Bahia Integrated State Highway Management Project

Abstract*

The project of Bahia Integrated State Highway Management for Brazil will increase effective use of the state road infrastructure, with an aim at stimulating higher economic growth. The project consists of the following components: Component 1: The state's road network management strategy focuses on improving transport conditions on the state's main transport corridors and on their feeders. Component 2: Will support: (a) government efforts in optimizing...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The Project's ultimate development objective is to increase effective use of the state road infrastructure, with an aim at stimulating higher economic growth.

Key Details

Project Details

  • P095460

  • Closed

  • Gregoire Gauthier

  • N/A

  • Brazil

  • September 12, 2005

  • (as of board presentation)

    November 14, 2006

  • December 6, 2007

  • US$ 100.00 million

  • B

  • Not Applicable

  • September 30, 2013

  • BANK APPROVED

  • March 11, 2021

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Borrower/Recipient 100.00
International Bank for Reconstruction and Development 100.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 100.00
IDA Commitment N/A
IBRD + IDA Commitment 100.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 200.00

Summary Status of World Bank Financing (US$ Millions) as of July 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of July 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Dec 15, 2015 IBRD-74110 Int Charges 235,959.27
Jun 21, 2022 IBRD-74110 Loan Repay 4,209,501.00
Jun 15, 2015 IBRD-74110 Int Charges 213,215.77
Jun 15, 2015 IBRD-74110 Loan Repay 4,209,501.00
Dec 15, 2014 IBRD-74110 Loan Repay 4,209,501.00
Dec 15, 2014 IBRD-74110 Int Charges 219,316.92
Jun 15, 2014 IBRD-74110 Int Charges 238,327.73
Jun 15, 2014 IBRD-74110 Loan Repay 4,209,501.00
Dec 15, 2013 IBRD-74110 Int Charges 192.53
Dec 15, 2013 IBRD-74110 Int Charges 646.82
Dec 15, 2013 IBRD-74110 Int Charges 280,460.34
Dec 15, 2013 IBRD-74110 Loan Repay 4,209,501.00
Dec 15, 2013 IBRD-74110 Int Charges 92.47
Aug 29, 2013 IBRD-74110 Loan Disb 1,259,149.10
Jun 18, 2018 IBRD-74110 Loan Repay 104.00
Jun 18, 2018 IBRD-74110 Int Charges 469,725.78
Dec 15, 2017 IBRD-74110 Int Charges 428,149.16
Dec 15, 2017 IBRD-74110 Loan Repay 3,781,299.80
Dec 15, 2017 IBRD-74110 Loan Repay 428,097.16
Jun 15, 2017 IBRD-74110 Int Charges 428,198.56
Jun 15, 2017 IBRD-74110 Loan Repay 4,209,501.00
Dec 15, 2016 IBRD-74110 Int Charges 356,016.28
Dec 15, 2016 IBRD-74110 Loan Repay 4,209,501.00
Jun 15, 2016 IBRD-74110 Int Charges 320,571.62
Jun 15, 2016 IBRD-74110 Loan Repay 4,209,501.00
Jun 15, 2021 IBRD-74110 Int Charges 53,003.10
Jun 15, 2021 IBRD-74110 Loan Repay 4,209,501.00
Dec 15, 2020 IBRD-74110 Int Charges 85,751.25
Dec 15, 2020 IBRD-74110 Loan Repay 4,209,501.00
Jun 15, 2020 IBRD-74110 Int Charges 319,684.44
Jun 15, 2020 IBRD-74110 Loan Repay 4,209,501.00
Dec 15, 2019 IBRD-74110 Loan Repay 4,209,501.00
Dec 15, 2019 IBRD-74110 Int Charges 438,913.72
Jun 15, 2019 IBRD-74110 Loan Repay 4,209,501.00
Jun 15, 2019 IBRD-74110 Int Charges 602,064.75
Dec 15, 2018 IBRD-74110 Int Charges 0.02
Dec 15, 2018 IBRD-74110 Int Charges 587,345.44
Dec 15, 2018 IBRD-74110 Loan Repay 4,209,501.00
Jun 15, 2018 IBRD-74110 Loan Repay 4,209,501.00
Nov 14, 2006 IBRD-74110 Loan Commitment 100,000,000.00
Jun 15, 2023 IBRD-74110 Loan Repay 4,130,258.20
Jun 15, 2023 IBRD-74110 Int Charges 114,008.91
Dec 15, 2022 IBRD-74110 Loan Repay 4,209,501.00
Dec 15, 2022 IBRD-74110 Int Charges 1,936.37
Dec 15, 2022 IBRD-74110 Int Charges 117,006.83
Dec 15, 2021 IBRD-74110 Int Charges 34,076.15
Dec 15, 2021 IBRD-74110 Loan Repay 4,209,501.00
Jun 15, 2022 IBRD-74110 Int Charges 34,893.91
Dec 15, 2015 IBRD-74110 Loan Repay 4,209,501.00

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Procurement Moderately Satisfactory 2013-04-24
Financial Management Satisfactory 2013-04-24
Monitoring and Evaluation Satisfactory 2013-04-24
Overall Low 2013-04-24
Overall Implementation Progress (IP) Satisfactory 2013-04-24
Counterpart Funding Satisfactory 2013-04-24
Project Management Satisfactory 2013-04-24
Overall Safeguards Rating Satisfactory 2013-04-24
Progress towards achievement of PDO Moderately Satisfactory 2013-04-24
Overall Safeguards Rating Satisfactory 2013-04-24

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 03-27-2014
OutcomesModerately Satisfactory
Risk to Development OutcomeModest
Bank PerformanceSubstantial
Borrower PerformanceSubstantial
Government PerformanceModerately Satisfactory
Implementing AgencySubstantial

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 09-29-2014PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeModerateN/a
Bank PerformanceModerately UnsatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceModerately UnsatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualityUnsatisfactoryN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • % reduction in average land transport freight rates on selected itineraries (cum.)Value0% reductionn.a.6% reduction
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    CommentThe study that will monitor this indicator is on-going.
  • % increase in use of road transport infrastructure on selected itineraries (as measured in veh.-km. increase relatively to 2005 levels ) (cum.)Value0% increasen.a.12% increase
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    CommentThe traffic surveys are on-going.
  • % decrease of average unit vehicle costs on selected itineraries (cum.)Value0.0012.508.00
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    CommentTarget met.

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Cumulative number of km of roads rehabilitated under result-based contractsValue011362000
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    CommentCorresponds to the km of the BA state highway network under CREMA.
  • % of network traffic traveling on paved roads in good conditions (cum.)Value50%83%80%
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    Comment
  • Integrated road planning and management system operationalValueSystem not operationalSystem not operationalSystem operational
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    CommentPavement Management System still under design. (surveys being finalized)
  • # of regional offices (residencias) operating DERBA's information systems on-line (cum.)Value01010
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    Comment8 central information systems are accessible from DEBA regional offices
  • # of staff weeks of training for DERBA staff (cum.)Value00200
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    CommentNo progress, as other institutional strengthening activities were prioritized. Training on the DERBA reform may come afterwards.
  • # of technical audits realized annually by the Quality GroupValue065 each year starting in year 2
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    Comment6 audits carried out during the last two quarters of 2012
  • State multimodal strategy definedValueNo strategyStartegy partially definedStrategy defined
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    Comment(i) Bahia State airport plan, (ii) intermunicipal passenger transport, (iii) transport survey Salvador metropolitan area, (iv)waterborne transport regulation
  • Data warehouse system for PELTBAHIA operationalValueNo data warehouseDatawarehouse not operationalData warehouse operational
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    CommentPELTBahia contract signed in January 2013.
  • Plan under implementation to optimize logistics impacts on the development of Salvador Metropolitan RegionValueNo planNo planPlan developed
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    CommentStudy that has been contracted out to elaborate this plan has failed and the proposed plan is not considered satisfactory.
  • Geo-referenced social and economic database in operationValueNo databaseDatabase in operationDatabase in operation
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    CommentEducation and health georeferenced database in operation. Banco de dados and IDE-Bahia starting implementation.
  • AGERBA's normative body, and analysis/supervision capacity consolidatedValueNo capacity consolidationCapacityconsolidatedCapacity consolidated
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    CommentStudy to consolidate the waterways transport regulation framework completed.
  • # of feasibility studies for PPP (cum.)ValueNo feasibility study44
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    CommentTarget met. Concession BA93, PPP road terminal Feira de Santana, PPP Ferry-boat
  • # of staff weeks of training for AGERBA staff (cum.)Value00100
    DateJanuary 2, 2006March 13, 2013September 30, 2013
    CommentThe MBA course for AGERBA staff will not be organized.