Financier | Commitments |
---|---|
Borrower/Recipient | 2.00 |
IDA Credit | 135.00 |
P081712
Closed
Wachuka W. Ikua
N/A
February 14, 2005
(as of board presentation)
June 26, 2007
March 12, 2008
US$ 137.00 million
National AIDS Control Council
2007
US$ 135.00 million
B
March 31, 2015
June 30, 2014
BANK APPROVED
Financier | Commitments |
---|---|
Borrower/Recipient | 2.00 |
IDA Credit | 135.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 135.00 |
IBRD + IDA Commitment | 135.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 137.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Nov 15, 2016 | IDA-43360 | Int Charges | 3,093.47 |
Nov 15, 2016 | IDA-43360 | Int Charges | 267,465.70 |
Nov 15, 2016 | IDA-43360 | Int Charges | 267,465.70 |
Nov 15, 2016 | IDA-48410 | Int Charges | 2,068.53 |
Nov 15, 2016 | IDA-48410 | Int Charges | 2,068.53 |
Nov 15, 2016 | IDA-48410 | Int Charges | 178,848.45 |
Nov 15, 2016 | IDA-48410 | Int Charges | 178,848.45 |
May 15, 2016 | IDA-48410 | Int Charges | 3,580.62 |
May 15, 2016 | IDA-48410 | Int Charges | 3,580.62 |
May 17, 2016 | IDA-48410 | Int Charges | 179,227.67 |
May 17, 2016 | IDA-48410 | Int Charges | 179,227.67 |
May 15, 2016 | IDA-43360 | Int Charges | 5,354.74 |
May 15, 2016 | IDA-43360 | Int Charges | 5,354.74 |
May 17, 2016 | IDA-43360 | Int Charges | 268,032.80 |
May 17, 2016 | IDA-43360 | Int Charges | 268,032.80 |
Nov 15, 2015 | IDA-43360 | Int Charges | 9,029.65 |
Nov 15, 2015 | IDA-43360 | Int Charges | 4,774.04 |
Nov 15, 2015 | IDA-43360 | Int Charges | 4,774.04 |
Nov 15, 2015 | IDA-43360 | Int Charges | 266,718.70 |
Nov 15, 2015 | IDA-43360 | Int Charges | 266,718.70 |
Nov 15, 2015 | IDA-43360 | Int Charges | 9,029.65 |
Nov 15, 2015 | IDA-48410 | Int Charges | 6,038.96 |
Nov 15, 2015 | IDA-48410 | Int Charges | 6,038.96 |
Nov 15, 2015 | IDA-48410 | Int Charges | 181,541.25 |
Nov 15, 2015 | IDA-48410 | Int Charges | 181,541.25 |
May 15, 2015 | IDA-48410 | Int Charges | 3,970.48 |
May 15, 2015 | IDA-48410 | Int Charges | 3,970.48 |
May 15, 2018 | IDA-48410 | Int Charges | 691.04 |
May 15, 2018 | IDA-48410 | Int Charges | 691.04 |
May 17, 2018 | IDA-48410 | Int Charges | 185,843.94 |
May 17, 2018 | IDA-48410 | Int Charges | 185,843.94 |
May 17, 2018 | IDA-43360 | Loan Repay | 740,151.40 |
May 17, 2018 | IDA-43360 | Int Charges | 247.96 |
May 17, 2018 | IDA-43360 | Int Charges | 247.96 |
May 17, 2018 | IDA-43360 | Int Charges | 276,166.80 |
May 17, 2018 | IDA-43360 | Int Charges | 276,166.80 |
Dec 1, 2017 | IDA-48410 | Int Charges | 186,071.66 |
Dec 1, 2017 | IDA-43360 | Int Charges | 278,267.88 |
Dec 1, 2017 | IDA-43360 | Int Charges | 278,267.88 |
Dec 1, 2017 | IDA-43360 | Int Charges | 4,215.57 |
Dec 1, 2017 | IDA-43360 | Int Charges | 4,215.57 |
Dec 1, 2017 | IDA-43360 | Loan Repay | 742,047.60 |
Dec 1, 2017 | IDA-48410 | Int Charges | 2,818.85 |
Dec 1, 2017 | IDA-48410 | Int Charges | 2,818.85 |
Dec 1, 2017 | IDA-48410 | Int Charges | 186,071.66 |
May 15, 2017 | IDA-43360 | Int Charges | 257,435.31 |
May 15, 2017 | IDA-43360 | Int Charges | 257,435.31 |
May 15, 2017 | IDA-43360 | Int Charges | 7,294.02 |
May 15, 2017 | IDA-43360 | Int Charges | 7,294.02 |
May 15, 2017 | IDA-48410 | Int Charges | 4,877.36 |
May 15, 2017 | IDA-48410 | Int Charges | 4,877.36 |
May 15, 2017 | IDA-48410 | Int Charges | 172,141.36 |
May 15, 2017 | IDA-48410 | Int Charges | 172,141.36 |
Nov 15, 2016 | IDA-43360 | Int Charges | 3,093.47 |
Nov 15, 2019 | IDA-43360 | Loan Repay | 8,764.38 |
Nov 15, 2019 | IDA-43360 | Loan Repay | 698,547.80 |
Nov 15, 2019 | IDA-43360 | Int Charges | 129.75 |
Nov 15, 2019 | IDA-43360 | Int Charges | 129.75 |
Nov 15, 2019 | IDA-43360 | Int Charges | 253,694.48 |
Nov 15, 2019 | IDA-43360 | Int Charges | 253,694.48 |
Nov 15, 2019 | IDA-48410 | Int Charges | 1,639.93 |
Nov 15, 2019 | IDA-48410 | Int Charges | 1,639.93 |
Nov 15, 2019 | IDA-48410 | Int Charges | 178,470.31 |
Nov 15, 2019 | IDA-48410 | Int Charges | 178,470.31 |
May 15, 2019 | IDA-48410 | Int Charges | 2,675.03 |
May 15, 2019 | IDA-48410 | Int Charges | 2,675.03 |
May 15, 2019 | IDA-43360 | Loan Repay | 15,425.23 |
May 24, 2019 | IDA-48410 | Int Charges | 178,312.31 |
May 24, 2019 | IDA-48410 | Int Charges | 178,312.31 |
May 24, 2019 | IDA-43360 | Loan Repay | 694,647.50 |
May 24, 2019 | IDA-43360 | Int Charges | 14.57 |
May 24, 2019 | IDA-43360 | Int Charges | 14.57 |
May 24, 2019 | IDA-43360 | Int Charges | 257,397.94 |
May 24, 2019 | IDA-43360 | Int Charges | 257,397.94 |
May 15, 2019 | IDA-43360 | Int Charges | 185.98 |
May 15, 2019 | IDA-43360 | Int Charges | -185.98 |
Nov 15, 2018 | IDA-48410 | Int Charges | 4,084.11 |
Nov 15, 2018 | IDA-48410 | Int Charges | 4,084.11 |
Nov 16, 2018 | IDA-48410 | Int Charges | 177,224.38 |
Nov 16, 2018 | IDA-48410 | Int Charges | 177,224.38 |
Sep 26, 2018 | IDA-43360 | Loan Cancel | 1,154,850.10 |
Sep 26, 2018 | IDA-43360 | Loan Disb | -831,578.70 |
Jul 2, 2018 | IDA-43360 | Loan Disb | -323,856.60 |
Nov 16, 2018 | IDA-43360 | Int Charges | 264,888.25 |
Nov 16, 2018 | IDA-43360 | Int Charges | 264,888.25 |
Nov 16, 2018 | IDA-43360 | Int Charges | 29.98 |
Nov 16, 2018 | IDA-43360 | Int Charges | 29.98 |
Nov 15, 2018 | IDA-43360 | Loan Repay | 22,339.59 |
Nov 16, 2018 | IDA-43360 | Loan Repay | 700,709.80 |
May 15, 2018 | IDA-43360 | Loan Repay | 3,748.23 |
May 15, 2021 | IDA-43360 | Int Charges | 2,242.66 |
May 15, 2021 | IDA-43360 | Int Charges | 2,242.66 |
May 15, 2021 | IDA-43360 | Loan Repay | 740,343.90 |
May 15, 2021 | IDA-43360 | Int Charges | 251,085.80 |
May 15, 2021 | IDA-43360 | Int Charges | 251,085.80 |
May 15, 2021 | IDA-48410 | Loan Repay | 503,214.44 |
Nov 15, 2020 | IDA-43360 | Loan Repay | 717,515.70 |
Nov 15, 2020 | IDA-43360 | Int Charges | 255,333.30 |
Nov 15, 2020 | IDA-43360 | Int Charges | 255,333.30 |
Nov 15, 2020 | IDA-48410 | Int Charges | 2,464.35 |
Nov 15, 2020 | IDA-48410 | Int Charges | 2,464.35 |
Nov 15, 2020 | IDA-48410 | Int Charges | 183,347.60 |
Nov 15, 2020 | IDA-48410 | Int Charges | 183,347.60 |
Nov 15, 2020 | IDA-43360 | Loan Repay | 13,112.69 |
May 15, 2021 | IDA-48410 | Int Charges | 183,787.27 |
May 15, 2021 | IDA-48410 | Int Charges | 183,787.27 |
May 15, 2021 | IDA-48410 | Int Charges | 422.63 |
May 15, 2021 | IDA-48410 | Int Charges | 422.63 |
May 15, 2020 | IDA-48410 | Int Charges | 178,302.81 |
May 15, 2020 | IDA-48410 | Int Charges | 178,302.81 |
May 15, 2020 | IDA-48410 | Int Charges | 173.84 |
May 15, 2020 | IDA-48410 | Int Charges | 173.84 |
May 15, 2020 | IDA-43360 | Int Charges | 927.61 |
May 15, 2020 | IDA-43360 | Int Charges | 927.61 |
May 15, 2020 | IDA-43360 | Loan Repay | 699,531.56 |
May 15, 2020 | IDA-43360 | Int Charges | 249,208.12 |
May 15, 2020 | IDA-43360 | Int Charges | 249,208.12 |
Nov 15, 2022 | IDA-43360 | Loan Repay | 643,672.00 |
Nov 15, 2022 | IDA-43360 | Int Charges | 214,056.05 |
Nov 15, 2022 | IDA-43360 | Int Charges | 214,056.05 |
Nov 15, 2022 | IDA-43360 | Loan Repay | 33,515.95 |
Nov 15, 2022 | IDA-48410 | Loan Repay | 23,226.77 |
Nov 15, 2022 | IDA-48410 | Loan Repay | 437,060.38 |
Nov 15, 2022 | IDA-48410 | Int Charges | 157,383.83 |
Nov 15, 2022 | IDA-48410 | Int Charges | 157,383.83 |
May 15, 2022 | IDA-48410 | Loan Repay | 455,286.06 |
May 15, 2022 | IDA-48410 | Int Charges | 171,057.95 |
May 15, 2022 | IDA-48410 | Int Charges | 171,057.95 |
May 15, 2022 | IDA-48410 | Loan Repay | 10,177.68 |
May 15, 2022 | IDA-43360 | Loan Repay | 14,687.22 |
May 15, 2022 | IDA-43360 | Loan Repay | 670,116.75 |
May 15, 2022 | IDA-43360 | Int Charges | 233,689.39 |
May 15, 2022 | IDA-43360 | Int Charges | 233,689.39 |
Nov 15, 2021 | IDA-48410 | Int Charges | 182,433.25 |
Nov 15, 2021 | IDA-48410 | Int Charges | 182,433.25 |
Nov 15, 2021 | IDA-48410 | Int Charges | 4,802.71 |
Nov 15, 2021 | IDA-48410 | Int Charges | 4,802.71 |
Nov 15, 2021 | IDA-48410 | Loan Repay | 491,402.70 |
Nov 15, 2021 | IDA-43360 | Int Charges | 6,942.31 |
Nov 15, 2021 | IDA-43360 | Int Charges | 6,942.31 |
Nov 15, 2021 | IDA-43360 | Loan Repay | 722,966.10 |
Nov 15, 2021 | IDA-43360 | Int Charges | 249,423.34 |
Nov 15, 2021 | IDA-43360 | Int Charges | 249,423.34 |
Jun 26, 2007 | IDA-43360 | Loan Commitment | 80,000,000.00 |
Dec 14, 2010 | IDA-48410 | Loan Commitment | 55,000,000.00 |
May 15, 2024 | IDA-48410 | Int Charges | 3,642.52 |
May 15, 2024 | IDA-48410 | Int Charges | 3,642.52 |
May 15, 2024 | IDA-48410 | Int Charges | 163,157.42 |
May 15, 2024 | IDA-48410 | Int Charges | 163,157.42 |
May 15, 2024 | IDA-48410 | Loan Repay | 462,857.94 |
May 15, 2024 | IDA-43360 | Loan Repay | 680,970.25 |
May 15, 2024 | IDA-43360 | Int Charges | 222,166.53 |
May 15, 2024 | IDA-43360 | Int Charges | 222,166.53 |
May 15, 2024 | IDA-43360 | Int Charges | 5,255.25 |
May 15, 2024 | IDA-43360 | Int Charges | 5,255.25 |
Nov 15, 2023 | IDA-48410 | Int Charges | 161,619.86 |
Nov 15, 2023 | IDA-48410 | Int Charges | 161,619.86 |
Nov 15, 2023 | IDA-43360 | Int Charges | 7,867.02 |
Nov 15, 2023 | IDA-43360 | Int Charges | 7,867.02 |
Nov 15, 2023 | IDA-43360 | Loan Repay | 682,529.44 |
Nov 15, 2023 | IDA-43360 | Int Charges | 219,967.44 |
Nov 15, 2023 | IDA-43360 | Int Charges | 219,967.44 |
May 15, 2023 | IDA-43360 | Int Charges | 14,788.88 |
May 15, 2023 | IDA-43360 | Int Charges | 14,788.88 |
May 15, 2023 | IDA-43360 | Int Charges | 222,631.60 |
May 15, 2023 | IDA-43360 | Int Charges | 222,631.60 |
May 15, 2023 | IDA-43360 | Loan Repay | 690,922.44 |
Nov 15, 2023 | IDA-48410 | Int Charges | 5,452.49 |
Nov 15, 2023 | IDA-48410 | Int Charges | 5,452.49 |
Nov 15, 2023 | IDA-48410 | Loan Repay | 463,917.75 |
May 15, 2023 | IDA-48410 | Int Charges | 10,249.36 |
May 15, 2023 | IDA-48410 | Int Charges | 10,249.36 |
May 15, 2023 | IDA-48410 | Loan Repay | 469,622.50 |
May 15, 2023 | IDA-48410 | Int Charges | 163,544.55 |
May 15, 2023 | IDA-48410 | Int Charges | 163,544.55 |
Nov 15, 2014 | IDA-43360 | Int Charges | 1,822.61 |
Nov 15, 2014 | IDA-43360 | Int Charges | 1,822.61 |
Nov 15, 2014 | IDA-43360 | Int Charges | 284,877.00 |
Nov 15, 2014 | IDA-43360 | Int Charges | 284,877.00 |
Nov 15, 2014 | IDA-48410 | Int Charges | 181,876.75 |
Nov 15, 2014 | IDA-48410 | Int Charges | 181,876.75 |
Nov 15, 2014 | IDA-48410 | Int Charges | 1,161.50 |
Nov 15, 2014 | IDA-48410 | Int Charges | 1,161.50 |
Nov 6, 2014 | IDA-48410 | Loan Cancel | 33,823.16 |
Oct 31, 2014 | IDA-43360 | Loan Cancel | 875,599.75 |
Nov 6, 2014 | IDA-48410 | Loan Disb | 2,539,771.00 |
May 15, 2015 | IDA-43360 | Int Charges | 6,979.01 |
May 15, 2015 | IDA-43360 | Int Charges | 6,979.01 |
May 18, 2015 | IDA-43360 | Int Charges | 261,930.36 |
May 18, 2015 | IDA-43360 | Int Charges | 261,930.36 |
May 18, 2015 | IDA-48410 | Int Charges | 175,843.34 |
May 18, 2015 | IDA-48410 | Int Charges | 175,843.34 |
Sep 5, 2014 | IDA-43360 | Loan Disb | 219,338.38 |
May 23, 2014 | IDA-43360 | Int Charges | 1,772.16 |
May 23, 2014 | IDA-43360 | Int Charges | 1,772.16 |
May 23, 2014 | IDA-43360 | Int Charges | 302,316.47 |
May 23, 2014 | IDA-43360 | Int Charges | 302,316.47 |
May 23, 2014 | IDA-48410 | Int Charges | 1,041.80 |
May 23, 2014 | IDA-48410 | Int Charges | 1,041.80 |
May 23, 2014 | IDA-48410 | Int Charges | 192,742.52 |
May 23, 2014 | IDA-48410 | Int Charges | 192,742.52 |
Nov 15, 2013 | IDA-48410 | Int Charges | 1,316.86 |
Nov 15, 2013 | IDA-48410 | Int Charges | 1,316.86 |
Nov 15, 2013 | IDA-48410 | Int Charges | 175,304.92 |
Nov 15, 2013 | IDA-48410 | Int Charges | 175,304.92 |
Nov 15, 2013 | IDA-43360 | Int Charges | 3,036.74 |
Nov 15, 2013 | IDA-43360 | Int Charges | 3,036.74 |
Nov 15, 2013 | IDA-43360 | Int Charges | 297,407.00 |
Nov 15, 2013 | IDA-43360 | Int Charges | 297,407.00 |
Dec 26, 2013 | IDA-43360 | Loan Disb | -894,508.75 |
Dec 26, 2013 | IDA-48410 | Loan Disb | -598,313.25 |
Jul 1, 2013 | IDA-48410 | Loan Disb | 15,486,297.00 |
Name | Review | Date |
---|---|---|
Counterpart Funding | Satisfactory | 2014-06-21 |
Monitoring and Evaluation | Satisfactory | 2014-06-21 |
Overall Implementation Progress (IP) | Satisfactory | 2014-06-21 |
Progress towards achievement of PDO | Satisfactory | 2014-06-21 |
Procurement | Satisfactory | 2014-06-21 |
Financial Management | Satisfactory | 2014-06-21 |
Project Management | Satisfactory | 2014-06-21 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 03-31-2015 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | Substantial |
Bank Performance | Substantial |
Borrower Performance | Substantial |
Government Performance | Moderately Satisfactory |
Implementing Agency | Substantial |
INDICATOR | ICR REVIEW: 06-30-2015 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | Significant | N/a |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | Moderately Satisfactory | N/a |
Government Performance | Moderately Satisfactory | N/a |
Implementing Agency | Moderately Satisfactory | N/a |
Icr Quality | Satisfactory | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Proportion of recipients of subproject grants scoring #Very Good# or #Excellent# for target achievement in the annual performance audit. during the year. | Value | 0.00 | 80.50 | 80.00 |
Date | December 31, 2010 | December 31, 2013 | June 30, 2014 | |
Comment |
Number (cumulative) of civil society/private sector grants supported by the end of the year. | Value | 0.00 | 10800.00 | 8400.00 |
Date | December 31, 2008 | March 31, 2014 | June 30, 2014 | |
Comment |
Proportion of sexually active youth 15- 24 who report having had sex with a non-spousal, non-regular partner in the past 12 months. | Value | F=30%M=84% (DHS 2003) | F=20%M=70% | |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |
Proportion of youth aged 15-24 reporting condom use in the last sexual encounter with a non-regular partner (of those reporting sexual intercourse with a non-regular partner in the last 12 months). | Value | F=24%M=47%(DHS 2003) | F=55%M=75% | |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |
Percentage of households in malaria endemic areas in the districts supported by the TOWA Project that have at least one ITN. | Value | 27.6% | 80% | |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |
Number of individuals provided with counseling and testing services (through TOWA) in the past 12 months | Value | 0.00 | 1835027.00 | 172450.00 |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |
Project beneficiaries, Number of individuals with access to an ITN. | Value | 0.00 | 5250000.00 | 5100000.00 |
Date | January 1, 2007 | July 31, 2013 | June 30, 2014 | |
Comment |
Number of HIV+ clients provided with palliative care. | Value | 0.00 | 10574.00 | 3483.00 |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |
Project Benificiaries, Number of youth reached with HIV prevention messages | Value | N/A | 1,036,137 | 348,232 |
Date | January 1, 2007 | January 31, 2014 | June 30, 2014 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Issues in NACC#s qualified report to be addressed by end of March of following year | Value | Yes | Yes | |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |
The proportion o f KNASP M&E indicators included in the annual M&E report, disseminated and available on time for the JAPR. | Value | 55.00 | 96.00 | 85.00 |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |
Proportion of registered CBOs reporting through COBPAR at the time of the JAPR. | Value | 65.80 | 129.00 | 100.00 |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |
Number of persons who undergo testing and counseling in the last 12 months. (national, from NASCOP). | Value | 949250.00 | 6400000.00 | 4500000.00 |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |
Number of couples counseled and tested under the TOWA project- up to the end of the reporting year | Value | 0.00 | 642092.00 | 6305.00 |
Date | December 31, 2013 | June 30, 2014 | ||
Comment |
Number of youth reached with BCE messages in the past 12 months. | Value | 0.00 | 2032500.00 | 348232.00 |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |
Number of HIV+ individuals provided with Home-Based Care (Palliative care) through the TOWA interventions in the past 12 months. | Value | 0.00 | 10574.00 | 3483.00 |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |
Number of male and female condoms distributed in the last 12 months (national, from NASCOP). | Value | 144000000.00 | 153360000.00 | 150000000.00 |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |
Number of long lasting insecticide treated malaria nets purchased and/or distributed. | Value | 0.00 | 2875000.00 | 2800000.00 |
Date | January 1, 2007 | July 31, 2013 | June 30, 2014 | |
Comment |
Level of stakeholder satisfaction with NACC | Value | 70.00 | 87.00 | 75.00 |
Date | January 1, 2007 | December 31, 2013 | June 30, 2014 | |
Comment |