Community-Based Rural Development

Abstract*

The development objective of the Community Based Rural Development Project is to improve the living conditions of village communities, in terms of sustainable income increase, access to basic socio-economic services, and improved natural resource management practices. The project would achieve its objective through capacity building, and investments in economic, social and environmental sub-projects, implemented by these communities. The capacity...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

Improve the living conditions of project-supported village communities in terms of sustainable income increase, access to basic socio-economic services, and improved natural management practices.

Key Details

Project Details

  • P081368

  • Closed

  • Salamata Bal

  • N/A

  • Mauritania

  • July 31, 2003

  • (as of board presentation)

    April 20, 2004

  • October 23, 2004

  • US$ 45.00 million

  • B

  • Not Applicable

  • December 31, 2011

  • BANK APPROVED

  • January 15, 2013

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Credit 45.00
Local Communities 7.30
Borrower/Recipient 5.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 45.00
IBRD + IDA Commitment 45.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 57.30

Summary Status of World Bank Financing (US$ Millions) as of April 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of April 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Oct 3, 2014 IDA-38830 Int Charges 811.62
Oct 3, 2014 IDA-38830 Int Charges 811.62
Oct 3, 2014 IDA-38830 Loan Repay 436,727.10
Oct 3, 2014 IDA-38830 Int Charges 163,772.66
Oct 3, 2014 IDA-38830 Int Charges 163,772.66
Apr 7, 2016 IDA-38830 Int Charges 51.01
Apr 7, 2016 IDA-38830 Int Charges 138,277.45
Apr 7, 2016 IDA-38830 Int Charges 138,277.45
Apr 7, 2016 IDA-38830 Int Charges 4,883.92
Apr 7, 2016 IDA-38830 Int Charges 4,883.92
Oct 7, 2015 IDA-38830 Loan Repay 407,359.78
Oct 7, 2015 IDA-38830 Int Charges 41.10
Oct 7, 2015 IDA-38830 Int Charges 41.10
Oct 7, 2015 IDA-38830 Int Charges 147,364.20
Oct 7, 2015 IDA-38830 Int Charges 147,364.20
Oct 1, 2015 IDA-38830 Loan Repay 6,868.39
Apr 6, 2015 IDA-38830 Loan Repay 390,649.88
Apr 6, 2015 IDA-38830 Int Charges 17.10
Apr 6, 2015 IDA-38830 Int Charges 17.10
Apr 6, 2015 IDA-38830 Int Charges 152,304.23
Apr 6, 2015 IDA-38830 Int Charges 152,304.23
Apr 1, 2015 IDA-38830 Loan Repay 19,407.35
Apr 7, 2014 IDA-38830 Int Charges 169,390.75
Apr 7, 2014 IDA-38830 Int Charges 169,390.75
Apr 7, 2014 IDA-38830 Int Charges 2,956.78
Apr 7, 2014 IDA-38830 Int Charges 2,956.78
Oct 8, 2013 IDA-38830 Int Charges 161,753.52
Oct 8, 2013 IDA-38830 Int Charges 161,753.52
Oct 1, 2013 IDA-38830 Int Charges 5,035.80
Oct 1, 2013 IDA-38830 Int Charges 5,035.80
Oct 9, 2018 IDA-38830 Int Charges 141,143.10
Oct 1, 2018 IDA-38830 Loan Repay 2,915.85
Apr 6, 2018 IDA-38830 Int Charges 79.32
Apr 6, 2018 IDA-38830 Int Charges 148,710.34
Apr 6, 2018 IDA-38830 Int Charges 148,710.34
Apr 6, 2018 IDA-38830 Int Charges 88.63
Apr 6, 2018 IDA-38830 Int Charges 88.63
Apr 6, 2018 IDA-38830 Loan Repay 426,409.53
Apr 6, 2018 IDA-38830 Int Charges 79.32
Oct 10, 2017 IDA-38830 Int Charges 146,484.28
Oct 10, 2017 IDA-38830 Int Charges 146,484.28
Oct 10, 2017 IDA-38830 Loan Repay 412,467.28
Oct 10, 2017 IDA-38830 Int Charges 86.10
Oct 10, 2017 IDA-38830 Int Charges 86.10
Oct 1, 2017 IDA-38830 Loan Repay 3,338.86
Apr 1, 2017 IDA-38830 Loan Repay 2,403.52
Apr 11, 2017 IDA-38830 Int Charges 41.56
Apr 11, 2017 IDA-38830 Int Charges 41.56
Apr 11, 2017 IDA-38830 Int Charges 142,097.25
Apr 11, 2017 IDA-38830 Int Charges 142,097.25
Apr 11, 2017 IDA-38830 Loan Repay 396,469.90
Oct 6, 2016 IDA-38830 Int Charges 12,476.79
Oct 6, 2016 IDA-38830 Int Charges 12,476.79
Oct 6, 2016 IDA-38830 Loan Repay 409,599.30
Oct 6, 2016 IDA-38830 Int Charges 51.20
Oct 6, 2016 IDA-38830 Int Charges 51.20
Oct 6, 2016 IDA-38830 Int Charges 147,455.73
Oct 6, 2016 IDA-38830 Int Charges 147,455.73
Apr 7, 2016 IDA-38830 Loan Repay 414,887.62
Apr 7, 2016 IDA-38830 Int Charges 51.01
Apr 5, 2022 IDA-38830 Int Charges 129,158.50
Apr 5, 2022 IDA-38830 Int Charges 129,158.50
Oct 5, 2021 IDA-38830 Int Charges 51.93
Oct 5, 2021 IDA-38830 Int Charges 51.93
Oct 1, 2021 IDA-38830 Loan Repay 5,216.43
Oct 5, 2021 IDA-38830 Loan Repay 410,745.22
Oct 5, 2021 IDA-38830 Int Charges 134,148.80
Oct 5, 2021 IDA-38830 Int Charges 134,148.80
Apr 7, 2021 IDA-38830 Loan Repay 419,115.47
Apr 7, 2021 IDA-38830 Int Charges 34.47
Apr 7, 2021 IDA-38830 Int Charges 34.47
Apr 7, 2021 IDA-38830 Int Charges 136,887.38
Apr 7, 2021 IDA-38830 Int Charges 136,887.38
Apr 1, 2021 IDA-38830 Loan Repay 460.06
Oct 1, 2020 IDA-38830 Loan Repay 5,794.30
Oct 5, 2020 IDA-38830 Int Charges 60.47
Oct 5, 2020 IDA-38830 Int Charges 60.47
Oct 5, 2020 IDA-38830 Int Charges 137,193.77
Oct 5, 2020 IDA-38830 Int Charges 137,193.77
Oct 5, 2020 IDA-38830 Loan Repay 409,938.60
Apr 8, 2020 IDA-38830 Loan Repay 400,053.06
Apr 8, 2020 IDA-38830 Int Charges 49.57
Apr 8, 2020 IDA-38830 Int Charges 49.57
Apr 8, 2020 IDA-38830 Int Charges 133,866.62
Apr 8, 2020 IDA-38830 Int Charges 133,866.62
Apr 1, 2020 IDA-38830 Loan Repay 1,048.29
Oct 1, 2019 IDA-38830 Loan Repay 4,482.84
Oct 7, 2019 IDA-38830 Loan Repay 398,018.47
Oct 7, 2019 IDA-38830 Int Charges 33.10
Oct 7, 2019 IDA-38830 Int Charges 33.10
Oct 7, 2019 IDA-38830 Int Charges 135,849.73
Oct 7, 2019 IDA-38830 Int Charges 135,849.73
Apr 1, 2019 IDA-38830 Loan Repay 5,412.79
Apr 5, 2019 IDA-38830 Int Charges 67.59
Apr 5, 2019 IDA-38830 Int Charges 67.59
Apr 5, 2019 IDA-38830 Int Charges 139,376.83
Apr 5, 2019 IDA-38830 Int Charges 139,376.83
Apr 5, 2019 IDA-38830 Loan Repay 403,021.70
Oct 9, 2018 IDA-38830 Loan Repay 406,208.00
Oct 9, 2018 IDA-38830 Int Charges 42.63
Oct 9, 2018 IDA-38830 Int Charges 42.63
Oct 9, 2018 IDA-38830 Int Charges 141,143.10
Apr 20, 2004 IDA-38830 Loan Commitment 45,000,000.00
Apr 5, 2024 IDA-38830 Int Charges 40.52
Apr 5, 2024 IDA-38830 Int Charges 118,589.67
Apr 5, 2024 IDA-38830 Int Charges 118,589.67
Apr 5, 2024 IDA-38830 Int Charges 40.52
Apr 1, 2024 IDA-38830 Loan Repay 10,620.03
Apr 5, 2024 IDA-38830 Loan Repay 379,780.75
Oct 6, 2023 IDA-38830 Loan Repay 385,004.94
Oct 6, 2023 IDA-38830 Int Charges 46.02
Oct 6, 2023 IDA-38830 Int Charges 46.02
Oct 6, 2023 IDA-38830 Int Charges 118,804.23
Oct 6, 2023 IDA-38830 Int Charges 118,804.23
Oct 1, 2023 IDA-38830 Loan Repay 1,353.32
Oct 11, 2022 IDA-38830 Loan Repay 367,431.30
Oct 11, 2022 IDA-38830 Int Charges 30.84
Oct 11, 2022 IDA-38830 Int Charges 30.84
Oct 11, 2022 IDA-38830 Int Charges 118,398.11
Oct 11, 2022 IDA-38830 Int Charges 118,398.11
Apr 1, 2023 IDA-38830 Loan Repay 18,661.39
Apr 7, 2023 IDA-38830 Int Charges 123,554.28
Apr 7, 2023 IDA-38830 Int Charges 123,554.28
Apr 7, 2023 IDA-38830 Loan Repay 378,259.70
Apr 7, 2023 IDA-38830 Int Charges 80.83
Apr 7, 2023 IDA-38830 Int Charges 80.83
Oct 1, 2022 IDA-38830 Loan Repay 8,457.98
Apr 1, 2022 IDA-38830 Loan Repay 6,269.93
Apr 5, 2022 IDA-38830 Loan Repay 398,952.50
Apr 5, 2022 IDA-38830 Int Charges 33.34
Apr 5, 2022 IDA-38830 Int Charges 33.34

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Counterpart Funding Satisfactory 2012-01-04
Project Management Satisfactory 2012-01-04
Procurement Satisfactory 2012-01-04
Progress towards achievement of PDO Satisfactory 2012-01-04
Financial Management Satisfactory 2012-01-04
Monitoring and Evaluation Satisfactory 2012-01-04
Overall Implementation Progress (IP) Satisfactory 2012-01-04

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 06-27-2012
OutcomesSubstantial
Risk to Development OutcomeModest
Bank PerformanceSubstantial
Borrower PerformanceSubstantial
Government PerformanceSubstantial
Implementing AgencySubstantial

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 05-20-2014PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingSatisfactory N/a
Risk To Development OutcomeSignificantN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceSatisfactoryN/a
Government PerformanceSatisfactoryN/a
Implementing AgencySatisfactoryN/a
Icr QualitySatisfactoryN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • By the end of the project at least 75% of income-generating sub-projects implemented by ADCs have a financial rate of return above 10%ValueNot applicable86%75% of income-generating sub-projects have a finan
    DateNovember 1, 2004December 20, 2011December 31, 2011
    CommentThis indicator has largely been achieved its objective. The PIU conducted two studies (i) cost-benefit analysis of sub-projectsandii) socio-economic impact of sub-projects which assess that the 86.6% of incoming generating sub projects implemented by theADC have a financial rate between 13% and 63%
  • By the end of the project 80% of the ADC's perceive improvement in environmental sustainability because of project interventionsValueNot applicable90%80% of ADCs
    DateNovember 1, 2004December 20, 2011December 31, 2011
    CommentEnvironmental audit has been undertaken in January 2011 and concluded that 90% of ADC perceive an improvement on environmentalsustainability. The beneficiaries met during the mission have all expressed satisfaction of the improvement of environment,indicator has largely achieved its objectives
  • By the end of the project ADCs perceive significant improvement in quality of life because of project interventions.ValueNot applicable80% of ADCs80% of ADCs
    DateNovember 1, 2004December 20, 2011December 31, 2011
    CommentAssessed during MTR and field visits and socio-economic impact of sub-projects and technical audit realized in September 2011confirm the result of assessment about improvements in living conditions due to project activities.Indicator achieved its objectives
  • The quantitative impact evaluation of project is positive. Response upon beneficial assessment.Valuenon existant for the previous project (PGRNP)Impact evaluation available and positive by the en
    DateNovember 1, 2004March 10, 2011December 31, 2011
    CommentTechnical audit is undergoing and will be finalized in early august to measure the perception of most communities met whichexpressed their entire satisfaction of the project impact

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • New ADCs with legal status are created: 682 out 700 expected at the end of the project.Value295 under RNRMP706700 new ADCs created
    DateNovember 1, 2004December 20, 2011December 31, 2011
    CommentAbove the end of project target
  • By the end of the project at least 80% of the ADCs have satisfactory operational capacityValue65% of ADCs100%80% of ADCs have satisfactory operational capacity
    DateNovember 1, 2004December 20, 2011December 31, 2011
    CommentOperational capacity of ADCs to implement their project is satisfactory. Source: survey conducted by external consultant from asurvey sample in September 2010andtechnical audit of sub-projects conducted in September 2011
  • By the end of the project at least 75% of the ADCssatisfactory manage and maintain the investmentsValue60% of ADCs97% (+100%)75% of ADCs
    DateNovember 1, 2004December 20, 2011December 31, 2011
    CommentThis indicator achieve more than100% of the target. based on the result of samples survey conducted in September 2010 by anexternal consultant+100%
  • By the end of the project at least 80% of the communes have elaborated a satisfactory process of communal developmentValue0100%80% of the communes
    DateNovember 1, 2004December 20, 2011December 31, 2011
    Comment10 local Development plans have been elaborated for the 10 test communes and approved by the communities and disseminated. TheCapacity building activities have been also conducted in July 2010
  • By the end of the project of the project 80% of the communities are satisfied by agricultural services provide to themValue50%80% of the communities
    DateNovember 1, 2004March 10, 2011December 31, 2011
    CommentThis indicator has not achieved its target due to the lack of field agents of the ministry (only 70 for 141 communes) will noteasea good support to communities. support from the Ministry of rural development failed also.
  • By the end of the project 200 micro-enterprises have benefited from project supportValue0100%200 micro-enterprises have benefited from project
    DateNovember 1, 2004December 20, 2011December 31, 2011
    Comment200 micro-entrepreneurs benefited from training program and have been equipped by the project
  • Project-supported micro-enterprises are satisfied by the services provided to them:Value081%
    DateNovember 1, 2004June 30, 2011December 31, 2011
    Commenta survey sample has been done and the 90% assessed beneficiaries of micro-enterprises have been satisfied by the services providedto them.
  • By the end of the project about 3,000 activities are implemented by project-supported ADCsValue025213000
    DateNovember 1, 2004June 30, 2011December 31, 2011
    CommentActually the project objective was to achieve 84% of this target. Compared to last SPN mission, 81% of this objective has beenreached
  • By the e nd of the project at least 805 OF ADCs; developments have implementedValue0+100% (850 ADC)805
    DateNovember 1, 2004December 20, 2011December 31, 2011
    CommentThe number of ADCs with development plan have exceeded the target: 853 instead of 850 initially targeted.
  • By the end of the project bout 60 civil work works on rural roads have implementedValue055 civil works on feeder roads have been implement60 civil works
    DateNovember 1, 2004June 20, 2011December 31, 2011
    Comment
  • Procurement deadline is assessed as satisfactory: has improved substantiallyValueSatisfactorysatisfactorySatisfactory
    DateNovember 1, 2004December 20, 2010December 31, 2011
    CommentProcurement issue has improved. The staff has been trained and is following Bank procurement procedures
  • Key partners are satisfied with the database: Improvement is needed to feed the systemValueSituation not assessed yet.periodic report produced since last june and keys periodic report timely produced
    DateNovember 1, 2004December 20, 2011December 31, 2011
    CommentData base fully constructed and deployed at regional level. Dashbord now available for project reporting. data collection processhas been improved
  • GEF: Comp. A. Two watershed management plans are developed and adopted for the selected sites by the end of Y2, and 4 by end of Y4.Value034
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment4 are available and the validation workshop have already been organized for 3 sites.
  • GEF: Comp. A. Watershed associations have developed and applied local rules for SLM. Associations have been developped but delayshave been experienced in applying rules for SLMValue034
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Commentundergoing for 3 watershed association and delay for one of association
  • GEF: Comp. A. Each watershed association has adopted at least 2 improved SLM practices. in processValue082
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment2 measures under experimentation: Mise en defens for 170 ha; and Reforestation activities for 300 ha on progress
  • GEF: Comp. A. The project coordination unit has prepared a document with a strategy for financing SLM ctivities.Value01
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    CommentNo progress at this stage
  • GEF: Comp. B. At least 20 eligible subprojects are financed and implemented. Subprojects are been implemented.Value02020
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    CommentOnly some experiments are underway in 3 watersheds. more than 20 sub projects are financed and implemented
  • GEF: Comp. B. Rules for sustainable maintenance of investments are elaborated and applied in at least 80% of subprojects lasting more than 1 year.Value080%
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment
  • GEF: Comp. C. At least 80% of activities in annual work programs have been immplemented.Value080%
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Commentsome investment have been made in the 3 watershed sites.
  • GEF: Comp. C. Safeguard measures applied in accordance with the ESMF.ValueNone.Measures applied yearly.
    DateJanuary 26, 2007March 10, 2011September 30, 2012
    Commentsafeguard measures are applied satisfactory
  • GEF: Comp. C. Performance monitoring indicators are regularly updated.ValueNoneIndicators updated regularly.
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Commentperformance indicators are updated regularly
  • GEF: Comp. C. Performance mgt. chart and periodic reports on activities and indicators produced and disseminated on time.ValueNot yet due.Yearly report and charts provided on a regular, pe
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment
  • GEF: Comp. C. Project partners and beneficiary population in watersheds are sensitized to project objectives and activities.Value2 launching workshops and sensitization sessions a44 workshops.
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment4 ABV and some projects partners are sensitized to the projects objectives and activities. workshops and training sessions arealready organized to update population in watersheds (Number of beneficiaries will be assessed for the next period.
  • GEF: Comp. A. Two watershed management plans are developed and adopted for the selected sites by the end of Y2, and 4 by end of Y4.Value034
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment
  • GEF: Comp. A. Watershed associations have developed and applied local rules for SLM. Associations have been developped but delayshave been experienced in applying rules for SLMValue04
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment
  • GEF: Comp. A. Each watershed association has adopted at least 2 improved SLM practices. in processValue08
    DateJanuary 26, 2007March 10, 2011September 30, 2012
    Comment
  • GEF: Comp. A. The project coordination unit has prepared a document with a strategy for financing SLM ctivities.Value01
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment
  • GEF: Comp. B. At least 20 eligible subprojects are financed and implemented. Subprojects are been implemented.Value020
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment
  • GEF: Comp. B. Rules for sustainable maintenance of investments are elaborated and applied in at least 80% of subprojects lasting more than 1 year.Value080%
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment
  • GEF: Comp. C. At least 80% of activities in annual work programs have been immplemented.Value080%
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment50% in annual work program has been implemented
  • GEF: Comp. C. Safeguard measures applied in accordance with the ESMF.ValueNone.Measures applied yearly.
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment
  • GEF: Comp. C. Performance monitoring indicators are regularly updated.ValueNoneIndicators updated regularly.
    DateJanuary 26, 2007December 20, 2011September 30, 2011
    Comment
  • GEF: Comp. C. Performance mgt. chart and periodic reports on activities and indicators produced and disseminated on time.ValueNot yet due.Yearly report and charts provided on a regular, pe
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Commenta periodic report is prepared during the SPN mission (each 6 months)
  • GEF: Comp. C. Project partners and beneficiary population in watersheds are sensitized to project objectives and activities.Value2 launching workshops and sensitization sessions a4 launching workshops and sensitization re organiz4 workshops.
    DateJanuary 26, 2007December 20, 2011September 30, 2012
    Comment
  • Appropriate implementation of the sustainable land management process by the Watershed Associations in Project area. In processValue4 schema finalized
    DateDecember 31, 2007December 20, 2011September 30, 2012
    CommentWatershed management plans have been finalized and under implementation. the Watershed Association manage and develop landmanagement activities to sustain the process of land management
  • 2/3 of activities introduced generate positive income flow for the communities: Beneficial assessment will be undertaken before thenext supervision mission.Value2/3+2/3100%
    DateDecember 31, 2007December 20, 2010September 30, 2012
    Commentmore than 2/3 of activities introduced in the project generate positive flow of income for income, (74% )target achieved
  • 25% increase in biomass in project areas treated indicating sustainable regeneration of grass and shrubs.Value
    DateDecember 31, 2007March 20, 2011September 30, 2012
    CommentThe project sites have been tested for this indicator (Greiguel). It was noted that 84% of biomass in this project area treatedindicating sustainable regeneration of grass and shrubs.