Financier | Commitments |
---|---|
IDA Credit | 79.00 |
Borrower/Recipient | 9.00 |
P090807
Closed
Mokhlesur Rahman , Shiro Nakata
PEOPLE'S REPUBLIC OF BANGLADESH
November 17, 2008
(as of board presentation)
June 10, 2010
August 22, 2010
US$ 88.00 million
Directorate of Technical Education
2010
US$ 79.00 million
B
September 6, 2022
June 30, 2019
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 79.00 |
Borrower/Recipient | 9.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 79.00 |
IBRD + IDA Commitment | 79.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 88.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Oct 15, 2016 | IDA-57360 | Int Charges | 47,287.32 |
Mar 14, 2016 | IDA-47640 | Loan Disb | 1,271,377.50 |
Jan 14, 2016 | IDA-47640 | Loan Disb | -732.38 |
Jan 14, 2016 | IDA-47640 | Loan Disb | -23,858.76 |
Feb 15, 2016 | IDA-47640 | Int Charges | 244,654.17 |
Feb 15, 2016 | IDA-47640 | Int Charges | 3,517.61 |
Aug 15, 2017 | IDA-47640 | Int Charges | 270,108.62 |
Aug 15, 2017 | IDA-47640 | Int Charges | 270,108.62 |
Aug 15, 2017 | IDA-47640 | Int Charges | 2,064.13 |
Aug 15, 2017 | IDA-47640 | Int Charges | 2,064.13 |
Oct 30, 2017 | IDA-57360 | Loan Disb | 1,942,189.20 |
Apr 15, 2017 | IDA-57360 | Int Charges | 68,298.13 |
Apr 15, 2017 | IDA-57360 | Int Charges | 68,298.13 |
Apr 15, 2017 | IDA-57360 | Int Charges | 580.70 |
Apr 15, 2017 | IDA-57360 | Int Charges | 580.70 |
Oct 15, 2017 | IDA-57360 | Int Charges | 3,401.90 |
Apr 15, 2023 | IDA-57360 | Int Charges | 319,034.16 |
Apr 15, 2023 | IDA-57360 | Loan Repay | 58,933.12 |
Oct 15, 2022 | IDA-57360 | Loan Repay | 1,340,079.10 |
Oct 15, 2022 | IDA-57360 | Int Charges | 327,552.03 |
Oct 15, 2022 | IDA-57360 | Int Charges | 327,552.03 |
Oct 15, 2017 | IDA-57360 | Int Charges | 3,401.90 |
Oct 15, 2017 | IDA-57360 | Int Charges | 124,738.38 |
Oct 15, 2017 | IDA-57360 | Int Charges | 124,738.38 |
Jun 22, 2017 | IDA-57360 | Loan Disb | 5,589,747.00 |
Jun 8, 2017 | IDA-57360 | Loan Disb | 5,801,315.50 |
Feb 15, 2017 | IDA-47640 | Int Charges | 2,028.89 |
Feb 15, 2017 | IDA-47640 | Int Charges | 2,028.89 |
Feb 15, 2017 | IDA-47640 | Int Charges | 259,825.80 |
Feb 15, 2017 | IDA-47640 | Int Charges | 259,825.80 |
Mar 23, 2017 | IDA-57360 | Loan Disb | 6,177,771.00 |
Aug 15, 2018 | IDA-47640 | Int Charges | 8,403.12 |
Aug 15, 2018 | IDA-47640 | Int Charges | 8,403.12 |
Aug 15, 2018 | IDA-47640 | Int Charges | 270,376.12 |
Aug 15, 2018 | IDA-47640 | Int Charges | 270,376.12 |
Jun 14, 2018 | IDA-57360 | Loan Disb | 6,135,496.00 |
Jun 28, 2018 | IDA-57360 | Loan Disb | 3,394,528.00 |
Jun 21, 2018 | IDA-57360 | Loan Disb | 5,610,131.50 |
Aug 30, 2018 | IDA-57360 | Loan Disb | 2,770,686.50 |
Mar 29, 2018 | IDA-57360 | Loan Disb | 4,673,204.00 |
Jan 25, 2018 | IDA-57360 | Loan Disb | 5,661,158.00 |
Apr 15, 2018 | IDA-57360 | Int Charges | 693.60 |
Apr 15, 2018 | IDA-57360 | Int Charges | 693.60 |
Apr 15, 2018 | IDA-57360 | Int Charges | 160,690.28 |
Apr 15, 2018 | IDA-57360 | Int Charges | 160,690.28 |
Feb 15, 2018 | IDA-47640 | Int Charges | 5,134.66 |
Feb 15, 2018 | IDA-47640 | Int Charges | 5,134.66 |
Feb 15, 2018 | IDA-47640 | Int Charges | 276,215.66 |
Feb 15, 2018 | IDA-47640 | Int Charges | 276,215.66 |
Mar 6, 2019 | IDA-57360 | Loan Disb | 5,786,013.00 |
Jun 19, 2019 | IDA-57360 | Loan Disb | 11,727,325.00 |
May 28, 2019 | IDA-57360 | Loan Disb | 2,555,242.50 |
Oct 15, 2018 | IDA-57360 | Int Charges | 1,054.48 |
Oct 15, 2018 | IDA-57360 | Int Charges | 1,054.48 |
Oct 15, 2018 | IDA-57360 | Int Charges | 216,479.98 |
Aug 15, 2013 | IDA-47640 | Int Charges | 422.90 |
Aug 15, 2013 | IDA-47640 | Int Charges | 74,350.49 |
Aug 15, 2013 | IDA-47640 | Int Charges | 74,350.49 |
Aug 21, 2013 | IDA-47640 | Loan Disb | 1,731,868.40 |
Jul 8, 2013 | IDA-47640 | Loan Disb | 1,154,649.50 |
Mar 11, 2015 | IDA-47640 | Loan Disb | 6,982,635.00 |
Aug 15, 2014 | IDA-47640 | Int Charges | 439.45 |
Aug 15, 2014 | IDA-47640 | Int Charges | 439.45 |
Aug 15, 2014 | IDA-47640 | Int Charges | 156,644.25 |
Aug 15, 2014 | IDA-47640 | Int Charges | 156,644.25 |
Feb 15, 2015 | IDA-47640 | Int Charges | 14,001.26 |
Feb 15, 2015 | IDA-47640 | Int Charges | 14,001.26 |
Feb 15, 2015 | IDA-47640 | Int Charges | 173,609.05 |
Feb 15, 2015 | IDA-47640 | Int Charges | 173,609.05 |
Jun 30, 2014 | IDA-47640 | Loan Disb | 8,761,548.00 |
Jun 17, 2014 | IDA-47640 | Loan Disb | 6,729,357.00 |
May 21, 2014 | IDA-47640 | Loan Disb | 1,913,854.50 |
Jun 4, 2014 | IDA-47640 | Loan Disb | -15,043,563.00 |
May 15, 2014 | IDA-47640 | Loan Disb | -1,651,615.50 |
May 15, 2014 | IDA-47640 | Loan Disb | 1,651,615.50 |
Feb 15, 2016 | IDA-47640 | Int Charges | 3,517.61 |
Feb 15, 2016 | IDA-47640 | Int Charges | 244,654.17 |
Sep 16, 2015 | IDA-47640 | Loan Disb | 3,461,182.50 |
Nov 5, 2015 | IDA-47640 | Loan Disb | 3,746,740.00 |
May 27, 2015 | IDA-47640 | Loan Disb | 3,809,151.80 |
Mar 9, 2015 | IDA-47640 | Loan Cancel | 23,902.69 |
Aug 15, 2015 | IDA-47640 | Int Charges | 6,082.27 |
Aug 15, 2015 | IDA-47640 | Int Charges | 6,082.27 |
Aug 15, 2015 | IDA-47640 | Int Charges | 195,302.55 |
Aug 15, 2015 | IDA-47640 | Int Charges | 195,302.55 |
Jun 30, 2015 | IDA-47640 | Loan Disb | 3,870,115.80 |
Jun 14, 2016 | IDA-57360 | Loan Disb | 19,132,654.00 |
Jun 14, 2016 | IDA-47640 | Loan Disb | 1,466,836.80 |
May 11, 2016 | IDA-47640 | Loan Disb | 2,470,293.50 |
Aug 15, 2016 | IDA-47640 | Int Charges | 2,119.24 |
Aug 15, 2016 | IDA-47640 | Int Charges | 2,119.24 |
Aug 15, 2016 | IDA-47640 | Int Charges | 263,995.03 |
Aug 15, 2016 | IDA-47640 | Int Charges | 263,995.03 |
Oct 15, 2016 | IDA-57360 | Int Charges | 47,287.32 |
Jun 10, 2010 | IDA-47640 | Loan Commitment | 79,000,000.00 |
Oct 30, 2015 | IDA-57360 | Loan Commitment | 100,000,000.00 |
Feb 15, 2024 | IDA-47640 | Loan Repay | 687,824.75 |
Feb 15, 2024 | IDA-47640 | Int Charges | 229,461.25 |
Feb 15, 2024 | IDA-47640 | Int Charges | 229,461.25 |
Feb 15, 2024 | IDA-47640 | Int Charges | 10,980.89 |
Feb 15, 2024 | IDA-47640 | Int Charges | 10,980.89 |
Feb 15, 2024 | IDA-47640 | Loan Repay | 1,615.11 |
Apr 15, 2024 | IDA-57360 | Loan Repay | 1,399,451.60 |
Apr 15, 2024 | IDA-57360 | Int Charges | 321,697.80 |
Apr 15, 2024 | IDA-57360 | Int Charges | 321,697.80 |
Aug 15, 2024 | IDA-47640 | Loan Repay | 685,016.50 |
Aug 15, 2024 | IDA-47640 | Int Charges | 226,002.80 |
Aug 15, 2024 | IDA-47640 | Int Charges | 226,002.80 |
Aug 15, 2024 | IDA-47640 | Loan Repay | 12,632.09 |
Apr 15, 2024 | IDA-57360 | Loan Repay | 30,316.55 |
Oct 15, 2023 | IDA-57360 | Int Charges | 22,278.83 |
Oct 15, 2023 | IDA-57360 | Int Charges | 22,278.83 |
Oct 15, 2023 | IDA-57360 | Loan Repay | 1,422,762.50 |
Oct 15, 2023 | IDA-57360 | Int Charges | 325,456.90 |
Oct 15, 2023 | IDA-57360 | Int Charges | 325,456.90 |
Aug 15, 2020 | IDA-47640 | Loan Repay | 3,240.50 |
Aug 15, 2020 | IDA-47640 | Loan Repay | 731,469.80 |
Aug 15, 2020 | IDA-47640 | Int Charges | 253,780.81 |
Aug 15, 2020 | IDA-47640 | Int Charges | 253,780.81 |
Oct 15, 2020 | IDA-57360 | Int Charges | 233.63 |
Oct 15, 2020 | IDA-57360 | Int Charges | 233.63 |
Oct 15, 2020 | IDA-57360 | Int Charges | 367,234.28 |
Oct 15, 2020 | IDA-57360 | Int Charges | 367,234.28 |
Apr 15, 2020 | IDA-57360 | Int Charges | 863.07 |
Apr 15, 2020 | IDA-57360 | Int Charges | 863.07 |
Apr 15, 2020 | IDA-57360 | Int Charges | 353,921.40 |
Apr 15, 2020 | IDA-57360 | Int Charges | 353,921.40 |
Dec 15, 2019 | IDA-57360 | Loan Cancel | 2,473,015.50 |
Feb 15, 2020 | IDA-47640 | Int Charges | 1,756.84 |
Oct 15, 2021 | IDA-57360 | Int Charges | 364,870.06 |
Oct 15, 2021 | IDA-57360 | Int Charges | 364,870.06 |
Oct 15, 2021 | IDA-57360 | Int Charges | 3,171.34 |
Oct 15, 2021 | IDA-57360 | Int Charges | 3,171.34 |
Aug 15, 2021 | IDA-47640 | Int Charges | 272,049.72 |
Aug 15, 2021 | IDA-47640 | Int Charges | 272,049.72 |
Aug 15, 2021 | IDA-47640 | Int Charges | 1,993.73 |
Aug 15, 2021 | IDA-47640 | Int Charges | 1,993.73 |
Aug 15, 2021 | IDA-47640 | Loan Repay | 740,271.44 |
Apr 15, 2021 | IDA-57360 | Int Charges | 485.45 |
Apr 15, 2021 | IDA-57360 | Int Charges | 485.45 |
Apr 15, 2021 | IDA-57360 | Int Charges | 372,399.88 |
Apr 15, 2021 | IDA-57360 | Int Charges | 372,399.88 |
Feb 15, 2021 | IDA-47640 | Int Charges | 22,214.62 |
Feb 15, 2021 | IDA-47640 | Int Charges | 22,214.62 |
Feb 15, 2021 | IDA-47640 | Loan Repay | 750,903.70 |
Feb 15, 2021 | IDA-47640 | Int Charges | 276,750.66 |
Feb 15, 2021 | IDA-47640 | Int Charges | 276,750.66 |
Oct 15, 2022 | IDA-57360 | Loan Repay | 46,384.45 |
Aug 15, 2022 | IDA-47640 | Int Charges | 247,742.40 |
Aug 15, 2022 | IDA-47640 | Int Charges | 247,742.40 |
Aug 15, 2022 | IDA-47640 | Int Charges | 2,880.79 |
Aug 15, 2022 | IDA-47640 | Int Charges | 2,880.79 |
Aug 15, 2022 | IDA-47640 | Loan Repay | 688,173.30 |
Feb 15, 2022 | IDA-47640 | Loan Repay | 716,663.10 |
Feb 15, 2022 | IDA-47640 | Loan Repay | 13,439.93 |
Feb 15, 2022 | IDA-47640 | Int Charges | 262,518.66 |
Feb 15, 2022 | IDA-47640 | Int Charges | 262,518.66 |
Apr 15, 2022 | IDA-57360 | Loan Repay | 2,207.92 |
Apr 15, 2022 | IDA-57360 | Loan Repay | 1,481,900.10 |
Apr 15, 2022 | IDA-57360 | Int Charges | 250,588.45 |
Apr 15, 2022 | IDA-57360 | Int Charges | 250,588.45 |
Apr 15, 2022 | IDA-57360 | Int Charges | 105,597.46 |
Apr 15, 2022 | IDA-57360 | Int Charges | 105,597.46 |
Aug 15, 2023 | IDA-47640 | Int Charges | 244,778.38 |
Aug 15, 2023 | IDA-47640 | Int Charges | 244,778.38 |
Aug 15, 2023 | IDA-47640 | Int Charges | 4,626.63 |
Aug 15, 2023 | IDA-47640 | Int Charges | 4,626.63 |
Aug 15, 2023 | IDA-47640 | Loan Repay | 694,406.75 |
Feb 15, 2023 | IDA-47640 | Loan Repay | 688,901.60 |
Feb 15, 2023 | IDA-47640 | Int Charges | 243,672.23 |
Feb 15, 2023 | IDA-47640 | Int Charges | 243,672.23 |
Feb 15, 2023 | IDA-47640 | Loan Repay | 8,126.72 |
Apr 15, 2023 | IDA-57360 | Loan Repay | 1,412,347.50 |
Apr 15, 2023 | IDA-57360 | Int Charges | 319,034.16 |
Oct 15, 2018 | IDA-57360 | Int Charges | 216,479.98 |
Jan 15, 2019 | IDA-57360 | Loan Disb | 4,510,041.50 |
Feb 15, 2019 | IDA-47640 | Int Charges | 5,576.06 |
Feb 15, 2019 | IDA-47640 | Int Charges | 5,576.06 |
Feb 15, 2019 | IDA-47640 | Int Charges | 263,942.06 |
Feb 15, 2019 | IDA-47640 | Int Charges | 263,942.06 |
Feb 15, 2019 | IDA-47640 | Int Charges | 151.43 |
Feb 15, 2019 | IDA-47640 | Int Charges | -151.43 |
Jun 27, 2018 | IDA-47640 | Loan Cancel | 230,720.52 |
Feb 15, 2020 | IDA-47640 | Int Charges | 1,756.84 |
Feb 15, 2020 | IDA-47640 | Int Charges | 265,517.56 |
Feb 15, 2020 | IDA-47640 | Int Charges | 265,517.56 |
Nov 5, 2019 | IDA-57360 | Loan Disb | 147,058.50 |
Dec 11, 2019 | IDA-57360 | Loan Disb | 216,756.48 |
Oct 28, 2019 | IDA-57360 | Loan Disb | 1,856,285.10 |
Oct 28, 2019 | IDA-57360 | Loan Disb | 304,679.25 |
Oct 29, 2019 | IDA-57360 | Loan Disb | 174,120.89 |
Aug 15, 2019 | IDA-47640 | Int Charges | 1,468.48 |
Aug 15, 2019 | IDA-47640 | Int Charges | 1,468.48 |
Aug 15, 2019 | IDA-47640 | Int Charges | 268,619.10 |
Aug 15, 2019 | IDA-47640 | Int Charges | 268,619.10 |
Oct 15, 2019 | IDA-57360 | Int Charges | 5,364.68 |
Oct 15, 2019 | IDA-57360 | Int Charges | 5,364.68 |
Oct 15, 2019 | IDA-57360 | Int Charges | 317,868.53 |
Oct 15, 2019 | IDA-57360 | Int Charges | 317,868.53 |
Oct 23, 2019 | IDA-57360 | Loan Disb | 3,097,506.50 |
Apr 15, 2019 | IDA-57360 | Int Charges | 4,839.16 |
Apr 15, 2019 | IDA-57360 | Int Charges | 4,839.16 |
Apr 15, 2019 | IDA-57360 | Int Charges | 255,704.30 |
Apr 15, 2019 | IDA-57360 | Int Charges | 255,704.30 |
Apr 2, 2014 | IDA-47640 | Loan Disb | 2,761,238.80 |
Feb 20, 2014 | IDA-47640 | Loan Disb | 14,990,354.00 |
Feb 15, 2014 | IDA-47640 | Int Charges | 1,774.15 |
Feb 15, 2014 | IDA-47640 | Int Charges | 1,774.15 |
Feb 15, 2014 | IDA-47640 | Int Charges | 107,597.00 |
Feb 15, 2014 | IDA-47640 | Int Charges | 107,597.00 |
Oct 7, 2013 | IDA-47640 | Loan Disb | 677,199.50 |
Feb 27, 2014 | IDA-47640 | Loan Disb | 1,351,034.20 |
Aug 15, 2013 | IDA-47640 | Int Charges | 422.90 |
Name | Review | Date |
---|---|---|
Monitoring and Evaluation | Highly Satisfactory | 2018-11-16 |
Procurement | Moderately Satisfactory | 2018-11-16 |
Counterpart Funding | Satisfactory | 2018-11-16 |
Project Management | Satisfactory | 2018-11-16 |
Progress towards achievement of PDO | Satisfactory | 2018-11-16 |
Financial Management | Satisfactory | 2018-11-16 |
Overall Implementation Progress (IP) | Satisfactory | 2018-11-16 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 12-26-2019 |
---|---|
Outcomes | Highly Satisfactory |
Risk to Development Outcome | |
Bank Performance | Substantial |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 06-12-2020 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Highly Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | Not Rated | N/a |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Number of disadvantaged students supported through stipends selected based on household information based selection criteria | Value | 0.00 | 240118.00 | 175000.00 |
Date | September 1, 2009 | June 30, 2019 | June 30, 2019 | |
Comment |
Employment rates for trainees of short-term courses within 6 months of course completion | Value | 30.00 | 51.00 | 46.00 |
Date | September 1, 2009 | June 30, 2019 | June 30, 2019 | |
Comment |
Pass rates of students from supported Diploma programs (%) | Value | 50.00 | 86.50 | 65.00 |
Date | September 1, 2009 | June 30, 2019 | June 30, 2019 | |
Comment |
Female | Value | 66.00 | 89.50 | 68.00 |
Date | October 30, 2015 | June 30, 2019 | June 30, 2019 | |
Comment |
Disadvantaged | Value | 55.00 | 92.50 | 60.00 |
Date | October 30, 2015 | June 30, 2019 | June 30, 2019 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Direct project beneficiaries | Value | 240000.00 | 420000.00 | 0.00 |
Date | August 19, 2015 | June 30, 2019 | ||
Comment |
Component 2.1 Number of Industry Skills Councils functioning supported by the project | Value | 0.00 | 6.00 | 7.00 |
Date | March 25, 2010 | June 30, 2019 | June 30, 2019 | |
Comment |
Number of staff trained in Leadership and Management areas. | Value | 22.00 | 150.00 | 0.00 |
Date | April 15, 2015 | June 30, 2019 | ||
Comment |
Component 4.1: Awareness raising campaigns | Value | 0.00 | 36.00 | 30.00 |
Date | March 25, 2010 | June 30, 2019 | June 30, 2019 | |
Comment |
Component 2.2: Evaluation of SSC (Voc) | Value | 0 | Evaluation Completed | Evaluation Completed |
Date | March 25, 2010 | June 30, 2019 | June 30, 2019 | |
Comment |
Satisfaction Survey (Student, Faculty, and Employers’) for IDG recipient institutions | Value | Nil | Survey Completed | |
Date | April 15, 2015 | June 30, 2019 | ||
Comment |
Female beneficiaries | Value | 14.00 | 20.20 | 0.00 |
Date | January 25, 2010 | January 31, 2018 | ||
Comment |
% of utilization of Institutional Development Grants under AF | Value | 0.00 | 95.00 | 0.00 |
Date | June 30, 2015 | June 30, 2019 | ||
Comment |
Number of individuals assessed for RPL in supported centers | Value | 1900.00 | 30000.00 | 0.00 |
Date | April 15, 2015 | June 30, 2019 | ||
Comment |
Component 4.2: Assessment Studies | Value | Nil | 2nd tracer study on polytechnic completed; RPL imp | |
Date | April 15, 2015 | June 30, 2019 | ||
Comment |
Component 1.1: Enrollment as a proportion of sanctioned intake capacity in supported courses | Value | 55.00 | 99.00 | 95.00 |
Date | January 25, 2010 | June 30, 2019 | June 30, 2019 | |
Comment |
Component 1.1: Share of vacancies in sanctioned faculty posts in supported courses | Value | 25.00 | 3.00 | 5.00 |
Date | March 25, 2010 | September 28, 2018 | June 30, 2019 | |
Comment |
Component 1.1: Transition rates of students from second to third semester in supported courses | Value | 80.00 | 98.00 | 95.00 |
Date | March 25, 2010 | June 30, 2019 | June 30, 2019 | |
Comment |
Number of faculty in supported courses trained | Value | 1500.00 | 6000.00 | 0.00 |
Date | April 15, 2015 | June 30, 2019 | ||
Comment |
Component 1.2: completion rates for trainees in supported short-term training courses | Value | 50.00 | 96.00 | 95.00 |
Date | March 25, 2010 | June 30, 2019 | June 30, 2019 | |
Comment |
Share of girl trainees in supported short-term training courses | Value | 5.00 | 32.00 | 30.00 |
Date | March 25, 2010 | June 30, 2019 | June 30, 2019 | |
Comment |