Vishnugad Pipalkoti Hydro Electric Project

Abstract*

The objectives of the Vishnugad Pipalkoti Hydro Electric Project are: a) to increase the supply of electricity to India's national grid through the addition of renewable, low-carbon energy; and b) strengthen the institutional capacity of the borrower with respect to the preparation and implementation of economically, environmentally and socially sustainable hydropower projects. There are two components to the project. The first component is construction...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The Project Development Objectives are: (a) to increase the supply of electricity to India's national grid through the addition of renewable, low-carbon energy; and (b) strengthen the institutional capacity of THDC with respect to the preparation and implementation of economically, environmentally and socially sustainable hydropower projects.

Key Details

Project Details

  • P096124

  • Active

  • Dzenan Malovic

  • India

  • India

  • (as of board presentation)

    June 30, 2011

  • US$ 922.00 million

  • THDC (Tehri Hydro Development Corporation)

  • South Asia

  • 2011

  • US$ 648.00 million

  • A

  • December 8, 2023

  • December 31, 2026

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 648.00
Borrower/Recipient 274.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 648.00
IDA Commitment N/A
IBRD + IDA Commitment 648.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 922.00

Summary Status of World Bank Financing (US$ Millions) as of December 31, 2024

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of December 31, 2024

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Aug 24, 2023 IBRD-80780 Loan Disb 3,612,847.20
Dec 6, 2023 IBRD-80780 Loan Disb 7,491,327.50
Jun 23, 2023 IBRD-80780 Loan Disb 1,473,763.50
Jun 23, 2023 IBRD-80780 Loan Disb 8,529,814.00
Jun 30, 2023 IBRD-80780 Loan Disb 4,710,619.00
Jan 19, 2022 IBRD-80780 Loan Disb 2,569,852.20
Aug 17, 2022 IBRD-80780 Loan Disb 12,585,249.00
Nov 15, 2022 IBRD-80780 Loan Disb 2,613,000.80
Nov 15, 2022 IBRD-80780 Int Charges 2,613,000.80
Nov 15, 2022 IBRD-80780 Loan Repay 4,355,245.50
Jan 24, 2023 IBRD-80780 Loan Disb 7,635,370.00
Apr 3, 2023 IBRD-80780 Loan Disb 9,038,342.00
Nov 15, 2021 IBRD-80780 Loan Repay 3,433,687.20
May 31, 2022 IBRD-80780 Loan Disb 7,522,276.50
Nov 15, 2021 IBRD-80780 Loan Disb 614,866.70
Nov 15, 2021 IBRD-80780 Int Charges 614,866.70
Jun 21, 2022 IBRD-80780 Loan Disb 6,768,684.00
Aug 3, 2015 IBRD-80780 Loan Disb 2,157,055.50
May 15, 2015 IBRD-80780 Loan Disb 100,782.70
May 15, 2015 IBRD-80780 Int Charges 100,782.70
Jul 14, 2015 IBRD-80780 Loan Disb 4,419,938.50
Aug 3, 2015 IBRD-80780 Loan Disb 278,193.03
Dec 12, 2014 IBRD-80780 Loan Disb 277,209.50
Mar 27, 2015 IBRD-80780 Loan Disb 6,740,285.50
Mar 11, 2015 IBRD-80780 Loan Disb 286,813.47
Mar 11, 2015 IBRD-80780 Loan Disb 406,408.50
Nov 15, 2013 IBRD-80780 Loan Disb 7,496.52
Nov 15, 2013 IBRD-80780 Int Charges 7,496.52
Mar 20, 2014 IBRD-80780 Loan Disb 9,181,262.00
Mar 28, 2014 IBRD-80780 Loan Disb 4,688,808.00
May 15, 2014 IBRD-80780 Loan Disb 23,951.40
May 15, 2014 IBRD-80780 Int Charges 23,951.40
Nov 15, 2014 IBRD-80780 Loan Disb 62,785.47
Nov 15, 2014 IBRD-80780 Int Charges 62,785.47
Jan 22, 2015 IBRD-80780 Loan Disb 8,088,324.50
Dec 1, 2014 IBRD-80780 Loan Disb 1,293,748.90
Jun 30, 2011 IBRD-80780 Loan Commitment 648,000,000.00
Jun 24, 2024 IBRD-80780 Loan Disb 6,554,070.50
May 9, 2024 IBRD-80780 Loan Disb 41,525,820.00
May 15, 2024 IBRD-80780 Loan Disb 7,022,272.00
May 15, 2024 IBRD-80780 Int Charges 7,022,272.00
May 15, 2024 IBRD-80780 Loan Repay 6,390,605.50
Aug 19, 2024 IBRD-80780 Loan Disb 15,994,335.00
Nov 15, 2023 IBRD-80780 Loan Disb 5,853,334.50
Nov 15, 2023 IBRD-80780 Int Charges 5,853,334.50
Nov 15, 2023 IBRD-80780 Loan Repay 5,724,904.50
Jan 8, 2024 IBRD-80780 Loan Disb 8,698,403.00
Apr 18, 2024 IBRD-80780 Loan Disb 15,504,666.00
Mar 22, 2024 IBRD-80780 Loan Disb 3,604,910.00
May 15, 2023 IBRD-80780 Loan Disb 4,299,236.50
May 15, 2023 IBRD-80780 Int Charges 4,299,236.50
May 15, 2023 IBRD-80780 Loan Repay 4,647,324.00
Aug 23, 2023 IBRD-80780 Loan Disb 5,112,870.00
Mar 7, 2022 IBRD-80780 Loan Disb 2,727,228.50
May 15, 2022 IBRD-80780 Loan Repay 3,593,309.80
May 15, 2022 IBRD-80780 Loan Disb 630,501.10
May 15, 2022 IBRD-80780 Int Charges 630,501.10
Nov 15, 2020 IBRD-80780 Loan Repay 3,299,348.80
Nov 15, 2020 IBRD-80780 Loan Disb 920,773.80
Nov 15, 2020 IBRD-80780 Int Charges 920,773.80
Nov 19, 2020 IBRD-80780 Loan Disb 3,671,941.20
Apr 7, 2021 IBRD-80780 Loan Cancel 100,000,000.00
May 15, 2021 IBRD-80780 Loan Disb 637,453.00
May 15, 2021 IBRD-80780 Int Charges 637,453.00
May 15, 2021 IBRD-80780 Loan Repay 3,416,922.20
Jun 18, 2020 IBRD-80780 Loan Disb 4,056,637.80
May 15, 2020 IBRD-80780 Loan Repay 3,158,445.20
May 15, 2020 IBRD-80780 Loan Disb 1,592,253.60
May 15, 2020 IBRD-80780 Int Charges 1,592,253.60
Nov 15, 2019 IBRD-80780 Loan Disb 1,794,325.20
Nov 15, 2019 IBRD-80780 Int Charges 1,794,325.20
Nov 15, 2019 IBRD-80780 Loan Repay 2,735,778.20
Jun 27, 2019 IBRD-80780 Loan Cancel 100,000,000.00
Sep 3, 2019 IBRD-80780 Loan Disb 13,895,238.00
Feb 27, 2020 IBRD-80780 Loan Disb 11,823,652.00
Mar 6, 2020 IBRD-80780 Loan Disb 3,775,727.80
Feb 27, 2020 IBRD-80780 Loan Disb 9,876.40
May 15, 2019 IBRD-80780 Loan Repay 2,198,383.00
May 15, 2018 IBRD-80780 Loan Repay 30.00
May 15, 2018 IBRD-80780 Int Charges 2,053.29
May 15, 2018 IBRD-80780 Int Charges 1,058,615.40
May 15, 2018 IBRD-80780 Loan Repay 2,048,419.50
Jun 27, 2018 IBRD-80780 Loan Disb 6,606,319.00
Nov 15, 2018 IBRD-80780 Int Charges 1,554,824.10
Nov 15, 2018 IBRD-80780 Loan Repay 2,198,383.00
May 15, 2019 IBRD-80780 Loan Disb 8,684,400.00
May 15, 2019 IBRD-80780 Int Charges 1,690,396.80
Dec 1, 2017 IBRD-80780 Loan Repay 2,026,245.60
Nov 15, 2017 IBRD-80780 Loan Disb 997,471.25
Nov 15, 2017 IBRD-80780 Int Charges 997,471.25
Sep 2, 2016 IBRD-80780 Loan Disb 6,422,579.00
Feb 27, 2017 IBRD-80780 Loan Disb 4,398,336.50
May 15, 2017 IBRD-80780 Loan Disb 779,274.75
May 15, 2017 IBRD-80780 Int Charges 779,274.75
Mar 21, 2017 IBRD-80780 Loan Disb 3,358,209.50
Mar 21, 2017 IBRD-80780 Loan Disb 3,052,917.80
May 15, 2016 IBRD-80780 Loan Disb 279,308.56
May 15, 2016 IBRD-80780 Int Charges 279,308.56
Jan 31, 2017 IBRD-80780 Loan Disb 2,889,652.00
Sep 7, 2016 IBRD-80780 Loan Disb 5,687,728.50
Nov 21, 2016 IBRD-80780 Loan Disb 3,240,985.00
Nov 15, 2016 IBRD-80780 Loan Disb 440,357.56
Nov 15, 2016 IBRD-80780 Int Charges 440,357.56
Mar 21, 2016 IBRD-80780 Loan Disb 2,692,571.20
Dec 14, 2016 IBRD-80780 Loan Disb 8,141,635.00
Aug 1, 2016 IBRD-80780 Loan Disb 2,685,565.00
Dec 30, 2016 IBRD-80780 Loan Disb 328,396.16
Aug 13, 2015 IBRD-80780 Loan Disb 3,118,023.50
Nov 15, 2015 IBRD-80780 Loan Disb 186,190.81
Nov 15, 2015 IBRD-80780 Int Charges 186,190.81
Jan 7, 2016 IBRD-80780 Loan Disb 6,013,970.50

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Financial Management Satisfactory 2024-12-19
Procurement Moderately Satisfactory 2024-12-19
Project Management Satisfactory 2024-12-19
Progress towards achievement of PDO Moderately Satisfactory 2024-12-19
Monitoring and Evaluation Moderately Satisfactory 2024-12-19
Overall Implementation Progress (IP) Moderately Satisfactory 2024-12-19

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Generation capacity of energy constructed or rehabilitatedValue0.000.00444.00
    DateJanuary 1, 2014December 30, 2024December 31, 2024
    Comment
  • Hydropower generation capacity constructed under the projectValue0.000.00444.00
    DateJanuary 1, 2014December 30, 2024December 31, 2024
    Comment
  • Generation Capacity of Hydropower constructed or rehabilitated under the projectValue0.000.00444.00
    DateJune 30, 2011December 30, 2024December 31, 2024
    Comment
  • Generation Capacity of Hydropower constructed under the projectValue0.000.00444.00
    DateJune 30, 2011December 30, 2024December 31, 2024
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Development of detailed institutional capacity planValueNoneComplete
    Date
    Comment
  • Implementation of Capacity Building and Institutional Strengthening PlanValueNoneOngoing
    Date
    Comment
  • Power house civil excavationValue0.0090.00100.00
    DateNovember 2, 2009November 30, 2023December 31, 2024
    Comment
  • Desilting chamberValue0.0097.00100.00
    DateNovember 2, 2009November 30, 2023December 31, 2024
    Comment
  • Social and Environmental Capacity TrainingValueNoYesYes
    DateJanuary 1, 2014May 15, 2023December 31, 2021
    Comment
  • Power House Electro-mechanical (equipment installation)ValueNo equipment delivered.Design completed; installation will be synchronizeEquipment for all four units ready
    DateNovember 2, 2009December 30, 2024December 31, 2024
    Comment
  • Recruitment/deployment of new environmental staff for corporate and projectValue2+1Complete
    Date
    Comment
  • Financial disbursement (% of projected cost to completion)Value0.0054.8095.00
    DateNovember 2, 2009November 30, 2023December 31, 2024
    Comment
  • Social staff in Corporate Social and Environment Cell (number of staff)Value2.004.000.00
    Date
    Comment
  • Cost overruns within physical contingency allowanceValueNo overrunno overrun indicated to dateAchieved
    DateNovember 2, 2009March 23, 2021December 31, 2024
    Comment
  • Environmental Management Plan (EMP) implementationValue0In progressCompleted.
    DateNovember 2, 2009March 23, 2021December 31, 2024
    Comment
  • Number of environmental staff posted at siteValue1.003.000.00
    Date
    Comment
  • Funds utilization on CAT plan activities (excluding maintenance)Value0.0015.000.00
    Date
    Comment
  • Development of Capacity Building and Institutional Strengthening (CBIS) planValueNoYesYes
    DateJanuary 1, 2014March 23, 2021June 30, 2021
    Comment
  • RAP and community development plan implementationValue0.0098.00100.00
    DateNovember 2, 2009December 30, 2024December 31, 2024
    Comment
  • All entitlements for property losses and restrictions on access fully deliveredValue0.0085.000.00
    Date
    Comment
  • Initial skills gap analysis (resulting in preparation of CBIS Plan)ValueRFP for skills gap analysis launched by project efComplete
    Date
    Comment
  • Completion of scheduled resettlement including Haat village as agreed with the PAPsValue0.0090.000.00
    Date
    Comment
  • Review of THDC institutional arrangements and current capacity building plans in consultation with THDC management and staff.ValueNoneComplete
    Date
    Comment
  • Amount spent on small infrastructure under CSR and Peripheral Development in project affected villagesValueRs. 5 millionRs 57 million
    Date
    Comment
  • Development of framework institutional capacity planValueNoneComplete
    Date
    Comment
  • Headrace tunnel completionValue0.004.00100.00
    DateNovember 2, 2009December 30, 2024December 31, 2024
    Comment