Second East-West Highway Improvement

Abstract*

The Georgia Second East-West Highway Improvement Project aims (i) to contribute to the gradual reduction of road transport costs and improve ease of transit, and safety along the central part of Georgia's East-West corridor, through upgrading a segment of the East-West Highway from Tbilisi to Rikoti; and (ii) to strengthen the capacity of the government agencies to develop and implement a traffic safety program. The project includes the following...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The project development objectives are: (i) To contribute to the gradual reduction of road transport costs and improve ease of transit, and safety along the central part of Georgia's East-West corridor, through upgrading a segment of the East-West Highway from Tbilisi to Rikoti; and (ii) To strengthen the capacity of the government agencies (and particularly RDMED) to develop and implement a traffic safety program.

Key Details

Project Details

  • P094044

  • Closed

  • Jean-Francois Marteau

  • N/A

  • Georgia

  • April 3, 2007

  • (as of board presentation)

    December 18, 2007

  • March 10, 2008

  • US$ 35.00 million

  • A

  • Not Applicable

  • June 30, 2012

  • BANK APPROVED

  • March 11, 2021

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Borrower/Recipient 45.00
IDA Credit 35.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 35.00
IBRD + IDA Commitment 35.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 80.00

Summary Status of World Bank Financing (US$ Millions) as of July 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of July 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Feb 15, 2015 IDA-45120 Int Charges 64,920.55
Feb 15, 2015 IDA-45120 Int Charges 64,920.55
Aug 15, 2015 IDA-43730 Int Charges 3,854.76
Aug 15, 2015 IDA-43730 Int Charges 3,854.76
Aug 15, 2015 IDA-43730 Int Charges 114,051.00
Aug 15, 2015 IDA-43730 Int Charges 114,051.00
Aug 15, 2014 IDA-45120 Int Charges 285.52
Aug 15, 2014 IDA-45120 Int Charges 285.52
Aug 15, 2014 IDA-45120 Int Charges 70,653.12
Aug 15, 2014 IDA-45120 Int Charges 70,653.12
Feb 15, 2015 IDA-43730 Int Charges 883.03
Feb 15, 2015 IDA-43730 Int Charges 883.03
Feb 15, 2015 IDA-43730 Int Charges 118,018.97
Feb 15, 2015 IDA-43730 Int Charges 118,018.97
Aug 15, 2015 IDA-45120 Int Charges 2,120.45
Aug 15, 2015 IDA-45120 Int Charges 2,120.45
Aug 15, 2015 IDA-45120 Int Charges 62,737.82
Aug 15, 2015 IDA-45120 Int Charges 62,737.82
Feb 15, 2016 IDA-43730 Int Charges 63.85
Feb 15, 2016 IDA-43730 Int Charges 117,017.87
Feb 15, 2016 IDA-43730 Int Charges 117,017.87
Aug 15, 2016 IDA-45120 Int Charges 549.99
Oct 30, 2008 IDA-45120 Loan Commitment 20,000,000.00
Dec 18, 2007 IDA-43730 Loan Commitment 35,000,000.00
Feb 15, 2024 IDA-43730 Loan Repay 42,397.74
Feb 15, 2024 IDA-43730 Loan Repay 1,436,507.90
Feb 15, 2024 IDA-45120 Loan Repay 784,007.30
Feb 15, 2024 IDA-45120 Int Charges 30,561.90
Feb 15, 2024 IDA-45120 Int Charges 30,561.90
Feb 15, 2024 IDA-45120 Loan Repay 1,469.85
Feb 15, 2024 IDA-45120 Loan Repay 29,507.23
Feb 15, 2024 IDA-43730 Int Charges 44,446.75
Feb 15, 2024 IDA-43730 Int Charges 44,446.75
Aug 15, 2022 IDA-43730 Loan Repay 1,478,836.80
Aug 15, 2022 IDA-43730 Int Charges 8,057.90
Aug 15, 2022 IDA-43730 Int Charges 8,057.90
Aug 15, 2022 IDA-45120 Int Charges 35,243.68
Aug 15, 2022 IDA-45120 Int Charges 35,243.68
Feb 15, 2022 IDA-43730 Loan Repay 22,149.56
Feb 15, 2022 IDA-45120 Loan Repay 32,899.88
Feb 15, 2022 IDA-45120 Loan Repay 12,271.27
Aug 15, 2023 IDA-45120 Loan Repay 2,809.29
Aug 15, 2023 IDA-43730 Loan Repay 1,441,770.00
Aug 15, 2023 IDA-43730 Int Charges 50,362.83
Aug 15, 2023 IDA-43730 Int Charges 50,362.83
Aug 15, 2023 IDA-43730 Int Charges 7,605.61
Aug 15, 2023 IDA-43730 Int Charges 7,605.61
Aug 15, 2023 IDA-43730 Loan Repay 50,462.02
Aug 15, 2023 IDA-45120 Int Charges 4,213.98
Aug 15, 2023 IDA-45120 Int Charges 4,213.98
Aug 15, 2023 IDA-45120 Loan Repay 818,046.56
Aug 15, 2023 IDA-45120 Int Charges 33,860.29
Aug 15, 2023 IDA-45120 Int Charges 33,860.29
Feb 15, 2023 IDA-43730 Int Charges 6,012.33
Feb 15, 2023 IDA-43730 Int Charges 6,012.33
Feb 15, 2023 IDA-45120 Loan Repay 7,408.04
Feb 15, 2023 IDA-45120 Loan Repay 787,059.00
Feb 15, 2023 IDA-45120 Int Charges 32,848.06
Feb 15, 2023 IDA-45120 Int Charges 32,848.06
Feb 15, 2023 IDA-45120 Loan Repay 29,487.77
Feb 15, 2023 IDA-43730 Loan Repay 13,370.72
Feb 15, 2023 IDA-43730 Loan Repay 1,484,494.90
Feb 15, 2023 IDA-43730 Int Charges 42,523.31
Feb 15, 2023 IDA-43730 Int Charges 42,523.31
Feb 15, 2024 IDA-43730 Loan Repay 2,652.80
Aug 15, 2024 IDA-45120 Loan Repay 797,290.40
Aug 15, 2024 IDA-43730 Loan Repay 18,007.84
Aug 15, 2024 IDA-45120 Int Charges 14,490.38
Aug 15, 2024 IDA-45120 Int Charges 14,490.38
Aug 15, 2024 IDA-43730 Loan Repay 1,460,460.40
Aug 15, 2024 IDA-43730 Int Charges 15,274.02
Aug 15, 2024 IDA-43730 Int Charges 15,274.02
Aug 15, 2024 IDA-45120 Loan Repay 11,486.43
Aug 15, 2024 IDA-43730 Loan Repay 20,730.19
Aug 15, 2024 IDA-45120 Loan Repay 15,911.17
Aug 15, 2020 IDA-45120 Int Charges 35,489.33
Aug 15, 2020 IDA-45120 Loan Repay 43,271.16
Aug 15, 2020 IDA-45120 Loan Repay 814,323.00
Aug 15, 2020 IDA-45120 Int Charges 0.01
Aug 15, 2020 IDA-45120 Int Charges 0.01
Aug 15, 2020 IDA-45120 Loan Repay 10,904.38
Aug 15, 2020 IDA-43730 Loan Repay 19,683.78
Aug 15, 2020 IDA-43730 Loan Repay 1,544,872.00
Aug 15, 2020 IDA-43730 Loan Repay 14,285.81
Aug 15, 2020 IDA-43730 Int Charges 52,929.47
Feb 15, 2021 IDA-43730 Int Charges 81,380.32
Feb 15, 2021 IDA-43730 Int Charges 81,380.32
Feb 15, 2021 IDA-43730 Int Charges 36,671.19
Feb 15, 2021 IDA-43730 Int Charges 36,671.19
Feb 15, 2021 IDA-45120 Int Charges 20,315.54
Feb 15, 2021 IDA-45120 Int Charges 20,315.54
Feb 15, 2021 IDA-45120 Loan Repay 865,618.50
Feb 15, 2021 IDA-45120 Loan Repay 22,022.12
Feb 15, 2021 IDA-45120 Int Charges 51,410.43
Feb 15, 2021 IDA-45120 Int Charges 51,410.43
Aug 15, 2021 IDA-45120 Int Charges 1,821.85
Aug 15, 2021 IDA-45120 Loan Repay 49,899.15
Aug 15, 2021 IDA-45120 Loan Repay 825,173.10
Aug 15, 2021 IDA-45120 Int Charges 49,222.80
Aug 15, 2021 IDA-45120 Int Charges 49,222.80
Aug 15, 2021 IDA-43730 Int Charges 3,288.55
Aug 15, 2021 IDA-43730 Int Charges 3,288.55
Aug 15, 2021 IDA-43730 Loan Repay 1,590,792.00
Aug 15, 2021 IDA-43730 Int Charges 17,789.86
Aug 15, 2021 IDA-43730 Int Charges 17,789.86
Aug 15, 2021 IDA-43730 Int Charges 59,761.25
Aug 15, 2021 IDA-43730 Int Charges 59,761.25
Aug 15, 2021 IDA-45120 Int Charges 1,821.85
Feb 15, 2022 IDA-45120 Loan Repay 817,881.10
Feb 15, 2022 IDA-45120 Int Charges 42,521.94
Feb 15, 2022 IDA-45120 Int Charges 42,521.94
Feb 15, 2022 IDA-43730 Int Charges 48,236.06
Feb 15, 2022 IDA-43730 Int Charges 48,236.06
Feb 15, 2022 IDA-43730 Loan Repay 1,546,791.20
Feb 15, 2022 IDA-43730 Int Charges 17,333.56
Feb 15, 2022 IDA-43730 Int Charges 17,333.56
Aug 15, 2022 IDA-43730 Int Charges 52,944.11
Aug 15, 2022 IDA-43730 Int Charges 52,944.11
Aug 15, 2022 IDA-45120 Loan Repay 813,487.30
Aug 15, 2022 IDA-45120 Int Charges 4,413.81
Aug 15, 2022 IDA-45120 Int Charges 4,413.81
Aug 15, 2022 IDA-45120 Int Charges 2,628.18
Aug 15, 2022 IDA-45120 Int Charges 2,628.18
Aug 15, 2022 IDA-43730 Int Charges 4,743.69
Aug 15, 2022 IDA-43730 Int Charges 4,743.69
Aug 15, 2018 IDA-43730 Int Charges 50,913.49
Aug 15, 2018 IDA-43730 Loan Repay 113,620.15
Aug 15, 2018 IDA-43730 Loan Repay 1,435,765.50
Aug 15, 2018 IDA-43730 Int Charges 110,393.72
Aug 15, 2018 IDA-43730 Int Charges 110,393.72
Feb 15, 2018 IDA-43730 Int Charges 2,206.80
Feb 15, 2018 IDA-43730 Int Charges 2,206.80
Feb 15, 2018 IDA-43730 Loan Repay 118,713.66
Feb 15, 2018 IDA-43730 Loan Repay 1,514,907.10
Feb 15, 2019 IDA-43730 Loan Repay 34,216.83
Feb 15, 2019 IDA-43730 Int Charges 95,762.06
Feb 15, 2019 IDA-43730 Int Charges 95,762.06
Feb 15, 2019 IDA-43730 Loan Repay 70,034.82
Feb 15, 2019 IDA-43730 Loan Repay 1,448,706.80
Feb 15, 2019 IDA-45120 Loan Repay 3,351.73
Feb 15, 2019 IDA-45120 Int Charges 59,049.25
Feb 15, 2019 IDA-45120 Int Charges 59,049.25
Feb 15, 2019 IDA-45120 Loan Repay 1,318.28
Feb 15, 2019 IDA-45120 Loan Repay 849,590.56
Aug 15, 2019 IDA-45120 Int Charges 531.72
Aug 15, 2019 IDA-45120 Int Charges 59,799.65
Aug 15, 2019 IDA-45120 Int Charges 59,799.65
Feb 15, 2020 IDA-43730 Int Charges 29,279.15
Feb 15, 2020 IDA-43730 Int Charges 29,279.15
Feb 15, 2020 IDA-43730 Int Charges 62,617.52
Feb 15, 2020 IDA-43730 Int Charges 62,617.52
Feb 15, 2020 IDA-45120 Loan Repay 51,626.74
Feb 15, 2020 IDA-45120 Loan Repay 784,958.30
Feb 15, 2020 IDA-43730 Loan Repay 1,520,901.60
Feb 15, 2020 IDA-45120 Loan Repay 5,932.71
Feb 15, 2020 IDA-45120 Int Charges 56,869.95
Feb 15, 2020 IDA-45120 Int Charges 56,869.95
Feb 15, 2020 IDA-43730 Loan Repay 10,709.55
Aug 15, 2019 IDA-43730 Loan Repay 1,539,316.80
Aug 15, 2019 IDA-43730 Int Charges 1,029.78
Aug 15, 2019 IDA-43730 Int Charges 1,029.78
Aug 15, 2019 IDA-43730 Int Charges 97,101.67
Aug 15, 2019 IDA-43730 Int Charges 97,101.67
Aug 15, 2019 IDA-45120 Int Charges 4,976.17
Aug 15, 2019 IDA-45120 Int Charges 4,976.17
Aug 15, 2019 IDA-43730 Int Charges 8,983.03
Aug 15, 2019 IDA-43730 Int Charges 8,983.03
Aug 15, 2019 IDA-45120 Loan Repay 846,756.50
Aug 15, 2019 IDA-45120 Int Charges 531.72
Feb 15, 2021 IDA-43730 Loan Repay 1,573,866.40
Feb 15, 2021 IDA-43730 Loan Repay 39,773.59
Aug 15, 2020 IDA-43730 Int Charges 52,929.47
Aug 15, 2020 IDA-45120 Int Charges 35,489.33
Aug 15, 2016 IDA-45120 Int Charges 549.99
Aug 15, 2016 IDA-45120 Int Charges 64,485.38
Aug 15, 2016 IDA-45120 Int Charges 64,485.38
Aug 15, 2016 IDA-43730 Int Charges 999.81
Aug 15, 2016 IDA-43730 Int Charges 999.81
Aug 15, 2016 IDA-43730 Int Charges 117,227.88
Aug 15, 2016 IDA-43730 Int Charges 117,227.88
Feb 15, 2016 IDA-45120 Int Charges 35.12
Feb 15, 2016 IDA-45120 Int Charges 35.12
Feb 15, 2016 IDA-45120 Int Charges 64,369.85
Feb 15, 2016 IDA-45120 Int Charges 64,369.85
Feb 15, 2016 IDA-43730 Int Charges 63.85
Feb 15, 2017 IDA-45120 Int Charges 61,411.64
Feb 15, 2017 IDA-43730 Int Charges 111,640.14
Feb 15, 2017 IDA-43730 Int Charges 111,640.14
Feb 15, 2017 IDA-45120 Int Charges 61,411.64
Feb 15, 2017 IDA-45120 Int Charges 495.84
Feb 15, 2017 IDA-45120 Int Charges 495.84
Feb 15, 2017 IDA-43730 Int Charges 901.39
Feb 15, 2017 IDA-43730 Int Charges 901.39
Feb 15, 2018 IDA-45120 Int Charges 1,213.93
Feb 15, 2018 IDA-45120 Int Charges 1,213.93
Feb 15, 2018 IDA-45120 Int Charges 65,302.69
Feb 15, 2018 IDA-45120 Int Charges 65,302.69
Aug 15, 2017 IDA-45120 Int Charges 63,858.88
Aug 15, 2017 IDA-45120 Int Charges 63,858.88
Aug 15, 2017 IDA-43730 Int Charges 887.13
Aug 15, 2017 IDA-43730 Int Charges 887.13
Aug 15, 2017 IDA-43730 Int Charges 116,088.95
Aug 15, 2017 IDA-43730 Int Charges 116,088.95
Aug 15, 2017 IDA-45120 Int Charges 488.00
Aug 15, 2017 IDA-45120 Int Charges 488.00
Feb 15, 2018 IDA-43730 Int Charges 68,840.07
Feb 15, 2018 IDA-43730 Int Charges 68,840.07
Aug 15, 2018 IDA-45120 Int Charges 1,986.66
Aug 15, 2018 IDA-45120 Int Charges 1,986.66
Aug 15, 2018 IDA-45120 Int Charges 63,922.12
Aug 15, 2018 IDA-45120 Int Charges 63,922.12
Aug 15, 2018 IDA-43730 Int Charges 50,913.49
Aug 15, 2013 IDA-45120 Int Charges 633.75
Aug 15, 2013 IDA-45120 Int Charges 633.75
Aug 15, 2013 IDA-45120 Int Charges 69,515.71
Aug 15, 2013 IDA-45120 Int Charges 69,515.71
Aug 15, 2013 IDA-43730 Int Charges 126,642.60
Aug 15, 2013 IDA-43730 Int Charges 126,642.60
Aug 15, 2013 IDA-43730 Int Charges 882.00
Aug 15, 2013 IDA-43730 Int Charges 882.00
Feb 15, 2014 IDA-43730 Int Charges 526.68
Feb 15, 2014 IDA-43730 Int Charges 526.68
Feb 15, 2014 IDA-43730 Int Charges 128,654.41
Feb 15, 2014 IDA-43730 Int Charges 128,654.41
Feb 15, 2014 IDA-45120 Int Charges 70,770.95
Feb 15, 2014 IDA-45120 Int Charges 70,770.95
Feb 15, 2014 IDA-45120 Int Charges 289.72
Feb 15, 2014 IDA-45120 Int Charges 289.72
Aug 15, 2014 IDA-43730 Int Charges 519.04
Aug 15, 2014 IDA-43730 Int Charges 519.04
Aug 15, 2014 IDA-43730 Int Charges 128,440.20
Aug 15, 2014 IDA-43730 Int Charges 128,440.20
Feb 15, 2015 IDA-45120 Int Charges 485.74
Feb 15, 2015 IDA-45120 Int Charges 485.74

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Procurement Satisfactory 2012-06-26
Financial Management Satisfactory 2012-06-26
Counterpart Funding Satisfactory 2012-06-26
Progress towards achievement of PDO Moderately Satisfactory 2012-06-26
Project Management Moderately Unsatisfactory 2012-06-26
Monitoring and Evaluation Moderately Satisfactory 2012-06-26
Overall Implementation Progress (IP) Moderately Unsatisfactory 2012-06-26

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 12-28-2012
Outcomes
Risk to Development OutcomeSubstantial
Bank Performance
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 10-28-2013PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeSignificantN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceModerately UnsatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualitySatisfactoryN/a
M&e QualitySubstantialN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Transit time from Igoeti to Sveneti (Minutes)Value19.0011.8012.00
    DateOctober 1, 2007December 31, 2011June 30, 2012
    Commenttarget met as the whole road section has been constructed even if localized repairs still remain to be done
  • Vehicle operating cost from Igoeti to Sveneti (cars in US$/km)Value0.200.180.18
    DateOctober 1, 2007December 31, 2011June 30, 2012
    Commenttarget met as the whole road section has been constructed even if localized repairs still remain to be done
  • Vehicle operating cost from Igoeti to Sveneti (trucks in US$/km)Value0.760.710.72
    DateOctober 1, 2007December 31, 2011June 30, 2012
    Commenttarget met as the whole road section has been constructed even if localized repairs still remain to be done
  • National road safety action plan with targets and monitoring indicators devisedValueNoYesYes
    DateOctober 1, 2007December 31, 2011December 31, 2008
    CommentNational Road Safety strategy and action plan adopted. Monitoring indicators limited to the partial indicators defined in theproject as intermediate outcome indicators
  • National road safety action plan with targets and monitoring indicators under implementionValueNoNoYes
    DateOctober 1, 2007December 31, 2011December 31, 2008
    CommentImplementation has started (essentially in Tbilisi and on East West Highway but not yet in a comprehensive and systematic manner

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Roads constructed, non-ruralValue0.0024.0024.00
    DateSeptember 1, 2007December 31, 2011June 30, 2012
    CommentConstruction of both LH and RH lanes is largely completed. Some defect fixing under way on the LHS.
  • Roads rehabilitated, Non-ruralValue0.0024.0024.00
    DateSeptember 1, 2007December 31, 2011June 30, 2012
    CommentConstruction of both LH and RH lanes is completed. Some defect fixing under way on the LHS.
  • Roads in good and fair condition as a share of total classified roadsValue76.0093.0090.00
    DateJanuary 1, 2006December 31, 2011June 30, 2012
    CommentPercentage is for the primary (international) network. Suppl value is the number of km in the primary network.target value was to have almost all international network in good condition
  • Size of the total classified networkValue1495.001495.001495.00
    DateJanuary 1, 2006December 31, 2011June 30, 2012
    CommentPercentage is for the primary (international) network. Suppl value is the number of km in the primary network. Previous ISR waslisting value for the total network including secondary and local roads. percentage in fair ofTarget value will be identified in 2010
  • New Accident data System in place and in use by key agenciesValueNoYesYes
    DateJanuary 1, 2006December 31, 2009June 30, 2012
    Comment
  • Percentage of vehicle occupants wearing seat belts in TbilisiValue20.00100.00100.00
    DateJanuary 1, 2006December 31, 2009June 30, 2012
    Comment
  • percentage of vehicle occupants wearing seat belts on E60Value60.00100.00100.00
    DateJanuary 1, 2006December 31, 2009June 30, 2012
    Comment
  • National Road Safety Council or similar institution in place with adequate financial support establishedValueNoYesYes
    DateSeptember 1, 2007December 31, 2010June 30, 2012
    Comment
  • RDMED Road Safety Unit strengthened (staff number)Value2.005.005.00
    DateJanuary 1, 2006December 31, 2009June 30, 2012
    Comment
  • Number of Hazardous locations improved per yearValue0.0024.0020.00
    DateJanuary 1, 2006December 31, 2009June 30, 2012
    Comment