Skip to Main Navigation

DRC Multi-modal Transport

Abstract*

The development objectives of the Multimodal Transport Project are: (i) to improve transport connectivity in the Democratic Republic of Congo (DRC) so as to support national economic integration, (ii) to restore Societe Nationale des Chemins de Fer du Congo (National Railway Company of DRC - SNCC) financial and operational viability, and (iii) to implement a sector wide governance plan and strengthen transport state-owned enterprises (SOEs) operational...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The Revised Project Development Objectives are: (i) to improve transport connectivity in DRC; (ii) to restore SNCC’s financial and operational viability; and (iii) to strengthen transport SOEs’ operational performance.

Key Details

Project Details

  • P092537

  • Closed

  • Tojoarofenitra Ramanankirahina

  • CEPTM

  • Congo, Democratic Republic of

  • November 5, 2009

  • (as of board presentation)

    June 29, 2010

  • April 15, 2011

  • US$ 255.00 million

  • B

  • March 5, 2024

  • June 30, 2018

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Grant 255.00
Borrower/Recipient 376.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 255.00
IBRD + IDA Commitment 255.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 631.00

Summary Status of World Bank Financing (US$ Millions) as of February 28, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of February 28, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jan 29, 2014 IDA-H5950 Loan Disb 58,432.49
Jan 29, 2014 IDA-H5950 Loan Disb 116,865.00
Jan 9, 2014 IDA-H5950 Loan Disb 58,187.50
Aug 16, 2013 IDA-H5950 Loan Disb 1,597,284.50
Oct 17, 2013 IDA-H5950 Loan Disb 57,942.50
Oct 17, 2013 IDA-H5950 Loan Disb 115,884.99
Oct 17, 2013 IDA-H5950 Loan Disb 115,884.99
Oct 17, 2013 IDA-H5950 Loan Disb 115,884.99
Nov 13, 2013 IDA-H5950 Loan Disb 115,885.00
Nov 13, 2013 IDA-H5950 Loan Disb 57,942.00
Oct 30, 2013 IDA-H5950 Loan Disb 2,116,027.50
Oct 22, 2013 IDA-H5950 Loan Disb 115,885.00
Oct 23, 2013 IDA-H5950 Loan Disb 115,885.00
Mar 3, 2014 IDA-H5950 Loan Disb 919,361.20
Dec 17, 2013 IDA-H5950 Loan Disb 714,325.94
Feb 11, 2014 IDA-H5950 Loan Disb 116,865.00
Oct 22, 2013 IDA-H5950 Loan Disb 115,885.00
Dec 16, 2013 IDA-H5950 Loan Disb 58,187.50
Oct 17, 2013 IDA-H5950 Loan Disb 115,884.99
Dec 16, 2013 IDA-H5950 Loan Disb 115,885.00
Dec 16, 2013 IDA-H5950 Loan Disb 58,432.51
Oct 22, 2013 IDA-H5950 Loan Disb 115,885.00
Nov 26, 2013 IDA-H5950 Loan Disb 57,942.50
Nov 26, 2013 IDA-H5950 Loan Disb 57,942.50
Nov 26, 2013 IDA-H5950 Loan Disb 57,942.50
Nov 26, 2013 IDA-H5950 Loan Disb 115,885.01
Oct 22, 2013 IDA-H5950 Loan Disb 115,885.00
Oct 22, 2013 IDA-H5950 Loan Disb 115,885.00
Dec 16, 2013 IDA-H5950 Loan Disb 117,110.00
Jan 24, 2014 IDA-H5950 Loan Disb 154,116.08
Oct 3, 2013 IDA-H5950 Loan Disb 173,827.50
Oct 3, 2013 IDA-H5950 Loan Disb 173,827.50
Oct 3, 2013 IDA-H5950 Loan Disb 115,885.00
Jan 31, 2014 IDA-H5950 Loan Disb 58,432.51
Jan 31, 2014 IDA-H5950 Loan Disb 58,432.51
Jul 12, 2013 IDA-H5950 Loan Disb 115,150.00
Feb 25, 2015 IDA-H8590 Loan Disb 378,189.00
Jul 8, 2013 IDA-H5950 Loan Disb 28,200,000.00
Jul 19, 2013 IDA-H5950 Loan Disb 117,110.01
Feb 25, 2015 IDA-H8590 Loan Disb 112,700.01
Jul 23, 2013 IDA-H5950 Loan Disb 57,942.50
Mar 5, 2015 IDA-H8590 Loan Disb 1,319,896.40
Feb 24, 2015 IDA-H8590 Loan Disb 364,000.00
Mar 17, 2015 IDA-H8590 Loan Disb 214,200.00
Apr 8, 2015 IDA-H5950 Loan Disb 964,418.06
Apr 8, 2015 IDA-H8590 Loan Disb 1,874,231.10
Jun 24, 2015 IDA-H8590 Loan Disb 716,627.40
Jun 12, 2015 IDA-H8590 Loan Disb 2,469,916.00
Mar 6, 2015 IDA-H5950 Loan Disb 1,840,443.80
Mar 26, 2015 IDA-H5950 Loan Disb 224,117.17
Sep 5, 2014 IDA-H5950 Loan Disb 779,953.30
Sep 5, 2014 IDA-H5950 Loan Disb 451,596.47
Aug 13, 2014 IDA-H5950 Loan Disb 3,058,840.50
Mar 3, 2015 IDA-H8590 Loan Disb 291,200.00
Jun 11, 2014 IDA-H8590 Loan Disb 9,100,000.00
Jul 8, 2014 IDA-H5950 Loan Disb 1,051,669.50
Jun 20, 2014 IDA-H5950 Loan Disb 1,715,342.00
Dec 29, 2014 IDA-H5950 Loan Disb 803,812.56
Sep 15, 2014 IDA-H5950 Loan Disb 597,199.30
Feb 17, 2015 IDA-H8590 Loan Disb 385,529.34
Sep 19, 2014 IDA-H5950 Loan Disb 263,768.60
Aug 18, 2014 IDA-H8590 Loan Disb 1,042,043.20
Aug 27, 2014 IDA-H8590 Loan Disb 2,905,444.50
Aug 11, 2014 IDA-H8590 Loan Disb 750,212.60
Mar 20, 2015 IDA-H8590 Loan Disb 1,309,914.60
Aug 8, 2014 IDA-H8590 Loan Disb 3,852,951.00
Mar 19, 2015 IDA-H8590 Loan Disb 458,571.90
Mar 3, 2015 IDA-H8590 Loan Disb 125,251.00
Apr 1, 2014 IDA-H5950 Loan Disb 1,345,869.20
Apr 1, 2014 IDA-H5950 Loan Disb 514,314.66
Apr 17, 2014 IDA-H5950 Loan Disb 668,549.94
Apr 24, 2014 IDA-H5950 Loan Disb 1,889,416.20
Apr 24, 2014 IDA-H5950 Loan Disb 295,313.06
May 12, 2014 IDA-H5950 Loan Disb 3,151,713.00
Jun 5, 2014 IDA-H5950 Loan Disb 136,601.20
Jun 5, 2014 IDA-H5950 Loan Disb 606,093.44
Jun 27, 2017 IDA-H5950 Loan Disb 95,800.55
Jun 27, 2017 IDA-H5950 Loan Disb 156,098.62
Jun 27, 2017 IDA-H5950 Loan Disb 451,082.25
May 26, 2017 IDA-H5950 Loan Disb 112,183.95
Jul 5, 2017 IDA-H8590 Loan Disb 995,509.90
May 23, 2017 IDA-H8590 Loan Disb 1,164,408.50
Apr 4, 2017 IDA-H8590 Loan Disb 68,024.15
Jun 15, 2017 IDA-H8590 Loan Disb 50,661.20
Jun 2, 2017 IDA-H8590 Loan Disb 43,226.96
Jun 2, 2017 IDA-H8590 Loan Disb 1,036,581.44
Jul 14, 2017 IDA-H8590 Loan Disb 484,315.00
Jul 24, 2017 IDA-H8590 Loan Disb 694,395.00
Nov 8, 2017 IDA-H8590 Loan Disb 2,915,003.50
Aug 22, 2017 IDA-H8590 Loan Disb 700,380.70
Dec 1, 2016 IDA-H8590 Loan Disb 1,464,190.20
Jul 19, 2013 IDA-H5950 Loan Disb 115,150.00
Jul 19, 2013 IDA-H5950 Loan Disb 115,885.00
Aug 20, 2013 IDA-H5950 Loan Disb 115,150.00
Aug 20, 2013 IDA-H5950 Loan Disb 115,150.00
Aug 20, 2013 IDA-H5950 Loan Disb 115,150.00
Aug 29, 2013 IDA-H5950 Loan Disb 1,340,040.00
Jul 9, 2013 IDA-H5950 Loan Disb 2,024,076.50
Aug 20, 2013 IDA-H5950 Loan Disb 115,150.00
Sep 3, 2013 IDA-H5950 Loan Disb 113,925.01
Sep 3, 2013 IDA-H5950 Loan Disb 3,179,862.80
Sep 3, 2013 IDA-H5950 Loan Disb 115,149.99
Sep 3, 2013 IDA-H5950 Loan Disb 113,925.01
Jul 31, 2013 IDA-H5950 Loan Disb 115,150.01
Nov 7, 2013 IDA-H5950 Loan Disb 57,942.51
Feb 11, 2014 IDA-H8590 Loan Disb 5,500,000.00
Sep 29, 2014 IDA-H5950 Loan Disb 179,626.34
Oct 1, 2014 IDA-H5950 Loan Disb 527,067.00
Nov 17, 2014 IDA-H5950 Loan Disb 96,818.41
Oct 24, 2014 IDA-H8590 Loan Disb 2,033,341.80
Oct 29, 2014 IDA-H8590 Loan Disb 550,000.00
Oct 22, 2014 IDA-H5950 Loan Disb 1,275,431.80
Dec 15, 2014 IDA-H5950 Loan Disb 1,098,978.50
Dec 15, 2014 IDA-H8590 Loan Disb 1,559,011.40
Jan 12, 2015 IDA-H5950 Loan Disb 1,072,392.60
Dec 30, 2014 IDA-H8590 Loan Disb 1,276,785.80
Oct 17, 2014 IDA-H5950 Loan Disb 1,837,912.10
Dec 1, 2014 IDA-H8590 Loan Disb 705,368.60
Dec 1, 2014 IDA-H8590 Loan Disb 3,663,208.50
Dec 1, 2014 IDA-H5950 Loan Disb 1,128,149.20
Dec 1, 2014 IDA-H8590 Loan Disb 637,455.00
Jul 31, 2013 IDA-H5950 Loan Disb 115,150.01
Jul 31, 2013 IDA-H5950 Loan Disb 115,150.01
Jul 23, 2013 IDA-H5950 Loan Disb 57,575.00
Jul 23, 2013 IDA-H5950 Loan Disb 57,575.00
Feb 3, 2014 IDA-H5950 Loan Disb 116,865.00
Feb 3, 2014 IDA-H5950 Loan Disb 116,865.00
Jan 31, 2014 IDA-H5950 Loan Disb 58,432.51
Feb 14, 2014 IDA-H5950 Loan Disb 116,864.99
Feb 14, 2014 IDA-H5950 Loan Disb 116,864.99
Feb 14, 2014 IDA-H5950 Loan Disb 50,155.50
Oct 15, 2013 IDA-H5950 Loan Disb 115,885.00
Sep 25, 2013 IDA-H5950 Loan Disb 230,300.00
Nov 12, 2013 IDA-H5950 Loan Disb 1,218,791.10
Oct 28, 2013 IDA-H5950 Loan Disb 916,097.20
Sep 25, 2013 IDA-H5950 Loan Disb 382,081.70
Sep 19, 2013 IDA-H5950 Loan Disb 905,198.70
Oct 15, 2013 IDA-H5950 Loan Disb 115,885.00
Nov 12, 2013 IDA-H5950 Loan Disb 115,884.99
Oct 3, 2013 IDA-H5950 Loan Disb 115,885.00
Jan 9, 2014 IDA-H5950 Loan Disb 58,432.50
Dec 5, 2013 IDA-H5950 Loan Disb 271,730.00
Jan 17, 2014 IDA-H5950 Loan Disb 116,865.00
Jan 17, 2014 IDA-H5950 Loan Disb 58,432.49
Jan 9, 2014 IDA-H5950 Loan Disb 116,865.00
Jan 17, 2014 IDA-H5950 Loan Disb 57,575.00
Jan 17, 2014 IDA-H5950 Loan Disb 58,187.50
Jan 17, 2014 IDA-H5950 Loan Disb 58,432.49
May 29, 2014 IDA-H5950 Loan Disb 1,382,758.00
May 27, 2014 IDA-H8590 Loan Disb 2,895,787.00
May 30, 2014 IDA-H8590 Loan Disb 1,919,408.10
Jun 27, 2014 IDA-H5950 Loan Disb 421,751.28
Jun 18, 2014 IDA-H5950 Loan Disb 397,142.80
Jan 9, 2014 IDA-H5950 Loan Disb 116,865.00
Jan 9, 2014 IDA-H5950 Loan Disb 58,432.50
Jan 9, 2014 IDA-H5950 Loan Disb 116,865.00
Jan 9, 2014 IDA-H5950 Loan Disb 58,187.50
Jan 29, 2014 IDA-H5950 Loan Disb 58,432.49
Jan 27, 2014 IDA-H5950 Loan Disb 58,432.50
Dec 2, 2013 IDA-H5950 Loan Disb 235,345.72
Apr 28, 2014 IDA-H5950 Loan Disb 6,303,426.00
Mar 10, 2014 IDA-H5950 Loan Disb 344,884.50
Jan 27, 2014 IDA-H5950 Loan Disb 58,432.50
Jan 27, 2014 IDA-H5950 Loan Disb 58,432.50
Jan 27, 2014 IDA-H5950 Loan Disb 3,861,830.00
Dec 2, 2013 IDA-H5950 Loan Disb 3,133,908.50
Jan 27, 2014 IDA-H5950 Loan Disb 116,865.00
Mar 5, 2014 IDA-H5950 Loan Disb 3,321,935.00
Feb 12, 2014 IDA-H5950 Loan Disb 1,484,535.80
Jan 31, 2014 IDA-H5950 Loan Disb 58,432.51
Dec 30, 2013 IDA-H5950 Loan Disb 208,964.02
Dec 19, 2013 IDA-H5950 Loan Disb 277,916.34
Dec 27, 2013 IDA-H5950 Loan Disb 66,220.01
Nov 21, 2013 IDA-H5950 Loan Disb 3,445,957.20
Oct 24, 2013 IDA-H5950 Loan Disb 382,491.10
Oct 17, 2013 IDA-H5950 Loan Disb 115,884.99
Feb 3, 2014 IDA-H5950 Loan Disb 116,865.00
Jun 29, 2016 IDA-H8590 Loan Disb 446,479.62
Oct 6, 2016 IDA-H8590 Loan Disb 721,207.25
Aug 25, 2016 IDA-H8590 Loan Disb 818,718.40
Jan 25, 2017 IDA-H8590 Loan Disb 992,500.00
Oct 4, 2016 IDA-H8590 Loan Disb 1,724,502.20
Feb 16, 2017 IDA-H8590 Loan Disb 685,444.70
Mar 14, 2017 IDA-H8590 Loan Disb 2,230,276.00
Jul 6, 2016 IDA-H8590 Loan Disb 1,303,745.60
Oct 7, 2016 IDA-H8590 Loan Disb 735,424.30
Jul 6, 2016 IDA-H8590 Loan Disb 1,521,036.60
Jun 20, 2016 IDA-H5950 Loan Disb 541,322.56
Jun 20, 2016 IDA-H8590 Loan Disb 140,450.19
Aug 2, 2016 IDA-H8590 Loan Disb 500,594.10
Jun 20, 2016 IDA-H8590 Loan Disb 1,214,457.00
Aug 2, 2016 IDA-H5950 Loan Disb 111,402.76
May 31, 2016 IDA-H5950 Loan Disb 31,530.91
May 31, 2016 IDA-H8590 Loan Disb 332,897.62
May 6, 2016 IDA-H8590 Loan Disb 876,000.00
May 24, 2016 IDA-H8590 Loan Disb 3,151,713.00
May 31, 2016 IDA-H8590 Loan Disb 1,186,410.10
Feb 7, 2017 IDA-H8590 Loan Disb 1,854,836.50
Feb 7, 2017 IDA-H5950 Loan Disb 314,305.66
Sep 19, 2016 IDA-H8590 Loan Disb 81,535.78
Dec 6, 2016 IDA-H8590 Loan Disb 448,885.80
Oct 13, 2016 IDA-H8590 Loan Disb 482,025.60
Dec 20, 2016 IDA-H8590 Loan Disb 613,323.00
Apr 28, 2016 IDA-H8590 Loan Disb 1,658,689.40
Feb 18, 2016 IDA-H8590 Loan Disb 261,812.60
Apr 11, 2016 IDA-H8590 Loan Disb 165,706.20
Dec 29, 2016 IDA-H5950 Loan Disb 375,496.53
Dec 30, 2016 IDA-H8590 Loan Disb 2,276,237.20
Sep 28, 2016 IDA-H5950 Loan Disb 77,017.11
Sep 28, 2016 IDA-H8590 Loan Disb 435,254.40
Nov 24, 2015 IDA-H5950 Loan Disb 118,408.27
Nov 24, 2015 IDA-H8590 Loan Disb 177,857.06
Feb 5, 2016 IDA-H8590 Loan Disb 527,240.00
Feb 9, 2016 IDA-H5950 Loan Disb 1,685,136.20
Oct 13, 2015 IDA-H8590 Loan Disb 132,074.64
Mar 15, 2016 IDA-H8590 Loan Disb 131,436.06
Mar 16, 2016 IDA-H5950 Loan Disb 67,055.99
Apr 19, 2016 IDA-H8590 Loan Disb 229,641.10
Sep 8, 2015 IDA-H5950 Loan Disb 511,664.40
Dec 11, 2015 IDA-H8590 Loan Disb 415,136.12
Oct 6, 2015 IDA-H8590 Loan Disb 112,457.08
Sep 9, 2015 IDA-H8590 Loan Disb 1,357,814.00
Sep 9, 2015 IDA-H8590 Loan Disb 237,620.40
Sep 17, 2015 IDA-H5950 Loan Disb 1,515,390.20
Feb 11, 2016 IDA-H8590 Loan Disb 2,351,378.80
Jul 8, 2015 IDA-H8590 Loan Disb 13,932,760.00
Jul 8, 2015 IDA-H8590 Loan Disb 467,991.28
Aug 5, 2015 IDA-H5950 Loan Disb 1,742,885.10
Aug 4, 2015 IDA-H8590 Loan Disb 219,532.50
Jul 24, 2015 IDA-H8590 Loan Disb 2,552,725.50
Aug 20, 2015 IDA-H8590 Loan Disb 647,010.00
Jun 23, 2015 IDA-H8590 Loan Disb 832,420.20
Jun 8, 2015 IDA-H5950 Loan Disb 712,269.44
Jun 8, 2015 IDA-H8590 Loan Disb 182,825.98
Jun 23, 2015 IDA-H8590 Loan Disb 2,112,553.50
Apr 17, 2015 IDA-H8590 Loan Disb 1,653,050.10
Nov 20, 2015 IDA-H8590 Loan Disb 1,156,954.90
Aug 20, 2015 IDA-H8590 Loan Disb 550,390.70
Sep 14, 2015 IDA-H8590 Loan Disb 2,714,715.00
Mar 17, 2015 IDA-H8590 Loan Disb 329,840.00
Mar 17, 2015 IDA-H8590 Loan Disb 50,050.00
Jun 29, 2010 IDA-H5950 Loan Commitment 255,000,000.00
Jun 11, 2013 IDA-H8590 Loan Commitment 180,000,000.00
Aug 13, 2020 IDA-H8590 Loan Cancel 16,467,195.00
Aug 13, 2020 IDA-H8590 Loan Disb -532,198.90
Jun 15, 2020 IDA-H8590 Loan Disb -500,688.88
May 14, 2019 IDA-H8590 Loan Disb -6,229.74
Jan 11, 2019 IDA-H5950 Loan Disb -835,789.25
Jan 11, 2019 IDA-H5950 Loan Disb -124,917.47
Mar 25, 2019 IDA-H8590 Loan Disb -797,836.00
Mar 25, 2019 IDA-H8590 Loan Disb -14,043.00
Apr 5, 2019 IDA-H5950 Loan Cancel 8,885,562.00
Mar 13, 2019 IDA-H5950 Loan Disb -4,431,094.50
Nov 9, 2018 IDA-H8590 Loan Disb 1,235,773.00
Jan 11, 2019 IDA-H8590 Loan Disb -960,706.75
Nov 19, 2018 IDA-H5950 Loan Disb -275.11
Jan 11, 2019 IDA-H8590 Loan Disb 960,706.75
Jul 23, 2018 IDA-H8590 Loan Disb 1,149,999.00
Aug 8, 2018 IDA-H8590 Loan Disb 884,942.00
Jun 5, 2018 IDA-H8590 Loan Disb 1,355,183.50
May 7, 2018 IDA-H8590 Loan Cancel 23,467,184.00
Jul 25, 2018 IDA-H5950 Loan Disb 738,420.00
Jan 11, 2019 IDA-H8590 Loan Disb -40,427.74
Jan 18, 2018 IDA-H8590 Loan Disb 10,491.33
Jan 31, 2018 IDA-H8590 Loan Disb 992,500.00
Jan 25, 2018 IDA-H5950 Loan Disb 417,850.80
Jan 31, 2018 IDA-H8590 Loan Disb 1,826,797.80
Apr 11, 2018 IDA-H5950 Loan Disb 135,315.34
Jan 17, 2018 IDA-H5950 Loan Disb 180,885.81
Dec 27, 2017 IDA-H8590 Loan Disb 6,682.49
Dec 27, 2017 IDA-H5950 Loan Disb 239,716.53
Dec 27, 2017 IDA-H8590 Loan Disb 33,066.89
Dec 27, 2017 IDA-H5950 Loan Disb 96,323.81
Jun 26, 2018 IDA-H8590 Loan Disb 1,359,043.20
Jun 5, 2018 IDA-H8590 Loan Disb 39,644.15
Jun 29, 2018 IDA-H8590 Loan Disb 320,990.62
Oct 20, 2017 IDA-H5950 Loan Disb 142,944.03
Oct 20, 2017 IDA-H8590 Loan Disb 46,573.66
Oct 20, 2017 IDA-H5950 Loan Disb 224,173.38
Aug 11, 2017 IDA-H8590 Loan Disb 1,057,998.20
Nov 3, 2017 IDA-H5950 Loan Disb 215,982.95
Nov 2, 2017 IDA-H8590 Loan Disb 70,580.89
Oct 20, 2017 IDA-H5950 Loan Disb 112,130.34
Apr 10, 2018 IDA-H8590 Loan Disb 32,189.83
Dec 26, 2017 IDA-H8590 Loan Disb 1,488,750.00
Apr 4, 2018 IDA-H8590 Loan Disb 964,682.94
Apr 4, 2018 IDA-H8590 Loan Disb 699,072.50
Feb 27, 2018 IDA-H8590 Loan Disb 741,699.25
Jun 27, 2017 IDA-H5950 Loan Disb 91,818.65
Jun 27, 2017 IDA-H5950 Loan Disb 190,410.64

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Overall Safeguards Rating Satisfactory 2017-10-17
Financial Management Satisfactory 2017-10-17
Monitoring and Evaluation Satisfactory 2017-10-17
Counterpart Funding Moderately Satisfactory 2017-10-17
Procurement Moderately Satisfactory 2017-10-17
Project Management Moderately Satisfactory 2017-10-17
Overall Implementation Progress (IP) Moderately Unsatisfactory 2017-10-17
Progress towards achievement of PDO Moderately Unsatisfactory 2017-10-17
Overall Safeguards Rating Satisfactory 2017-10-17

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 12-31-2018
OutcomesUnsatisfactory
Risk to Development Outcome
Bank PerformanceModerately Unsatisfactory
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 05-07-2019PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingHighly Unsatisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceUnsatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceNot RatedN/a
Implementing AgencyN/a
Icr QualityModestN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Female beneficiariesValue0.000.0050.00
    DateDecember 31, 2009November 29, 2016June 30, 2018
    Comment
  • Direct project beneficiariesValue1500000.0030000.0010120.00
    DateDecember 31, 2009November 29, 2016June 30, 2018
    Comment
  • SNCC: Mainline locomotives dispatch reliability (breakdowns per 100,000 km)Value75.0010.0025.00
    DateDecember 31, 2009April 15, 2011June 30, 2018
    Comment
  • SNCC: Total transport volumes in Traffic Units (TU millions)Value185.00152.00152.70
    DateDecember 31, 2009November 29, 2016June 30, 2018
    Comment
  • SNCC: Staff productivity (TU/staff/year)Value17700.0016000.0028147.00
    DateDecember 31, 2009November 29, 2016June 30, 2018
    Comment
  • SNCC: Cash flow from operations before Interests, Taxes and Amortization (million US$)Value-35.00-100.00-100.00
    DateDecember 31, 2009November 29, 2016June 30, 2018
    Comment
  • Number of transport SOEs to achieve improvement of operational performance targetsValue0.004.002.00
    DateDecember 31, 2009May 15, 2013June 30, 2018
    Comment
  • Number of individual transport SOEs to adopt a governance planValue0.006.006.00
    DateDecember 31, 2009May 15, 2013June 30, 2018
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • The National Committee on Transport and Trade Facilitation is in place and effectiveValueNoYesNo
    DateJuly 9, 2014June 30, 2018June 30, 2018
    Comment
  • Length of waterways with Navigational aids and markings installed by RVFValue0.001500.001424.00
    DateNovember 1, 2016June 30, 2018June 30, 2018
    Comment
  • SNCC: Cumulative length of rehabilitated and upgraded rail trackValue0.001300.001262.00
    DateDecember 31, 2009November 9, 2016June 30, 2018
    Comment
  • SNCC: Cumulative number of staff taking retirementValue0.003500.004354.00
    DateDecember 31, 2009December 31, 2017March 31, 2017
    Comment
  • RVA: Cumulative number of ADS-B systems installedValue0.005.005.00
    DateDecember 31, 2009December 31, 2015March 31, 2017
    Comment
  • RVA: Average annual number of Air Traffic System (ATS) incidents (airprox)Value12.005.002.00
    DateDecember 31, 2009December 31, 2015June 30, 2018
    Comment
  • RVA: Average annual number of Air Traffic System (ATS) incidents (comms)Value78.0020.0012.00
    DateDecember 31, 2009December 31, 2015June 30, 2018
    Comment
  • Completion of annual procurement and financial audits of SOEsValueNoYesYes
    DateDecember 31, 2009December 31, 2015March 31, 2017
    Comment
  • Average passenger transit time at Beach Ngobila passenger terminalValue1.000.505.00
    DateJuly 9, 2014June 30, 2018March 31, 2017
    Comment