Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 395.40 |
IDA Credit | 137.50 |
Local Communities | 164.85 |
Indonesia - Free-standing Trust Fund Program | 23.60 |
Borrower/Recipient | 854.08 |
P085375
Closed
Irma Setiono
Republic of Indonesia
March 13, 2006
(as of board presentation)
June 27, 2006
June 6, 2008
US$ 1577.83 million
DG Community Health, Ministry of Health,Ministry of Public Works and Housing,DG Regional Development, Ministry of Home Affairs,DG Village Government, Ministry of Home Affairs
2006
US$ 556.50 million
B
April 22, 2024
August 31, 2022
BANK APPROVED
Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 395.40 |
IDA Credit | 137.50 |
Local Communities | 164.85 |
Indonesia - Free-standing Trust Fund Program | 23.60 |
Borrower/Recipient | 854.08 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | 395.40 |
IDA Commitment | 137.50 |
IBRD + IDA Commitment | 532.90 |
Lending Instrument | |
---|---|
Grant Amount | 23.60 |
Total Project Cost** | 1577.83 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Sep 12, 2014 | IBRD-82590 | Loan Disb | 16,000,000.00 |
Mar 30, 2015 | IBRD-82590 | Loan Disb | 500,000.00 |
Apr 1, 2014 | IDA-42040 | Int Charges | 70,506.74 |
Apr 1, 2014 | IDA-42040 | Int Charges | 70,506.74 |
Jan 1, 2019 | IBRD-85780 | Int Charges | 1,580,048.90 |
Jul 15, 2018 | IBRD-82590 | Int Charges | 1,113,814.00 |
Jan 16, 2018 | IDA-42040 | Loan Repay | 6,465,867.00 |
Jan 1, 2018 | IBRD-85780 | Int Charges | 317,282.53 |
Jan 1, 2018 | IBRD-85780 | Int Charges | 83,993.21 |
Jan 15, 2018 | IBRD-82590 | Int Charges | 855,170.70 |
Jul 1, 2018 | IBRD-85780 | Int Charges | 264,114.72 |
Jul 1, 2018 | IBRD-85780 | Int Charges | 1,136,723.60 |
Apr 1, 2018 | IDA-42040 | Int Charges | 3,525.09 |
Apr 1, 2018 | IDA-42040 | Int Charges | 3,525.09 |
Apr 1, 2018 | IDA-42040 | Loan Repay | 3,267,113.50 |
Jan 1, 2018 | IBRD-85780 | Int Charges | 317,282.53 |
Jan 1, 2018 | IBRD-85780 | Int Charges | 542,468.06 |
Jan 1, 2018 | IBRD-85780 | Int Charges | -317,282.53 |
Jan 1, 2018 | IBRD-85780 | Int Charges | -83,993.21 |
Apr 1, 2018 | IDA-42040 | Int Charges | 320,585.50 |
Apr 1, 2018 | IDA-42040 | Int Charges | 320,585.50 |
Jan 1, 2021 | IBRD-85780 | Int Charges | 1,544,790.00 |
Jan 1, 2021 | IBRD-85780 | Int Charges | 7,889.34 |
Oct 1, 2020 | IDA-42040 | Int Charges | 213,956.05 |
Oct 1, 2020 | IDA-42040 | Int Charges | 213,956.05 |
Oct 1, 2020 | IDA-42040 | Loan Repay | 26,595.35 |
Jul 15, 2020 | IBRD-82590 | Int Charges | 1,133,682.20 |
Jul 15, 2020 | IBRD-82590 | Loan Repay | 4,265,241.00 |
May 27, 2020 | IBRD-85780 | Loan Disb | 33,000,000.00 |
Jul 1, 2020 | IBRD-85780 | Int Charges | 59,657.53 |
Jul 1, 2020 | IBRD-85780 | Int Charges | 112,715.16 |
Jul 1, 2020 | IBRD-85780 | Int Charges | 2,760,500.50 |
Aug 19, 2020 | IBRD-85780 | Loan Disb | 26,000,000.00 |
Jul 1, 2020 | IBRD-85780 | Int Charges | 5,342.47 |
Oct 1, 2020 | IDA-42040 | Loan Repay | 3,143,124.50 |
Apr 1, 2020 | IDA-42040 | Loan Repay | 3,051,066.20 |
Apr 1, 2020 | IDA-42040 | Int Charges | 221,005.80 |
Apr 1, 2020 | IDA-42040 | Int Charges | 221,005.80 |
Apr 1, 2020 | IDA-42040 | Loan Repay | 18,406.01 |
Apr 1, 2020 | IDA-42040 | Loan Repay | 0.01 |
Apr 1, 2020 | IDA-42040 | Int Charges | -0.01 |
Apr 1, 2020 | IDA-42040 | Int Charges | -0.01 |
Feb 24, 2020 | IBRD-85780 | Loan Disb | 11,000,000.00 |
Jul 1, 2022 | IBRD-85780 | Int Charges | 1,714,442.40 |
May 19, 2022 | IBRD-85780 | Loan Cancel | 1,813,973.40 |
May 2, 2013 | IBRD-82590 | Loan Commitment | 99,900,000.00 |
Jan 8, 2016 | IBRD-85780 | Loan Commitment | 300,000,000.00 |
Jul 15, 2024 | IBRD-82590 | Int Charges | 13,535.36 |
Jul 15, 2024 | IBRD-82590 | Int Charges | 1,849,094.50 |
Jul 15, 2024 | IBRD-82590 | Loan Repay | 5,200,350.00 |
Jun 27, 2006 | IDA-42040 | Loan Commitment | 137,500,000.00 |
Jul 1, 2024 | IBRD-85780 | Loan Repay | 8,701,005.00 |
Jul 1, 2024 | IBRD-85780 | Int Charges | 9,369,335.00 |
Jul 1, 2024 | IBRD-85780 | Int Charges | 62,556.36 |
Oct 1, 2023 | IDA-42040 | Loan Repay | 28,891.40 |
Oct 1, 2023 | IDA-42040 | Loan Repay | 5,881,153.50 |
Oct 1, 2023 | IDA-42040 | Int Charges | 88,650.69 |
Oct 1, 2023 | IDA-42040 | Int Charges | 88,650.69 |
Apr 1, 2024 | IDA-42040 | Loan Repay | 112,813.69 |
Apr 1, 2024 | IDA-42040 | Loan Repay | 5,836,332.50 |
Apr 1, 2024 | IDA-42040 | Int Charges | 66,927.91 |
Apr 1, 2024 | IDA-42040 | Int Charges | 66,927.91 |
Jan 15, 2024 | IBRD-82590 | Int Charges | 29,120.36 |
Jan 15, 2024 | IBRD-82590 | Int Charges | 1,996,811.40 |
Jan 15, 2024 | IBRD-82590 | Loan Repay | 5,066,763.00 |
Aug 2, 2023 | IBRD-85780 | Loan Cancel | 206,267.27 |
Jan 1, 2024 | IBRD-85780 | Int Charges | 0.20 |
Jan 1, 2024 | IBRD-85780 | Int Charges | 162,890.33 |
Jan 1, 2024 | IBRD-85780 | Int Charges | 44.51 |
Jan 1, 2024 | IBRD-85780 | Int Charges | 9,561,271.00 |
Jan 1, 2024 | IBRD-85780 | Loan Repay | 8,492,419.00 |
Jun 26, 2023 | IBRD-85780 | Loan Disb | -905.04 |
Jul 1, 2023 | IBRD-85780 | Int Charges | 249.96 |
Jul 1, 2023 | IBRD-85780 | Int Charges | 8,205,422.50 |
Jul 1, 2023 | IBRD-85780 | Loan Repay | 8,283,966.50 |
Jul 1, 2023 | IBRD-85780 | Int Charges | 3.26 |
Apr 1, 2014 | IDA-42040 | Loan Repay | 3,635,177.00 |
Apr 1, 2014 | IDA-42040 | Int Charges | 430,655.44 |
Apr 1, 2014 | IDA-42040 | Int Charges | 430,655.44 |
Dec 11, 2013 | IBRD-82590 | Loan Disb | 1,800,000.00 |
Oct 14, 2016 | IBRD-85780 | Loan Disb | 30,000,000.00 |
Jul 15, 2016 | IBRD-82590 | Int Charges | 451,451.00 |
Jul 15, 2016 | IBRD-82590 | Int Charges | 3,726.00 |
Jun 15, 2016 | IBRD-82590 | Loan Disb | 15,000,000.00 |
Sep 14, 2016 | IBRD-85780 | Fee Charges | 750,000.00 |
Apr 1, 2016 | IDA-42040 | Int Charges | 289,561.40 |
Apr 1, 2016 | IDA-42040 | Int Charges | 289,561.40 |
Apr 1, 2016 | IDA-42040 | Int Charges | -6,428.65 |
Apr 1, 2016 | IDA-42040 | Int Charges | 6,428.65 |
Apr 1, 2016 | IDA-42040 | Int Charges | 14,809.60 |
Apr 1, 2016 | IDA-42040 | Int Charges | 14,809.60 |
Apr 1, 2016 | IDA-42040 | Loan Repay | 3,170,016.80 |
Jan 1, 2017 | IBRD-85780 | Int Charges | 239,959.02 |
Jan 1, 2017 | IBRD-85780 | Int Charges | 106,650.00 |
Feb 19, 2016 | IDA-42040 | Loan Disb | -94,358.90 |
Feb 19, 2016 | IDA-42040 | Loan Cancel | 94,358.90 |
Dec 10, 2015 | IBRD-82590 | Loan Disb | 4,600,000.00 |
Jun 18, 2015 | IDA-42040 | Loan Cancel | 4,519,609.50 |
Oct 1, 2015 | IDA-42040 | Int Charges | 364,535.38 |
Oct 1, 2015 | IDA-42040 | Int Charges | 364,535.38 |
Oct 1, 2015 | IDA-42040 | Loan Repay | 79,089.82 |
Oct 1, 2015 | IDA-42040 | Loan Repay | 3,215,139.50 |
Jan 15, 2016 | IBRD-82590 | Int Charges | 3,634.00 |
Jan 15, 2016 | IBRD-82590 | Int Charges | 281,520.00 |
Jun 18, 2015 | IDA-42040 | Loan Disb | -436,019.72 |
Jul 15, 2015 | IBRD-82590 | Int Charges | 161,622.92 |
Apr 1, 2015 | IDA-42040 | Loan Repay | 128,760.98 |
Apr 1, 2015 | IDA-42040 | Loan Repay | 3,117,124.50 |
Apr 1, 2015 | IDA-42040 | Int Charges | 386,769.60 |
Apr 1, 2015 | IDA-42040 | Int Charges | 386,769.60 |
Jul 9, 2015 | IBRD-82590 | Loan Disb | 19,900,000.00 |
May 22, 2015 | IBRD-82590 | Loan Disb | 1,300,000.00 |
Mar 8, 2018 | IBRD-85780 | Loan Disb | 20,000,000.00 |
Mar 9, 2018 | IBRD-82590 | Loan Disb | 10,000,000.00 |
Jul 15, 2017 | IBRD-82590 | Int Charges | 779,567.00 |
Feb 26, 2020 | IBRD-82590 | Loan Disb | -17,626.22 |
Jan 1, 2020 | IBRD-85780 | Int Charges | 159,438.38 |
Jan 1, 2020 | IBRD-85780 | Int Charges | 2,595,166.80 |
Jan 1, 2020 | IBRD-85780 | Int Charges | 9,267.12 |
Jan 1, 2020 | IBRD-85780 | Int Charges | 128,663.71 |
Feb 26, 2020 | IBRD-82590 | Loan Cancel | 17,626.22 |
Jan 15, 2020 | IBRD-82590 | Int Charges | 1,317,029.10 |
Jan 15, 2020 | IDA-42040 | Loan Repay | 1,076,380.90 |
Oct 1, 2019 | IDA-42040 | Loan Repay | 25,081.93 |
Oct 1, 2019 | IDA-42040 | Loan Repay | 3,035,648.80 |
Oct 1, 2019 | IDA-42040 | Int Charges | 233,534.44 |
Oct 1, 2019 | IDA-42040 | Int Charges | 233,534.44 |
Dec 2, 2019 | IBRD-85780 | Loan Disb | 26,000,000.00 |
Jul 1, 2019 | IBRD-85780 | Int Charges | 200,587.34 |
Jul 1, 2019 | IBRD-85780 | Int Charges | 2,412,133.00 |
Jul 15, 2019 | IBRD-82590 | Int Charges | 1,635,464.60 |
May 10, 2019 | IBRD-82590 | Loan Cancel | 4,463,109.50 |
Jul 1, 2022 | IBRD-85780 | Int Charges | 5,241.16 |
Jul 1, 2022 | IBRD-85780 | Int Charges | 425.35 |
Apr 1, 2022 | IDA-42040 | Loan Repay | 79,113.55 |
Apr 1, 2022 | IDA-42040 | Loan Repay | 6,124,865.00 |
Apr 1, 2022 | IDA-42040 | Int Charges | 162,854.47 |
Apr 1, 2022 | IDA-42040 | Int Charges | 162,854.47 |
Oct 1, 2021 | IDA-42040 | Loan Repay | 51,825.14 |
Oct 1, 2021 | IDA-42040 | Loan Repay | 6,292,828.00 |
Oct 1, 2021 | IDA-42040 | Int Charges | 190,339.55 |
Oct 1, 2021 | IDA-42040 | Int Charges | 190,339.55 |
Nov 15, 2021 | IBRD-85780 | Loan Disb | 5,400,000.00 |
May 19, 2022 | IBRD-85780 | Loan Disb | -1,363,973.40 |
Sep 1, 2021 | IBRD-85780 | Loan Disb | 8,000,000.00 |
Jul 1, 2021 | IBRD-85780 | Int Charges | 2,320.36 |
Jul 1, 2021 | IBRD-85780 | Int Charges | 8,719.89 |
Jul 1, 2021 | IBRD-85780 | Int Charges | 22,156.50 |
Jul 1, 2021 | IBRD-85780 | Int Charges | 1,531,954.50 |
Jul 15, 2021 | IBRD-82590 | Int Charges | 335,973.90 |
Jul 15, 2021 | IBRD-82590 | Loan Repay | 4,484,705.50 |
Apr 1, 2021 | IDA-42040 | Loan Repay | 6,117.15 |
Apr 1, 2021 | IDA-42040 | Loan Repay | 3,177,310.50 |
Apr 1, 2021 | IDA-42040 | Int Charges | 202,943.48 |
Sep 26, 2017 | IBRD-85780 | Loan Disb | 750,000.00 |
Oct 27, 2017 | IBRD-85780 | Loan Disb | 40,000,000.00 |
Oct 1, 2017 | IDA-42040 | Loan Repay | 15,306.63 |
Oct 1, 2017 | IDA-42040 | Loan Repay | 3,160,660.50 |
Jul 1, 2017 | IBRD-85780 | Int Charges | 333,023.97 |
Jul 1, 2017 | IBRD-85780 | Int Charges | 324,936.38 |
Apr 1, 2017 | IDA-42040 | Loan Repay | 3,046,485.00 |
Apr 1, 2017 | IDA-42040 | Int Charges | 331,609.44 |
Apr 1, 2017 | IDA-42040 | Int Charges | 331,609.44 |
Apr 1, 2017 | IDA-42040 | Loan Repay | 2,862.93 |
Feb 9, 2017 | IDA-42040 | Loan Cancel | 6,595.50 |
Oct 1, 2017 | IDA-42040 | Int Charges | 330,049.78 |
Oct 1, 2017 | IDA-42040 | Int Charges | 330,049.78 |
Jan 15, 2017 | IBRD-82590 | Int Charges | 15,375.00 |
Jan 15, 2017 | IBRD-82590 | Int Charges | 622,349.30 |
Oct 1, 2016 | IDA-42040 | Int Charges | 78,124.14 |
Oct 1, 2016 | IDA-42040 | Int Charges | 78,124.14 |
Oct 1, 2016 | IDA-42040 | Loan Repay | 3,136,905.50 |
Oct 1, 2016 | IDA-42040 | Int Charges | 352,901.88 |
Oct 1, 2016 | IDA-42040 | Int Charges | 352,901.88 |
Apr 21, 2017 | IBRD-85780 | Loan Disb | 3,500,000.00 |
Feb 9, 2017 | IDA-42040 | Loan Disb | -6,595.50 |
May 21, 2019 | IBRD-85780 | Loan Disb | 33,000,000.00 |
Apr 1, 2019 | IDA-42040 | Loan Repay | 17,929.96 |
Apr 1, 2019 | IDA-42040 | Loan Repay | 3,101,520.00 |
Apr 1, 2019 | IDA-42040 | Int Charges | 260,886.81 |
Apr 1, 2019 | IDA-42040 | Int Charges | 260,886.81 |
Feb 20, 2019 | IBRD-85780 | Loan Disb | 20,000,000.00 |
May 10, 2019 | IBRD-82590 | Loan Disb | -2,163,109.50 |
Jul 1, 2019 | IBRD-85780 | Int Charges | 7,082.19 |
Jul 1, 2019 | IBRD-85780 | Int Charges | 87,126.70 |
Oct 1, 2018 | IDA-42040 | Loan Repay | 3,132,569.80 |
Oct 1, 2018 | IDA-42040 | Int Charges | 282,293.62 |
Oct 1, 2018 | IDA-42040 | Int Charges | 282,293.62 |
Oct 1, 2018 | IDA-42040 | Loan Repay | 4,026.31 |
Jan 15, 2019 | IBRD-82590 | Int Charges | 1,496,533.40 |
Nov 15, 2018 | IBRD-85780 | Loan Disb | 22,000,000.00 |
Jan 15, 2019 | IDA-42040 | Loan Repay | 5,183,944.50 |
Jan 1, 2019 | IBRD-85780 | Int Charges | 252,219.17 |
Apr 1, 2021 | IDA-42040 | Int Charges | 202,943.48 |
Nov 19, 2020 | IBRD-85780 | Loan Disb | 7,900,000.00 |
Feb 26, 2021 | IBRD-85780 | Loan Disb | 13,000,000.00 |
Jan 15, 2021 | IBRD-82590 | Int Charges | 391,354.60 |
Jan 15, 2021 | IBRD-82590 | Loan Repay | 4,370,202.50 |
Jan 1, 2021 | IBRD-85780 | Int Charges | 78,414.83 |
Jan 1, 2021 | IBRD-85780 | Int Charges | 50,056.69 |
Jul 1, 2023 | IBRD-85780 | Int Charges | 465,168.70 |
Jul 15, 2023 | IBRD-82590 | Loan Repay | 4,942,718.00 |
Jan 15, 2023 | IBRD-82590 | Int Charges | 88,191.83 |
Jan 15, 2023 | IBRD-82590 | Int Charges | 1,433,466.40 |
Jan 15, 2023 | IBRD-82590 | Loan Repay | 4,828,215.00 |
Aug 2, 2023 | IBRD-85780 | Loan Disb | -3,169.84 |
May 17, 2023 | IBRD-85780 | Loan Disb | -577.39 |
Jul 15, 2023 | IBRD-82590 | Int Charges | 95,979.56 |
Jul 15, 2023 | IBRD-82590 | Int Charges | 1,803,303.00 |
Apr 1, 2023 | IDA-42040 | Loan Repay | 5,839,799.00 |
Apr 1, 2023 | IDA-42040 | Int Charges | 113,362.53 |
Apr 1, 2023 | IDA-42040 | Int Charges | 113,362.53 |
Apr 1, 2023 | IDA-42040 | Loan Repay | 206,201.12 |
Oct 1, 2022 | IDA-42040 | Int Charges | 129,426.59 |
Oct 1, 2022 | IDA-42040 | Int Charges | 129,426.59 |
Oct 1, 2022 | IDA-42040 | Loan Repay | 81,085.58 |
Oct 1, 2022 | IDA-42040 | Loan Repay | 5,671,205.50 |
Oct 5, 2022 | IBRD-85780 | Loan Disb | -193,952.66 |
Jan 1, 2023 | IBRD-85780 | Int Charges | 132.54 |
Jan 1, 2023 | IBRD-85780 | Int Charges | 315,179.84 |
Jan 1, 2023 | IBRD-85780 | Int Charges | 116.90 |
Jan 1, 2023 | IBRD-85780 | Int Charges | 5,909,907.50 |
Oct 28, 2022 | IBRD-85780 | Loan Disb | -6,924.26 |
Nov 29, 2022 | IBRD-85780 | Loan Disb | -738.09 |
Jan 15, 2022 | IBRD-82590 | Int Charges | 286,035.12 |
Jan 15, 2022 | IBRD-82590 | Loan Repay | 4,589,666.50 |
Jul 15, 2022 | IBRD-82590 | Int Charges | 366,812.80 |
Jul 15, 2022 | IBRD-82590 | Loan Repay | 4,704,169.50 |
Jan 1, 2022 | IBRD-85780 | Int Charges | 9,031.50 |
Jan 1, 2022 | IBRD-85780 | Int Charges | 1,474,759.00 |
Jul 1, 2022 | IBRD-85780 | Int Charges | 1,738.34 |
Sep 27, 2013 | IBRD-82590 | Loan Disb | 27,200,000.00 |
Jan 15, 2014 | IBRD-82590 | Int Charges | 55,684.45 |
Sep 4, 2013 | IBRD-82590 | Fee Charges | 249,750.00 |
Oct 1, 2013 | IDA-42040 | Loan Repay | 3,502,766.00 |
Oct 1, 2013 | IDA-42040 | Loan Repay | 112,744.13 |
Oct 1, 2013 | IDA-42040 | Int Charges | 401,362.20 |
Oct 1, 2013 | IDA-42040 | Int Charges | 401,362.20 |
Jan 16, 2015 | IBRD-82590 | Loan Disb | 1,300,000.00 |
Oct 1, 2014 | IDA-42040 | Loan Repay | 3,487,981.20 |
Oct 1, 2014 | IDA-42040 | Int Charges | 428,696.88 |
Oct 1, 2014 | IDA-42040 | Int Charges | 428,696.88 |
Oct 1, 2014 | IDA-42040 | Int Charges | 28,559.58 |
Oct 1, 2014 | IDA-42040 | Int Charges | 28,559.58 |
Jul 15, 2014 | IBRD-82590 | Int Charges | 1,172.50 |
Jul 15, 2014 | IBRD-82590 | Int Charges | 88,941.38 |
Jan 15, 2015 | IBRD-82590 | Int Charges | 128,380.00 |
Name | Review | Date |
---|---|---|
Procurement | Moderately Satisfactory | 2022-06-16 |
Financial Management | Moderately Satisfactory | 2022-06-16 |
Project Management | Satisfactory | 2022-06-16 |
Progress towards achievement of PDO | Satisfactory | 2022-06-16 |
Counterpart Funding | Satisfactory | 2022-06-16 |
Monitoring and Evaluation | Satisfactory | 2022-06-16 |
Overall Implementation Progress (IP) | Satisfactory | 2022-06-16 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 06-29-2023 |
---|---|
Outcomes | Highly Satisfactory |
Risk to Development Outcome | |
Bank Performance | Highly Satisfactory |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 12-18-2023 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | N/a | |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
# of additional people with sustainable access to improved water facilities | Value | 0.00 | 24800000.00 | 22100000.00 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
villages with improved water supply systems that are effectively managed and financed | Value | 0.00 | 92.25 | 90.00 |
Date | September 1, 2006 | August 31, 2022 | December 31, 2020 | |
Comment |
People provided with access to "improved sanitation facilities” under the proj. | Value | 0.00 | 26000000.00 | 14900000.00 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
Number of additional people with access to improved sanitation facilities | Value | 0.00 | 26000000.00 | 14900000.00 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
Additional people with sustainable access to improved sanitation facilities | Value | 0.00 | 26000000.00 | 14900000.00 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
Number of people in rural areas provided with access to Improved Water Sources under the project | Value | 0.00 | 24800000.00 | 22100000.00 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
# of people in rural areas provided with access to Improved Water Sources under the project - female | Value | 4000000.00 | 12238000.00 | 0.00 |
Date | December 7, 2015 | August 31, 2022 | ||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
New piped household water connections that are resulting from the project intervention | Value | 0.00 | 4490000.00 | 0.00 |
Date | September 1, 2006 | August 31, 2022 | ||
Comment |
actual project district WSS expenditure as a percentage of the budget needed to achieve UA targets | Value | 0.00 | 76.26 | 70.00 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
Piped household water connections that are benefiting from rehabilitation works undertaken by the project | Value | 0.00 | 117000.00 | 0.00 |
Date | September 1, 2006 | August 31, 2022 | ||
Comment |
People trained to improve hygiene behavior/sanitation practices - female | Value | 0.00 | 1512000.00 | 0.00 |
Date | September 1, 2006 | August 31, 2022 | ||
Comment |
number of districts that are replicating the Pamsimas approach outside targeted communities | Value | 0.00 | 404.00 | 370.00 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
% of villages with improved water supply systems that are functioning to the satisfaction of the majority of targeted community. | Value | 0.00 | 91.00 | 80.00 |
Date | September 1, 2006 | August 31, 2022 | June 30, 2020 | |
Comment |
Number of other water service providers that the project is supporting | Value | 0.00 | 35553.00 | 0.00 |
Date | September 1, 2006 | August 31, 2022 | ||
Comment |
% of target communities free of open defecation | Value | 0% | 82.5 | 60 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
# of villages developing community action plans | Value | 0 | 38200 | 27000 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
Number of districts exceeding project performance criteria and receiving supplementary grants | Value | 0.00 | 351.00 | 400.00 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
% of districts with Project monitoring structure and tools (IMIS, M&E) that provides regular information on project implementation quality | Value | 0.00 | 95.06 | 90.00 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
% of village government incorporating community WSS plan to annual/mid-term village plan to support achievement of universal access | Value | 0.00 | 98.90 | 0.00 |
Date | September 9, 2015 | August 31, 2022 | ||
Comment |
% of targeted schools that have improved sanitation facilities and hygiene programs | Value | 0.00 | 96.60 | 95.00 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
Improved community water points constructed or rehabilitated under the project | Value | 0.00 | 125000.00 | 0.00 |
Date | September 1, 2006 | August 31, 2022 | ||
Comment |
# of villages exceeding project performance criteria and receiving supplementary grants | Value | 0.00 | 8176.00 | 4649.00 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
% of villages that has an increased budget to maintain and expanding existing WSS system to support implementation Community WSS Plan | Value | 0.00 | 87.90 | 0.00 |
Date | September 9, 2015 | August 31, 2022 | ||
Comment |
Improved latrines constructed under the project | Value | 0.00 | 30000.00 | 0.00 |
Date | September 1, 2006 | August 31, 2022 | ||
Comment |
% of districts with Capacity building plan to support the adoption and mainstreaming of the PAMSIMAS approach, and progress towardsachieving its objectives | Value | 0% | 95.7 | 70 |
Date | September 1, 2006 | August 31, 2022 | December 30, 2020 | |
Comment |
People trained to improve hygiene behavior/sanitation practices under the project | Value | 0.00 | 2686000.00 | 0.00 |
Date | December 1, 2006 | August 31, 2022 | ||
Comment |