Himachal Pradesh Mid-Himalayan Watershed Development Project

Abstract*

The Himachal Pradesh Mid-Himalayan Watershed Development Project for India aims to reverse the process of degradation of the natural resource base and improve the productive potential of natural resources and incomes of the rural households in the project area. The secondary objective is to support policy and institutional development to harmonize watershed development projects and policies across the State in accordance with best practices. Besides...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The primary objective of the proposed project is to reverse the process of degradation of the natural resource base and improve the productive potential of natural resources and incomes of the rural households in the project areas. The secondary objective is to support policy and institutional development to harmonize watershed development projects and policies across the State in accordance with best practices.

Key Details

Project Details

  • P093720

  • Closed

  • Ranjan Samantaray

  • Department of Economic Affairs, Ministry of Finance, Government of India

  • India

  • April 13, 2005

  • (as of board presentation)

    December 13, 2005

  • February 24, 2006

  • US$ 75.00 million

  • Himachal Pradesh Natural Resource Management Society, Forest Department

  • South Asia

  • 2006

  • US$ 60.00 million

  • B

  • Not Applicable

  • June 30, 2020

  • BANK APPROVED

  • March 8, 2022

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Borrower/Recipient 10.00
IDA Credit 60.00
Local Communities 5.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 60.00
IBRD + IDA Commitment 60.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 75.00

Summary Status of World Bank Financing (US$ Millions) as of April 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of April 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
May 15, 2022 IDA-41330 Int Charges 136,873.88
May 15, 2024 IDA-41330 Int Charges 8,662.60
Dec 13, 2005 IDA-41330 Loan Commitment 60,000,000.00
Sep 27, 2012 IDA-51590 Loan Commitment 37,000,000.00
Mar 15, 2024 IDA-51590 Loan Repay 35,243.78
Mar 15, 2024 IDA-51590 Loan Repay 1,045,749.10
Mar 15, 2024 IDA-51590 Int Charges 0.01
Mar 15, 2024 IDA-51590 Int Charges 82,302.87
Mar 15, 2024 IDA-51590 Int Charges 82,302.87
Mar 15, 2024 IDA-51590 Int Charges 137,171.45
May 15, 2024 IDA-41330 Loan Repay 1,369,636.20
May 15, 2024 IDA-41330 Int Charges 118,131.08
May 15, 2024 IDA-41330 Int Charges 118,131.08
May 15, 2024 IDA-41330 Int Charges 8,662.60
Sep 15, 2023 IDA-51590 Loan Repay 17,047.34
Sep 15, 2023 IDA-51590 Loan Repay 1,053,489.50
May 15, 2023 IDA-41330 Int Charges 24,407.49
May 15, 2023 IDA-41330 Int Charges 24,407.49
May 15, 2023 IDA-41330 Loan Repay 1,389,653.10
Nov 15, 2018 IDA-41330 Loan Repay 29,158.45
Nov 15, 2018 IDA-41330 Loan Repay 1,400,870.00
Nov 15, 2018 IDA-41330 Int Charges 171,603.40
Nov 15, 2018 IDA-41330 Int Charges 171,603.40
Sep 15, 2018 IDA-51590 Int Charges 125,128.86
Sep 15, 2018 IDA-51590 Int Charges 125,128.86
Sep 15, 2018 IDA-51590 Int Charges 207,792.33
Sep 15, 2018 IDA-51590 Int Charges 20,877.42
Sep 15, 2018 IDA-51590 Loan Repay 1,138,711.90
May 15, 2018 IDA-41330 Loan Repay 12,877.69
Mar 15, 2020 IDA-51590 Loan Repay 16,398.84
Mar 15, 2020 IDA-51590 Loan Repay 1,090,434.50
Mar 15, 2020 IDA-51590 Int Charges 110,353.41
Mar 15, 2020 IDA-51590 Int Charges 110,353.41
Mar 15, 2020 IDA-51590 Int Charges 183,922.34
Mar 15, 2020 IDA-51590 Loan Repay 11,956.99
Sep 15, 2019 IDA-51590 Loan Repay 3,084.61
Sep 15, 2019 IDA-51590 Loan Repay 1,111,654.80
Sep 15, 2019 IDA-51590 Int Charges 114,134.07
Sep 15, 2019 IDA-51590 Int Charges 114,134.07
Sep 15, 2019 IDA-51590 Int Charges 190,223.50
May 15, 2019 IDA-41330 Loan Repay 24,377.98
Nov 15, 2019 IDA-41330 Int Charges -0.01
Nov 15, 2019 IDA-41330 Int Charges -0.01
Nov 15, 2019 IDA-41330 Int Charges 158,501.60
Nov 15, 2019 IDA-41330 Int Charges 158,501.60
Nov 15, 2019 IDA-41330 Loan Repay 1,411,030.00
Nov 15, 2019 IDA-41330 Loan Repay 0.01
Nov 15, 2019 IDA-41330 Loan Repay 11,587.83
May 15, 2019 IDA-41330 Loan Repay 1,406,333.60
May 15, 2019 IDA-41330 Int Charges 166,320.19
May 15, 2019 IDA-41330 Int Charges 166,320.19
Mar 15, 2021 IDA-51590 Int Charges 16,187.16
Mar 15, 2021 IDA-51590 Loan Repay 579,820.00
Mar 15, 2021 IDA-51590 Int Charges 107,859.73
Mar 15, 2021 IDA-51590 Int Charges 107,859.73
Mar 15, 2021 IDA-51590 Int Charges 78,564.71
Nov 15, 2020 IDA-41330 Int Charges 152,307.70
Nov 15, 2020 IDA-41330 Int Charges 152,307.70
Nov 15, 2020 IDA-41330 Loan Repay 21,560.71
Nov 15, 2020 IDA-41330 Loan Repay 713,196.10
May 15, 2021 IDA-41330 Int Charges 2,017.70
May 15, 2021 IDA-41330 Int Charges 2,017.70
May 15, 2021 IDA-41330 Loan Repay 744,527.25
May 15, 2021 IDA-41330 Int Charges 147,164.72
May 15, 2021 IDA-41330 Int Charges 147,164.72
Sep 15, 2020 IDA-51590 Loan Repay 3,383.57
Sep 15, 2020 IDA-51590 Int Charges 109,121.97
Sep 15, 2020 IDA-51590 Int Charges 109,121.97
Sep 15, 2020 IDA-51590 Int Charges 165,817.00
Sep 15, 2020 IDA-51590 Loan Repay 571,630.60
May 15, 2020 IDA-41330 Int Charges 1,525.94
May 15, 2020 IDA-41330 Int Charges 1,525.94
May 15, 2020 IDA-41330 Loan Repay 1,406,968.60
May 15, 2020 IDA-41330 Int Charges 153,007.80
May 15, 2020 IDA-41330 Int Charges 153,007.80
May 15, 2022 IDA-41330 Int Charges 136,873.88
May 15, 2022 IDA-41330 Loan Repay 13,205.36
Mar 15, 2022 IDA-51590 Int Charges 99,949.51
Nov 15, 2021 IDA-41330 Loan Repay 727,051.25
Nov 15, 2021 IDA-41330 Int Charges 147,227.84
Nov 15, 2021 IDA-41330 Int Charges 147,227.84
Nov 15, 2021 IDA-41330 Int Charges 6,243.92
Nov 15, 2021 IDA-41330 Int Charges 6,243.92
Mar 15, 2016 IDA-51590 Int Charges 114,152.64
Aug 11, 2015 IDA-41330 Loan Disb 343,861.84
Nov 15, 2015 IDA-41330 Int Charges 52,377.81
Nov 15, 2015 IDA-41330 Int Charges 52,377.81
Nov 15, 2015 IDA-41330 Loan Repay 1,432,522.80
Nov 15, 2015 IDA-41330 Int Charges 200,039.23
Nov 15, 2015 IDA-41330 Int Charges 200,039.23
Nov 20, 2015 IDA-41330 Loan Disb 361,313.30
May 15, 2015 IDA-41330 Loan Repay 1,423,464.60
May 15, 2015 IDA-41330 Int Charges 153,047.45
May 15, 2015 IDA-41330 Int Charges 153,047.45
May 15, 2015 IDA-41330 Loan Repay 42,074.64
Jun 1, 2015 IDA-51590 Loan Disb 3,806,970.20
Jan 5, 2017 IDA-51590 Loan Disb 2,158,399.20
Mar 15, 2017 IDA-51590 Int Charges 1,037.05
Mar 15, 2017 IDA-51590 Int Charges 100,784.12
Mar 15, 2017 IDA-51590 Int Charges 100,784.12
Mar 15, 2017 IDA-51590 Int Charges 167,973.55
May 15, 2016 IDA-41330 Loan Repay 32,162.96
May 15, 2016 IDA-41330 Loan Repay 619,212.60
May 15, 2016 IDA-41330 Loan Repay 808,978.40
May 15, 2016 IDA-41330 Int Charges 181,061.95
May 15, 2016 IDA-41330 Int Charges 181,061.95
Nov 3, 2016 IDA-51590 Loan Disb 948,884.25
Nov 15, 2016 IDA-41330 Int Charges 19,726.76
Nov 15, 2016 IDA-41330 Int Charges 19,726.76
Nov 15, 2016 IDA-41330 Loan Repay 1,411,274.20
Nov 15, 2016 IDA-41330 Int Charges 190,522.02
Nov 15, 2016 IDA-41330 Int Charges 190,522.02
Jul 13, 2016 IDA-51590 Loan Disb 4,051,671.50
Sep 15, 2016 IDA-51590 Int Charges 87,908.21
Sep 15, 2016 IDA-51590 Int Charges 145,437.69
Mar 29, 2016 IDA-51590 Loan Disb 2,438,440.50
Mar 31, 2016 IDA-41330 Loan Disb 128,800.68
Mar 15, 2018 IDA-51590 Int Charges 201,812.95
Mar 15, 2018 IDA-51590 Int Charges 8,197.62
Mar 15, 2018 IDA-51590 Loan Repay 1,179,780.90
Mar 15, 2018 IDA-51590 Int Charges 134,066.00
Sep 15, 2021 IDA-51590 Loan Repay 571,439.90
Sep 15, 2021 IDA-51590 Int Charges 105,501.90
Sep 15, 2021 IDA-51590 Int Charges 105,501.90
Sep 15, 2021 IDA-51590 Int Charges 174,979.95
Sep 15, 2021 IDA-51590 Loan Repay 7,373.52
Mar 15, 2021 IDA-51590 Int Charges 101,201.47
Nov 15, 2023 IDA-41330 Int Charges 12,975.84
Nov 15, 2023 IDA-41330 Int Charges 12,975.84
Nov 15, 2023 IDA-41330 Loan Repay 1,372,772.20
Nov 15, 2023 IDA-41330 Int Charges 114,867.07
Nov 15, 2023 IDA-41330 Int Charges 114,867.07
May 15, 2023 IDA-41330 Int Charges 117,144.53
May 15, 2023 IDA-41330 Int Charges 117,144.53
Mar 15, 2023 IDA-51590 Loan Repay 14,414.03
Mar 15, 2023 IDA-51590 Loan Repay 1,066,286.60
Mar 15, 2023 IDA-51590 Int Charges 90,385.87
Mar 15, 2023 IDA-51590 Int Charges 90,385.87
Mar 15, 2023 IDA-51590 Int Charges 150,643.12
Sep 15, 2023 IDA-51590 Int Charges 85,521.26
Sep 15, 2023 IDA-51590 Int Charges 85,521.26
Sep 15, 2023 IDA-51590 Int Charges 142,535.48
Nov 15, 2022 IDA-41330 Loan Repay 30,124.36
Nov 15, 2022 IDA-41330 Loan Repay 1,331,904.60
Nov 15, 2022 IDA-41330 Int Charges 108,875.51
Nov 15, 2022 IDA-41330 Int Charges 108,875.51
Sep 15, 2022 IDA-51590 Loan Repay 1,034,073.56
Sep 15, 2022 IDA-51590 Int Charges 91,861.20
Sep 15, 2022 IDA-51590 Int Charges 91,861.20
Sep 15, 2022 IDA-51590 Int Charges 153,102.05
Sep 15, 2022 IDA-51590 Loan Repay 17,134.38
Mar 15, 2022 IDA-51590 Int Charges 99,949.51
Mar 15, 2022 IDA-51590 Int Charges 166,582.56
Mar 15, 2022 IDA-51590 Int Charges 828.51
Mar 15, 2022 IDA-51590 Loan Repay 559,870.06
May 15, 2022 IDA-41330 Loan Repay 675,468.10
Mar 15, 2018 IDA-51590 Int Charges 134,066.00
Sep 15, 2017 IDA-51590 Int Charges 195,873.56
Sep 15, 2017 IDA-51590 Int Charges 122,013.11
Sep 15, 2017 IDA-51590 Int Charges 122,013.11
Nov 15, 2017 IDA-41330 Int Charges 25,061.98
Nov 15, 2017 IDA-41330 Int Charges 25,061.98
Nov 15, 2017 IDA-41330 Loan Repay 1,462,392.90
Nov 15, 2017 IDA-41330 Int Charges 186,455.10
Nov 15, 2017 IDA-41330 Int Charges 186,455.10
Apr 28, 2017 IDA-51590 Loan Disb 2,041,948.10
Jul 31, 2017 IDA-51590 Loan Disb 158,712.52
Sep 15, 2017 IDA-51590 Int Charges 329.84
Sep 15, 2017 IDA-51590 Int Charges 329.84
May 15, 2017 IDA-41330 Loan Repay 43,714.70
May 15, 2017 IDA-41330 Loan Repay 1,374,607.90
May 15, 2017 IDA-41330 Int Charges 161,848.08
May 15, 2017 IDA-41330 Int Charges 161,848.08
Jul 12, 2017 IDA-51590 Loan Disb 2,665,468.80
Mar 15, 2019 IDA-51590 Int Charges 199,946.38
Mar 15, 2019 IDA-51590 Int Charges 750.26
Mar 15, 2019 IDA-51590 Loan Repay 1,130,317.90
Mar 15, 2019 IDA-51590 Int Charges 119,967.83
Mar 15, 2019 IDA-51590 Int Charges 119,967.83
May 15, 2018 IDA-41330 Loan Repay 1,465,330.00
May 15, 2018 IDA-41330 Int Charges 182,928.16
May 15, 2018 IDA-41330 Int Charges 182,928.16
Nov 3, 2014 IDA-41330 Loan Disb 241,608.98
Oct 16, 2014 IDA-51590 Loan Disb 313,941.47
Nov 15, 2014 IDA-41330 Int Charges 215,619.97
Nov 15, 2014 IDA-41330 Int Charges 215,619.97
Nov 15, 2014 IDA-41330 Loan Repay 997.29
Nov 15, 2013 IDA-41330 Int Charges 214,305.16
Nov 15, 2013 IDA-41330 Int Charges 214,305.16
Mar 6, 2014 IDA-41330 Loan Disb 161,956.97
Mar 15, 2014 IDA-51590 Int Charges 5,419.49
Mar 15, 2014 IDA-51590 Int Charges 5,419.49
Mar 15, 2014 IDA-51590 Int Charges 4,758.61
Mar 15, 2014 IDA-51590 Int Charges 381.45
Mar 15, 2014 IDA-51590 Int Charges 381.45
Mar 15, 2014 IDA-51590 Int Charges 635.77
Mar 20, 2014 IDA-41330 Loan Disb 204,783.28
Jan 21, 2014 IDA-51590 Loan Disb 1,365,597.50
Feb 6, 2014 IDA-41330 Loan Disb 806,572.60
Jan 17, 2014 IDA-41330 Loan Disb 375,253.88
Sep 10, 2013 IDA-51590 Loan Disb 684,787.40
Nov 15, 2014 IDA-41330 Loan Repay 1,514,346.20
Jul 31, 2013 IDA-51590 Loan Disb 321,039.62
Aug 5, 2013 IDA-41330 Loan Disb 63,282.41
Aug 28, 2015 IDA-51590 Loan Disb 1,455,510.20
May 15, 2015 IDA-41330 Loan Disb 212,908.30
Sep 15, 2014 IDA-51590 Int Charges 33,781.12
Sep 15, 2014 IDA-51590 Int Charges 4,133.04
Sep 15, 2014 IDA-51590 Int Charges 20,268.66
Sep 15, 2014 IDA-51590 Int Charges 20,268.66
Jul 24, 2014 IDA-41330 Loan Disb 308,628.03
Feb 20, 2015 IDA-41330 Loan Disb 352,430.90
Mar 15, 2015 IDA-51590 Int Charges 1,758.59
Mar 15, 2015 IDA-51590 Int Charges 1,758.59
Mar 15, 2015 IDA-51590 Int Charges 27,485.16
Mar 15, 2015 IDA-51590 Int Charges 27,485.16
Mar 15, 2015 IDA-51590 Int Charges 48,739.59
Mar 5, 2015 IDA-51590 Loan Disb 2,727,423.20
Dec 12, 2014 IDA-41330 Loan Disb 168,128.95
Dec 29, 2014 IDA-41330 Loan Disb 137,662.95
Dec 29, 2014 IDA-51590 Loan Disb 1,760,578.00
Sep 11, 2014 IDA-41330 Loan Disb 118,941.56
Mar 31, 2015 IDA-41330 Loan Disb 386,975.62
Mar 18, 2014 IDA-51590 Loan Disb 1,350,433.80
May 15, 2014 IDA-41330 Int Charges 1,273.77
May 15, 2014 IDA-41330 Int Charges 1,273.77
May 15, 2014 IDA-41330 Int Charges 218,300.77
May 15, 2014 IDA-41330 Int Charges 218,300.77
May 15, 2014 IDA-41330 Int Charges 4,147.69
May 15, 2014 IDA-41330 Int Charges 4,147.69
Jun 18, 2014 IDA-51590 Loan Disb 3,798,607.80
Jun 18, 2014 IDA-41330 Loan Disb 322,532.53
Nov 15, 2013 IDA-41330 Int Charges 1,540.56
Nov 15, 2013 IDA-41330 Int Charges 1,540.56
Sep 15, 2016 IDA-51590 Int Charges 1,376.98
Sep 15, 2016 IDA-51590 Int Charges 87,908.21
Sep 15, 2015 IDA-51590 Int Charges 1,673.35
Sep 15, 2015 IDA-51590 Int Charges 1,673.35
Sep 15, 2015 IDA-51590 Int Charges 50,967.91
Sep 15, 2015 IDA-51590 Int Charges 50,967.91
Sep 15, 2015 IDA-51590 Int Charges 85,089.13
Nov 30, 2015 IDA-51590 Loan Disb 2,860,097.80
Feb 5, 2016 IDA-41330 Loan Disb 444,822.30
Mar 15, 2016 IDA-51590 Int Charges 2,614.82
Mar 15, 2016 IDA-51590 Int Charges 69,313.90
Mar 15, 2016 IDA-51590 Int Charges 69,313.90

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Financial Management Satisfactory 2017-03-31
Overall Implementation Progress (IP) Satisfactory 2017-03-31
Progress towards achievement of PDO Satisfactory 2017-03-31
Procurement Satisfactory 2017-03-31
Project Management Satisfactory 2017-03-31
Monitoring and Evaluation Moderately Satisfactory 2017-03-31
Counterpart Funding Satisfactory 2017-03-31

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 09-27-2017
Outcomes
Risk to Development OutcomeSubstantial
Bank Performance
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 03-15-2018PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Unsatisfactory N/a
Risk To Development OutcomeModestN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceSatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualityModestN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Increase in real incomeValueRs. 60,52099% increase in absolute per capita income which i15% in original GPs; 8% in additional GPs
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Increase in production and coverage of grasses, bushes and treesValueProduction: 4.0 Q/Ha; 1800/ Ha; 200/ Ha50 - 52% increase in biomass production and 60 - 650% in original GPs; 15% in additional GPs
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Increase in yields of milk, paddy, wheat, maize, and horticultureValue3 ltrs./day/animal; 15 Qtls./Ha; 12 Q/Ha; 13 Q/Ha;For Original Project: Wheat:2,563 kg./ha (141% o30% in original GPs; 20% in additional GPs
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Degree to which the Project has influenced State policies for watershed developmentValueNoKey areas where MHWDP has shown harmonization are Yes
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Direct project beneficiariesValue0.001605652.001050000.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • 30% increase in irrigation potential in target areasValue5.0035.0030.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Participants in consultation activities during project implementation (number)Value10000.00264000.00264000.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Community contribution in the total project costs (percentage)Value0.0011.0010.00
    DateMarch 6, 2006March 16, 2017March 31, 2016
    Comment
  • Female beneficiariesValue5.0051.3950.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Participants in consultation activities during project implementation - femaleValue10000.00143000.00143000.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Total community contribution (US$)Value0.009000000.0010000000.00
    DateMarch 6, 2006March 16, 2017March 31, 2016
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Treatable areas of arable land treatedValue068% in old GPs and 60% in additional financing GPs70% in original GPs; 20% in additional GPs
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • % of the eligible housheolds have benefitted by the Mountain Livelihood Fund through business plansValue0.0035.0015.00
    DateJanuary 1, 2006March 16, 2017March 31, 2017
    Comment
  • 80% of user groups in place with bank account and operations & maintenance policy for the resources they useValue0.0098.5085.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • 50% GP meetings with quorum (two third attendance)Value0.0066.0050.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • 20% increase in fodder availability over baselineValue5.0025.0020.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • 50% of farmers to have access to improved veterinary care either through public facility or through community-managed veterinary careValue25.0075.0050.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Two thirds of GPs with tribal or nomad populations settled in project area are represented in watershed committeesValue0more than 50% represented in 40 tribal villages90
    DateNovember 18, 2009March 16, 2017March 31, 2017
    Comment
  • 50% of CIGs have linkage with marketValue5.0031.0030.00
    DateNovember 18, 2009March 16, 2017March 31, 2017
    Comment
  • 10 % of the SHGs/CIGs have credit linkage with other financial institutionsValue0.007.0010.00
    DateNovember 18, 2006March 16, 2017March 31, 2017
    Comment
  • HPNRM Society Executive Committee and other committees meet at least twice in a year and the Governing body meets at least once a yearValueNo meetings yetYesMeetings convened regularly
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Financial and physical reporting submitted on regular and timely basisValueNot yetYesYes
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • M&L system in placeValueNoYesYes
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Environmental and social screening and mitigation systems fully functionalValueNoYesYes
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Annual work plans being implemented on time and on targetValueNoYesYes
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Area provided with irrigation and drainage services (ha)Value50.0011740.0011500.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • 10% of available rainfed agriculture land will have access to irrigation facilitiesValue1.0012.0010.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • 14 project GPs are awarded by a competitive GP Incentive Scheme every year, with their performance evaluated through participatory monitoring and evaluation (PME)Value0.00116.0084.00
    DateNovember 18, 2009March 16, 2017March 31, 2017
    Comment
  • 30% of the irrigated area diversified into high value vegetable cropValue10.0040.0030.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • At least 5,000 households participate and benefit from bio-carbon plantationValue100.004359.005000.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Area provided with irrigation and drainage services - Improved (ha)Value1000.0036939.0025000.00
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Self Help Groups with atleast Rs. 5000 in accountsValue10018232,400
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • User Groups established and taking care of resources in a sustainable mannerValue25066503,000
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment
  • Treatable areas of non-arable land treatedValue07070% in original GPs; 20% in additional GPs
    DateMarch 6, 2006March 16, 2017March 31, 2017
    Comment