Abstract*

The overall Health Services and Social Assistance Project of Moldova objective is to promote the Government's program to increase access to quality and efficient health services with the aim of decreasing premature mortality and disability for the local population and improve the targeting of social transfers and services to the poor in line with the Medium Term Expenditure Framework for 2007-09. There are 3 components to the Project. Component I...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The proposed Project will be an integral part of a larger and longer-term program of the Government to improve the effectiveness of health and social assistance systems in Moldova. In addition to the proposed IDA credit, several donors including IDA, EU, SIDA, DfID, CEB and relevant UN agencies, will through coordinated but parallel financed operations, support the Government initiatives in this area. The overall project objective is to promote the Government's program to increase access to quality and efficient health services with the aim of decreasing premature mortality and disability for the local population and improve the targeting of social transfers and services to the poor in line with the MTEF for 2007-2009.

Key Details

Project Details

  • P095250

  • Closed

  • Son Nguyen

  • N/A

  • Moldova

  • November 15, 2005

  • (as of board presentation)

    June 7, 2007

  • September 5, 2007

  • US$ 59.00 million

  • B

  • Not Applicable

  • August 31, 2014

  • BANK APPROVED

  • February 3, 2014

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Global Food Crisis Response Program 7.00
IDA Credit 27.20
Borrower/Recipient 2.56
Bilateral Agencies (unidentified) 24.80

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 27.20
IBRD + IDA Commitment 27.20
Lending Instrument
Grant Amount 31.80
Total Project Cost** 61.56

Summary Status of World Bank Financing (US$ Millions) as of July 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of July 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Aug 15, 2013 IDA-43200 Int Charges 147.73
Aug 15, 2013 IDA-43200 Int Charges 147.73
Aug 15, 2013 IDA-43200 Int Charges 63,937.83
Aug 15, 2013 IDA-43200 Int Charges 63,937.83
Jul 8, 2013 IDA-50230 Loan Disb 550,000.00
Dec 18, 2014 IDA-50230 Loan Disb -925.81
Jul 15, 2013 IDA-50230 Loan Disb 600,000.00
Aug 13, 2013 IDA-50230 Loan Disb 500,000.00
Nov 15, 2014 IDA-50230 Int Charges 471.21
Nov 15, 2014 IDA-50230 Int Charges 471.21
Nov 15, 2014 IDA-50230 Int Charges 58,201.94
Nov 15, 2014 IDA-50230 Int Charges 34,449.95
Nov 15, 2014 IDA-50230 Int Charges 34,449.95
Nov 14, 2013 IDA-50230 Loan Disb 1,000,000.00
Dec 20, 2013 IDA-43200 Loan Disb -26,921.62
Oct 24, 2013 IDA-50230 Loan Disb 200,000.02
Sep 6, 2013 IDA-50230 Loan Disb 1,000,000.00
Feb 15, 2014 IDA-43200 Int Charges 264.68
Feb 15, 2014 IDA-43200 Int Charges 264.68
Feb 15, 2014 IDA-43200 Int Charges 64,902.57
Feb 15, 2014 IDA-43200 Int Charges 64,902.57
Jan 3, 2014 IDA-43200 Loan Cancel 26,937.23
Nov 15, 2013 IDA-50230 Int Charges 35,708.50
Nov 15, 2013 IDA-50230 Int Charges 342.00
Nov 15, 2013 IDA-50230 Int Charges 342.00
Nov 15, 2013 IDA-50230 Int Charges 21,456.35
Nov 15, 2013 IDA-50230 Int Charges 21,456.35
Feb 28, 2014 IDA-50230 Loan Disb 87,000.00
Feb 13, 2014 IDA-50230 Loan Disb 150,000.00
Aug 15, 2014 IDA-43200 Int Charges 231.12
Feb 15, 2015 IDA-43200 Int Charges 59,444.16
Feb 15, 2015 IDA-43200 Int Charges 59,444.16
Feb 15, 2015 IDA-43200 Int Charges 444.57
Feb 15, 2015 IDA-43200 Int Charges 444.57
Aug 15, 2014 IDA-43200 Int Charges 15.64
Aug 15, 2014 IDA-43200 Int Charges -15.64
May 28, 2014 IDA-50230 Loan Disb 800,000.00
May 15, 2014 IDA-50230 Int Charges 628.00
May 15, 2014 IDA-50230 Int Charges 31,827.19
May 15, 2014 IDA-50230 Int Charges 31,827.19
May 15, 2014 IDA-50230 Int Charges 53,045.27
May 15, 2015 IDA-50230 Int Charges 2,266.86
May 15, 2015 IDA-50230 Int Charges 2,266.86
May 15, 2015 IDA-50230 Int Charges 32,679.53
May 15, 2015 IDA-50230 Int Charges 32,679.53
Aug 15, 2015 IDA-43200 Int Charges 57,445.36
Aug 15, 2015 IDA-43200 Int Charges 57,445.36
Aug 15, 2015 IDA-43200 Int Charges 1,941.59
Aug 15, 2015 IDA-43200 Int Charges 1,941.59
May 15, 2015 IDA-50230 Int Charges 55,277.81
Jul 28, 2014 IDA-50230 Loan Disb 765,231.40
Dec 30, 2014 IDA-50230 Loan Disb -35,038.56
Jan 13, 2015 IDA-50230 Loan Cancel 35,475.95
Aug 15, 2014 IDA-43200 Int Charges 64,692.94
Aug 15, 2014 IDA-43200 Int Charges 64,692.94
Aug 15, 2014 IDA-43200 Int Charges 231.12
Nov 17, 2015 IDA-50230 Int Charges 2,886.51
Nov 17, 2015 IDA-50230 Int Charges 33,975.70
Nov 17, 2015 IDA-50230 Int Charges 33,975.70
Nov 17, 2015 IDA-50230 Int Charges 56,626.20
Feb 15, 2016 IDA-43200 Int Charges 58,939.75
Feb 15, 2016 IDA-43200 Int Charges 58,939.75
Feb 15, 2016 IDA-43200 Int Charges 32.14
Feb 15, 2016 IDA-43200 Int Charges 32.14
Nov 15, 2016 IDA-50230 Int Charges 56,034.84
May 15, 2016 IDA-50230 Int Charges 2,209.09
May 15, 2016 IDA-50230 Int Charges 2,209.09
May 15, 2016 IDA-50230 Int Charges 32,581.03
May 15, 2016 IDA-50230 Int Charges 32,581.03
May 15, 2016 IDA-50230 Int Charges 56,850.68
May 15, 2017 IDA-50230 Loan Repay 146,224.30
Feb 15, 2017 IDA-43200 Int Charges 56,231.05
Feb 15, 2017 IDA-43200 Int Charges 56,231.05
Feb 15, 2017 IDA-43200 Int Charges 454.02
Feb 15, 2017 IDA-43200 Int Charges 454.02
Aug 15, 2016 IDA-43200 Int Charges 503.59
Aug 15, 2016 IDA-43200 Int Charges 503.59
Aug 15, 2016 IDA-43200 Int Charges 59,045.51
Aug 15, 2016 IDA-43200 Int Charges 59,045.51
Nov 15, 2016 IDA-50230 Int Charges 1,094.81
Nov 15, 2016 IDA-50230 Int Charges 33,620.89
Nov 15, 2016 IDA-50230 Int Charges 33,620.89
Aug 15, 2017 IDA-43200 Loan Repay 155,499.30
Aug 15, 2017 IDA-43200 Loan Repay 3,285.51
Aug 15, 2017 IDA-43200 Int Charges 55,633.17
Aug 15, 2017 IDA-43200 Int Charges 55,633.17
May 15, 2017 IDA-50230 Int Charges 33,594.53
May 15, 2017 IDA-50230 Int Charges 33,594.53
May 15, 2017 IDA-50230 Int Charges 52,697.43
May 15, 2017 IDA-50230 Int Charges 194.28
May 15, 2017 IDA-50230 Int Charges 194.28
May 15, 2017 IDA-50230 Loan Repay 2,446.54
Nov 15, 2017 IDA-50230 Int Charges 34,263.91
Nov 15, 2017 IDA-50230 Int Charges 34,263.91
Nov 15, 2017 IDA-50230 Int Charges 57,106.49
Nov 15, 2017 IDA-50230 Int Charges 3,729.67
Nov 15, 2017 IDA-50230 Loan Repay 92,102.01
Nov 15, 2017 IDA-50230 Loan Repay 61,188.34
Aug 15, 2017 IDA-43200 Int Charges 446.84
Aug 15, 2017 IDA-43200 Int Charges 446.84
May 15, 2018 IDA-50230 Int Charges 56,755.63
May 15, 2018 IDA-50230 Loan Repay 1,910.90
May 15, 2018 IDA-50230 Loan Repay 90,492.09
Feb 15, 2018 IDA-43200 Loan Repay 9,077.61
Feb 15, 2018 IDA-43200 Int Charges 54,081.66
Feb 15, 2018 IDA-43200 Int Charges 54,081.66
Feb 15, 2018 IDA-43200 Int Charges 4,053.54
Feb 15, 2018 IDA-43200 Int Charges 4,053.54
Feb 15, 2018 IDA-43200 Loan Repay 155,487.20
Feb 15, 2019 IDA-43200 Loan Repay 4,402.18
Feb 15, 2019 IDA-43200 Loan Repay 52,191.49
Feb 15, 2019 IDA-43200 Loan Repay 99,845.51
Feb 15, 2019 IDA-43200 Int Charges 55,738.46
Feb 15, 2019 IDA-43200 Int Charges 55,738.46
Aug 15, 2018 IDA-43200 Loan Repay 58,639.46
Aug 15, 2018 IDA-43200 Int Charges 57,359.14
Nov 15, 2018 IDA-50230 Int Charges 25,785.90
Nov 15, 2018 IDA-50230 Int Charges 25,785.90
Nov 15, 2018 IDA-50230 Int Charges 53,968.94
Nov 15, 2018 IDA-50230 Loan Repay 4,313.86
Nov 15, 2018 IDA-50230 Loan Repay 145,584.00
Nov 15, 2018 IDA-50230 Int Charges 6,595.42
Nov 15, 2018 IDA-50230 Int Charges 6,595.42
May 15, 2018 IDA-50230 Loan Repay 62,545.10
May 15, 2018 IDA-50230 Int Charges 34,053.36
May 15, 2018 IDA-50230 Int Charges 34,053.36
Aug 15, 2018 IDA-43200 Int Charges 6,651.40
Aug 15, 2018 IDA-43200 Int Charges 6,651.40
Aug 15, 2018 IDA-43200 Loan Repay 97,439.81
Aug 15, 2018 IDA-43200 Int Charges 57,359.14
May 15, 2019 IDA-50230 Loan Repay 3,595.87
May 15, 2019 IDA-50230 Loan Repay 81,911.94
May 15, 2019 IDA-50230 Loan Repay 64,461.66
May 15, 2019 IDA-50230 Int Charges 31,834.45
May 15, 2019 IDA-50230 Int Charges 31,834.45
May 15, 2019 IDA-50230 Int Charges 53,057.39
Aug 15, 2019 IDA-43200 Int Charges 55,823.38
Aug 15, 2019 IDA-43200 Int Charges 55,823.38
Aug 15, 2019 IDA-43200 Loan Repay 147.39
Nov 15, 2019 IDA-50230 Int Charges 0.01
Nov 15, 2019 IDA-50230 Int Charges 0.01
Nov 15, 2019 IDA-50230 Loan Repay 1,704.12
Nov 15, 2019 IDA-50230 Loan Repay 147,416.95
Nov 15, 2019 IDA-50230 Int Charges 1,558.74
Nov 15, 2019 IDA-50230 Int Charges 1,558.74
Nov 15, 2019 IDA-50230 Int Charges 29,536.39
Nov 15, 2019 IDA-50230 Int Charges 29,536.39
Nov 15, 2019 IDA-50230 Int Charges 51,599.00
Feb 15, 2020 IDA-43200 Int Charges 3,249.91
Feb 15, 2020 IDA-43200 Int Charges 3,249.91
Feb 15, 2020 IDA-43200 Loan Repay 1,379.28
Feb 15, 2020 IDA-43200 Loan Repay 152,909.45
Feb 15, 2020 IDA-43200 Int Charges 51,715.45
Feb 15, 2020 IDA-43200 Int Charges 51,715.45
Aug 15, 2019 IDA-43200 Int Charges 1,156.04
Aug 15, 2019 IDA-43200 Int Charges 1,156.04
Aug 15, 2019 IDA-43200 Loan Repay 154,917.58
Aug 15, 2020 IDA-43200 Loan Repay 2,537.06
Aug 15, 2020 IDA-43200 Loan Repay 155,624.58
Aug 15, 2020 IDA-43200 Loan Repay 884.90
Aug 15, 2020 IDA-43200 Int Charges 51,435.66
Aug 15, 2020 IDA-43200 Int Charges 51,435.66
Aug 15, 2020 IDA-43200 Loan Repay 0.01
Aug 15, 2020 IDA-43200 Int Charges -0.01
Aug 15, 2020 IDA-43200 Int Charges -0.01
May 15, 2020 IDA-50230 Int Charges 223.71
May 15, 2020 IDA-50230 Loan Repay 81,648.40
May 15, 2020 IDA-50230 Loan Repay 65,832.29
May 15, 2020 IDA-50230 Int Charges 30,199.99
May 15, 2020 IDA-50230 Int Charges 30,199.99
May 15, 2020 IDA-50230 Int Charges 50,333.35
May 15, 2021 IDA-50230 Int Charges 30,791.32
May 15, 2021 IDA-50230 Int Charges 49,622.99
Nov 15, 2020 IDA-50230 Int Charges 51,078.22
Nov 15, 2020 IDA-50230 Loan Repay 3,151.45
Nov 15, 2020 IDA-50230 Loan Repay 150,885.31
Nov 15, 2020 IDA-50230 Int Charges 2,806.44
Nov 15, 2020 IDA-50230 Int Charges 2,806.44
Nov 15, 2020 IDA-50230 Int Charges 28,158.47
Nov 15, 2020 IDA-50230 Int Charges 28,158.47
May 15, 2021 IDA-50230 Loan Repay 74,561.98
May 15, 2021 IDA-50230 Int Charges 536.98
May 15, 2021 IDA-50230 Loan Repay 81,523.09
Feb 15, 2021 IDA-43200 Int Charges 4,730.23
Feb 15, 2021 IDA-43200 Int Charges 4,730.23
Feb 15, 2021 IDA-43200 Loan Repay 157,509.27
Feb 15, 2021 IDA-43200 Loan Repay 5,042.75
Feb 15, 2021 IDA-43200 Int Charges 56,259.41
Feb 15, 2021 IDA-43200 Int Charges 56,259.41
Nov 15, 2021 IDA-50230 Int Charges 28,867.12
Nov 15, 2021 IDA-50230 Int Charges 28,867.12
Aug 15, 2021 IDA-43200 Int Charges 424.51
Aug 15, 2021 IDA-43200 Int Charges 424.51
Aug 15, 2021 IDA-43200 Loan Repay 56,024.54
Aug 15, 2021 IDA-43200 Loan Repay 104,225.85
Aug 15, 2021 IDA-43200 Int Charges 55,286.36
Aug 15, 2021 IDA-43200 Int Charges 55,286.36
May 15, 2021 IDA-50230 Int Charges 30,791.32
Feb 15, 2022 IDA-43200 Int Charges 53,283.60
Feb 15, 2022 IDA-43200 Int Charges 53,283.60
Nov 15, 2021 IDA-50230 Int Charges 49,161.65
Nov 15, 2021 IDA-50230 Int Charges 1,656.06
Nov 15, 2021 IDA-50230 Loan Repay 152,421.34
Nov 15, 2021 IDA-50230 Int Charges 629.83
Nov 15, 2021 IDA-50230 Int Charges 629.83
May 15, 2022 IDA-50230 Loan Repay 72,238.55
May 15, 2022 IDA-50230 Loan Repay 3,490.38
May 15, 2022 IDA-50230 Loan Repay 68,646.77
May 15, 2022 IDA-50230 Int Charges 27,398.58
May 15, 2022 IDA-50230 Int Charges 27,398.58
Nov 15, 2022 IDA-50230 Int Charges 40,845.93
Aug 15, 2022 IDA-43200 Loan Repay 50,718.75
Aug 15, 2022 IDA-43200 Loan Repay 98,253.69
Aug 15, 2022 IDA-43200 Int Charges 50,278.21
Aug 15, 2022 IDA-43200 Int Charges 50,278.21
Aug 15, 2022 IDA-43200 Int Charges 613.33
Aug 15, 2022 IDA-43200 Int Charges 613.33
Feb 15, 2022 IDA-43200 Int Charges -0.01
Feb 15, 2022 IDA-43200 Int Charges -0.01
Feb 15, 2022 IDA-43200 Loan Repay 0.01
May 15, 2022 IDA-50230 Int Charges 45,664.28
Feb 15, 2022 IDA-43200 Loan Repay 2,861.55
Feb 15, 2022 IDA-43200 Loan Repay 50,907.20
Feb 15, 2022 IDA-43200 Loan Repay 104,280.42
Nov 15, 2022 IDA-50230 Loan Repay 7,934.36
Nov 15, 2022 IDA-50230 Loan Repay 61,754.87
Nov 15, 2022 IDA-50230 Loan Repay 73,080.81
Nov 15, 2022 IDA-50230 Int Charges 26,558.49
Nov 15, 2022 IDA-50230 Int Charges 26,558.49
Nov 15, 2023 IDA-50230 Loan Repay 75,797.56
Nov 15, 2023 IDA-50230 Int Charges 25,688.75
Nov 15, 2023 IDA-50230 Int Charges 25,688.75
Nov 15, 2023 IDA-50230 Int Charges 41,582.08
Aug 15, 2023 IDA-43200 Loan Repay 100,629.06
Aug 15, 2023 IDA-43200 Int Charges 49,606.19
Aug 15, 2023 IDA-43200 Int Charges 49,606.19
Aug 15, 2023 IDA-43200 Int Charges 984.94
Aug 15, 2023 IDA-43200 Int Charges 984.94
Aug 15, 2023 IDA-43200 Loan Repay 49,692.76
Feb 15, 2023 IDA-43200 Int Charges 48,381.81
Feb 15, 2023 IDA-43200 Int Charges 48,381.81
Feb 15, 2023 IDA-43200 Loan Repay 149,159.20
Feb 15, 2023 IDA-43200 Int Charges 988.87
Feb 15, 2023 IDA-43200 Int Charges 988.87
Feb 15, 2023 IDA-43200 Loan Repay 1,730.13
May 15, 2023 IDA-50230 Loan Repay 140,939.17
May 15, 2023 IDA-50230 Loan Repay 4,726.49
May 15, 2023 IDA-50230 Int Charges 26,550.89
May 15, 2023 IDA-50230 Int Charges 26,550.89
May 15, 2023 IDA-50230 Int Charges 42,380.61
Aug 15, 2024 IDA-43200 Int Charges 45,579.15
Aug 15, 2024 IDA-43200 Int Charges 45,579.15
Aug 15, 2024 IDA-43200 Loan Repay 45,253.91
Aug 15, 2024 IDA-43200 Loan Repay 2,688.92
Aug 15, 2024 IDA-43200 Loan Repay 103,080.77
Nov 15, 2023 IDA-50230 Loan Repay 68,098.62
Nov 15, 2023 IDA-50230 Int Charges 1,848.11
May 15, 2023 IDA-50230 Int Charges 3,487.52
Jun 7, 2007 IDA-43200 Loan Commitment 17,000,000.00
Dec 8, 2011 IDA-50230 Loan Commitment 10,200,000.00
Feb 15, 2024 IDA-43200 Loan Repay 343.81
May 15, 2024 IDA-50230 Int Charges 1,229.68
May 15, 2024 IDA-50230 Loan Repay 67,337.52
May 15, 2024 IDA-50230 Loan Repay 76,229.93
May 15, 2024 IDA-50230 Int Charges 25,091.68
May 15, 2024 IDA-50230 Int Charges 25,091.68
May 15, 2024 IDA-50230 Int Charges 41,819.48
Feb 15, 2024 IDA-43200 Loan Repay 148,902.80
Feb 15, 2024 IDA-43200 Int Charges 2,371.27
Feb 15, 2024 IDA-43200 Int Charges 2,371.27
Feb 15, 2024 IDA-43200 Int Charges 46,320.43
Feb 15, 2024 IDA-43200 Int Charges 46,320.43

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Overall Safeguards Rating Satisfactory 2014-08-27
Progress towards achievement of PDO Moderately Satisfactory 2014-08-27
Financial Management Moderately Satisfactory 2014-08-27
Procurement Satisfactory 2014-08-27
Monitoring and Evaluation Moderately Satisfactory 2014-08-27
Overall Moderately Ineffective 2014-08-27
Counterpart Funding Satisfactory 2014-08-27
Project Management Satisfactory 2014-08-27
Overall Implementation Progress (IP) Satisfactory 2014-08-27
Overall Safeguards Rating Satisfactory 2014-08-27

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 02-26-2015
OutcomesModerately Satisfactory
Risk to Development OutcomeModest
Bank PerformanceModerately Satisfactory
Borrower PerformanceModerately Satisfactory
Government PerformanceSubstantial
Implementing AgencyModerately Satisfactory

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 05-11-2015PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeModerateN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceModerately SatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualitySatisfactoryN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Share of eligible patients tested for arterial blood pressureValue81.3084.5095.00
    DateDecember 31, 2009July 2, 2014August 31, 2014
    CommentOff trackThere can be various potential reasons for not meeting the target: realism of target setting, inadequate motivation mechanism forservice providers, low level of awareness among population, etc. The exact cause will be investigated by the ICR.
  • Share of eligible patients tested for cervical cancerValue59.0059.9075.00
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentOff trackThere can be various potential reasons for not meeting the target: realism of target setting, in adequate number of providers whocan do cervical cancer screening, inadequate motivation mechanism for service providers, low level of awareness among population,etc. The exact cause will be investigated by the ICR.
  • Share of population covered with mandatory health insurance increasedValue76.7083.2080.00
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget exceededAt least 80%
  • Share of new cases of grade IV malignant tumors identifiedValue30.0027.6025.00
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentOff trackThere can be various potential reasons for not meeting the target: realism of target setting, in adequate number of providers whocan do cancer screening, lack of protocols for cancer screening, inadequate motivation mechanism for service providers, low levelof awareness among population, etc. The exact cause will be investigated by the ICR.
  • Share of early pregnancies (within the first 12 weeks) registered at a family doctors' centerValue77.6079.9080.00
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentOn trackAt least 80%
  • Average number of bed-days used during the yearValue277.00302.00310.00
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentOff track, but almost achieved, (representing 83% of total number of days per year)represents 85% of total number of days per year (365)
  • Number of RHCs (health centers, family doctors centers) directly contracted out by the National Health Insurance CompanyValue17.0084.00100.00
    DateAugust 31, 2007December 19, 2013August 31, 2014
    CommentOn trackEnd target of 100 RHCs with direct contracts represents 40% of total number of RHCs (250)
  • Social Assistance Automated Information System (SAAIS) developedValueAll information on cash benefits is manually recor100% of Social Assist. Dept. process Ajutor Social100% of Social Assist. Dept. process Ajutor Social
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentAchieved
  • Number of households benefiting from Ajutor SocialValue151.0057000.0050000.00
    DateAugust 31, 2008July 2, 2014August 31, 2014
    CommentTarget exceeded

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • National Health Account reports produced for three yearsValue05At least 3 NHA reports produced
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget exceeded
  • Human Resource Strategy (including Action Plan) for health sector completedValue0HR strategy (including Action Plan) approved and uHR strategy developed
    DateAugust 31, 2007December 19, 2013August 31, 2014
    CommentTarget met
  • Number of training events sponsored by HSSAP to which MoH officers participateValue0All planned training events have been completedAll planned training each year completed
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget met
  • Allocations for primary care maintained (as share of National health insurance budget)Value30.0030.0030.00
    DateAugust 31, 2007June 12, 2013August 31, 2014
    CommentAt least 30%
  • New DRG-based payment system for hospitals pilotedValue0DRG-based payment system implemented nationwideDRG-based payment system piloted
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget met
  • Study to increase health insurance coverage completedValueAssignment in process: selection of TACompletedCompleted
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget met
  • Three rounds of health budget survey with health module conducted and analyzedValue0.003.003.00
    DateAugust 31, 2007June 12, 2013August 31, 2014
    CommentCompleted
  • Enhanced curricula/education program for family doctors finalizedValueSelection of international TA processedCompletedCompleted
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget met
  • Health facilities constructed, renovated, and/or equipped (number)Value0.0071.0074.00
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentAll rural health centers (RHCs, including health centers, family doctors centers) will be built/rehabilitated in line with renewednational norms and standards.On track
  • Percent of vacant family doctors# positions at Rural Healh Care FacilitiesValue20.0013.2010.00
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentOff track
  • Number of standardized protocols of family doctors in place and operational (cumulative)Value0.0070.00107.00
    DateAugust 31, 2007December 19, 2013August 31, 2014
    CommentAt least 107 FD protocols (cumulative), including 60 new protocols.
  • National Hospital Master Plan completed and approved by GovernmentValueSelection of international consultantCompletedCompleted
    DateAugust 31, 2007June 12, 2013August 31, 2014
    Comment
  • Oncology Institute feasibility study and rehabilitation plan completedValue0CompletedCompleted
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget met
  • Program on decentralization of oncology (chemo, and radiotherapy) services developed and adopted by MoHValue0CompletedDecentralization plan completed and adopted by MoH
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget met
  • Number of PPP pilots establishedValue022
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget metat least 2
  • Regional Hospital Action Plan for a pilot region (Hincesti, Cimislia, Leova, Basarabeasca) completedValue0CompletedStudy completed
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget met
  • Construction of Republican Clinical Hospital new surgical block initiatedValue0Construction completed, RCH's new surgical block oRCH new surgical block under construction
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget exceeded
  • Number of social workers provided with new IT equipmentValue01375All social workers in Moldova are equipped with ne
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget met. 100% of social workers are equipped with new IT equipment
  • Functional review of the MoLSPF conductedValue0FR completedFR completed
    DateAugust 31, 2007July 2, 2014August 31, 2014
    CommentTarget met