ANGOLA EMERGENCY MULTI-SECTOR RECOVERY - PHASE 2

Development Objective

The overall purpose of the program is to help to build the foundation for long-term reconstruction, economic rehabilitation, and the reestablishment of state administration throughout the country. The specific objectives of the EMRP 2 are to assist the government to: (a) facilitate agricultural marketing in specific areas with high agricultural potential that have been affected by the conflict, (b) reconstruct and rehabilitate critical infrastructure, and (c) strengthen capacity of participating ministries and agencies for improved governance and transparency and of local governments for future decentralization. These objectives build on the objectives and activities of EMRP 1 and are consistent with the ECP and the PPMRRP.

Key Details

Project Details

  • P095229

  • Closed

  • Jose Domingos Diogo Lopes Chembeze

  • N/A

  • Angola

  • May 3, 2007

  • (as of board presentation)

    May 22, 2007

  • January 28, 2008

  • US$ 103.00 million

  • B

  • Not Applicable

  • May 31, 2013

  • BANK APPROVED

  • March 11, 2021

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
UN Development Programme 1.00
Borrower/Recipient 31.00
IDA Credit 102.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 102.00
IBRD + IDA Commitment 102.00
Lending Instrument
Grant Amount 1.00
Total Project Cost** 134.00

Summary Status of World Bank Financing (US$ Millions) as of June 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of June 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
May 7, 2021 IDA-43100 Int Charges 1,809.53
May 7, 2021 IDA-43100 Int Charges 187,009.84
May 7, 2021 IDA-43100 Int Charges 187,009.84
May 7, 2021 IDA-43100 Int Charges 4,723.37
May 7, 2021 IDA-43100 Loan Repay 906,714.30
Oct 15, 2021 IDA-43100 Loan Repay 876,445.90
Oct 15, 2021 IDA-43100 Int Charges 408.67
Oct 15, 2021 IDA-43100 Int Charges 408.67
Oct 15, 2021 IDA-43100 Int Charges 2,179.56
Oct 15, 2021 IDA-43100 Int Charges 180,557.03
Oct 15, 2021 IDA-43100 Int Charges 180,557.03
Oct 15, 2021 IDA-43100 Int Charges 962,970.90
Oct 15, 2021 IDA-43100 Loan Repay 899,527.40
Oct 15, 2021 IDA-43100 Loan Repay 7,306.22
Apr 15, 2022 IDA-43100 Int Charges 168,268.95
Apr 15, 2022 IDA-43100 Int Charges 168,268.95
Apr 15, 2022 IDA-43100 Int Charges 897,434.60
Apr 15, 2022 IDA-43100 Loan Repay 0.03
Apr 15, 2022 IDA-43100 Loan Repay 17,573.72
Apr 15, 2022 IDA-43100 Loan Repay 1,708,262.10
Oct 15, 2022 IDA-43100 Int Charges 125,795.93
Oct 15, 2022 IDA-43100 Int Charges 25,356.01
Oct 15, 2022 IDA-43100 Int Charges 25,356.01
Oct 15, 2022 IDA-43100 Int Charges 806,143.70
Oct 15, 2022 IDA-43100 Loan Repay 70,360.53
Apr 15, 2023 IDA-43100 Loan Repay 88,350.18
Oct 15, 2022 IDA-43100 Loan Repay 1,541,926.90
Oct 15, 2022 IDA-43100 Int Charges 125,795.93
Apr 18, 2023 IDA-43100 Loan Repay 7,054.59
Apr 18, 2023 IDA-43100 Int Charges 153,368.90
Apr 18, 2023 IDA-43100 Int Charges 153,368.90
Apr 18, 2023 IDA-43100 Int Charges 794,196.00
Apr 18, 2023 IDA-43100 Loan Repay 1,609,046.10
Apr 15, 2024 IDA-43100 Loan Repay 1,618,433.80
Apr 15, 2024 IDA-43100 Loan Repay 44,211.54
Apr 15, 2024 IDA-43100 Int Charges 137,168.23
Apr 15, 2024 IDA-43100 Int Charges 137,168.23
Apr 15, 2024 IDA-43100 Int Charges 731,563.94
Oct 15, 2023 IDA-43100 Int Charges 142,700.52
Oct 15, 2023 IDA-43100 Int Charges 142,700.52
Oct 15, 2023 IDA-43100 Int Charges 761,069.30
Oct 15, 2023 IDA-43100 Int Charges 23,079.45
Oct 15, 2023 IDA-43100 Loan Repay 920,272.10
Oct 15, 2023 IDA-43100 Loan Repay 734,226.44
Oct 15, 2023 IDA-43100 Int Charges 98.06
Oct 15, 2023 IDA-43100 Int Charges 98.06
Oct 15, 2023 IDA-43100 Int Charges 523.01
May 22, 2007 IDA-43100 Loan Commitment 102,000,000.00
Apr 15, 2016 IDA-43100 Int Charges 34,005.24
Apr 15, 2016 IDA-43100 Loan Repay 1,751,486.60
Dec 2, 2015 IDA-43100 Loan Cancel 11,390,134.00
Oct 15, 2016 IDA-43100 Int Charges 235,074.94
Oct 15, 2016 IDA-43100 Int Charges 1,253,732.90
Oct 15, 2016 IDA-43100 Loan Repay 551.65
Oct 15, 2016 IDA-43100 Loan Repay 1,370,960.60
Oct 15, 2016 IDA-43100 Loan Repay 369,783.34
Oct 15, 2016 IDA-43100 Int Charges 235,074.94
Nov 6, 2017 IDA-43100 Int Charges 225,636.97
Nov 6, 2017 IDA-43100 Int Charges 1,203,397.10
Nov 6, 2017 IDA-43100 Int Charges 225,636.97
Nov 6, 2017 IDA-43100 Loan Repay 652,294.10
Apr 15, 2017 IDA-43100 Loan Repay 603,478.25
Apr 15, 2017 IDA-43100 Int Charges 225,221.27
Apr 15, 2017 IDA-43100 Int Charges 225,221.27
Apr 15, 2017 IDA-43100 Int Charges 1,181,103.40
Apr 15, 2017 IDA-43100 Loan Repay 39,666.37
Apr 15, 2017 IDA-43100 Loan Repay 1,072,826.80
Apr 15, 2018 IDA-43100 Int Charges 4,286.36
Apr 15, 2018 IDA-43100 Int Charges 227,329.95
Apr 15, 2018 IDA-43100 Int Charges 227,329.95
Nov 6, 2017 IDA-43100 Int Charges 20,705.27
Nov 6, 2017 IDA-43100 Loan Repay 1,117,407.50
Apr 15, 2018 IDA-43100 Loan Repay 14,008.60
Apr 15, 2018 IDA-43100 Loan Repay 1,483,889.50
Apr 15, 2018 IDA-43100 Int Charges 1,212,426.50
Apr 15, 2018 IDA-43100 Loan Repay 339,111.66
Apr 15, 2018 IDA-43100 Int Charges 803.70
Apr 15, 2018 IDA-43100 Int Charges 803.70
Oct 15, 2018 IDA-43100 Int Charges 173,237.69
Oct 15, 2018 IDA-43100 Int Charges 173,237.69
Oct 15, 2018 IDA-43100 Int Charges 38,629.39
Oct 15, 2018 IDA-43100 Int Charges 38,629.39
Oct 15, 2018 IDA-43100 Int Charges 1,097,791.20
Apr 15, 2019 IDA-43100 Loan Repay 1,132,241.00
Apr 15, 2019 IDA-43100 Int Charges 204,168.47
Oct 15, 2018 IDA-43100 Loan Repay 9,283.23
Oct 15, 2018 IDA-43100 Loan Repay 1,756,275.60
Oct 15, 2019 IDA-43100 Loan Repay 1,048,643.80
Oct 15, 2019 IDA-43100 Loan Repay 682,661.10
Oct 15, 2019 IDA-43100 Int Charges 194,771.81
Oct 15, 2019 IDA-43100 Int Charges 194,771.81
Oct 15, 2019 IDA-43100 Int Charges 8,606.79
Oct 15, 2019 IDA-43100 Int Charges 1,038,782.94
Apr 15, 2019 IDA-43100 Int Charges 204,168.47
Apr 15, 2019 IDA-43100 Int Charges 1,080,167.60
Apr 15, 2019 IDA-43100 Loan Repay 624,047.06
Apr 15, 2019 IDA-43100 Int Charges 31,997.54
Apr 15, 2020 IDA-43100 Loan Repay 0.01
Apr 15, 2020 IDA-43100 Int Charges 1,001,138.60
Apr 15, 2020 IDA-43100 Loan Repay 7,939.48
Apr 15, 2020 IDA-43100 Loan Repay 1,718,161.60
Apr 15, 2020 IDA-43100 Int Charges 187,713.48
Apr 15, 2020 IDA-43100 Int Charges 187,713.48
Nov 3, 2020 IDA-43100 Int Charges 104,417.13
Nov 3, 2020 IDA-43100 Int Charges 890,250.40
Nov 3, 2020 IDA-43100 Int Charges 187,371.66
Nov 3, 2020 IDA-43100 Int Charges 187,371.66
Nov 3, 2020 IDA-43100 Loan Repay 890,324.56
Oct 15, 2020 IDA-43100 Loan Repay 1,919.67
May 7, 2021 IDA-43100 Int Charges 997,385.75
May 7, 2021 IDA-43100 Int Charges 339.30
May 7, 2021 IDA-43100 Int Charges 339.30
Oct 15, 2014 IDA-43100 Loan Repay 10,575.98
Oct 15, 2014 IDA-43100 Int Charges 282,005.28
Oct 15, 2014 IDA-43100 Int Charges 282,005.28
Oct 15, 2014 IDA-43100 Int Charges 1,504,028.00
Aug 22, 2013 IDA-43100 Loan Disb 513,491.10
Aug 19, 2013 IDA-43100 Loan Disb 1,025,310.25
Aug 19, 2013 IDA-43100 Loan Disb 210,654.20
Aug 28, 2013 IDA-43100 Loan Disb 92,224.44
Jul 26, 2013 IDA-43100 Loan Disb 226,487.86
Aug 6, 2013 IDA-43100 Loan Disb 309,793.94
Aug 1, 2013 IDA-43100 Loan Disb 164,949.94
Oct 15, 2014 IDA-43100 Int Charges 4,695.58
Oct 15, 2014 IDA-43100 Loan Repay 1,863,639.90
Oct 15, 2014 IDA-43100 Int Charges 43,795.85
Oct 15, 2014 IDA-43100 Int Charges -43,795.85
Oct 15, 2013 IDA-43100 Int Charges 257,823.92
Oct 15, 2013 IDA-43100 Int Charges 257,823.92
Oct 15, 2013 IDA-43100 Int Charges 1,318,262.90
Oct 7, 2013 IDA-43100 Loan Disb -135,213.44
Sep 11, 2013 IDA-43100 Loan Disb 189,385.00
Oct 15, 2013 IDA-43100 Int Charges 784.88
Aug 9, 2013 IDA-43100 Loan Disb 2,132,340.80
Aug 6, 2013 IDA-43100 Loan Disb 242,716.36
Sep 4, 2013 IDA-43100 Loan Disb 209,329.61
Sep 4, 2013 IDA-43100 Loan Disb 628,673.90
Sep 4, 2013 IDA-43100 Loan Disb 167,244.62
Sep 4, 2013 IDA-43100 Loan Disb 377,800.03
Sep 4, 2013 IDA-43100 Loan Disb 825,745.80
Sep 6, 2013 IDA-43100 Loan Disb 262,500.10
Aug 19, 2013 IDA-43100 Loan Disb 259,542.34
Aug 19, 2013 IDA-43100 Loan Disb 305,483.22
Aug 19, 2013 IDA-43100 Loan Disb 286,964.53
Aug 19, 2013 IDA-43100 Loan Disb 241,216.84
Apr 15, 2014 IDA-43100 Int Charges 1,571,113.90
Apr 15, 2014 IDA-43100 Int Charges 57,467.11
Apr 15, 2014 IDA-43100 Int Charges 295,502.06
Apr 15, 2014 IDA-43100 Int Charges 295,502.06
Dec 17, 2013 IDA-43100 Loan Disb -22,432.07
Sep 24, 2013 IDA-43100 Loan Disb 1,412,153.60
Sep 24, 2013 IDA-43100 Loan Disb 105,760.31
Sep 19, 2013 IDA-43100 Loan Disb 257,060.77
Sep 24, 2013 IDA-43100 Loan Disb 1,342,902.20
Jul 2, 2014 IDA-43100 Loan Cancel 12,858,934.00
Jun 27, 2014 IDA-43100 Loan Disb -605,352.70
May 30, 2013 IDA-43100 Loan Cancel 13,000,000.00
Apr 15, 2015 IDA-43100 Loan Repay 324,038.03
Apr 15, 2015 IDA-43100 Int Charges 253,471.55
Apr 15, 2015 IDA-43100 Int Charges 253,471.55
Apr 15, 2015 IDA-43100 Int Charges 1,351,848.40
Dec 17, 2013 IDA-43100 Loan Disb 22,432.07
Oct 15, 2015 IDA-43100 Int Charges 1,326,362.50
Oct 15, 2015 IDA-43100 Loan Repay 1,686,033.10
Oct 15, 2015 IDA-43100 Int Charges 43,105.77
Oct 15, 2015 IDA-43100 Int Charges 43,105.77
Oct 15, 2015 IDA-43100 Int Charges 212,019.12
Oct 15, 2015 IDA-43100 Int Charges 212,019.12
Oct 15, 2015 IDA-43100 Loan Repay 104,316.97
Jul 2, 2014 IDA-43100 Loan Cancel -12,858,934.00
Apr 15, 2015 IDA-43100 Loan Repay 110,392.28
Apr 15, 2015 IDA-43100 Loan Repay 1,298,708.60
Apr 15, 2016 IDA-43100 Loan Repay 23,848.29
Apr 15, 2016 IDA-43100 Int Charges 246,608.36
Apr 15, 2016 IDA-43100 Int Charges 246,608.36
Apr 15, 2016 IDA-43100 Int Charges 1,315,244.90

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Overall Safeguards Rating Satisfactory 2013-06-12
Progress towards achievement of PDO Moderately Satisfactory 2013-06-12
Procurement Satisfactory 2013-06-12
Financial Management Satisfactory 2013-06-12
Counterpart Funding Satisfactory 2013-06-12
Project Management Moderately Satisfactory 2013-06-12
Overall Safeguards Rating Satisfactory 2013-06-12
Monitoring and Evaluation Moderately Unsatisfactory 2013-06-12
Overall Implementation Progress (IP) Moderately Unsatisfactory 2013-06-12

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 05-29-2014
OutcomesModerately Satisfactory
Risk to Development OutcomeModest
Bank PerformanceModerately Unsatisfactory
Borrower PerformanceModerately Satisfactory
Government PerformanceModerately Satisfactory
Implementing AgencyModerately Satisfactory

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 10-27-2015PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeSignificantN/a
Bank PerformanceModerately UnsatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceModerately SatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualitySatisfactoryN/a
M&e QualityNegligibleN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Kilometers in good condition for targeted roads in selected provincesValueAll selected roads are in poor condition (0km)44 kmAll selected roads are in good condition (600km)
    DateJuly 23, 2007May 20, 2013May 31, 2013
    CommentCivil works for the rehabilitation of 200 km in Bie province started on September 1, 2012. There are delays on the execution oftheworks due to the heavy rains. Only 35% (70 km) of the works will be completed by the closing date.
  • Medium and low-voltage distribution systems in N'Dalantando, Uige, Malanje, Luena, Kuito, and Luanda rehabilitated and operatingValueOnly about half of installed capacity is operationCivil works are underway but will not be completedRehabilitation complete and services operating con
    DateJuly 23, 2007May 20, 2013May 31, 2013
    CommentThe works will not be completed by the closing date. 90% of the contract will be executed.
  • Number of people in Malange with access to improved water services through house connections and rehabilitated standpipes risesValue0816 house connection by end of January 2013.40,000 (2,500 house connections and 40 standpipes)
    DateJuly 23, 2007May 20, 2013May 31, 2013
    CommentCivil works are under way and will be completed by the closing date
  • Number of people in N'Dalantando with access to improved water services through house connections and rehabilitated standpipes risesValue059,000 (1,600 house connections and 93 standpipes)
    DateJuly 23, 2007December 29, 2011May 31, 2013
    CommentAll house connections were completed as of March 2011. To be updated on next sequence.
  • Systems of procurement and financial management in the ministries and agencies involved in the project, according to the World BankassessmentValueProcurement risk assessment shows risk to be highProcurement risk assessment shows risk to have dec
    DateJuly 23, 2007May 30, 2012May 31, 2013
    Comment
  • Number of people in urban areas provided with access to Improved Water Sources under the projectValue0.0093.0059000.00
    DateJuly 23, 2007December 29, 2011May 31, 2013
    CommentThe value refers only to N'DalatandoEstimated from house connections and standpipes constructed

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • 600 kilometers of feeder roads rehabilitatedValue0 km rehabilitated44 km rehabilitaed300 km rehabilitated
    DateJuly 23, 2007May 20, 2013May 31, 2013
    CommentActual target are well below of the final goal. At the closing date, 70 km will be rehabilitated.
  • 150 kilometers of trunk roads rehabilitatedValue0 km rehabilitated0 km75 km rehabilitated
    DateJuly 23, 2007May 20, 2013May 31, 2013
    CommentThe road was rehabilitated by the GoA using his own funds
  • Kilometers of water network in Malanje and N'Dalantando rehabilitatedValue0 km rehabilitated35.6 km of main pipe installed50 km rehabilitated in Malanje and 35 rehabilitate
    DateJuly 23, 2007May 20, 2013May 31, 2013
    CommentCurrent value to be reassessed during site visits as the indicated includes main pipeline only.
  • Ministries involved produce sector strategies acceptable to IDAValueNo strategies yetStrategies completed
    DateJuly 23, 2007May 20, 2013May 31, 2013
    CommentThis activity was dropped because there is no time to implementWater and power sector strategies have been completed. Transport strategy has been dropped.
  • Capacity of Ministry of Energy and Water to carry out public expenditure tracking studies improvedValueCapacity weakStrengthened capacity
    DateJuly 23, 2007May 30, 2012May 31, 2013
    CommentWill be included in next sequence.
  • Roads rehabilitated, RuralValue0.000.00600.00
    DateJuly 23, 2007May 30, 2012May 31, 2013
    CommentFeeder roads- Contracts were signed in July 2012 and implementation started in September 1, 2012. Target will be reassessed aspart of restructuring.
  • Roads rehabilitated, Non-ruralValue0.00150.00150.00
    DateJuly 23, 2007May 30, 2012May 31, 2013
    CommentThe rehabilitations is completed (as of 3/2011). The Borrower did with its own resources.
  • New piped household water connections that are resulting from the project interventionValue0.003572.004100.00
    DateJuly 23, 2007May 20, 2013May 31, 2013
    CommentAdditional 1840 of Malange as of Feb 2013. Will be updated next sequence.
  • Improved community water points constructed or rehabilitated under the projectValue0.0093.00133.00
    DateJuly 23, 2007June 21, 2012May 31, 2013
    CommentContract awardedActual target was surpassed