Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 200.00 |
P094063
Closed
Lynnette Dela Cruz Perez
N/A
June 6, 2005
(as of board presentation)
June 20, 2006
January 1, 2007
US$ 200.00 million
N/A
2006
US$ 200.00 million
C
August 15, 2023
December 31, 2012
BANK APPROVED
Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 200.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | 200.00 |
IDA Commitment | N/A |
IBRD + IDA Commitment | 200.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 200.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Jun 15, 2016 | IBRD-73930 | Int Charges | 7,283.66 |
Jun 15, 2016 | IBRD-73930 | Int Charges | 79,708.56 |
Jun 15, 2016 | IBRD-73930 | Int Charges | 36,715.66 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 105,518.25 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 165,579.66 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 470,478.12 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 400,656.72 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 272,472.80 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 39,591.72 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 281,624.53 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 6,589.34 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 61,887.22 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 186,869.10 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 749,043.90 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 311,932.84 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 72,110.28 |
Jun 15, 2017 | IBRD-73930 | Int Charges | 33,215.70 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 105,518.25 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 378,659.84 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 367,306.30 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 769,714.10 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 32,905.93 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 389,652.75 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 143,439.53 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 177,023.94 |
Jun 15, 2017 | IBRD-73930 | Loan Repay | 126,035.15 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 367,306.30 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 5,895.02 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 64,512.06 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 29,715.76 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 105,518.25 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 378,659.84 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 769,714.10 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 126,035.15 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 156,856.08 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 445,691.03 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 379,548.25 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 258,117.66 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 37,505.84 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 266,787.20 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 6,242.18 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 68,311.20 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 31,465.80 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 105,518.25 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 378,659.84 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 709,580.70 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 295,498.75 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 367,306.30 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 769,714.10 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 126,035.15 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 32,905.93 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 389,652.75 |
Dec 15, 2017 | IBRD-73930 | Loan Repay | 143,439.53 |
Dec 15, 2017 | IBRD-73930 | Int Charges | 58,626.70 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 143,439.53 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 27,965.82 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 105,518.25 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 378,659.84 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 367,306.30 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 33,334.12 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 946,359.94 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 394,103.47 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 209,197.27 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 236,094.88 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 78,189.78 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 8,325.12 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 91,105.86 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 41,965.56 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 355,811.16 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 946,359.94 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 394,103.47 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 209,197.27 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 594,413.25 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 40,215.56 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 105,518.25 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 378,659.84 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 367,306.30 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 769,714.10 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 126,035.15 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 74,929.28 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 226,249.70 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 906,896.75 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 377,669.34 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 200,473.72 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 569,626.20 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 485,090.75 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 329,893.44 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 47,935.30 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 340,973.80 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 32,905.93 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 389,652.75 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 143,439.53 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 769,714.10 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 367,306.30 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 105,518.25 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 105,137.62 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 71,500.44 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 16,240.00 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 49,036.94 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 378,659.84 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 114,723.52 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 14,561.14 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 103,576.60 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 2,423.42 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 26,520.92 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 12,216.18 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 105,518.25 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 378,659.84 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 147,354.60 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 100,210.78 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 22,761.08 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 68,727.22 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 275,485.40 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 389,652.75 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 126,035.15 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 32,905.93 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 389,652.75 |
Jun 20, 2006 | IBRD-73930 | Loan Commitment | 200,000,000.00 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 143,439.53 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 769,714.10 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 196,558.98 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 81,855.28 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 43,450.24 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 123,459.66 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 378,659.84 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 367,306.30 |
Jun 15, 2024 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 10,389.42 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 73,901.94 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 1,729.10 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 18,922.68 |
Jun 15, 2024 | IBRD-73930 | Int Charges | 8,716.26 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 237,112.55 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 5,547.88 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 60,712.92 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 32,905.93 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 389,652.75 |
Jun 15, 2018 | IBRD-73930 | Loan Repay | 143,439.53 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 55,366.20 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 167,178.80 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 670,117.50 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 279,064.70 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 148,132.56 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 420,904.03 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 358,439.72 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 243,762.48 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 35,419.98 |
Jun 15, 2018 | IBRD-73930 | Int Charges | 251,949.88 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 126,035.15 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 262,630.53 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 139,409.05 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 396,117.00 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 337,331.16 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 229,407.30 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 769,714.10 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 126,035.15 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 32,905.93 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 52,105.66 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 157,333.62 |
Dec 15, 2018 | IBRD-73930 | Int Charges | 630,654.30 |
Dec 15, 2018 | IBRD-73930 | Loan Repay | 389,652.75 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 32,905.93 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 389,652.75 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 143,439.53 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 105,518.25 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 378,659.84 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 769,714.10 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 32,905.93 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 389,652.75 |
Jun 15, 2015 | IBRD-73930 | Loan Repay | 143,439.53 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 7,977.98 |
Jun 15, 2015 | IBRD-73930 | Int Charges | 87,306.72 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 216,404.56 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 867,433.56 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 361,235.20 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 191,750.22 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 544,839.20 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 71,668.78 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 389,652.75 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 143,439.53 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 463,982.25 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 315,538.30 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 45,849.36 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 326,136.47 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 7,630.80 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 83,507.62 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 126,035.15 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 32,905.93 |
Dec 15, 2015 | IBRD-73930 | Int Charges | 38,465.60 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 105,518.25 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 378,659.84 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Dec 15, 2015 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 6,936.50 |
Jun 15, 2016 | IBRD-73930 | Int Charges | 68,408.24 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 32,905.93 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 389,652.75 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 143,439.53 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 769,714.10 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 126,035.15 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 378,659.84 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 367,306.30 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Jun 15, 2016 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Jun 15, 2016 | IBRD-73930 | Int Charges | 206,559.42 |
Jun 15, 2016 | IBRD-73930 | Int Charges | 827,970.40 |
Jun 15, 2016 | IBRD-73930 | Int Charges | 344,801.10 |
Jun 15, 2016 | IBRD-73930 | Int Charges | 183,026.64 |
Jun 15, 2016 | IBRD-73930 | Int Charges | 520,052.20 |
Jun 15, 2016 | IBRD-73930 | Int Charges | 442,873.75 |
Jun 15, 2016 | IBRD-73930 | Int Charges | 301,183.12 |
Jun 15, 2016 | IBRD-73930 | Int Charges | 43,763.50 |
Jun 15, 2016 | IBRD-73930 | Int Charges | 311,299.12 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 495,265.12 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 421,765.25 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 286,827.94 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 41,677.64 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 296,461.84 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 75,909.40 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 34,965.68 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 389,652.75 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 143,439.53 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 769,714.10 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 126,035.15 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 32,905.93 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 65,147.70 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 196,714.20 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 788,507.10 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 328,367.00 |
Dec 15, 2016 | IBRD-73930 | Int Charges | 174,303.19 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 105,518.25 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 378,659.84 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 367,306.30 |
Dec 15, 2016 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 104,514.96 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 296,968.90 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 24,990.58 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 177,763.27 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 4,159.24 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 45,516.48 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 769,714.10 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 126,035.15 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 274,005.66 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 186,341.77 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 192,600.60 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 27,076.46 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 4,506.36 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 367,306.30 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 769,714.10 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 126,035.15 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 32,905.93 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 389,652.75 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 143,439.53 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 433,338.22 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 180,459.95 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 95,791.38 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 272,181.84 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 231,788.64 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 157,631.45 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 252,897.14 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 171,986.64 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 22,904.68 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 162,925.86 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 3,812.04 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 41,717.34 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 19,216.02 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 35,803.08 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 210,680.14 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 143,276.31 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 20,818.80 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 17,466.06 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 105,518.25 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 3,464.92 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 37,918.26 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 148,088.58 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 32,542.56 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 769,714.10 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 126,035.15 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 32,905.93 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 389,652.75 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 143,439.53 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 314,948.62 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 131,157.60 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 69,620.82 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 389,652.75 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 143,439.53 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 197,820.72 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 168,463.14 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 114,565.98 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 16,647.06 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 118,413.94 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 2,770.62 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 30,320.02 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 769,714.10 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 126,035.15 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 32,905.93 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 26,021.58 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 13,966.12 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 105,518.25 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 378,659.84 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 367,306.30 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Jun 15, 2019 | IBRD-73930 | Loan Repay | 769,714.10 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 48,845.16 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 147,488.45 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 591,191.06 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 246,196.40 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 130,685.52 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 371,329.97 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 316,222.72 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 215,052.12 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 31,248.18 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 222,275.20 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 5,200.70 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 56,913.84 |
Jun 15, 2019 | IBRD-73930 | Int Charges | 26,215.86 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 105,518.25 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 378,659.84 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 367,306.30 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 769,714.10 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 24,465.90 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 45,584.64 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 346,542.97 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 295,114.20 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 200,696.98 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 29,162.32 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 207,437.94 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 4,853.56 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 53,114.70 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 137,643.30 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 49,315.62 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 22,715.96 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 105,518.25 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 42,324.10 |
Jun 15, 2021 | IBRD-73930 | Int Charges | 108,107.84 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 105,518.25 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 378,659.84 |
Jun 15, 2021 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 18,732.92 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 189,571.62 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 128,921.12 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 29,282.10 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 88,417.56 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 354,411.80 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 147,591.72 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 78,344.40 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 222,607.73 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 769,714.10 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 126,035.15 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 32,905.93 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 389,652.75 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 143,439.53 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 133,251.23 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 3,117.72 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 34,119.12 |
Jun 15, 2022 | IBRD-73930 | Int Charges | 15,716.06 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 105,518.25 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 378,659.84 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 367,306.30 |
Jun 15, 2022 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 378,659.84 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 367,306.30 |
Dec 15, 2021 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 393,875.03 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 164,025.84 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 87,067.90 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 247,394.80 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Dec 15, 2022 | IBRD-73930 | Loan Repay | 367,306.30 |
Dec 15, 2021 | IBRD-73930 | Int Charges | 98,262.70 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 143,439.53 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 60,897.30 |
Jun 15, 2023 | IBRD-73930 | Int Charges | 173,033.72 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 367,306.30 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 769,714.10 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 126,035.15 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Jun 15, 2023 | IBRD-73930 | Loan Repay | 32,905.93 |
Dec 15, 2022 | IBRD-73930 | Int Charges | 78,572.34 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 143,439.53 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 32,905.93 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 389,652.75 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 148,246.69 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 126,246.08 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 85,855.58 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 12,475.26 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 88,739.28 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 22,721.76 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 2,076.30 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 19,500.48 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 236,022.20 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 98,289.40 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 52,173.82 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 58,882.08 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 367,306.30 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 769,714.10 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 126,035.15 |
Dec 15, 2023 | IBRD-73930 | Int Charges | 10,466.16 |
Dec 15, 2023 | IBRD-73930 | Loan Repay | 105,518.25 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 127,798.16 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 512,264.62 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 213,328.19 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 378,659.84 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 143,439.53 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 126,035.15 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 769,714.10 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 367,306.30 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 32,905.93 |
Jun 15, 2020 | IBRD-73930 | Loan Repay | 389,652.75 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 113,238.48 |
Jun 15, 2020 | IBRD-73930 | Int Charges | 321,755.88 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 551,727.80 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 229,762.31 |
Dec 15, 2019 | IBRD-73930 | Int Charges | 121,962.00 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 126,035.15 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 32,905.93 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 389,652.75 |
Dec 15, 2019 | IBRD-73930 | Loan Repay | 143,439.53 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 20,965.94 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 105,518.25 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 378,659.84 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 367,306.30 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 32,905.93 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 389,652.75 |
Dec 15, 2020 | IBRD-73930 | Loan Repay | 143,439.53 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 39,063.64 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 117,953.00 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 472,801.47 |
Dec 15, 2020 | IBRD-73930 | Int Charges | 196,894.10 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 606.40 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 1,262.66 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 78,189.78 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 236,094.86 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 946,359.94 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 394,103.47 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 209,197.27 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 594,413.25 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 506,199.30 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 91,105.86 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 41,965.56 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 344,248.70 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 50,021.14 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 355,811.16 |
Dec 15, 2013 | IBRD-73930 | Int Charges | 8,325.12 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 506,199.30 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 344,248.70 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 126,035.15 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 1,206,286.50 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 344,248.70 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 50,021.14 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 355,811.16 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 8,325.12 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 91,105.86 |
Jun 15, 2014 | IBRD-73930 | Int Charges | 50,021.13 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 41,965.56 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 105,518.25 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 378,659.84 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 1,506,229.50 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 1,014,451.44 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 367,306.30 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 1,188,826.50 |
Dec 15, 2014 | IBRD-73930 | Loan Repay | 1,110,974.20 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 594,413.25 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 506,199.30 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 78,189.78 |
Dec 15, 2014 | IBRD-73930 | Int Charges | 236,094.86 |
Name | Review | Date |
---|---|---|
Financial Management | Moderately Unsatisfactory | 2012-12-24 |
Progress towards achievement of PDO | Moderately Satisfactory | 2012-12-24 |
Counterpart Funding | Satisfactory | 2012-12-24 |
Project Management | Moderately Satisfactory | 2012-12-24 |
Monitoring and Evaluation | Satisfactory | 2012-12-24 |
Procurement | Satisfactory | 2012-12-24 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2012-12-24 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 06-26-2013 |
---|---|
Outcomes | |
Risk to Development Outcome | Substantial |
Bank Performance | |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 05-07-2014 | PROJECT PERFORMANCE ASSESSMENT REPORT: 05-21-2018 |
---|---|---|
Outcome Rating | Moderately Satisfactory | Moderately Satisfactory |
Risk To Development Outcome | Moderate | Modest |
Bank Performance | Moderately Satisfactory | Moderately Satisfactory |
Borrower Performance | Moderately Satisfactory | Moderately Satisfactory |
Government Performance | Moderately Satisfactory | Not Rated |
Implementing Agency | Moderately Satisfactory | Moderately Satisfactory |
Icr Quality | Satisfactory | Not Rated |
M&e Quality | Modest | Modest |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Interquartile ratio for elementary and secondary schools | Value | IQR for elementary: 2.00IQR for secondary: 2.54 | IQR for elementary: 1.95 IQR for secondary: 2.19 | IQR for elementary: 1.40IQR for secondary: 1.8 |
Date | December 31, 2010 | December 31, 2011 | ||
Comment | The 2011 IQR data have not yet been obtained |
Elementary Participation Rate | Value | 88.58% | 95.96% | 93.0% |
Date | October 21, 2005 | December 31, 2011 | December 31, 2011 | |
Comment | The elementary participation rate of 95.96% for 2011 was computed using the 2010 census data recently released by the NationalStatistics Office. The Inter-Agency Committee on Education Statistics is currently reviewing this prior to granting officialconfirmation. T | The National Economic and Development Authority (NEDA), the government's socioeconomic planning agency, revised the target forElementary Participation Rate in mid 2011 for inclusion in the Philippine Development Plan (PDP) for 2011-2016. The revised PDPtargetfor this indicator for 2011 is 90.16%. |
Secondary Participation Rate | Value | 58.49% | 64.84% | 84.7% |
Date | October 21, 2005 | December 31, 2011 | December 31, 2011 | |
Comment | The secondary participation rate of 64.84% for 2011 was computed using the 2010 census data recently released by the NationalStatistics Office. The Inter-Agency Committee on Education Statistics is currently reviewing this prior to granting officialconfirmation. | The National Economic and Development Authority (NEDA), the government's socioeconomic planning agency, revised the target forSecondary Participation Rate in mid 2011 for inclusion in the Philippine Development Plan (PDP) for 2011-2016. The revised PDPtarget for this indicator for 2011 is 65.16%. |
Elementary Cohort Survival Rate | Value | 63.57% | 74.23% | 78.0% |
Date | October 21, 2005 | December 31, 2011 | December 31, 2011 | |
Comment |
Secondary Cohort Survival Rate | Value | 63.11% | 79.43% | 71.5% |
Date | October 21, 2005 | December 31, 2011 | December 31, 2011 | |
Comment |
Elementary Completion Rate | Value | 62.06% | 72.11% | 77% |
Date | October 21, 2005 | December 31, 2011 | December 31, 2011 | |
Comment | The Department of Education is using the completion rate formula for efficiency. If the completion rate formula for access isused(as used by UIS and WDI), the completion rate at the elementary level for 2011 is at 92.82% |
Secondary Completion Rate | Value | 58.22% | 75.06% | 69.0% |
Date | December 31, 2011 | December 31, 2011 | ||
Comment | he Department of Education is using the completion rate formula for efficiency. If the completion rate formula for access is used(as used by UIS and WDI), the completion rate at the secondary level for 2011 is at 66.79% |
Elementary Dropout Rate | Value | 8.9% | 6.29% | 4.3% |
Date | October 21, 2005 | December 31, 2011 | December 31, 2011 | |
Comment |
Secondary Dropout Rate | Value | 14.3% | 7.79% | 8.1% |
Date | October 21, 2005 | December 31, 2011 | December 31, 2011 | |
Comment |
Grade 6 Achievement Mean Percentage Score | Value | 54.66% | 68.14% | |
Date | March 25, 2005 | |||
Comment |
Mean Percentage Score, Grade 6 for Math, Filipino, English, Science, Social Studies | Value | Math- 53.66; Filipino - 60.68%; English - 54.05%; | Math- 68.41%; Filipino - 76.44%; English- 65.11%; | NA |
Date | March 25, 2005 | June 24, 2011 | June 24, 2011 | |
Comment | There were no targets set for this indicator at the time the project was being prepared since the National Achievement Test wasjust developed a little more than a year earlier |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Schools/clusters with adequate FM system | Value | NA | 76% | 65% |
Date | December 31, 2011 | December 31, 2011 | ||
Comment | No baseline yet at the time the project was being prepared | These include schools which have received training on the Simplified Accounting Manual and are currently using it for theirfinance-related transactions and recording |
Schools/clusters eligible to receive school grants | Value | No baseline yet at the time the project was being | 76% | 65% |
Date | December 31, 2011 | December 31, 2011 | ||
Comment | The SBM grant was only included as a budget item as a result of its inclusion as an eligible item for financing under thisproject.Hence, there was no baseline yet at the time of project preparation |
Schools/clusters where school heads have been trained in SBM | Value | NA | 86.5% | 85% |
Date | December 31, 2011 | December 31, 2011 | ||
Comment | No baseline yet at the time the project was being prepared | DepEd reported a higher figure in the March 2012 mission (96.54%) but this is still being verified in view of the significantincrease |
Schools/clusters using school report card | Value | NA | 84% | 75% |
Date | December 31, 2011 | December 31, 2011 | ||
Comment | No baseline yet at the time the project was being prepared | DepEd reported a higher number in the last Implementation Support Mission of 2012 (97.76%) but this has to be verified given thetremendous increase and given that many of the schools visited in the last missions did not yet strictly follow the revisedtemplate for this school report card (eg including client feedback on school performance in the report card) |
Divisions Engaged in tracking students at risk | Value | NA | 51% | 33% |
Date | December 31, 2011 | December 31, 2011 | ||
Comment | No baseline yet at the time the project was being prepared | I'm not sure whether this is really the updated figure since majority of the divisions (and the schools under them) are trackingstudents at risk of dropping out so that they can iimmediately respond to the needs of the learner, and prevent dropouts orfailure.DepEd undertook a family mapping program to identify the students and pupils at risk so that these learners can also beprovided the necessary intervention (provided alternative delivery modes of learning, or provided demand-side interventions in caseof extreme poverty or disability) |
Divisions where CBTS used in at least 50% of schools | Value | NA | 93.75% | 85% |
Date | December 31, 2011 | December 31, 2011 | ||
Comment | No baseline yet at the time the project was being prepared | Actually, as of 2010, all of the schools were required to use the National Competency Based Teacher Standards in their hiring,promotion, training needs identification so I'm not sure why DepEd reported only this figure |
Competency-Based Teacher standards applied to pre-service training | Value | NA | Implemented by year 3 | Implemented by Year 3 |
Date | December 31, 2011 | December 31, 2011 | ||
Comment | No baseline yet at the time the project was being prepared | DepEd reported that 90% of the Teacher Education Institutions have integrated the National Competency-Based Teacher Standards intheir pre-service education curriculum. This is a tribute to the efforts of the Teacher Education council chaired by DepEd withthe cooperation and support of the Commission on Higher Education Technical Panel for Teacher Education |
Competency Based teacher standards used in promotion and hiring | Value | NA | Developed, trialled, revised, trialled again and c | Revised and refined |
Date | December 31, 2011 | December 31, 2011 | ||
Comment | No baseline yet at the time the project was being prepared |
Five year staffing plan devised for allocation and redeployment of teachers | Value | NA | DepED has yet to develop a five-year projection fo | |
Date | ||||
Comment | No baseline yet at the time the project was being prepared | There were several discussions on this in the course of the project implementation especially during the implementation supportmissions. Instead of coming up with the five-year projection for school staffing, the DepEd management opted to continue usingthe color-coding spectrum based on the Basic Education Information System which highlights teacher shortages (or surpluses) to bethe bases of the DepED’s annual request for teacher items and deployment although the NCBTS is being used in the Revised HiringGuidelinesof DepEd |
Student Achievement Standards Defined | Value | Student Achievement Standards defined by results o | Policy in Place | |
Date | October 21, 2005 | |||
Comment | Student Achievement Standards defined by results of National Achievement Test |
Improved equity in pupil/teacher ratios | Value | NA | 2011 data on pupil-teacher ratio indicate an impro | 75% improved |
Date | December 31, 2011 | |||
Comment | No baseline | There were some issues in the definition of this indicator. While DepEd has a comprehensive school-level data across severalyears(since 2004), where they also track pupil/student-teacher ratios, there was difficulty interpreting this indicator reflectedin theproject results framework. They used instead reductions of the students-to-teacher ratio at the top 25th percentile point oftheirrespective distribution to monitor progress on this. For 2011, the actual figures for this is 40.37 in elementary (from 43in 2005)and 42.03 in secondary (from 45 in 2005) |
Strategies devised: teachers' compensation, incentives and benefits | Value | NA | Strategies devised for various incentives and bene | |
Date | ||||
Comment | No baseline | The different schemes/strategies devised did not have to go through Congress since many of these can be devised and issued throughexecutive fiat; however, while they have started piloting the transfer allowance for teachers, this has not yet been fullyimplemented nationwide so there were delays in terms of its adoption and nationwide implementation |
National strategies and Action Plan (includes teaching materials) | Value | NA | ||
Date | ||||
Comment |
English proficiency for teachers | Value | NA | National English Proficiency program implemented | Support target |
Date | December 31, 2011 | December 31, 2011 | ||
Comment | This program was implemented in the early part of the project in response to the high demand for English speakers in the BusinessProcess Outsourcing support of high labor market demand for English-speakers (to man the Business Process Outsourcing firms);however, in view of the Mother tongue-based Multilingual Education policy of the government adopted in 2010, this program hadreduced itsscope and coverage in the last few years of the project |
Schools receive feedback from national assessment | Value | No explicit DepEd policy to provide feedback to sc | Policy in place and being implemented to provide f | |
Date | October 21, 2005 | |||
Comment | The National Educational Testing and Research Center has been providing the results of the National Achievement Test to allschoolsthrough their respective Division Offices; the results are also uploaded in the NETRC website as soon as results are madeavailable;however, there is still room for improvement in terms of training/retooling of teachers in terms of identifying theleast-learnedskills generated by the test results as well as in coming up with teaching interventions and strategies to addressthese learning gaps |
National standards framework developed for inputs (minimum service standards) and outcomes (participation, completion, achievement) | Value | Policy not yet in place for most inputs before pro | Policy in Place by year 1 of project; standards f | |
Date | October 21, 2005 | |||
Comment | During project implementation, standards were redefined for most inputs (classrooms, textbooks, teachers, instructionalmaterials,etc) to integrate quality standards and also as part of the accreditation standards developed for elementary as well assecondary schools; in terms of outcomes, standards were defined by the targets set in the Education for All National Plan ofAction and the MDG commitments of the government and then some targets were revised when the Philippine Development Plan for2011-2016 was prepared (which affected participation rate for both levels, completion rate, and other outcome indicators) |
Divisions with their schools receive feedback from EMIS | Value | There was no explicit policy yet in place during p | All schools provide basic data and information on | |
Date | October 21, 2005 | December 31, 2011 | ||
Comment | With the rolling out of the enhanced Basic Education Information System as of end 2011, the schools and divisions can now haveaccess to these critical data and information not just on the performance of their schools but also by other schools or diviisions |
ICT Policy Framework developed | Value | ICT Policy Framework was not yet existent during p | Policy was in place by Year 1 but revised in 2011 | Policy in Place by Year 1 (2007) |
Date | October 14, 2005 | December 31, 2011 | December 31, 2011 | |
Comment | The Bank mobilized technical assistance (funded by the AusAID SPHERE AAA managed by the WB) in 2011 to assist the DepEd inrefiningits ICT Policy and Masterplan for Basic Education |
Financing framework developed | Value | 10 year Multiyear Spending Plan for Basic Educatio | financing framework in place on year 1 (through th | Policy in place in year 1 |
Date | October 21, 2005 | December 31, 2011 | December 31, 2011 | |
Comment | The Bank team, led by our now Education Sector Director, Elizabeth King, worked with the DepEd in the preparation of thisMultiyear Spending Plan which informed the preparation of the budget for 2006 and 2007 |
Cost sharing between GOP and Local Government Unit (LGU) applied to classroom construction, including equity factors | Value | There were cost-sharing arrangements in place at t | All classroom construction projects, particularly | |
Date | October 21, 2005 | |||
Comment | In most cases, the relatively poor LGU would provide in-kind contribution (eg mobilization of their municipal engineers,assistance in site preparation, provision of manpower from LGU, etc. |
ICT Policy implemented | Value | ICT Policy was implemented in 2008 by the previou | ICT policy developed under the present DepEd manag | Phase 4 rollout (assumes continued implementation |
Date | July 11, 2008 | December 31, 2011 | December 31, 2011 | |
Comment | During the early years of the project, the ICT policy in place at that time was the Cyber education policy, which was alsocloselyassociated with the then government's National Broadband Network project | The current DepEd management pursued the development of and implementation of an ICT policy framework and eventually, ICTMasterplan for BAsic Education that support the targetted outcomes and outputs stipulated in its reform agenda and MDG and EFAcommitments; these include use of ICT for teaching and learning, student assessment , human resource management, professionaldevelopment, administration, budgeting, resource allocation among others. Currently, several information systems are either beingdeveloped (Learner Information System, Financial Management Information System, Human Resource Information system, etc) or arebeing implemented (eg enhanced Basic Education Information System) |
Schools/clusters meeting SBM criteria | Value | No baseline yet since the SBM criteria was being d | 81% | 75% |
Date | October 21, 2005 | December 31, 2011 | December 31, 2011 | |
Comment | Although DepEd did not directly track this indicator (since it came up with an SBM assessment tool with different levels butwhichwas later revised because of issues), this figure of 81% was computed based on the performance of the schools in terms ofthe different SBM criteria indicated here (School Improvement Plan, School Governing Council, School Report Card, Schools withacceptable FM system) |
Demand side financing mechanisms introduced to support needy students and their families | Value | No major demand-side financing mechanisms in place | Policy and program reviews were undertaken (led by | |
Date | ||||
Comment | The Government expanded the implementation of demand-side financing programs which were assessed or evaluated as having positiveimpact on the needy students and on education outcomes (CCT ESC) and abolished those which are not cost-effective and efficient |
Private sector participation | Value | The Education Service Contracting Scheme was in pl | Policy review of the Education Service Contracting | Policy reviewed based on M & E of the (Education S |
Date | October 21, 2005 | December 31, 2011 | December 31, 2011 | |
Comment | The Bank led by Harry Patrinos conducted a review of the Education Service Contracting Scheme at the secondary level, and based onthe favorable findings, the Government expanded the budget allocation by 50% on the year following the review. On the otherhand,the preschool service contracting program was reduced because of its minimal impact and high cost. The DepEd is requesting WBto review the ALS program as well to assess its impact. |
Schools/clusters with a School Improvement Plan | Value | 19.00 | 80.00 | 80.00 |
Date | August 14, 2005 | December 31, 2011 | December 31, 2011 | |
Comment |
Teacher performance standards developed and agreed | Value | Not yet developed and agreed | Developed and agreed | Developed and agreed |
Date | August 14, 2005 | December 31, 2011 | December 31, 2011 | |
Comment |