Skip to Main Navigation

NATIONAL HIGHWAY ASSET MANAGEMENT

Abstract*

The National Highway Asset Management Project for Argentina in support of the first phase of the National Highway Asset Management Program builds on the achievements of the ongoing National Highways Rehabilitation and Maintenance Project (rep. no. 17195) and has the following specific objectives: a) Preserve the condition of vital road assets. b) Strengthen road sector management through carrying out a renewal program of the National Highway Directorate...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The overall purpose of the program is to gradually consolidate an efficient road network management strategy, bringing about the necessary resources to preserve the national road network in the long term. Specific Objectives are to:1. Preserve the condition of vital road assets, through the gradual expansion of performance-based contracts for the rehabilitation and maintenance of the non-concessioned primary paved network;2. Strengthen road sector management through carrying out a renewal program of DNV to revitalize its role in the sector by: (i) reinforcing its human resource base, (ii) consolidating its transformation into a results-oriented organization accountable for specific outputs; (iii) introducing a systematic approach to bridge management and (iv) enhancing road safety

Key Details

Project Details

  • P088153

  • Closed

  • Gylfi Palsson

  • N/A

  • Argentina

  • February 24, 2004

  • (as of board presentation)

    June 29, 2004

  • April 26, 2005

  • US$ 200.00 million

  • B

  • Not Applicable

  • August 31, 2010

  • BANK APPROVED

  • March 11, 2021

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 200.00
Borrower/Recipient 108.10

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 200.00
IDA Commitment N/A
IBRD + IDA Commitment 200.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 308.10

Summary Status of World Bank Financing (US$ Millions) as of July 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of July 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Dec 1, 2014 IBRD-72420 Int Charges 1,908,263.40
Jun 29, 2004 IBRD-72420 Loan Commitment 200,000,000.00
Dec 1, 2014 IBRD-72420 Loan Repay 10,410,234.00
Dec 1, 2014 IBRD-72420 Loan Repay 645,273.30
Dec 1, 2013 IBRD-72420 Int Charges 2,333,001.00
Dec 1, 2013 IBRD-72420 Int Charges 43,208.52
Dec 1, 2013 IBRD-72420 Loan Repay 10,410,234.00
Dec 1, 2013 IBRD-72420 Loan Repay 645,273.30
Jun 1, 2016 IBRD-72420 Loan Repay 645,273.30
Dec 1, 2015 IBRD-72420 Int Charges 27,463.86
Dec 1, 2015 IBRD-72420 Loan Repay 10,410,234.00
Dec 1, 2015 IBRD-72420 Loan Repay 645,273.30
Dec 1, 2015 IBRD-72420 Int Charges 1,483,525.80
Jun 1, 2015 IBRD-72420 Int Charges 1,695,894.60
Jun 1, 2015 IBRD-72420 Int Charges 31,400.04
Jun 1, 2015 IBRD-72420 Loan Repay 10,410,234.00
Jun 1, 2015 IBRD-72420 Loan Repay 645,273.30
Jun 1, 2014 IBRD-72420 Loan Repay 645,273.30
Jun 1, 2014 IBRD-72420 Int Charges 2,120,632.20
Jun 1, 2014 IBRD-72420 Int Charges 39,272.34
Jun 1, 2014 IBRD-72420 Loan Repay 10,410,234.00
Dec 1, 2018 IBRD-72420 Loan Repay 630,626.10
Dec 1, 2018 IBRD-72420 Int Charges 3,846.84
Dec 1, 2018 IBRD-72420 Int Charges 209,313.12
Dec 1, 2018 IBRD-72420 Loan Repay 10,260,446.00
Jun 1, 2018 IBRD-72420 Loan Repay 645,273.30
Jun 1, 2018 IBRD-72420 Loan Repay 10,410,234.00
Jun 1, 2018 IBRD-72420 Int Charges 7,783.02
Jun 1, 2018 IBRD-72420 Int Charges 421,681.90
Dec 1, 2017 IBRD-72420 Int Charges 634,050.70
Dec 1, 2017 IBRD-72420 Int Charges 11,719.20
Dec 1, 2017 IBRD-72420 Loan Repay 10,410,234.00
Dec 1, 2017 IBRD-72420 Loan Repay 645,273.30
Jun 1, 2017 IBRD-72420 Int Charges 846,419.44
Jun 1, 2017 IBRD-72420 Int Charges 15,655.32
Jun 1, 2017 IBRD-72420 Loan Repay 10,410,234.00
Jun 1, 2017 IBRD-72420 Loan Repay 645,273.30
Dec 1, 2016 IBRD-72420 Int Charges 1,058,788.20
Dec 1, 2016 IBRD-72420 Int Charges 19,591.50
Dec 1, 2016 IBRD-72420 Loan Repay 10,410,234.00
Dec 1, 2016 IBRD-72420 Loan Repay 645,273.30
Jun 1, 2016 IBRD-72420 Int Charges 1,271,157.00
Jun 1, 2016 IBRD-72420 Int Charges 23,527.68
Jun 1, 2016 IBRD-72420 Loan Repay 10,410,234.00
Dec 1, 2014 IBRD-72420 Int Charges 35,336.16

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Procurement Moderately Unsatisfactory 2010-12-24
Counterpart Funding Satisfactory 2010-12-24
Monitoring and Evaluation Satisfactory 2010-12-24
Overall Implementation Progress (IP) Satisfactory 2010-12-24
Project Management Satisfactory 2010-12-24
Progress towards achievement of PDO Satisfactory 2010-12-24
Financial Management Satisfactory 2010-12-24

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 02-22-2011
OutcomesSubstantial
Risk to Development OutcomeModest
Bank PerformanceSubstantial
Borrower PerformanceSubstantial
Government PerformanceSubstantial
Implementing AgencySubstantial

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 08-15-2011PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingSatisfactory N/a
Risk To Development OutcomeModerateN/a
Bank PerformanceSatisfactoryN/a
Borrower PerformanceSatisfactoryN/a
Government PerformanceSatisfactoryN/a
Implementing AgencySatisfactoryN/a
Icr QualitySatisfactoryN/a
M&e QualitySubstantialN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Implementation of a comprehensive results- oriented road maintenance program balancing efficiency, equity and regional development considerations, through the expansion of CREMA system.Value91741266416725
    DateMay 10, 2004August 31, 2010December 31, 2011
    CommentTarget includes APL1 and APL2 financed CREMA contracts

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Strengthen DNV capabilities to fulfill the evolving role of a modern, client-oriented road agency, through the implementation of the Institutional Renewal Dated Action Plan (IRDAP)ValueInstitutional Renewal Dated Action Plan outlined(1) Human Resorces Diagnostic completed. Short terShort-term Human Resources Program Implemented
    DateMay 10, 2004August 31, 2010August 31, 2010
    Comment
  • Roads in good and fair condition as a share of total classified roadsValue95.1098.0098.00
    DateDecember 31, 2004December 31, 2009August 31, 2010
    CommentGood IRI<4 Fair IRI Between 4 and 5 Avg. IRI 3.6Good IRI <4 Fair IRI Between 4 and 5 Average IRI 3.27 Data for 2009 measured but not yet processed.Good IRI<4 Fair IRI Between 4 and 5 Avg. IRI 3.2
  • Roads rehabilitated, Non-ruralValue0.003200.003200.00
    DateDecember 31, 2004August 31, 2010August 31, 2010
    CommentOn average 66% of the total length under CREMA has been rehabilitated