jun 15, 2023 | IDA-40180 | Int Charges | 90,614.81 |
Jun 15, 2023 | IDA-40180 | Loan Repay | 2,023,163.00 |
Apr 15, 2023 | IDA-47560 | Loan Repay | 93,462.75 |
Apr 15, 2023 | IDA-47560 | Loan Repay | 2,517,006.80 |
Apr 15, 2023 | IDA-47560 | Int Charges | 227,786.10 |
Apr 15, 2023 | IDA-47560 | Int Charges | 227,786.10 |
Dec 15, 2022 | IDA-40180 | Loan Repay | 1,985,953.10 |
Dec 15, 2022 | IDA-40180 | Int Charges | 106,338.72 |
Dec 15, 2022 | IDA-40180 | Int Charges | 106,338.72 |
Dec 15, 2022 | IDA-40180 | Loan Repay | 31,419.09 |
Oct 15, 2022 | IDA-47560 | Loan Repay | 2,419,701.50 |
Oct 15, 2022 | IDA-47560 | Loan Repay | 40,278.50 |
Oct 15, 2022 | IDA-47560 | Int Charges | 258,297.89 |
Oct 15, 2022 | IDA-47560 | Int Charges | 258,297.89 |
Dec 15, 2021 | IDA-40180 | Int Charges | 214,347.90 |
Dec 15, 2016 | IDA-40180 | Int Charges | 1,019.71 |
Dec 15, 2016 | IDA-40180 | Int Charges | 1,019.71 |
Dec 15, 2016 | IDA-40180 | Loan Repay | 2,030,969.90 |
Oct 15, 2016 | IDA-47560 | Int Charges | 1,190.01 |
Oct 15, 2016 | IDA-47560 | Int Charges | 1,190.01 |
Oct 15, 2016 | IDA-47560 | Loan Repay | 2,656,817.00 |
Jun 15, 2016 | IDA-40180 | Loan Repay | 42,669.32 |
Jun 15, 2016 | IDA-40180 | Loan Repay | 2,089,001.60 |
Jun 15, 2016 | IDA-40180 | Int Charges | 294,699.50 |
Jun 15, 2016 | IDA-40180 | Int Charges | 294,699.50 |
Oct 15, 2016 | IDA-47560 | Int Charges | 378,596.40 |
Oct 15, 2016 | IDA-47560 | Int Charges | 378,596.40 |
Mar 15, 2016 | IDA-47560 | Loan Cancel | 681,684.20 |
Apr 15, 2018 | IDA-47560 | Int Charges | 16,768.87 |
Apr 15, 2018 | IDA-47560 | Int Charges | 16,768.87 |
Apr 15, 2018 | IDA-47560 | Loan Repay | 2,802,854.80 |
Apr 15, 2018 | IDA-47560 | Int Charges | 367,874.66 |
Apr 15, 2018 | IDA-47560 | Int Charges | 367,874.66 |
Dec 15, 2017 | IDA-40180 | Int Charges | 41,421.11 |
Dec 15, 2017 | IDA-40180 | Int Charges | 41,421.11 |
Dec 15, 2017 | IDA-40180 | Loan Repay | 2,143,570.80 |
Dec 15, 2017 | IDA-40180 | Int Charges | 273,305.66 |
Dec 15, 2017 | IDA-40180 | Int Charges | 273,305.66 |
Oct 15, 2017 | IDA-47560 | Int Charges | 19,836.11 |
Oct 15, 2017 | IDA-47560 | Int Charges | 19,836.11 |
Oct 15, 2017 | IDA-47560 | Loan Repay | 2,726,444.00 |
Oct 15, 2017 | IDA-47560 | Int Charges | 351,758.25 |
Oct 15, 2017 | IDA-47560 | Int Charges | 351,758.25 |
Apr 15, 2017 | IDA-47560 | Int Charges | 344,223.72 |
Apr 15, 2017 | IDA-47560 | Int Charges | 344,223.72 |
Apr 15, 2017 | IDA-47560 | Loan Repay | 16,424.66 |
Apr 15, 2017 | IDA-47560 | Loan Repay | 2,580,887.80 |
Jun 15, 2017 | IDA-40180 | Loan Repay | 2,028,384.20 |
Jun 15, 2017 | IDA-40180 | Int Charges | 234,517.31 |
Name | Review | Date |
---|---|---|
Overall Safeguards Rating | Satisfactory | 2015-09-02 |
Counterpart Funding | Satisfactory | 2015-09-02 |
Financial Management | Satisfactory | 2015-09-02 |
Overall Implementation Progress (IP) | Satisfactory | 2015-09-02 |
Progress towards achievement of PDO | Satisfactory | 2015-09-02 |
Project Management | Satisfactory | 2015-09-02 |
Monitoring and Evaluation | Satisfactory | 2015-09-02 |
Procurement | Satisfactory | 2015-09-02 |
Overall Safeguards Rating | Satisfactory | 2015-09-02 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 07-25-2016 |
---|---|
Outcomes | Highly Satisfactory |
Risk to Development Outcome | Negligible |
Bank Performance | Highly Satisfactory |
Borrower Performance | Highly Satisfactory |
Government Performance | Highly Satisfactory |
Implementing Agency | Substantial |
INDICATOR | ICR REVIEW: 03-27-2017 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Satisfactory | N/a |
Risk To Development Outcome | Negligible | N/a |
Bank Performance | Satisfactory | N/a |
Borrower Performance | Satisfactory | N/a |
Government Performance | Highly Satisfactory | N/a |
Implementing Agency | Satisfactory | N/a |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Improved access to health care, as measured by inpatient utilization of services by the poorest of the population: proportion of population reporting ailment in last 15 days (36.7 per 1000) | Value | 8.50 | 13.20 | 0.00 |
Date | September 30, 2010 | June 30, 2015 | September 15, 2015 | |
Comment |
Improved patient satisfaction as shown by periodic surveys | Value | Overall satisfaction score is 3.96 | Overall Patient Satisfaction Score: 3.9; Overall | Maintain or increase patient satisfaction. |
Date | September 30, 2006 | June 30, 2015 | September 15, 2015 | |
Comment |
Cancer cervix screening and cardio-vascular disease prevention and treatment pilot scaled-up based on comprehensive assessments | Value | Cervical cancer screening operational in Theni and | Screening, treatment and follow-up of CaCx, CaB, H | Scale up on the basis of pilot evaluation |
Date | September 30, 2010 | June 30, 2015 | September 15, 2015 | |
Comment |
Proportion of C-sec deliveries amongst SC/ST mothers at secondary level CEmONCs | Value | 28.11 | 39.80 | 43.00 |
Date | March 31, 2008 | June 30, 2015 | September 15, 2015 | |
Comment |
No. of public hospitals accredited by the National Board of Accreditation of Hospitals | Value | 0.00 | 9.00 | 12.00 |
Date | March 31, 2010 | June 30, 2015 | September 15, 2015 | |
Comment |
Percentage of these who accessed any form of care | Value | 76.00 | 97.50 | 0.00 |
Date | September 30, 2010 | May 31, 2015 | September 15, 2015 | |
Comment |
No: of hospitalization cases per 1000 | Value | 33.40 | 41.90 | 0.00 |
Date | September 30, 2010 | May 31, 2015 | September 15, 2015 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Health personnel receiving training (number) | Value | 0.00 | 398285.00 | 403309.00 |
Date | August 6, 2010 | June 30, 2015 | September 15, 2015 | |
Comment |
No: of public health facilities implementing integrated health care waste management plan | Value | 267.00 | 450.00 | 449.00 |
Date | March 31, 2008 | June 30, 2015 | September 15, 2015 | |
Comment |
Health facilities constructed, renovated, and/or equipped (number) | Value | 0.00 | 2330.00 | 2228.00 |
Date | March 31, 2010 | June 30, 2015 | September 15, 2015 | |
Comment |
Total no. of complicated SC/ST maternal admissions at certified CEmONCs* (*where CEmONCs are certified to have at least 2 OBGYNs, 2pediatriciants and 1 anesthetist) | Value | 35156.00 | 55791.00 | 66000.00 |
Date | March 31, 2008 | June 30, 2015 | September 15, 2015 | |
Comment |
No. of health facilities where HMIS is used to submit monthly reports | Value | 0.00 | 2300.00 | 2228.00 |
Date | March 31, 2010 | June 30, 2015 | September 15, 2015 | |
Comment |
Percentage of eligible women in age group 30-60 years screened for cancer cervix | Value | 3.40 | 65.60 | 40.00 |
Date | September 30, 2010 | June 30, 2015 | September 15, 2015 | |
Comment |
Number of schools where health promotion activities for prevention of cardiovascular diseases is undertaken | Value | 50.00 | 16369.00 | 16369.00 |
Date | March 31, 2010 | June 30, 2015 | September 15, 2015 | |
Comment |
Number of performance based contracts delivering health care services through TNHSP in Tamil Nadu | Value | 0.00 | 37.00 | 9.00 |
Date | September 30, 2010 | June 30, 2015 | September 15, 2015 | |
Comment |
No: of tribal patients provided outpatient care through Mobile Outreach Vans | Value | 137543.00 | 187683.00 | 200000.00 |
Date | March 31, 2008 | June 30, 2015 | September 15, 2015 | |
Comment |
Percentage of calls made by pregnant women attended to by 108 services | Value | 90.30 | 99.30 | 96.80 |
Date | March 31, 2010 | June 30, 2015 | September 15, 2015 | |
Comment |
Percentage of eligible persons (both men and women) in age group >30years screened for hypertension | Value | 3.40 | 65.50 | 50.00 |
Date | September 30, 2010 | June 30, 2015 | September 15, 2015 | |
Comment |
Percentage of calls made for Road Traffic Accident victims attended by 108 services | Value | 66.10 | 87.40 | 79.40 |
Date | March 31, 2010 | June 30, 2015 | September 15, 2015 | |
Comment |