Support for Poor and Disadvantaged Areas Project

Abstract*

The project for Support for Poor and Disadvantaged Areas for Indonesia will help the Indonesian government address problems of governance and poverty in the 100 poorest districts of the country. The project consists of the following four components: Component 1) the project will provide subdistricts with unearmarked block grants that can be Rps. 500, 750, or 1,000 million rupiah, depending on their population. Component 2) district and subdistrict...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

To strengthen governance, promote growth, and improve service delivery in 32 of the poorest districts of Indonesia.

Key Details

Project Details

  • P078070

  • Closed

  • Natasha Hayward

  • N/A

  • Indonesia

  • January 20, 2004

  • (as of board presentation)

    June 9, 2005

  • December 1, 2005

  • US$ 104.00 million

  • B

  • Not Applicable

  • December 31, 2012

  • BANK APPROVED

  • January 15, 2013

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Credit 35.00
Borrower/Recipient 30.65
International Bank for Reconstruction and Development 69.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 69.00
IDA Commitment 35.00
IBRD + IDA Commitment 104.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 134.65

Summary Status of World Bank Financing (US$ Millions) as of April 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of April 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
May 15, 2020 IDA-40760 Loan Repay 769,068.50
May 15, 2020 IBRD-77760 Int Charges 208,200.45
Nov 15, 2019 IBRD-77760 Int Charges 281,293.62
Nov 15, 2019 IBRD-77760 Int Charges 404,451.40
Nov 15, 2019 IBRD-77760 Loan Repay 1,185,144.80
Nov 15, 2019 IBRD-77760 Loan Repay 1,219,574.80
Nov 15, 2019 IDA-40760 Loan Repay 6,135.47
Nov 15, 2019 IDA-40760 Loan Repay 771,487.10
Nov 15, 2019 IDA-40760 Int Charges 57,506.76
Nov 15, 2019 IDA-40760 Int Charges 57,506.76
May 15, 2022 IDA-40760 Loan Repay 1,481,107.80
May 15, 2022 IDA-40760 Int Charges 39,526.02
May 15, 2022 IDA-40760 Int Charges 39,526.02
May 15, 2022 IDA-40760 Loan Repay 24,646.01
May 15, 2022 IBRD-77760 Int Charges 55,507.95
Nov 15, 2021 IBRD-77760 Int Charges 278,857.60
Nov 15, 2021 IBRD-77760 Int Charges 61,716.86
Nov 15, 2021 IDA-40760 Int Charges 6,019.63
Nov 15, 2021 IDA-40760 Int Charges 6,019.63
Nov 15, 2021 IDA-40760 Loan Repay 1,589,665.10
Nov 15, 2021 IBRD-77760 Loan Repay 1,263,820.90
Nov 15, 2021 IBRD-77760 Loan Repay 1,299,975.20
Nov 15, 2021 IDA-40760 Int Charges 47,689.93
Nov 15, 2021 IDA-40760 Int Charges 47,689.93
May 15, 2021 IDA-40760 Loan Repay 813,937.80
May 15, 2021 IDA-40760 Int Charges 45,724.17
May 15, 2021 IDA-40760 Int Charges 45,724.17
May 15, 2021 IDA-40760 Int Charges 1,946.04
May 15, 2021 IDA-40760 Int Charges 1,946.04
May 15, 2021 IBRD-77760 Int Charges 71,337.88
May 15, 2021 IBRD-77760 Int Charges 311,022.47
May 15, 2021 IBRD-77760 Loan Repay 1,243,083.10
May 15, 2021 IBRD-77760 Loan Repay 1,278,922.10
May 15, 2023 IDA-40760 Int Charges 15,109.81
May 15, 2023 IDA-40760 Int Charges 15,109.81
May 15, 2023 IBRD-77760 Loan Repay 1,327,904.50
May 15, 2023 IBRD-77760 Loan Repay 1,366,136.40
May 15, 2023 IBRD-77760 Int Charges 209,196.27
May 15, 2023 IBRD-77760 Int Charges 179,029.98
May 15, 2023 IDA-40760 Loan Repay 1,519,207.20
May 15, 2023 IDA-40760 Int Charges 24,859.52
May 15, 2023 IDA-40760 Int Charges 24,859.52
Nov 15, 2022 IBRD-77760 Int Charges 121,570.85
Nov 15, 2022 IBRD-77760 Int Charges 212,858.80
Nov 15, 2022 IBRD-77760 Loan Repay 1,307,166.80
Nov 15, 2022 IBRD-77760 Loan Repay 1,345,082.20
Nov 15, 2022 IDA-40760 Loan Repay 56,387.50
Nov 15, 2022 IDA-40760 Loan Repay 1,432,620.20
Nov 15, 2022 IDA-40760 Int Charges 9,137.32
Nov 15, 2022 IDA-40760 Int Charges 9,137.32
May 15, 2022 IBRD-77760 Loan Repay 1,287,152.00
May 15, 2022 IBRD-77760 Loan Repay 1,324,231.10
May 15, 2022 IBRD-77760 Int Charges 246,163.22
Jun 9, 2005 IDA-40760 Loan Commitment 35,000,000.00
Jun 9, 2005 IBRD-47880 Loan Commitment 69,000,000.00
May 15, 2024 IDA-40760 Int Charges 16,844.86
May 15, 2024 IDA-40760 Int Charges 16,844.86
May 15, 2024 IDA-40760 Loan Repay 1,497,324.20
May 15, 2024 IBRD-77760 Int Charges 109,703.22
May 15, 2024 IBRD-77760 Int Charges 143,940.47
May 15, 2024 IBRD-77760 Loan Repay 1,375,054.00
May 15, 2024 IBRD-77760 Loan Repay 1,414,854.20
May 15, 2024 IDA-40760 Int Charges 8,818.59
May 15, 2024 IDA-40760 Int Charges 8,818.59
Nov 15, 2023 IBRD-77760 Int Charges 179,594.77
Nov 15, 2023 IBRD-77760 Int Charges 144,671.64
Nov 15, 2023 IBRD-77760 Loan Repay 1,351,723.00
Nov 15, 2023 IBRD-77760 Loan Repay 1,390,394.20
Nov 15, 2023 IDA-40760 Int Charges 13,212.86
Nov 15, 2023 IDA-40760 Int Charges 13,212.86
Nov 15, 2023 IDA-40760 Loan Repay 1,500,752.60
Nov 15, 2023 IDA-40760 Int Charges 13,672.51
Nov 15, 2023 IDA-40760 Int Charges 13,672.51
Nov 15, 2014 IDA-40760 Loan Repay 823,117.10
Nov 15, 2013 IDA-40760 Loan Repay 10,800.42
Nov 15, 2013 IDA-40760 Loan Repay 853,885.90
Nov 15, 2013 IDA-40760 Int Charges 111,042.54
Nov 15, 2013 IDA-40760 Int Charges 111,042.54
Nov 15, 2013 IBRD-77760 Loan Repay 996,632.44
Nov 15, 2013 IBRD-77760 Int Charges 246.11
Nov 15, 2013 IBRD-77760 Int Charges 197,614.75
Nov 15, 2013 IBRD-77760 Int Charges 734,445.80
Nov 15, 2013 IBRD-77760 Loan Repay 970,334.44
Nov 15, 2014 IBRD-77760 Int Charges 169,101.56
Nov 15, 2014 IBRD-77760 Int Charges 683,876.50
May 15, 2019 IDA-40760 Int Charges 63,541.31
May 15, 2019 IBRD-77760 Int Charges 434,599.38
May 15, 2019 IBRD-77760 Loan Repay 1,165,129.90
May 15, 2019 IBRD-77760 Loan Repay 1,198,724.60
May 15, 2019 IDA-40760 Loan Repay 769,078.30
May 15, 2019 IBRD-77760 Int Charges 320,133.90
May 15, 2019 IDA-40760 Loan Repay 12,968.41
Nov 15, 2018 IBRD-77760 Int Charges 316,437.10
Nov 15, 2018 IBRD-77760 Int Charges 464,223.00
Nov 15, 2018 IBRD-77760 Loan Repay 1,145,115.10
Nov 15, 2018 IBRD-77760 Loan Repay 1,177,876.50
Nov 15, 2018 IDA-40760 Loan Repay 15,512.92
Nov 15, 2018 IDA-40760 Loan Repay 766,160.44
Nov 15, 2018 IDA-40760 Int Charges 70,350.60
Nov 15, 2018 IDA-40760 Int Charges 70,350.60
Jan 15, 2019 IDA-40760 Loan Repay 1,578,791.50
May 15, 2018 IBRD-77760 Int Charges 493,322.20
May 15, 2018 IBRD-77760 Loan Repay 1,124,377.50
May 15, 2018 IBRD-77760 Loan Repay 1,157,026.50
May 15, 2018 IBRD-77760 Int Charges 244,490.31
May 15, 2018 IDA-40760 Int Charges 75,750.82
May 15, 2018 IDA-40760 Int Charges 75,750.82
May 15, 2018 IDA-40760 Loan Repay 6,852.09
May 15, 2018 IDA-40760 Loan Repay 801,156.70
Nov 15, 2020 IDA-40760 Loan Repay 11,386.77
Nov 15, 2020 IDA-40760 Int Charges 52,299.27
Nov 15, 2020 IDA-40760 Int Charges 52,299.27
Nov 15, 2020 IBRD-77760 Loan Repay 1,223,068.40
Nov 15, 2020 IBRD-77760 Loan Repay 1,258,071.00
Nov 15, 2020 IBRD-77760 Int Charges 109,011.66
Nov 15, 2020 IBRD-77760 Int Charges 342,662.97
Nov 15, 2020 IDA-40760 Loan Repay 791,869.75
May 15, 2020 IDA-40760 Int Charges 806.00
May 15, 2020 IDA-40760 Int Charges 806.00
May 15, 2020 IBRD-77760 Int Charges 373,779.12
May 15, 2020 IBRD-77760 Loan Repay 1,202,566.10
May 15, 2020 IBRD-77760 Loan Repay 1,237,224.00
May 15, 2020 IDA-40760 Int Charges 54,796.14
May 15, 2020 IDA-40760 Int Charges 54,796.14
Nov 15, 2014 IBRD-77760 Loan Repay 1,003,774.75
Nov 15, 2014 IBRD-77760 Loan Repay 1,031,518.94
Nov 15, 2014 IDA-40760 Int Charges 105,645.33
Nov 15, 2014 IDA-40760 Int Charges 105,645.33
Nov 15, 2014 IDA-40760 Loan Repay 5,473.57
Nov 15, 2015 IBRD-77760 Int Charges 167,431.52
Nov 15, 2015 IBRD-77760 Int Charges 631,638.10
May 15, 2015 IBRD-77760 Int Charges 161,316.31
May 15, 2015 IBRD-77760 Int Charges 657,933.80
May 15, 2016 IBRD-77760 Int Charges 181,091.95
May 15, 2016 IBRD-77760 Int Charges 604,903.75
May 15, 2016 IBRD-77760 Loan Repay 1,051,221.40
May 15, 2016 IBRD-77760 Loan Repay 1,080,440.80
Sep 29, 2016 IDA-40760 Loan Disb -7,838.00
Sep 29, 2016 IDA-40760 Loan Cancel 7,838.00
Sep 29, 2016 IBRD-77760 Loan Cancel 27,622.00
Nov 15, 2015 IDA-40760 Loan Repay 783,304.30
Nov 15, 2015 IDA-40760 Int Charges 93,996.50
Nov 15, 2015 IDA-40760 Int Charges 93,996.50
Nov 15, 2015 IDA-40760 Int Charges 28,017.57
Nov 15, 2015 IDA-40760 Int Charges 28,017.57
Nov 15, 2015 IBRD-77760 Loan Repay 1,034,501.25
Nov 15, 2015 IBRD-77760 Loan Repay 1,062,998.60
Nov 15, 2017 IBRD-77760 Int Charges 244,375.98
Nov 15, 2017 IBRD-77760 Int Charges 521,897.03
Nov 15, 2017 IBRD-77760 Loan Repay 1,104,362.60
Nov 15, 2017 IBRD-77760 Loan Repay 1,136,176.40
Nov 15, 2017 IDA-40760 Int Charges 77,938.02
Nov 15, 2017 IDA-40760 Int Charges 77,938.02
Nov 15, 2017 IDA-40760 Int Charges 13,367.22
Nov 15, 2017 IDA-40760 Int Charges 13,367.22
Nov 15, 2017 IDA-40760 Loan Repay 799,364.20
May 15, 2017 IDA-40760 Loan Repay 751,839.50
May 15, 2017 IDA-40760 Int Charges 67,534.94
May 15, 2017 IDA-40760 Int Charges 67,534.94
May 15, 2017 IDA-40760 Loan Repay 23,435.24
May 15, 2017 IBRD-77760 Int Charges -26.60
May 15, 2017 IBRD-77760 Int Charges 17.73
May 15, 2017 IBRD-77760 Int Charges 234,045.02
May 15, 2017 IBRD-77760 Int Charges 550,033.20
May 15, 2017 IBRD-77760 Loan Repay 1,087,781.20
May 15, 2017 IBRD-77760 Loan Repay 1,118,734.10
May 15, 2017 IBRD-77760 Int Charges 8.87
May 15, 2017 IBRD-77760 Int Charges 8.87
May 15, 2017 IBRD-77760 Int Charges 57.49
May 15, 2017 IDA-40760 Int Charges -4.92
May 15, 2017 IDA-40760 Int Charges 4.92
May 15, 2019 IDA-40760 Int Charges 63,541.31
May 15, 2015 IBRD-77760 Loan Repay 1,017,781.06
May 15, 2015 IBRD-77760 Loan Repay 1,045,553.30
May 15, 2015 IDA-40760 Loan Repay 22,741.73
May 15, 2015 IDA-40760 Loan Repay 778,616.00
May 15, 2015 IDA-40760 Int Charges 70,504.67
May 15, 2015 IDA-40760 Int Charges 70,504.67
May 15, 2014 IDA-40760 Int Charges 5,758.09
May 15, 2014 IDA-40760 Int Charges 5,758.09
May 15, 2014 IDA-40760 Loan Repay 872,875.44
May 15, 2014 IDA-40760 Int Charges 114,564.93
May 15, 2014 IDA-40760 Int Charges 114,564.93
May 15, 2014 IBRD-77760 Int Charges 178,069.38
May 15, 2014 IBRD-77760 Int Charges 709,380.50
May 15, 2014 IBRD-77760 Loan Repay 987,054.56
May 15, 2014 IBRD-77760 Loan Repay 1,014,074.70
Nov 15, 2016 IBRD-77760 Int Charges 210,224.50
Nov 15, 2016 IBRD-77760 Int Charges 577,730.60
Nov 15, 2016 IBRD-77760 Loan Repay 1,071,262.20
Nov 15, 2016 IBRD-77760 Loan Repay 1,101,290.90
Nov 15, 2016 IDA-40760 Loan Repay 771,685.56
Nov 15, 2016 IDA-40760 Int Charges 86,807.33
Nov 15, 2016 IDA-40760 Int Charges 86,807.33
Nov 15, 2016 IDA-40760 Int Charges 10,518.87
Nov 15, 2016 IDA-40760 Int Charges 10,518.87
Jan 17, 2017 IDA-40760 Loan Repay 1,535,127.40
Sep 29, 2016 IBRD-77760 Loan Disb -27,622.00
May 15, 2016 IDA-40760 Loan Repay 17,281.17
May 15, 2016 IDA-40760 Loan Repay 781,241.25
May 15, 2016 IDA-40760 Int Charges 81,943.54
May 15, 2016 IDA-40760 Int Charges 81,943.54

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Project Management Moderately Satisfactory 2013-05-18
Progress towards achievement of PDO Moderately Satisfactory 2013-05-18
Financial Management Moderately Satisfactory 2013-05-18
Monitoring and Evaluation Moderately Satisfactory 2013-05-18
Procurement Moderately Satisfactory 2013-05-18
Counterpart Funding Moderately Satisfactory 2013-05-18
Overall Implementation Progress (IP) Moderately Satisfactory 2013-05-18

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 06-20-2013
OutcomesModerately Satisfactory
Risk to Development OutcomeModest
Bank PerformanceModerately Unsatisfactory
Borrower PerformanceModerately Satisfactory
Government PerformanceModerately Satisfactory
Implementing AgencyModerately Satisfactory

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 06-29-2015PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeModerateN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceModerately SatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualitySatisfactoryN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • % Increase in national primary school test scores in participating districtsValue0Decreased 5% for elementary school and increase 6%[Not yet defined]
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentReduction of primary school test scores due to changing policy on national test score. Source: WB-Education Database
  • Improved access to cost effective, high-quality rural infrastructure (ERR>20%) through participatory planning processes in 8 provincesValue034.41%>20%
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentBased on assessment of 32 infrastructure sub-projects in eight provinces. The results are similar to PNPM survey, a full EIRRstudyreport was therefore not launched. All SPADA sub-projects used planning participatory process(source: assessment report byKPDT)
  • Increased use of Alternative Dispute Resolution and Legal mechanism by communities to resolve disputes peacefully in Makulu provinceValue32 cases (25 cases for criminal and 7 cases for ciNot Defined
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentIncluding 25 cases for criminal and seven cases for civil. This was reached through Mediation and Community Legal Empowerment(MCLE) program.Source: MCLE Final Report 2011
  • Increase in new business registrationsValue2,7544,762330
    DateJune 1, 2007December 31, 2012December 31, 2012
    CommentBusiness registrations increased more than 73% in the 20 target districts. Cumulative number of registration 2007-2010: 14,482.Source: PSD Final Report 2011
  • % decrease in number of violent conflict incidentsValue12498[Not yet defined]
    DateJanuary 1, 2010December 31, 2012December 31, 2012
    CommentBased on data from five districts in Maluku for issues related to conflicts. MCLE only operated in Maluku since 201021 % decrease in number of violent conflict incidents. Source: national violence monitoring system database,http://www.snpk-indonesia.com/
  • % Increase in use of public health services (# of new patients)Value01,570,380Not yet defined
    DateDecember 31, 2007December 31, 2012December 31, 2012
    CommentThe new patients increased 41%; calculated based on secondary data from Ministry of Health. Source: Provincial Health Profile

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • # Recommendations by Business-Government forums for regulatory improvements available in seven districts.Value057
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentBased on PSD Final Report 2011, the recommendations by Business-Government Forum with regards to regulatory improvement wereavailable in five districts (Alor, TTS, Lembata, Belu, Maluku Tengah)
  • % of planned consultants are in place at start of annual cycle.Value02007 = 72%2008 = 72%2009 = 81%2010 = 91%2011 =>70 %
    DateJune 1, 2006December 31, 2012December 31, 2011
    CommentSource: Project MIS
  • Unified MIS system functioningValue011
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentBased on NMC annual report, all participating districts and project team at central llevel used data from the MIS as the mainsource for monitoring and reports.
  • Baseline and impact surveys and thematic studies completed.Value053 baseline and impact surveys and studies
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentIncluding GSD survey in 2008, two assessments to investment climate (2009), study on participatory planning (2011), and study ofproject outputs (Oct 2012).
  • % of planned annual financing for sub-district grants disbursedValue0100% for 2007 cycle; 100% for 2008 cycle; 100% for70 %
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentBased on data source from project MIS. The sub district grants include planning grant and block grant. No disbursement in 2011
  • % of sub-district infrastructure quality classified as "satisfactory" to "excellent".Value092%70 %
    DateJune 1, 2006December 31, 2012December 31, 2012
    Comment
  • primary schools rehabilitatedValue0854300
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentBased on data source from project MIS.
  • health clinics rehabilitatedValue039750
    DateJune 1, 2006December 31, 2012December 31, 2012
    Commentased on data source from project MIS.
  • % of district grants disbursedValue0100% for 2007 cycle; 96% for 2008 cycle; 100% for 70 %
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentBased on data source from project MIS. The sub district grants include planning grant and block grant.
  • % of district infrastructure quality classified as "satisfactory" to "excellent"Value088%70 %
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentBased on data source from project MIS. Through output study, an independent firm was conducting assessment to reviewinfrastructurequality and local government follow up for asset inventory and operation and maintenance cost. The result showed96.4% of infrastructure sub project was maintained
  • # persons benefiting from legal aid, case handling assistance through the project.Value067,548500
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentThe figure, while appearing way in excess of the target, is the total beneficiaries involved in the 32 cases handled by MCLEprogram. Source: MCLE Final Report 2011.
  • # health and education committees trained and established involving range of government and non-government actorsValue05835
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentBased on project MIS, this includes 26 health committees and 32 education committees
  • # teachers, principals and education committee members trained.Value011,93510,000
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentBased on project MIS, the achievement including beneficiaries from additional/top up activities in 2011
  • # health workers receiving training in improved health service delivery.Value07,0391,500
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentBased on data source from project MIS.
  • #Assessments of obstacles to local private sector development completedValue029 districts20 districts
    DateJune 1, 2006December 31, 2012December 31, 2012
    CommentBased on data source from project MIS.