Skip to Main Navigation

Tunisia: Sustainable Municipal Solid Waste Management Project

Abstract*

The development objective of the Project is to assist the Tunisian Government in strengthening the key elements of sustainability of municipal solid waste management. This objective will be achieved through the operationalization of a planning and implementation system of solid waste management at the national and local levels and through the rehabilitation of a number of environmentally harmful dumpsites. There are 2 components to the Project. The...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The development objective of the Project is to assist the Tunisian Government in strengthening the key elements of sustainability of municipal solid waste management. This objective will be achieved through the operationalization of a planning and implementation system of solid waste management at the national and local levels and through the rehabilitation of a number of environmentally harmful dumpsites. These actions will enable the Tunisian Government to enter the emerging global market of carbon credits through the Clean Development Mechanism (CDM) introduced under the Kyoto Protocol.

Key Details

Project Details

  • P095012

  • Closed

  • Philip Bottern

  • Government of Tunisia

  • Tunisia

  • July 19, 2005

  • (as of board presentation)

    March 13, 2007

  • July 20, 2007

  • US$ 22.00 million

  • B

  • February 10, 2015

  • June 30, 2014

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 22.00
Borrower/Recipient 5.40

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 22.00
IDA Commitment N/A
IBRD + IDA Commitment 22.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 27.40

Summary Status of World Bank Financing (US$ Millions) as of February 28, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of February 28, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Feb 15, 2022 IBRD-74320 Int Charges 35,259.03
Feb 15, 2022 IBRD-74320 Loan Repay 219,981.86
Feb 15, 2022 IBRD-74320 Loan Repay 445,358.70
Aug 15, 2021 IBRD-74320 Int Charges 48,247.22
Aug 15, 2021 IBRD-74320 Loan Repay 307,586.47
Aug 15, 2021 IBRD-74320 Loan Repay 622,589.56
Mar 13, 2007 IBRD-74320 Loan Commitment 22,000,000.00
Aug 15, 2023 IBRD-74320 Int Charges 4,308.53
Aug 15, 2023 IBRD-74320 Int Charges 9,708.21
Aug 15, 2023 IBRD-74320 Loan Repay 254,286.39
Aug 15, 2023 IBRD-74320 Loan Repay 515,023.97
Feb 15, 2023 IBRD-74320 Int Charges 2,404.66
Feb 15, 2023 IBRD-74320 Int Charges 17,435.34
Feb 15, 2023 IBRD-74320 Loan Repay 207,670.17
Feb 15, 2023 IBRD-74320 Loan Repay 420,433.38
Oct 31, 2014 IBRD-74320 Loan Disb -583,414.44
Feb 15, 2014 IBRD-74320 Int Charges 4,055.39
Feb 15, 2014 IBRD-74320 Int Charges 16,343.97
Feb 15, 2014 IBRD-74320 Int Charges 238,344.20
Feb 15, 2014 IBRD-74320 Loan Repay 320,949.84
Feb 15, 2014 IBRD-74320 Loan Repay 672,566.90
Feb 27, 2014 IBRD-74320 Loan Disb 871,476.75
Aug 15, 2013 IBRD-74320 Int Charges 502.03
Aug 15, 2013 IBRD-74320 Int Charges 1,107.37
Aug 15, 2013 IBRD-74320 Int Charges 3,912.99
Aug 15, 2013 IBRD-74320 Int Charges 16,111.29
Aug 15, 2013 IBRD-74320 Int Charges 235,912.73
Aug 15, 2013 IBRD-74320 Loan Repay 124,367.91
Aug 15, 2013 IBRD-74320 Loan Repay 260,734.66
Aug 15, 2015 IBRD-74320 Int Charges 163,273.40
Nov 11, 2014 IBRD-74320 Loan Cancel 2,697,876.20
Aug 15, 2014 IBRD-74320 Int Charges 220,208.81
Aug 15, 2014 IBRD-74320 Loan Repay 361,138.00
Aug 15, 2014 IBRD-74320 Loan Repay 656,301.60
Aug 15, 2014 IBRD-74320 Int Charges 2,905.19
Aug 15, 2014 IBRD-74320 Int Charges 19,539.50
Feb 15, 2015 IBRD-74320 Int Charges 13,191.67
Feb 15, 2015 IBRD-74320 Int Charges 177,390.66
Feb 15, 2015 IBRD-74320 Loan Repay 276,708.47
Feb 15, 2015 IBRD-74320 Loan Repay 560,157.56
Feb 15, 2015 IBRD-74320 Int Charges 1,216.35
Aug 15, 2015 IBRD-74320 Loan Repay 357,504.03
Aug 15, 2015 IBRD-74320 Loan Repay 723,637.25
Aug 15, 2015 IBRD-74320 Int Charges 6,146.80
Aug 15, 2015 IBRD-74320 Int Charges 1,596.81
Aug 15, 2016 IBRD-74320 Loan Repay 712,481.70
Aug 15, 2016 IBRD-74320 Int Charges 2,705.58
Aug 15, 2016 IBRD-74320 Int Charges 136,162.39
Aug 15, 2016 IBRD-74320 Loan Repay 351,884.56
Feb 15, 2016 IBRD-74320 Int Charges 6,423.45
Feb 15, 2016 IBRD-74320 Int Charges 149,887.30
Feb 15, 2016 IBRD-74320 Loan Repay 352,577.62
Feb 15, 2016 IBRD-74320 Loan Repay 713,885.00
Feb 15, 2017 IBRD-74320 Int Charges 1,087.38
Feb 15, 2017 IBRD-74320 Int Charges 115,991.17
Feb 15, 2017 IBRD-74320 Loan Repay 102,318.49
Feb 15, 2017 IBRD-74320 Loan Repay 207,184.45
Feb 15, 2018 IBRD-74320 Loan Repay 392,916.75
Feb 15, 2018 IBRD-74320 Loan Repay 795,562.06
Feb 15, 2018 IBRD-74320 Int Charges 132,429.20
Aug 15, 2017 IBRD-74320 Int Charges 328.71
Aug 15, 2017 IBRD-74320 Int Charges 124,757.93
Feb 15, 2019 IBRD-74320 Int Charges 92,581.00
Feb 15, 2019 IBRD-74320 Loan Repay 355,113.60
Feb 15, 2019 IBRD-74320 Loan Repay 719,019.70
Aug 15, 2018 IBRD-74320 Int Charges 106,572.28
Aug 15, 2018 IBRD-74320 Loan Repay 356,578.44
Aug 15, 2018 IBRD-74320 Loan Repay 721,985.70
Feb 15, 2021 IBRD-74320 Int Charges 63,738.97
Feb 15, 2021 IBRD-74320 Loan Repay 364,656.44
Feb 15, 2021 IBRD-74320 Loan Repay 738,188.20
Aug 15, 2020 IBRD-74320 Int Charges 62,039.51
Feb 15, 2020 IBRD-74320 Loan Repay 319,049.12
Feb 15, 2020 IBRD-74320 Int Charges 62,947.32
Feb 15, 2020 IBRD-74320 Loan Repay 157,632.81
Aug 15, 2019 IBRD-74320 Loan Repay 711,461.10
Aug 15, 2019 IBRD-74320 Int Charges 78,196.68
Aug 15, 2019 IBRD-74320 Loan Repay 351,380.50
Aug 15, 2022 IBRD-74320 Loan Repay 197,840.20
Aug 15, 2022 IBRD-74320 Loan Repay 400,532.34
Aug 15, 2022 IBRD-74320 Int Charges 24,160.15

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Counterpart Funding Satisfactory 2014-06-25
Overall Safeguards Rating Moderately Unsatisfactory 2014-06-25
Project Management Moderately Satisfactory 2014-06-25
Monitoring and Evaluation Moderately Satisfactory 2014-06-25
Overall Implementation Progress (IP) Moderately Unsatisfactory 2014-06-25
Progress towards achievement of PDO Moderately Unsatisfactory 2014-06-25
Procurement Moderately Satisfactory 2014-06-25
Financial Management Moderately Unsatisfactory 2014-06-25
Overall Safeguards Rating Moderately Unsatisfactory 2014-06-25

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 12-30-2014
Outcomes
Risk to Development OutcomeSubstantial
Bank Performance
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 05-28-2015PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingHighly Unsatisfactory N/a
Risk To Development OutcomeSignificantN/a
Bank PerformanceUnsatisfactoryN/a
Borrower PerformanceModerately UnsatisfactoryN/a
Government PerformanceModerately UnsatisfactoryN/a
Implementing AgencyModerately UnsatisfactoryN/a
Icr QualityUnsatisfactoryN/a
M&e QualityNegligibleN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • The percentage of the Tunisian urban population living in areas serviced with sanitary landfills and large dumpsites have been closedValue0.0063.0063.50
    DateJune 30, 2012May 23, 2014June 30, 2014
    Comment
  • The Government of Tunisia enters the emerging market for carbon credits by selling Certified Emissions Reductions.Value0.003500000.004200000.00
    DateJune 30, 2012June 30, 2014June 30, 2014
    CommentThe generated CERs have been/are being certified by the UNFCCC-CDM

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Continuous monitoring system for Clean Development Mechanism (CDM) operations within ANGed in order to maximize carbon emissions reductions.ValueThis is the first CDM project in Tunisia, and no eAn operational CDM monitoring system in place.A fully operational monitoring system in place in
    DateDecember 18, 2006May 23, 2014June 30, 2014
    CommentSpecialized TA continues to be provided to ANGed in the context of the regular supervision missions to maximize the benefit fromthe CF operations.
  • Number of landfills equipped with land fill gases treatment systems as per the CDM requirements.Value0.007.008.00
    DateJune 30, 2012November 8, 2013June 30, 2014
    CommentThis is a new indicator which was introduced at project restructuring in June 2012.
  • The performance of the National Solid Waste Management Program (PRONGID) is reviewed and a new sector policy is endorsed by the Board of ANGedValuenoneSector Policy approved by ANGed Board
    DateJune 30, 2012May 23, 2014June 30, 2014
    CommentThe strategic review of the MSW Program is underway but may not be completed by the Project closing date
  • Number of open dumps which are closedValue1.008.008.00
    DateJune 30, 2012May 23, 2013June 30, 2014
    Comment
  • ANGed is equipped with new tools for planning, information management and monitoring and evaluationValue0GIS System in place and operationalGIS system in place and operational
    DateDecember 18, 2006May 23, 2014June 30, 2014
    Comment