Skip to Main Navigation

Mexico City Insurgentes Bus Rapid Transit System Carbon Finance Project

Abstract*

The Mexico City Insurgentes Bus Rapid Transit System Carbon Finance Project will contribute to reductions in local airborne pollutants and greenhouse gas emissions generated by the transport sector in the Metropolitan Area of Mexico City. This will be sought through the development of the first surface mass transport corridor in Mexico City (Insurgentes Avenue) and associated traffic management measures. The project is also intended to develop and...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

1. Project development objective: (see Annex 1) The project will contribute to reductions in local airborne pollutants and greenhouse gas emissions generated by the transport sector in the Metropolitan Area of Mexico City (MCMA). This will be sought through the development of the first surface mass transport corridor in Mexico City (Insurgentes Avenue) and associated traffic management measures. The project is also intended to develop and demonstrate the catalytic use of Clean Development Mechanism (CDM) to foster technology, regulatory and institutional changes in the public transport sector. It will also develop and implement tools required to measure and monitor greenhouse gas (GHG) emission reductions from the transport sector. While the operation of one single corridor does not result in large emission reductions, the project will help to develop the tools and procedures that may be applied, on a larger stage as a follow up to this operation. The availability of certified emission reductions is expected to accelerate this process. Thus, the project will demonstrate that a high-quality bus corridor approach is a viable alternative for promoting a modal shift. In this context, the project will provide a valuable blueprint for other corridors in the city and elsewhere which could bring about a much higher overall impact.

Key Details

Project Details

  • P082656

  • Closed

  • Felipe Targa Rodriguez

  • N/A

  • Mexico

  • November 4, 2005

  • (as of board presentation)

    November 4, 2005

  • November 19, 2006

  • US$ 2.40 million

  • B

  • Not Applicable

  • August 17, 2016

  • BANK APPROVED

  • December 19, 2024

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
PROTOTYPE CARBON FUND 2.40
Borrower/Recipient 47.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment N/A
IBRD + IDA Commitment N/A
Lending Instrument
Grant Amount 2.40
Total Project Cost** 49.40

Summary Status of World Bank Financing (US$ Millions) as of April 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of April 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Counterpart Funding Highly Satisfactory 2012-11-14
Project Management Satisfactory 2012-11-14
Overall Implementation Progress (IP) Highly Satisfactory 2012-11-14
Progress towards achievement of PDO Highly Satisfactory 2012-11-14
Monitoring and Evaluation Highly Satisfactory 2012-11-14

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Reduced emission of local and global pollutants from the transport system in Insurgentes Avenue as measured through the proposed monitoring protocol;ValueNo corridor on Insurgentes. 360 microbuses continuCorridor on Insurgente Av. is built and operating.368 buses have been scrapped or dissasembled (no l
    DateFebruary 10, 2006October 31, 2010June 30, 2007
    CommentIndicator has been met as said in next column. However, Metrobus has provided new information, particularly in modal shift whichisabove the 10% set as target. Emission reductions are on target.indicator met as of date stated above, in terms of scrapping and modal shift.
  • Improved operation of the bus transport system in the corridor as measured by reduced average travel times on the Insurgentes Avenue;ValueNo new bus transport system.Indicator has been met as said in next column. HowAverage speed increases to at least 23km/h.
    DateFebruary 10, 2006July 29, 2011June 30, 2007
    CommentSource is RTP, one of the operators of the Metrobus Insurgentes line, as published in http://www.rtp.gob.mx/MBUS/antecede.htm.Indicator Met
  • Improved bus system energy efficiency (in liters of diesel per passenger kilometer);ValueNo change in bus system energy efficiency.Articulated buses continue to consume less fuel peField measurement comply or surpass previously est
    DateFebruary 10, 2006October 31, 2010June 30, 2007
    CommentUpdated information, which indicates project is performing above end target. Data received on July 22 2011 for period Nov 1 2009to Oct. 31 2010.This target has been reached.
  • Improved bus productivity: serving more passengers with lesser number of units and increased modal share for large buses;Value360 bus units operating inefficiently on Insurgent105 articulated buses transport 260,000 trips per Increase in modal shift to 10%. Optimization of ki
    DateFebruary 10, 2006October 31, 2010June 30, 2007
    CommentUpdated information, which indicates project is performing above end target. Data received on July 22 2011 for period Nov 1 2009to Oct. 31 2010.This target has been reached.
  • Successful registration of CDM methodology and further implementation of the corridor program.ValueNo transport baseline methodology developed.Methodology was approved by UNFCC methodology paneMethodology has been accepted by Meth Panel. The m
    DateFebruary 10, 2006October 31, 2010June 30, 2007
    CommentUpdated information. Target has been met and exceeded.This target has been reached.

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • All the old Insurgentes buses have been scrapped.ValueNo buses scrapped.368 buses have been scrapped (262) or dissasembledAll buses scrapped and in addition documentation o
    DateFebruary 10, 2006October 27, 2010June 30, 2007
    CommentIndicator met.Indicator met.
  • Field measurements and surveys confirm reduced travel time. Majority of users of system are more satisfied with the service than before.ValueNo corridor - no change in travel time.Speed increased significantly, from 23 to 40 kph. Increase in modal shift. Increase in reduced trave
    DateFebruary 10, 2006June 30, 2007
    CommentThis target has been reached and exceeded.This target has been reached. Speed on Insurgentes corridor has already increased considerably. survey indicates that 70-75% aresatisfied with system. People accept new system.
  • Articulated buses consume less fuel per passenger kilometer confirmed by field measurement.ValueNo change in fuel used per passenger.Articulated buses continue to consume less fuel peReduced fuel per passenger is increased through in
    DateFebruary 10, 2006October 31, 2010June 30, 2007
    CommentUpdated information indicates indicator continues to be met and surpassed.This target has been reached.
  • Methodology for monitoring and validation of emission reductionsValue0.001.001.00
    DateJanuary 15, 2006January 14, 2010December 31, 2015
    Commentmethodology has been approved by the UNFCCCMethodology approved.