ODRA RIVER BASIN FLOOD PROTECTION

Abstract*

The main development objective of the Project is to protect the population in the Odra River Basin against loss of life and damage to property caused by severe flooding. This would be achieved by (i) reducing the extreme flood peaks through storage in a dry polder on the Odra River just upstream of Raciborz town, enabling a reduction of the flood peak downstream of the reservoir and allowing better control of the operation of the river system; and...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The main development objective o f the Project i s to protect the population in the ORB against loss o f life and damage to property caused by severe flooding. This would be achieved by: (i) reducing the extreme flood peaks through storage in a dry polder on the Odra River just upstream o f Raciborz town, enabling a reduction o f the flood peak downstream o f the reservoir and allowing bettercontrol o f the operation o f t he river system; and (ii)by increasing the flood carrying capacity o f t he Odra River channels through and around Wroclaw. The Project would protect more than 2.5 million people against flooding in several towns such as Raciborz, Kedzierzyn, Kozle, Krapkowice, Opole, Brzeg, Olawa and Wroclaw, and settlements in the three voivodships o f Slaslue, Opolskie and Dolnoslaslue.

Key Details

Project Details

  • P086768

  • Closed

  • Berina Uwimbabazi

  • Republic of Poland

  • Poland

  • July 6, 2004

  • (as of board presentation)

    March 21, 2007

  • July 9, 2007

  • US$ 489.00 million

  • Ministry of Environment

  • Europe and Central Asia

  • 2007

  • US$ 459.00 million

  • A

  • October 12, 2023

  • June 30, 2020

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Foreign Multilateral Institutions (unidentified) 145.00
International Bank for Reconstruction and Development 184.00
EC: European Commission 130.00
Borrower/Recipient 30.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 184.00
IDA Commitment N/A
IBRD + IDA Commitment 184.00
Lending Instrument
Grant Amount 275.00
Total Project Cost** 489.00

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Nov 27, 2020 IBRD-74360 Loan Disb -978,960.25
Nov 30, 2020 IBRD-74360 Loan Cancel 9,786,529.00
Nov 15, 2021 IBRD-74360 Loan Repay 10,837,179.00
Nov 15, 2015 IBRD-74360 Int Charges 1,449.22
Nov 15, 2015 IBRD-74360 Int Charges 1,019.24
Nov 15, 2015 IBRD-74360 Int Charges 46,387.19
Nov 15, 2015 IBRD-74360 Int Charges 152,190.12
Nov 15, 2015 IBRD-74360 Loan Repay 7,157,021.50
Apr 22, 2015 IBRD-74360 Loan Disb 9,181,381.00
May 15, 2015 IBRD-74360 Int Charges 66,458.96
May 15, 2015 IBRD-74360 Int Charges 187,242.23
May 15, 2015 IBRD-74360 Loan Repay 6,790,323.00
Nov 15, 2016 IBRD-74360 Int Charges 38,469.98
Nov 15, 2016 IBRD-74360 Int Charges 47,608.12
Nov 15, 2016 IBRD-74360 Loan Repay 8,645,580.00
May 15, 2016 IBRD-74360 Int Charges 48,149.66
May 15, 2016 IBRD-74360 Int Charges 114,154.75
May 15, 2016 IBRD-74360 Loan Repay 7,525,834.00
Sep 8, 2016 IBRD-74360 Loan Disb 17,360,360.00
Nov 15, 2017 IBRD-74360 Int Charges 27,979.56
Nov 15, 2017 IBRD-74360 Loan Repay 9,514,113.00
May 15, 2017 IBRD-74360 Int Charges 25,466.65
May 15, 2017 IBRD-74360 Int Charges 26,578.52
May 15, 2017 IBRD-74360 Loan Repay 8,809,408.00
May 15, 2018 IBRD-74360 Loan Repay 10,450,084.00
May 15, 2018 IBRD-74360 Int Charges 22,005.20
Jan 17, 2018 IBRD-74360 Loan Disb 7,202,425.00
Nov 15, 2019 IBRD-74360 Loan Repay 10,889,312.00
Nov 15, 2019 IBRD-74360 Int Charges 10,733.44
May 15, 2019 IBRD-74360 Loan Repay 9,817,011.00
May 15, 2019 IBRD-74360 Int Charges 17,821.75
May 28, 2019 IBRD-74360 Loan Disb 6,164,537.50
Nov 15, 2018 IBRD-74360 Int Charges 18,307.29
Nov 15, 2018 IBRD-74360 Loan Repay 9,920,039.00
May 15, 2020 IBRD-74360 Int Charges 9,857.66
May 15, 2020 IBRD-74360 Loan Repay 10,669,207.00
May 15, 2021 IBRD-74360 Int Charges 930.25
May 15, 2021 IBRD-74360 Loan Repay 11,452,873.00
Nov 30, 2020 IBRD-74360 Loan Disb -14,374.11
Nov 15, 2020 IBRD-74360 Int Charges 10,888.10
Nov 15, 2020 IBRD-74360 Int Charges 26,838.17
Nov 15, 2020 IBRD-74360 Loan Repay 11,664,617.00
Mar 21, 2007 IBRD-74360 Loan Commitment 184,000,000.00
Nov 15, 2014 IBRD-74360 Loan Repay 5,040,253.00
Sep 29, 2014 IBRD-74360 Loan Disb 8,879,850.00
Nov 15, 2013 IBRD-74360 Int Charges 2,487.02
Nov 15, 2013 IBRD-74360 Int Charges 2,858.77
Nov 15, 2013 IBRD-74360 Int Charges 154,355.98
Nov 15, 2013 IBRD-74360 Int Charges 137,375.06
Nov 15, 2013 IBRD-74360 Loan Repay 3,541,777.20
Sep 23, 2013 IBRD-74360 Loan Disb 12,319,089.00
Nov 15, 2014 IBRD-74360 Int Charges 1,235.02
Nov 15, 2014 IBRD-74360 Int Charges 1,419.65
Nov 15, 2014 IBRD-74360 Int Charges 107,725.27
Nov 15, 2014 IBRD-74360 Int Charges 251,535.89
May 15, 2015 IBRD-74360 Int Charges 2,559.78
May 15, 2015 IBRD-74360 Int Charges 4,291.89
Jan 5, 2015 IBRD-74360 Loan Disb 23,810,000.00
Jun 9, 2014 IBRD-74360 Loan Disb 8,318,392.00
May 15, 2014 IBRD-74360 Int Charges 4,095.45
May 15, 2014 IBRD-74360 Int Charges 138,044.22
May 15, 2014 IBRD-74360 Int Charges 186,537.60
Apr 23, 2014 IBRD-74360 Loan Disb 9,117,454.00
May 15, 2014 IBRD-74360 Loan Repay 4,374,995.50
May 15, 2014 IBRD-74360 Int Charges 4,519.81

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Satisfactory 2020-06-23
Counterpart Funding Satisfactory 2020-06-23
Monitoring and Evaluation Satisfactory 2020-06-23
Overall Implementation Progress (IP) Satisfactory 2020-06-23
Overall Safeguards Rating Moderately Satisfactory 2020-06-23
Overall Safeguards Rating Moderately Satisfactory 2020-06-23
Procurement Satisfactory 2020-06-23
Project Management Moderately Satisfactory 2020-06-23
Financial Management Satisfactory 2020-06-23

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 01-28-2021
OutcomesSubstantial
Risk to Development Outcome
Bank PerformanceSubstantial
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 06-10-2021PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingSatisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceSatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceNot RatedN/a
Implementing AgencyN/a
Icr QualitySubstantialN/a
M&e QualitySubstantialN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Reduction in area flooded, damages avoided and lives saved due to floods of various magnitudes and return periodsValueThe hectares that wereaffected during the 1997flMeasured as construction progress until project isFull protection against floods of the 1997 magnitu
    DateJuly 5, 2007June 12, 2020June 30, 2020
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Component A. Reduction in area flooded, damages avoided and lives saved in cities and settlements between Raciborz and Wroclaw cityValueArea flooded during 1997.The hectares that were aMeasured as construction progress until project isFull protection against floods of the 1997 magnitu
    DateJuly 5, 2007June 12, 2020June 30, 2020
    Comment
  • Component B: Full protection to Wroclaw city against flooding.ValueArea flooded during 1997 floods.The hectares thatMeasured as construction progress until project fuFull protection against floods of the 1997 magnitu
    DateJuly 5, 2007June 12, 2020June 30, 2020
    Comment
  • Component C: Improved flood forecasting and better linkage of forecaster and communication with flood managementValueStatus of forecast and communication during 1997 fThese activities are successfully completed and inEstablished institutional and communication setup
    DateJuly 20, 1997June 12, 2020June 30, 2020
    Comment
  • Component D: Implementation of RAP design of infrastructure and constructions completion on time.ValueNot yet dueAll RAPs prepared and RAP influenced designs (new Complete constructions of all project facilities.
    DateJuly 20, 1997June 12, 2020June 30, 2020
    Comment
  • Construction completion and expendituresValue0%43%
    DateJuly 5, 2007August 17, 2011
    Comment
  • Construction completion and expendituresValue0%All B1 and B2 contracts are completed (constructio
    DateJuly 5, 2007August 17, 2011
    Comment