Financier | Commitments |
---|---|
IDA Credit | 5.15 |
Borrower/Recipient | 0.56 |
P087620
Closed
Ivan Drabek
N/A
January 9, 2004
(as of board presentation)
June 10, 2004
January 8, 2003
US$ 5.71 million
N/A
2004
US$ 5.15 million
C
November 6, 2013
May 31, 2013
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 5.15 |
Borrower/Recipient | 0.56 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 5.15 |
IBRD + IDA Commitment | 5.15 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 5.71 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
May 1, 2023 | IDA-39210 | Loan Repay | 47,715.93 |
May 1, 2023 | IDA-39210 | Int Charges | 0.01 |
May 1, 2023 | IDA-39210 | Int Charges | 15,090.13 |
May 1, 2023 | IDA-39210 | Int Charges | 15,090.13 |
May 1, 2023 | IBRD-78480 | Int Charges | 3,346.31 |
May 1, 2023 | IBRD-78480 | Int Charges | 92,566.68 |
May 1, 2023 | IBRD-78480 | Loan Repay | 61,375.59 |
May 1, 2023 | IBRD-78480 | Loan Repay | 95,912.99 |
May 1, 2023 | IDA-39210 | Int Charges | 33,203.04 |
May 1, 2023 | IDA-39210 | Loan Repay | 766.37 |
May 1, 2018 | IDA-39210 | Int Charges | 17,999.21 |
May 1, 2018 | IDA-39210 | Loan Repay | 964.33 |
Nov 1, 2018 | IDA-39210 | Loan Repay | 49,175.92 |
Nov 1, 2018 | IDA-39210 | Int Charges | 0.01 |
Nov 1, 2018 | IDA-39210 | Int Charges | 0.01 |
Nov 1, 2018 | IDA-39210 | Int Charges | 17,203.88 |
Nov 1, 2018 | IDA-39210 | Int Charges | 17,203.88 |
Nov 1, 2018 | IDA-39210 | Int Charges | 38,995.42 |
May 1, 2018 | IDA-39210 | Int Charges | 40,798.21 |
Nov 1, 2017 | IBRD-78480 | Int Charges | 45,386.44 |
Nov 1, 2017 | IDA-39210 | Int Charges | 40,388.14 |
Nov 1, 2017 | IDA-39210 | Int Charges | 17,818.33 |
Nov 1, 2017 | IDA-39210 | Int Charges | 17,818.33 |
Nov 1, 2017 | IDA-39210 | Int Charges | 1,675.65 |
Nov 1, 2017 | IDA-39210 | Loan Repay | 50,548.33 |
Nov 1, 2020 | IDA-39210 | Loan Repay | 50,480.26 |
Nov 1, 2020 | IDA-39210 | Int Charges | 16,758.59 |
Nov 1, 2020 | IDA-39210 | Int Charges | 16,758.59 |
Nov 1, 2020 | IDA-39210 | Int Charges | 37,986.13 |
Nov 1, 2020 | IBRD-78480 | Int Charges | 30,105.78 |
Nov 1, 2020 | IBRD-78480 | Loan Repay | 127,182.80 |
Nov 1, 2020 | IBRD-78480 | Loan Repay | 30,105.78 |
May 1, 2020 | IBRD-78480 | Loan Repay | 99,739.43 |
May 1, 2020 | IBRD-78480 | Loan Repay | 57,549.15 |
May 1, 2020 | IBRD-78480 | Int Charges | 57,549.15 |
May 1, 2020 | IDA-39210 | Int Charges | 4,605.15 |
May 1, 2020 | IDA-39210 | Int Charges | 4,605.15 |
May 1, 2020 | IDA-39210 | Int Charges | 11,835.25 |
May 1, 2020 | IDA-39210 | Int Charges | 11,835.25 |
May 1, 2020 | IDA-39210 | Int Charges | 37,265.01 |
May 1, 2020 | IDA-39210 | Int Charges | 876.57 |
May 1, 2020 | IDA-39210 | Loan Repay | 49,259.71 |
Nov 1, 2019 | IDA-39210 | Loan Repay | 532.55 |
Nov 1, 2019 | IDA-39210 | Loan Repay | 49,113.52 |
Nov 1, 2019 | IDA-39210 | Loan Repay | 0.01 |
Nov 1, 2019 | IDA-39210 | Int Charges | 16,755.57 |
Nov 1, 2019 | IDA-39210 | Int Charges | 16,755.57 |
Nov 1, 2019 | IDA-39210 | Int Charges | 37,095.81 |
Nov 1, 2019 | IDA-39210 | Int Charges | -0.01 |
Nov 1, 2019 | IBRD-78480 | Int Charges | 75,080.78 |
Nov 1, 2022 | IBRD-78480 | Loan Repay | 56,164.07 |
Nov 1, 2022 | IDA-39210 | Loan Repay | 2,392.98 |
Nov 1, 2022 | IDA-39210 | Int Charges | 14,569.77 |
Nov 1, 2022 | IDA-39210 | Int Charges | 14,569.77 |
Nov 1, 2022 | IDA-39210 | Loan Repay | 43,860.31 |
Nov 1, 2022 | IBRD-78480 | Int Charges | 56,164.07 |
Nov 1, 2022 | IBRD-78480 | Loan Repay | 101,124.51 |
May 1, 2022 | IDA-39210 | Int Charges | 15,415.11 |
May 1, 2022 | IBRD-78480 | Int Charges | 14,821.11 |
May 1, 2022 | IBRD-78480 | Loan Repay | 157,288.58 |
May 1, 2022 | IDA-39210 | Loan Repay | 590.90 |
May 1, 2022 | IDA-39210 | Loan Repay | 47,770.16 |
May 1, 2022 | IDA-39210 | Int Charges | 15,415.11 |
Nov 1, 2021 | IDA-39210 | Loan Repay | 50,719.75 |
Nov 1, 2021 | IDA-39210 | Int Charges | 16,368.19 |
Nov 1, 2021 | IDA-39210 | Int Charges | 16,368.19 |
Nov 1, 2021 | IDA-39210 | Loan Repay | 34.35 |
Nov 1, 2021 | IBRD-78480 | Loan Repay | 16,080.18 |
Nov 1, 2021 | IBRD-78480 | Int Charges | 16,080.18 |
Nov 1, 2021 | IBRD-78480 | Loan Repay | 141,208.40 |
May 1, 2021 | IBRD-78480 | Int Charges | 16,403.20 |
May 1, 2021 | IBRD-78480 | Loan Repay | 140,885.38 |
May 1, 2021 | IBRD-78480 | Loan Repay | 16,403.20 |
May 1, 2021 | IDA-39210 | Loan Repay | 50,770.00 |
May 1, 2015 | IBRD-78480 | Int Charges | 14,961.29 |
May 1, 2015 | IDA-39210 | Loan Repay | 1,983.05 |
May 1, 2015 | IDA-39210 | Loan Repay | 48,643.34 |
May 1, 2015 | IDA-39210 | Int Charges | 18,795.08 |
May 1, 2021 | IDA-39210 | Int Charges | 16,853.98 |
May 1, 2021 | IDA-39210 | Int Charges | 16,853.98 |
May 1, 2021 | IDA-39210 | Loan Repay | 889.60 |
Nov 1, 2020 | IDA-39210 | Loan Repay | 303.35 |
Feb 25, 2010 | IBRD-78480 | Loan Commitment | 5,000,000.00 |
Jun 10, 2004 | IDA-39210 | Loan Commitment | 5,150,000.00 |
May 1, 2024 | IBRD-78480 | Loan Repay | 157,288.58 |
May 1, 2024 | IDA-39210 | Loan Repay | 1,524.12 |
May 1, 2024 | IBRD-78480 | Int Charges | 695.83 |
May 1, 2024 | IBRD-78480 | Int Charges | 110,229.26 |
May 1, 2024 | IDA-39210 | Loan Repay | 45,773.88 |
May 1, 2024 | IDA-39210 | Int Charges | 14,366.77 |
May 1, 2024 | IDA-39210 | Int Charges | 14,366.77 |
May 1, 2024 | IDA-39210 | Int Charges | 32,564.67 |
Nov 1, 2023 | IDA-39210 | Int Charges | 972.57 |
Nov 1, 2023 | IDA-39210 | Loan Repay | 47,094.74 |
Nov 1, 2023 | IDA-39210 | Int Charges | 983.40 |
Nov 1, 2023 | IDA-39210 | Int Charges | 983.40 |
Nov 1, 2023 | IDA-39210 | Int Charges | 13,498.21 |
Nov 1, 2023 | IDA-39210 | Int Charges | 13,498.21 |
Nov 1, 2023 | IDA-39210 | Int Charges | 32,825.00 |
Nov 1, 2023 | IBRD-78480 | Loan Repay | 110,023.63 |
Nov 1, 2023 | IBRD-78480 | Int Charges | 1,625.22 |
Nov 1, 2023 | IBRD-78480 | Int Charges | 108,398.41 |
Nov 1, 2023 | IBRD-78480 | Loan Repay | 47,264.95 |
May 1, 2015 | IDA-39210 | Int Charges | 18,795.08 |
May 1, 2015 | IDA-39210 | Int Charges | 42,602.12 |
May 1, 2014 | IDA-39210 | Int Charges | 226.38 |
May 1, 2014 | IDA-39210 | Int Charges | 226.38 |
May 1, 2014 | IDA-39210 | Int Charges | 20,874.52 |
May 1, 2014 | IDA-39210 | Int Charges | 20,874.52 |
May 1, 2014 | IBRD-78480 | Int Charges | 1.53 |
May 1, 2014 | IBRD-78480 | Int Charges | 14,722.29 |
Sep 23, 2013 | IBRD-78480 | Loan Disb | -2,036.92 |
Nov 1, 2013 | IBRD-78480 | Int Charges | 1,053.35 |
Nov 1, 2013 | IBRD-78480 | Int Charges | 16,175.71 |
Nov 1, 2013 | IDA-39210 | Int Charges | 103.58 |
Nov 1, 2013 | IDA-39210 | Int Charges | 20,440.90 |
Nov 1, 2013 | IDA-39210 | Int Charges | 20,440.90 |
Nov 1, 2013 | IDA-39210 | Int Charges | 103.58 |
Sep 30, 2013 | IBRD-78480 | Loan Cancel | 276,619.12 |
Jul 17, 2013 | IBRD-78480 | Loan Disb | 25,417.78 |
Nov 1, 2014 | IDA-39210 | Int Charges | 18,574.37 |
Nov 1, 2014 | IDA-39210 | Int Charges | 18,574.37 |
Nov 1, 2014 | IDA-39210 | Loan Repay | 53,182.77 |
Nov 1, 2014 | IDA-39210 | Int Charges | 1,369.16 |
Nov 1, 2014 | IDA-39210 | Int Charges | 1,369.16 |
Nov 1, 2014 | IDA-39210 | Int Charges | 71.65 |
Nov 1, 2014 | IDA-39210 | Int Charges | 71.65 |
Nov 1, 2014 | IBRD-78480 | Int Charges | 14,243.62 |
May 1, 2017 | IBRD-78480 | Int Charges | 39,659.33 |
May 1, 2017 | IDA-39210 | Int Charges | 17,550.83 |
May 1, 2017 | IDA-39210 | Int Charges | 17,550.83 |
May 1, 2017 | IDA-39210 | Int Charges | 38,148.74 |
May 1, 2017 | IDA-39210 | Loan Repay | 1,421.79 |
May 1, 2017 | IDA-39210 | Loan Repay | 47,843.67 |
Nov 1, 2016 | IDA-39210 | Int Charges | 2,694.31 |
Nov 1, 2016 | IDA-39210 | Loan Repay | 49,562.62 |
Nov 1, 2016 | IBRD-78480 | Int Charges | 30,659.98 |
May 1, 2016 | IDA-39210 | Int Charges | 39,268.03 |
May 1, 2016 | IBRD-78480 | Int Charges | 21,491.39 |
May 1, 2016 | IDA-39210 | Int Charges | 18,547.01 |
May 1, 2016 | IDA-39210 | Int Charges | 18,547.01 |
May 1, 2016 | IDA-39210 | Loan Repay | 870.01 |
May 1, 2016 | IDA-39210 | Loan Repay | 50,118.29 |
Nov 1, 2016 | IDA-39210 | Int Charges | 17,842.51 |
Nov 1, 2016 | IDA-39210 | Int Charges | 17,842.51 |
Nov 1, 2016 | IDA-39210 | Int Charges | 40,443.13 |
Nov 1, 2015 | IBRD-78480 | Int Charges | 17,864.86 |
Nov 1, 2015 | IDA-39210 | Int Charges | 18,467.68 |
Nov 1, 2015 | IDA-39210 | Int Charges | 18,467.68 |
Nov 1, 2015 | IDA-39210 | Int Charges | 41,860.17 |
Nov 1, 2015 | IDA-39210 | Loan Repay | 9.55 |
Nov 1, 2015 | IDA-39210 | Loan Repay | 50,242.70 |
May 1, 2019 | IDA-39210 | Loan Repay | 48,747.53 |
May 1, 2019 | IDA-39210 | Int Charges | 17,033.29 |
May 1, 2019 | IDA-39210 | Int Charges | 17,033.29 |
May 1, 2019 | IDA-39210 | Int Charges | 38,608.80 |
May 1, 2019 | IDA-39210 | Loan Repay | 1,166.93 |
May 1, 2019 | IBRD-78480 | Int Charges | 78,131.29 |
Nov 1, 2018 | IBRD-78480 | Int Charges | 72,183.74 |
Nov 1, 2018 | IDA-39210 | Loan Repay | 690.33 |
May 1, 2018 | IBRD-78480 | Int Charges | 48,208.66 |
May 1, 2018 | IDA-39210 | Loan Repay | 50,646.34 |
May 1, 2018 | IDA-39210 | Int Charges | 17,999.21 |
Name | Review | Date |
---|---|---|
Progress towards achievement of PDO | Satisfactory | 2013-05-29 |
Procurement | Satisfactory | 2013-05-29 |
Financial Management | Highly Satisfactory | 2013-05-29 |
Project Management | Moderately Satisfactory | 2013-05-29 |
Counterpart Funding | Satisfactory | 2013-05-29 |
Monitoring and Evaluation | Satisfactory | 2013-05-29 |
Overall Implementation Progress (IP) | Satisfactory | 2013-05-29 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 11-27-2013 |
---|---|
Outcomes | Moderately Satisfactory |
Risk to Development Outcome | Negligible |
Bank Performance | Moderately Satisfactory |
Borrower Performance | Substantial |
Government Performance | Substantial |
Implementing Agency | Substantial |
INDICATOR | ICR REVIEW: 05-07-2014 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | Negligible To Low | N/a |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | Satisfactory | N/a |
Government Performance | Satisfactory | N/a |
Implementing Agency | Satisfactory | N/a |
Icr Quality | Satisfactory | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
The share of pensioners who receive their pension timely (%) | Value | 50.4% | 99.7 | 100% |
Date | December 31, 2004 | June 29, 2012 | May 31, 2013 | |
Comment |
The share of pensionners who receive their pension fully (%) | Value | 50.4% | 98.7 | 100% |
Date | December 31, 2004 | June 29, 2012 | May 31, 2013 | |
Comment |
Proportion of social assisstance beneficiaries who get their benefit timely (% from total number of registered) | Value | 85.5% | 99.7 | 100% |
Date | December 31, 2004 | June 29, 2012 | May 31, 2013 | |
Comment |
Proportion of social assistance beneficiaries who get their benefit fully (% from total number of registered) | Value | 50.4% | 99.2 | 85% |
Date | December 31, 2004 | June 29, 2012 | May 31, 2013 | |
Comment |
Pensioners satisfied with the pension system (% of total number) | Value | 18.9% | 96.1 | 83% |
Date | December 31, 2005 | June 29, 2012 | May 31, 2013 | |
Comment |
Social assistance beneficiaries satisfied with social benefit system(% from total number) | Value | 21.8% | 98.9 | 86% |
Date | December 31, 2005 | June 29, 2012 | May 31, 2013 | |
Comment |
The share of job seekers satisfied with activities of State Employment Agency (% from total number) | Value | 76.90 | 80.60 | 90.00 |
Date | December 31, 2005 | June 29, 2012 | May 31, 2013 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Development and installation and smooth operation of software packages for personified reporting system | Value | Personified rekord-keeping and reporting not in pl | Software for PRK has been developed but unrelated | Smooth operation of the PRK system by State Revenu |
Date | December 31, 2006 | May 16, 2013 | May 31, 2013 | |
Comment |
Central register operational | Value | did not exist | Central Register of contribution payers, insured i | Agency programs are adapted to national informatio |
Date | December 31, 2004 | June 29, 2012 | May 31, 2013 | |
Comment |
Improvement of job seekers involvement in SES active employment programs. | Value | None | SES equipped, staff trained, ALMPs delivered. Y | Center for disabled in Gyumri is functional |
Date | December 31, 2004 | June 29, 2012 | May 31, 2013 | |
Comment |
Improved contributions collection in the pensions system, as a ratio of covered wage bill over gross wage bill | Value | 71.6 % | 77.8% | 86% |
Date | December 31, 2006 | June 29, 2012 | May 31, 2013 | |
Comment |
Level of involvement of employers and employees within central register | Value | didn't exist | Employers 72,985; Insured 523,791 | Employers 50,000, Insured 550,000 |
Date | December 31, 2004 | June 29, 2012 | May 31, 2013 | |
Comment |
System participants (pensioners) are aware of their rights and responsibilities | Value | aware of rights -12.9%, aware of responsibilities | aware of rights - 49.7%; aware of responsibilities | aware of rights -34%, aware of responsibilities -3 |
Date | December 31, 2006 | June 29, 2012 | May 31, 2013 | |
Comment |
Management Information Systems implementation for determining beneficiaries# eligibility. | Value | None | Information system of data exchange is launched. | CNIF is used to update data on Beneficiaries recei |
Date | December 31, 2004 | June 29, 2012 | May 31, 2013 | |
Comment |
Trainings for social protection field employees are implemented within timeframe approved by the project | Value | Did not exist | Training completed under original project; further | The Nork analytical center completed training for |
Date | December 31, 2004 | December 10, 2012 | May 31, 2013 | |
Comment | Wrongly reported in last ISR |
Number of disabled who received consultation in the "Professional Orientation and Rehabilitation Center for Disabled" SNCO | Value | 0.00 | 857.00 | 900.00 |
Date | December 31, 2006 | June 29, 2012 | May 31, 2013 | |
Comment | Professional Orientation and Rehabilitation Center for Disabled in Gyumi did not exist. |
Number of youth who received consultation in Yerevan SES offices | Value | 7314.00 | 11160.00 | 12000.00 |
Date | December 31, 2005 | June 29, 2012 | May 31, 2013 | |
Comment |
Number of disabled who received consultation in Gyumri SES regional office | Value | 252.00 | 150.00 | 150.00 |
Date | December 31, 2005 | June 29, 2012 | May 31, 2013 | |
Comment |
The share of disabled placed in a job (% of total registered in Gyumri SES regional office) | Value | 5.50 | 24.50 | 25.00 |
Date | December 31, 2005 | June 29, 2012 | May 31, 2013 | |
Comment |
Number of youth who received consultation in YPOC | Value | 1549.00 | 3907.00 | 4000.00 |
Date | December 31, 2008 | June 29, 2012 | May 31, 2013 | |
Comment |
Development of structural-functional model of joint system of social services integrated provision (SSICJS) and joint package of social services' standards | Value | Structural-functional model of joint system of soc | Government developed the model, approved the Decre | Introduction of a joint package of social services |
Date | December 31, 2006 | May 16, 2013 | May 31, 2013 | |
Comment |