Financier | Commitments |
---|---|
IDA Credit | 50.00 |
P093991
Closed
Pierre Joseph Kamano
N/A
May 16, 2005
(as of board presentation)
July 18, 2006
March 2, 2007
US$ 50.00 million
N/A
2007
US$ 50.00 million
B
Not Applicable
December 31, 2010
BANK APPROVED
May 30, 2024
Financier | Commitments |
---|---|
IDA Credit | 50.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 50.00 |
IBRD + IDA Commitment | 50.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 50.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Sep 1, 2014 | IDA-42221 | Int Charges | 142.71 |
Sep 1, 2014 | IDA-42221 | Int Charges | 44,036.09 |
Sep 1, 2014 | IDA-42221 | Int Charges | 44,036.09 |
Mar 6, 2014 | IDA-42220 | Int Charges | 1,034.68 |
Mar 6, 2014 | IDA-42220 | Int Charges | 1,034.68 |
Mar 6, 2014 | IDA-42220 | Int Charges | 109,398.63 |
Mar 6, 2014 | IDA-42220 | Int Charges | 109,398.63 |
Mar 6, 2014 | IDA-42221 | Int Charges | 422.41 |
Mar 6, 2014 | IDA-42221 | Int Charges | 422.41 |
Mar 6, 2014 | IDA-42221 | Int Charges | 44,661.75 |
Mar 6, 2014 | IDA-42221 | Int Charges | 44,661.75 |
Sep 1, 2013 | IDA-42220 | Int Charges | 2,028.29 |
Sep 1, 2013 | IDA-42220 | Int Charges | 2,028.29 |
Sep 1, 2013 | IDA-42221 | Int Charges | 828.04 |
Sep 1, 2013 | IDA-42221 | Int Charges | 828.04 |
Mar 3, 2016 | IDA-42220 | Int Charges | 98,207.45 |
Mar 3, 2016 | IDA-42220 | Int Charges | 98,207.45 |
Mar 3, 2016 | IDA-42221 | Int Charges | 83.73 |
Mar 3, 2016 | IDA-42221 | Int Charges | 83.73 |
Mar 3, 2016 | IDA-42221 | Int Charges | 40,092.97 |
Mar 3, 2016 | IDA-42221 | Int Charges | 40,092.97 |
Sep 3, 2015 | IDA-42220 | Int Charges | 95,966.51 |
Sep 3, 2015 | IDA-42220 | Int Charges | 95,966.51 |
Sep 3, 2015 | IDA-42221 | Int Charges | 39,178.12 |
Sep 3, 2015 | IDA-42221 | Int Charges | 39,178.12 |
Mar 5, 2015 | IDA-42220 | Int Charges | 97,143.14 |
Mar 5, 2015 | IDA-42220 | Int Charges | 97,143.14 |
Mar 5, 2015 | IDA-42221 | Int Charges | 39,658.47 |
Mar 5, 2015 | IDA-42221 | Int Charges | 39,658.47 |
Sep 1, 2015 | IDA-42220 | Int Charges | 3,643.27 |
Sep 1, 2015 | IDA-42220 | Int Charges | 3,643.27 |
Sep 1, 2015 | IDA-42221 | Int Charges | 1,487.36 |
Sep 1, 2015 | IDA-42221 | Int Charges | 1,487.36 |
Mar 1, 2015 | IDA-42220 | Int Charges | 2,137.40 |
Mar 1, 2015 | IDA-42220 | Int Charges | 2,137.40 |
Mar 1, 2015 | IDA-42221 | Int Charges | 872.60 |
Mar 1, 2015 | IDA-42221 | Int Charges | 872.60 |
Mar 6, 2017 | IDA-42220 | Int Charges | 93,628.18 |
Mar 6, 2017 | IDA-42220 | Int Charges | 93,628.18 |
Mar 6, 2017 | IDA-42220 | Loan Repay | 255,587.56 |
Mar 6, 2017 | IDA-42221 | Int Charges | 41.86 |
Mar 6, 2017 | IDA-42221 | Int Charges | 41.86 |
Sep 6, 2016 | IDA-42220 | Int Charges | 98,885.51 |
Sep 6, 2016 | IDA-42220 | Int Charges | 98,885.51 |
Sep 6, 2016 | IDA-42220 | Loan Repay | 264,499.66 |
Sep 6, 2016 | IDA-42221 | Int Charges | 40,389.46 |
Sep 6, 2016 | IDA-42221 | Int Charges | 40,389.46 |
Mar 3, 2016 | IDA-42220 | Int Charges | 205.12 |
Mar 3, 2016 | IDA-42220 | Int Charges | 205.12 |
Sep 6, 2017 | IDA-42220 | Int Charges | 91,249.29 |
Sep 6, 2017 | IDA-42220 | Int Charges | 91,249.29 |
Sep 6, 2017 | IDA-42221 | Int Charges | 147.99 |
Sep 6, 2017 | IDA-42221 | Int Charges | 147.99 |
Sep 6, 2017 | IDA-42220 | Int Charges | 28.03 |
Sep 6, 2017 | IDA-42220 | Int Charges | 28.03 |
Oct 4, 2022 | IDA-42220 | Int Charges | 80,525.44 |
Oct 4, 2022 | IDA-42221 | Int Charges | 271.79 |
Oct 4, 2022 | IDA-42221 | Int Charges | 271.79 |
Oct 4, 2022 | IDA-42221 | Int Charges | 33,621.54 |
Sep 6, 2017 | IDA-42221 | Int Charges | 38,067.79 |
Sep 6, 2017 | IDA-42221 | Int Charges | 38,067.79 |
Sep 6, 2017 | IDA-42220 | Int Charges | 1,325.66 |
Sep 6, 2017 | IDA-42220 | Int Charges | 1,325.66 |
Sep 6, 2017 | IDA-42220 | Loan Repay | 269,176.12 |
Mar 2, 2018 | IDA-42220 | Int Charges | 28.61 |
Mar 2, 2018 | IDA-42220 | Int Charges | 28.61 |
Mar 2, 2018 | IDA-42220 | Int Charges | 93,040.50 |
Mar 2, 2018 | IDA-42220 | Int Charges | 93,040.50 |
Mar 2, 2018 | IDA-42221 | Int Charges | 3,205.56 |
Mar 2, 2018 | IDA-42221 | Int Charges | 3,205.56 |
Mar 2, 2018 | IDA-42221 | Loan Repay | 112,142.76 |
Mar 6, 2017 | IDA-42221 | Int Charges | 38,988.14 |
Mar 6, 2017 | IDA-42221 | Int Charges | 38,988.14 |
Mar 6, 2017 | IDA-42220 | Int Charges | 376.89 |
Mar 6, 2017 | IDA-42220 | Int Charges | 376.89 |
Sep 6, 2017 | IDA-42221 | Loan Repay | 109,890.66 |
Mar 6, 2017 | IDA-42220 | Int Charges | 26.61 |
Mar 6, 2017 | IDA-42220 | Int Charges | 26.61 |
Sep 1, 2016 | IDA-42221 | Int Charges | 96.20 |
Sep 1, 2016 | IDA-42221 | Int Charges | 96.20 |
Sep 1, 2016 | IDA-42220 | Loan Repay | 235.64 |
Mar 6, 2019 | IDA-42220 | Loan Repay | 260,758.56 |
Mar 6, 2019 | IDA-42220 | Int Charges | 21.94 |
Mar 6, 2019 | IDA-42220 | Int Charges | 21.94 |
Mar 5, 2019 | IDA-42221 | Int Charges | 38,970.22 |
Mar 5, 2019 | IDA-42221 | Int Charges | 38,970.22 |
Mar 1, 2019 | IDA-42220 | Loan Repay | 2,634.21 |
Mar 6, 2019 | IDA-42220 | Int Charges | 93,830.92 |
Mar 6, 2019 | IDA-42220 | Int Charges | 93,830.92 |
Mar 1, 2019 | IDA-42221 | Loan Repay | 1,052.07 |
Mar 5, 2019 | IDA-42221 | Loan Repay | 106,615.33 |
Mar 5, 2019 | IDA-42221 | Int Charges | 8.98 |
Mar 5, 2019 | IDA-42221 | Int Charges | 8.98 |
Sep 5, 2018 | IDA-42220 | Int Charges | 6,624.32 |
Sep 5, 2018 | IDA-42220 | Int Charges | 6,624.32 |
Sep 5, 2018 | IDA-42220 | Loan Repay | 264,523.47 |
Sep 5, 2018 | IDA-42220 | Int Charges | 95,228.49 |
Sep 5, 2018 | IDA-42220 | Int Charges | 95,228.49 |
Sep 5, 2018 | IDA-42221 | Int Charges | 2,747.48 |
Sep 5, 2018 | IDA-42221 | Int Charges | 2,747.48 |
Sep 5, 2018 | IDA-42221 | Loan Repay | 107,991.22 |
Sep 5, 2018 | IDA-42221 | Int Charges | 39,686.78 |
Sep 5, 2018 | IDA-42221 | Int Charges | 39,686.78 |
Sep 5, 2018 | IDA-42220 | Int Charges | 5.52 |
Sep 5, 2018 | IDA-42220 | Int Charges | 5.52 |
Sep 5, 2018 | IDA-42221 | Int Charges | 2.25 |
Sep 5, 2018 | IDA-42221 | Int Charges | 2.25 |
Mar 2, 2018 | IDA-42220 | Loan Repay | 274,692.62 |
Mar 2, 2018 | IDA-42221 | Int Charges | 11.69 |
Mar 2, 2018 | IDA-42221 | Int Charges | 11.69 |
Mar 2, 2018 | IDA-42221 | Int Charges | 38,779.93 |
Mar 2, 2018 | IDA-42221 | Int Charges | 38,779.93 |
Mar 2, 2018 | IDA-42220 | Int Charges | 7,830.22 |
Mar 2, 2018 | IDA-42220 | Int Charges | 7,830.22 |
Mar 5, 2020 | IDA-42220 | Int Charges | 91,138.65 |
Mar 5, 2020 | IDA-42220 | Int Charges | 91,138.65 |
Mar 1, 2020 | IDA-42221 | Loan Repay | 2,091.26 |
Mar 5, 2020 | IDA-42221 | Loan Repay | 104,923.21 |
Mar 5, 2020 | IDA-42221 | Int Charges | 37,981.56 |
Mar 5, 2020 | IDA-42221 | Int Charges | 37,981.56 |
Mar 5, 2020 | IDA-42221 | Int Charges | 6.68 |
Mar 5, 2020 | IDA-42221 | Int Charges | 6.68 |
Mar 1, 2020 | IDA-42220 | Loan Repay | 4,541.85 |
Sep 11, 2013 | IDA-42220 | Int Charges | 104,688.36 |
Sep 11, 2013 | IDA-42220 | Int Charges | 104,688.36 |
Sep 11, 2013 | IDA-42221 | Int Charges | 42,738.79 |
Sep 11, 2013 | IDA-42221 | Int Charges | 42,738.79 |
Sep 1, 2014 | IDA-42220 | Int Charges | 349.58 |
Sep 1, 2014 | IDA-42220 | Int Charges | 349.58 |
Sep 1, 2014 | IDA-42220 | Int Charges | 107,866.08 |
Sep 1, 2014 | IDA-42220 | Int Charges | 107,866.08 |
Sep 1, 2014 | IDA-42221 | Int Charges | 142.71 |
Oct 4, 2022 | IDA-42221 | Int Charges | 33,621.54 |
Jul 12, 2022 | IDA-42220 | Int Charges | 82,808.70 |
Jul 12, 2022 | IDA-42220 | Int Charges | 82,808.70 |
Jul 12, 2022 | IDA-42221 | Loan Repay | 101,248.99 |
Jul 12, 2022 | IDA-42221 | Int Charges | 2.11 |
Jul 12, 2022 | IDA-42221 | Int Charges | 2.11 |
Jul 12, 2022 | IDA-42221 | Int Charges | 34,566.18 |
Jul 12, 2022 | IDA-42221 | Int Charges | 34,566.18 |
Jul 12, 2022 | IDA-42220 | Loan Repay | 247,975.31 |
Jul 12, 2022 | IDA-42220 | Int Charges | 5.15 |
Jul 12, 2022 | IDA-42220 | Int Charges | 5.15 |
Sep 2, 2021 | IDA-42221 | Int Charges | 37,974.72 |
Sep 2, 2021 | IDA-42221 | Int Charges | 37,974.72 |
Mar 1, 2023 | IDA-42220 | Loan Repay | 5,091.68 |
Mar 1, 2023 | IDA-42220 | Loan Repay | 10,760.38 |
Apr 6, 2023 | IDA-42221 | Int Charges | 71.70 |
Apr 6, 2023 | IDA-42221 | Int Charges | 71.70 |
Apr 6, 2023 | IDA-42221 | Int Charges | 33,006.42 |
Apr 6, 2023 | IDA-42221 | Int Charges | 33,006.42 |
Apr 6, 2023 | IDA-42221 | Loan Repay | 97,741.39 |
Apr 6, 2023 | IDA-42220 | Loan Repay | 239,432.94 |
Apr 6, 2023 | IDA-42220 | Int Charges | 175.63 |
Apr 6, 2023 | IDA-42220 | Int Charges | 175.63 |
Apr 6, 2023 | IDA-42220 | Int Charges | 79,030.37 |
Apr 6, 2023 | IDA-42220 | Int Charges | 79,030.37 |
Mar 1, 2023 | IDA-42221 | Loan Repay | 4,387.59 |
Mar 1, 2023 | IDA-42221 | Loan Repay | 2,090.57 |
Oct 4, 2022 | IDA-42221 | Loan Repay | 99,619.30 |
Jul 18, 2006 | IDA-42220 | Loan Commitment | 35,000,000.00 |
May 24, 2007 | IDA-42221 | Loan Commitment | 15,000,000.00 |
Apr 15, 2024 | IDA-42220 | Int Charges | 218.20 |
Apr 15, 2024 | IDA-42220 | Int Charges | 218.20 |
Apr 15, 2024 | IDA-42220 | Int Charges | 79,487.92 |
Apr 15, 2024 | IDA-42220 | Int Charges | 79,487.92 |
Apr 15, 2024 | IDA-42220 | Loan Repay | 244,347.81 |
Mar 1, 2024 | IDA-42221 | Loan Repay | 1,484.53 |
Mar 1, 2024 | IDA-42220 | Loan Repay | 5,065.34 |
Oct 12, 2023 | IDA-42221 | Int Charges | 69.52 |
Oct 12, 2023 | IDA-42221 | Int Charges | 69.52 |
Oct 12, 2023 | IDA-42221 | Int Charges | 33,570.07 |
Oct 12, 2023 | IDA-42221 | Int Charges | 33,570.07 |
Oct 12, 2023 | IDA-42221 | Int Charges | 1,756.31 |
Oct 12, 2023 | IDA-42221 | Int Charges | 1,756.31 |
Oct 12, 2023 | IDA-42221 | Loan Repay | 101,727.55 |
Oct 13, 2023 | IDA-42220 | Int Charges | 4,189.66 |
Oct 13, 2023 | IDA-42220 | Int Charges | 4,189.66 |
Oct 13, 2023 | IDA-42220 | Int Charges | 169.60 |
Oct 13, 2023 | IDA-42220 | Int Charges | 169.60 |
Oct 13, 2023 | IDA-42220 | Int Charges | 80,029.01 |
Oct 13, 2023 | IDA-42220 | Int Charges | 80,029.01 |
Oct 13, 2023 | IDA-42220 | Loan Repay | 248,152.02 |
Apr 12, 2024 | IDA-42221 | Loan Repay | 100,307.49 |
Apr 12, 2024 | IDA-42221 | Int Charges | 86.94 |
Apr 12, 2024 | IDA-42221 | Int Charges | 86.94 |
Apr 12, 2024 | IDA-42221 | Int Charges | 33,205.81 |
Apr 12, 2024 | IDA-42221 | Int Charges | 33,205.81 |
Mar 5, 2020 | IDA-42220 | Loan Repay | 257,593.58 |
Mar 5, 2020 | IDA-42220 | Int Charges | 21.84 |
Mar 5, 2020 | IDA-42220 | Int Charges | 21.84 |
Sep 1, 2019 | IDA-42220 | Loan Repay | 60.34 |
Sep 4, 2019 | IDA-42221 | Int Charges | 189.75 |
Sep 4, 2019 | IDA-42221 | Int Charges | 189.75 |
Sep 5, 2019 | IDA-42220 | Loan Repay | 259,505.39 |
Sep 5, 2019 | IDA-42220 | Int Charges | 26.76 |
Sep 5, 2019 | IDA-42220 | Int Charges | 26.76 |
Sep 5, 2019 | IDA-42220 | Int Charges | 91,496.91 |
Sep 5, 2019 | IDA-42220 | Int Charges | 91,496.91 |
Sep 4, 2019 | IDA-42221 | Loan Repay | 105,780.88 |
Sep 4, 2019 | IDA-42221 | Int Charges | 8.73 |
Sep 4, 2019 | IDA-42221 | Int Charges | 8.73 |
Sep 4, 2019 | IDA-42221 | Int Charges | 38,081.15 |
Sep 4, 2019 | IDA-42221 | Int Charges | 38,081.15 |
Sep 2, 2021 | IDA-42220 | Loan Repay | 268,480.16 |
Sep 2, 2021 | IDA-42220 | Int Charges | 90,996.53 |
Sep 2, 2021 | IDA-42220 | Int Charges | 90,996.53 |
Sep 2, 2021 | IDA-42220 | Int Charges | 5.62 |
Sep 2, 2021 | IDA-42220 | Int Charges | 5.62 |
Sep 1, 2021 | IDA-42220 | Loan Repay | 1,139.28 |
Sep 2, 2021 | IDA-42221 | Int Charges | 2.29 |
Sep 2, 2021 | IDA-42221 | Int Charges | 2.29 |
Sep 1, 2021 | IDA-42221 | Loan Repay | 453.02 |
Sep 2, 2021 | IDA-42221 | Loan Repay | 109,618.61 |
Mar 2, 2021 | IDA-42221 | Int Charges | 4,021.45 |
Mar 2, 2021 | IDA-42221 | Int Charges | 4,021.45 |
Mar 2, 2021 | IDA-42221 | Loan Repay | 111,043.78 |
Mar 2, 2021 | IDA-42221 | Int Charges | 97.16 |
Mar 2, 2021 | IDA-42221 | Int Charges | 97.16 |
Mar 2, 2021 | IDA-42221 | Int Charges | 38,726.55 |
Mar 2, 2021 | IDA-42221 | Int Charges | 38,726.55 |
Mar 2, 2021 | IDA-42220 | Int Charges | 9,757.61 |
Mar 2, 2021 | IDA-42220 | Int Charges | 9,757.61 |
Oct 13, 2020 | IDA-42221 | Int Charges | 151.41 |
Oct 13, 2020 | IDA-42221 | Int Charges | 151.41 |
Oct 13, 2020 | IDA-42221 | Loan Repay | 109,408.84 |
Mar 2, 2021 | IDA-42220 | Int Charges | 92,820.21 |
Mar 2, 2021 | IDA-42220 | Int Charges | 92,820.21 |
Mar 2, 2021 | IDA-42220 | Loan Repay | 272,000.70 |
Mar 2, 2021 | IDA-42220 | Int Charges | 238.00 |
Mar 2, 2021 | IDA-42220 | Int Charges | 238.00 |
Oct 13, 2020 | IDA-42221 | Int Charges | 8.94 |
Oct 13, 2020 | IDA-42221 | Int Charges | 8.94 |
Oct 13, 2020 | IDA-42221 | Int Charges | 34,604.36 |
Oct 13, 2020 | IDA-42221 | Int Charges | 34,604.36 |
Oct 13, 2020 | IDA-42220 | Int Charges | 299.84 |
Oct 13, 2020 | IDA-42220 | Int Charges | 299.84 |
Oct 13, 2020 | IDA-42220 | Loan Repay | 267,995.90 |
Oct 13, 2020 | IDA-42220 | Int Charges | 21.94 |
Oct 13, 2020 | IDA-42220 | Int Charges | 21.94 |
Oct 13, 2020 | IDA-42220 | Int Charges | 82,844.62 |
Oct 13, 2020 | IDA-42220 | Int Charges | 82,844.62 |
Mar 1, 2022 | IDA-42220 | Loan Repay | 149.84 |
Mar 1, 2022 | IDA-42221 | Loan Repay | 46.77 |
Oct 4, 2022 | IDA-42220 | Int Charges | 665.57 |
Oct 4, 2022 | IDA-42220 | Int Charges | 665.57 |
Oct 4, 2022 | IDA-42220 | Loan Repay | 244,016.53 |
Oct 4, 2022 | IDA-42220 | Int Charges | 80,525.44 |
Name | Review | Date |
---|---|---|
Progress towards achievement of PDO | Moderately Satisfactory | 2011-03-12 |
Project Management | Moderately Unsatisfactory | 2011-03-12 |
Monitoring and Evaluation | Moderately Satisfactory | 2011-03-12 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2011-03-12 |
Procurement | Moderately Unsatisfactory | 2011-03-12 |
Counterpart Funding | Satisfactory | 2011-03-12 |
Financial Management | Moderately Unsatisfactory | 2011-03-12 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 10-04-2011 |
---|---|
Outcomes | Moderately Satisfactory |
Risk to Development Outcome | Modest |
Bank Performance | Moderately Unsatisfactory |
Borrower Performance | Moderately Unsatisfactory |
Government Performance | Moderately Unsatisfactory |
Implementing Agency | Moderately Unsatisfactory |
INDICATOR | ICR REVIEW: 09-14-2012 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Unsatisfactory | N/a |
Risk To Development Outcome | Moderate | N/a |
Bank Performance | Moderately Unsatisfactory | N/a |
Borrower Performance | Moderately Unsatisfactory | N/a |
Government Performance | Moderately Unsatisfactory | N/a |
Implementing Agency | Moderately Unsatisfactory | N/a |
Icr Quality | Satisfactory | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
completion rate in primary education | Value | 43.2% (Education statistical yearbook) | 55.7% (64.4% Boys and 47.6% Girls) | 56.4% |
Date | November 15, 2005 | June 1, 2010 | December 31, 2010 | |
Comment |
Percentage of students reaching adequate score in language reading and Sciences and mathematics (SM) in grade 2, 4 and 6 | Value | Grade 2: Language (49.6), SM (41) Grade 4: Languag | G 2: 55.2 SMT G 4: 54.3 SMT G6 60.1 SMT In Readin | Grade 2 , 4and 6 : 60% in language reading and in |
Date | September 30, 2007 | June 1, 2010 | December 31, 2010 | |
Comment | Low achievement in reading is a consequence of low quality of education. |
Primary Gross Enrollment Rate | Value | 72.20 | 82.00 | 80.00 |
Date | September 30, 2007 | June 1, 2010 | December 31, 2010 | |
Comment |
Decline in Repetition Rate | Value | 18.60 | 14.20 | 15.00 |
Date | November 15, 2005 | June 1, 2010 | December 31, 2010 | |
Comment | These values are for primary education (first six years of schooling) |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Ratio of girls to boys in primary and secondary education (%) | Value | 61.9% | 70.7% | 68% |
Date | November 15, 2005 | June 1, 2010 | December 31, 2010 | |
Comment |
Decline in Shortfall of Classrooms at the Primary Level (%) | Value | 700.00 | 1500.00 | 2300.00 |
Date | March 3, 2005 | December 2, 2010 | December 31, 2010 | |
Comment |
Textbooks purchased and/or distributed | Value | 0.00 | 3000000.00 | 0.00 |
Date | February 28, 2005 | December 8, 2010 | December 31, 2010 | |
Comment |
Teachers trained in-service | Value | 0.00 | 9000.00 | 3000.00 |
Date | March 3, 2005 | June 1, 2010 | December 31, 2010 | |
Comment |
Decline in repetion rate in Lower secondary | Value | 23.90 | 15.60 | 18.80 |
Date | March 3, 2005 | June 1, 2010 | December 31, 2010 | |
Comment |
Number of schools financed by ADARS | Value | 0.00 | 6500.00 | 6000.00 |
Date | May 6, 2005 | June 1, 2010 | December 31, 2010 | |
Comment |
Percentage of non-teaching staff compared to the whole staff in the sub sector | Value | 24.00 | 19.00 | 20.00 |
Date | May 6, 2005 | June 1, 2010 | December 31, 2010 | |
Comment | According to the last CSR, the percentage has declined. |
Primary Gross intake rate | Value | 67.60% (Education statistical yearbook) | 82% (91.2% boys 73% girls) | 80.0% |
Date | November 15, 2005 | June 1, 2010 | December 31, 2010 | |
Comment |
Percentage of Government's recurrent budget allocated to basic education | Value | 35% (Education PER) | 47% | 40% |
Date | December 31, 2005 | June 1, 2010 | December 31, 2010 | |
Comment | The proportion of recurrent budget allocated to the sub sector has improved significantly, mainly because of direct transfers tocommunes within the law on decentralization. |
Number of children in apprenticeship program | Value | 9200 | 1,800 | 11000 |
Date | December 31, 2005 | June 1, 2010 | December 31, 2010 | |
Comment |