Financier | Commitments |
---|---|
Borrower/Recipient | 63.71 |
IDA Credit | 221.96 |
P097985
Closed
Milen Dyoulgerov Vollen , Sitarama Krishna Addepalli
The Republic of India
February 26, 2007
(as of board presentation)
June 15, 2010
August 12, 2008
US$ 285.67 million
Society of Integrated Coastal Management
2010
US$ 221.96 million
A
July 8, 2024
June 30, 2020
BANK APPROVED
Financier | Commitments |
---|---|
Borrower/Recipient | 63.71 |
IDA Credit | 221.96 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 221.96 |
IBRD + IDA Commitment | 221.96 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 285.67 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Dec 1, 2013 | IDA-47650 | Int Charges | 146,589.60 |
Oct 10, 2013 | IDA-47650 | Loan Disb | 341,284.78 |
Jan 31, 2014 | IDA-47650 | Loan Disb | 4,525,145.00 |
Mar 25, 2015 | IDA-47650 | Loan Disb | 2,837,245.20 |
Aug 12, 2014 | IDA-47650 | Loan Disb | 1,590,605.00 |
Jun 1, 2014 | IDA-47650 | Int Charges | 185,915.83 |
Jun 1, 2014 | IDA-47650 | Int Charges | 185,915.83 |
Jun 27, 2014 | IDA-47650 | Loan Disb | 1,972,123.80 |
Jun 20, 2014 | IDA-47650 | Loan Disb | 1,874,540.00 |
Mar 27, 2014 | IDA-47650 | Loan Disb | 1,702,677.20 |
Mar 27, 2014 | IDA-47650 | Loan Disb | 3,232,005.80 |
Jun 29, 2016 | IDA-47650 | Loan Disb | 7,278,796.00 |
Jun 27, 2016 | IDA-47650 | Loan Disb | 1,993,511.80 |
Feb 16, 2016 | IDA-47650 | Loan Disb | 1,166,566.80 |
Mar 31, 2016 | IDA-47650 | Loan Disb | 978,951.75 |
Dec 1, 2015 | IDA-47650 | Int Charges | 291,751.12 |
Dec 1, 2015 | IDA-47650 | Loan Repay | 109,831.58 |
Dec 1, 2015 | IDA-47650 | Loan Repay | 3,255,108.00 |
Dec 1, 2015 | IDA-47650 | Loan Repay | 1,680,781.60 |
Dec 1, 2015 | IDA-47650 | Int Charges | 291,751.12 |
Dec 1, 2015 | IDA-47650 | Int Charges | 4,572.69 |
Dec 1, 2015 | IDA-47650 | Int Charges | 4,572.69 |
Feb 11, 2016 | IDA-47650 | Loan Disb | 3,038,161.00 |
Oct 21, 2015 | IDA-47650 | Loan Disb | 3,406,168.50 |
Oct 21, 2015 | IDA-47650 | Loan Disb | 493,253.03 |
Dec 8, 2015 | IDA-47650 | Loan Disb | 1,896,656.00 |
Sep 10, 2015 | IDA-47650 | Loan Disb | 3,071,618.50 |
Jun 1, 2015 | IDA-47650 | Int Charges | 2,199.20 |
Jun 1, 2015 | IDA-47650 | Int Charges | 2,199.20 |
Jun 1, 2015 | IDA-47650 | Int Charges | 245,337.77 |
Jun 1, 2015 | IDA-47650 | Int Charges | 245,337.77 |
Jun 30, 2015 | IDA-47650 | Loan Disb | 1,658,479.90 |
Apr 8, 2015 | IDA-47650 | Loan Disb | 2,784,498.50 |
Jun 24, 2015 | IDA-47650 | Loan Disb | 3,406,168.50 |
Jun 1, 2018 | IDA-47650 | Loan Repay | 5,206,172.50 |
Jun 1, 2018 | IDA-47650 | Int Charges | 406,132.70 |
Jun 1, 2018 | IDA-47650 | Int Charges | 406,132.70 |
Jun 5, 2018 | IDA-47650 | Loan Disb | 1,993,511.80 |
Mar 28, 2018 | IDA-47650 | Loan Disb | 2,372,280.50 |
Mar 28, 2018 | IDA-47650 | Loan Disb | 1,993,511.80 |
Dec 18, 2017 | IDA-47650 | Loan Disb | 1,993,511.80 |
Mar 27, 2017 | IDA-47650 | Loan Disb | 580,910.60 |
Apr 4, 2017 | IDA-47650 | Loan Disb | 3,562,669.20 |
Jun 23, 2017 | IDA-47650 | Loan Disb | 1,993,511.80 |
Jun 14, 2017 | IDA-47650 | Loan Disb | 1,993,511.80 |
Jun 23, 2017 | IDA-47650 | Loan Disb | 803,934.94 |
Jun 14, 2017 | IDA-47650 | Loan Disb | 1,614,726.20 |
Jun 1, 2017 | IDA-47650 | Loan Repay | 311,480.38 |
Jun 1, 2017 | IDA-47650 | Loan Repay | 164,600.90 |
Jun 1, 2017 | IDA-47650 | Loan Repay | 4,609,523.00 |
Jun 1, 2017 | IDA-47650 | Int Charges | 234,448.64 |
Jun 1, 2017 | IDA-47650 | Int Charges | 234,448.64 |
Mar 27, 2017 | IDA-47650 | Loan Disb | 1,412,601.10 |
Jun 22, 2016 | IDA-47650 | Loan Disb | 627,416.30 |
Dec 1, 2016 | IDA-47650 | Loan Repay | 24,675.00 |
Jan 31, 2017 | IDA-47650 | Loan Disb | 1,993,511.80 |
Dec 1, 2016 | IDA-47650 | Loan Repay | 4,945,429.50 |
Dec 1, 2016 | IDA-47650 | Int Charges | 327,490.00 |
Dec 1, 2016 | IDA-47650 | Int Charges | 327,490.00 |
Jan 31, 2017 | IDA-47650 | Loan Disb | 1,221,878.10 |
Nov 8, 2016 | IDA-47650 | Loan Disb | 1,993,511.80 |
Nov 8, 2016 | IDA-47650 | Loan Disb | 1,484,925.40 |
Jun 1, 2016 | IDA-47650 | Loan Repay | 99,338.26 |
Jun 1, 2016 | IDA-47650 | Loan Repay | 5,052,444.50 |
Jun 1, 2016 | IDA-47650 | Int Charges | 316,476.78 |
Jun 1, 2016 | IDA-47650 | Int Charges | 316,476.78 |
Oct 28, 2020 | IDA-47650 | Loan Disb | 3,920,637.20 |
Feb 24, 2020 | IDA-47650 | Loan Cancel | 13,999,999.00 |
Jan 8, 2020 | IDA-47650 | Loan Cancel | 18,000,000.00 |
Mar 30, 2020 | IDA-47650 | Loan Disb | 707,733.44 |
Dec 1, 2019 | IDA-47650 | Loan Repay | 41,825.80 |
Dec 1, 2019 | IDA-47650 | Loan Repay | 5,000,149.50 |
Dec 1, 2019 | IDA-47650 | Int Charges | 389,130.47 |
Dec 1, 2019 | IDA-47650 | Int Charges | 389,130.47 |
Jun 1, 2019 | IDA-47650 | Loan Repay | 46,307.44 |
Jun 1, 2019 | IDA-47650 | Loan Repay | 5,013,002.00 |
Jun 1, 2019 | IDA-47650 | Int Charges | 412,679.40 |
Jun 1, 2019 | IDA-47650 | Int Charges | 412,679.40 |
Oct 21, 2019 | IDA-47650 | Loan Disb | 4,343,704.00 |
Dec 1, 2020 | IDA-47650 | Int Charges | 18,203.30 |
Dec 1, 2020 | IDA-47650 | Int Charges | 18,203.30 |
Dec 1, 2020 | IDA-47650 | Loan Repay | 249,680.88 |
Dec 1, 2020 | IDA-47650 | Loan Repay | 1,837,321.10 |
Dec 1, 2020 | IDA-47650 | Int Charges | 420,294.78 |
Dec 1, 2020 | IDA-47650 | Int Charges | 420,294.78 |
Jun 1, 2021 | IDA-47650 | Int Charges | 36,215.31 |
Jun 1, 2021 | IDA-47650 | Int Charges | 36,215.31 |
Jun 1, 2020 | IDA-47650 | Loan Repay | 4,005,320.50 |
Jun 1, 2020 | IDA-47650 | Int Charges | 415,772.44 |
Jun 1, 2020 | IDA-47650 | Int Charges | 415,772.44 |
Jun 1, 2020 | IDA-47650 | Int Charges | 46,930.95 |
Jun 1, 2020 | IDA-47650 | Int Charges | 46,930.95 |
Jun 15, 2020 | IDA-47650 | Loan Disb | 4,387,604.50 |
Jun 15, 2010 | IDA-47650 | Loan Commitment | 221,964,992.00 |
Jun 1, 2024 | IDA-47650 | Int Charges | 362,434.06 |
Jun 1, 2024 | IDA-47650 | Int Charges | 362,434.06 |
Jun 1, 2024 | IDA-47650 | Loan Repay | 3,865,963.00 |
Jun 1, 2024 | IDA-47650 | Int Charges | 55,032.21 |
Jun 1, 2024 | IDA-47650 | Int Charges | 55,032.21 |
Jun 1, 2023 | IDA-47650 | Int Charges | 133,181.28 |
Jun 1, 2023 | IDA-47650 | Loan Repay | 3,884,773.80 |
Jun 1, 2023 | IDA-47650 | Int Charges | 393,333.30 |
Jun 1, 2023 | IDA-47650 | Int Charges | 393,333.30 |
Jun 1, 2023 | IDA-47650 | Int Charges | 133,181.28 |
Dec 1, 2023 | IDA-47650 | Int Charges | 324,020.03 |
Dec 1, 2023 | IDA-47650 | Int Charges | 324,020.03 |
Dec 1, 2023 | IDA-47650 | Loan Repay | 50,581.33 |
Dec 1, 2023 | IDA-47650 | Loan Repay | 3,840,852.20 |
Dec 1, 2022 | IDA-47650 | Loan Repay | 0.01 |
Dec 1, 2022 | IDA-47650 | Int Charges | -0.01 |
Dec 1, 2022 | IDA-47650 | Int Charges | -0.01 |
Dec 1, 2022 | IDA-47650 | Loan Repay | 55,377.17 |
Dec 1, 2022 | IDA-47650 | Int Charges | 272,836.12 |
Dec 1, 2022 | IDA-47650 | Int Charges | 272,836.12 |
Dec 1, 2022 | IDA-47650 | Loan Repay | 3,802,757.80 |
Dec 1, 2017 | IDA-47650 | Int Charges | 116,610.25 |
Sep 14, 2017 | IDA-47650 | Loan Disb | 1,341,906.20 |
Sep 14, 2017 | IDA-47650 | Loan Disb | 1,993,511.80 |
Dec 18, 2017 | IDA-47650 | Loan Disb | 1,481,787.00 |
Jan 5, 2018 | IDA-47650 | Loan Disb | 3,101,269.50 |
Dec 1, 2017 | IDA-47650 | Loan Repay | 5,209,882.00 |
Dec 1, 2017 | IDA-47650 | Int Charges | 362,203.38 |
Dec 1, 2017 | IDA-47650 | Int Charges | 362,203.38 |
Jan 4, 2018 | IDA-47650 | Loan Disb | 1,993,511.80 |
Dec 1, 2017 | IDA-47650 | Int Charges | 116,610.25 |
Jun 1, 2021 | IDA-47650 | Loan Repay | 2,110,413.20 |
Jun 1, 2021 | IDA-47650 | Int Charges | 415,545.10 |
Jun 1, 2021 | IDA-47650 | Int Charges | 415,545.10 |
Dec 1, 2021 | IDA-47650 | Loan Repay | 2,043,918.40 |
Dec 1, 2021 | IDA-47650 | Int Charges | 444,552.22 |
Dec 1, 2021 | IDA-47650 | Int Charges | 444,552.22 |
Dec 1, 2021 | IDA-47650 | Int Charges | 49,764.81 |
Dec 1, 2021 | IDA-47650 | Int Charges | 49,764.81 |
Oct 17, 2018 | IDA-47650 | Loan Disb | 1,782,050.40 |
Dec 1, 2018 | IDA-47650 | Loan Repay | 144,060.60 |
Dec 1, 2018 | IDA-47650 | Loan Repay | 4,935,851.50 |
Mar 20, 2019 | IDA-47650 | Loan Disb | 1,619,051.10 |
Jul 9, 2019 | IDA-47650 | Loan Disb | 363,193.12 |
Jun 28, 2019 | IDA-47650 | Loan Disb | 1,993,511.80 |
Jun 14, 2019 | IDA-47650 | Loan Disb | 4,284,786.00 |
Jun 13, 2019 | IDA-47650 | Loan Disb | 1,993,511.80 |
Mar 21, 2019 | IDA-47650 | Loan Disb | 1,993,511.80 |
Jan 8, 2019 | IDA-47650 | Loan Disb | 1,993,511.80 |
Jan 8, 2019 | IDA-47650 | Loan Disb | 1,933,838.50 |
Oct 17, 2018 | IDA-47650 | Loan Disb | 1,993,511.80 |
Dec 1, 2018 | IDA-47650 | Int Charges | 405,696.10 |
Dec 1, 2018 | IDA-47650 | Int Charges | 405,696.10 |
Jun 5, 2018 | IDA-47650 | Loan Disb | 874,373.56 |
Jun 1, 2018 | IDA-47650 | Int Charges | 21,398.37 |
Jun 1, 2018 | IDA-47650 | Int Charges | 21,398.37 |
Jun 1, 2022 | IDA-47650 | Loan Repay | 1,948,278.90 |
Jun 1, 2022 | IDA-47650 | Int Charges | 421,166.44 |
Jun 1, 2022 | IDA-47650 | Int Charges | 421,166.44 |
Jun 1, 2022 | IDA-47650 | Loan Repay | 22,090.54 |
Jan 13, 2015 | IDA-47650 | Loan Disb | 3,406,168.50 |
Jan 13, 2015 | IDA-47650 | Loan Disb | 1,330,493.60 |
Dec 16, 2013 | IDA-47650 | Loan Disb | 4,194,592.00 |
Aug 30, 2013 | IDA-47650 | Loan Disb | 785,018.80 |
Dec 1, 2014 | IDA-47650 | Loan Disb | 1,140,978.40 |
Nov 19, 2014 | IDA-47650 | Loan Disb | 2,418,662.80 |
Dec 1, 2014 | IDA-47650 | Int Charges | 576.30 |
Dec 1, 2014 | IDA-47650 | Int Charges | 576.30 |
Dec 1, 2014 | IDA-47650 | Int Charges | 214,535.19 |
Dec 1, 2014 | IDA-47650 | Int Charges | 214,535.19 |
Dec 2, 2014 | IDA-47650 | Loan Disb | 3,406,168.50 |
Jul 26, 2013 | IDA-47650 | Loan Disb | 530,722.25 |
Jun 1, 2014 | IDA-47650 | Int Charges | 202.33 |
Jun 1, 2014 | IDA-47650 | Int Charges | 202.33 |
Mar 28, 2014 | IDA-47650 | Loan Disb | 1,994,943.00 |
Dec 1, 2013 | IDA-47650 | Int Charges | 2,081.38 |
Dec 1, 2013 | IDA-47650 | Int Charges | 2,081.38 |
Dec 1, 2013 | IDA-47650 | Int Charges | 146,589.60 |
Name | Review | Date |
---|---|---|
Overall Safeguards Rating | Satisfactory | 2020-06-29 |
Counterpart Funding | Satisfactory | 2020-06-29 |
Progress towards achievement of PDO | Highly Satisfactory | 2020-06-29 |
Monitoring and Evaluation | Highly Satisfactory | 2020-06-29 |
Financial Management | Satisfactory | 2020-06-29 |
Overall Implementation Progress (IP) | Highly Satisfactory | 2020-06-29 |
Procurement | Satisfactory | 2020-06-29 |
Project Management | Satisfactory | 2020-06-29 |
Overall Safeguards Rating | Satisfactory | 2020-06-29 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 12-21-2020 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | |
Bank Performance | Substantial |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 06-04-2021 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | Not Rated | N/a |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Direct project beneficiaries | Value | 0.00 | 17803373.00 | 11000000.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
Female beneficiaries | Value | 0.00 | 50.00 | 0.00 |
Date | December 15, 2010 | June 1, 2018 | ||
Comment |
National and State level technical capacity established for ICZM planning with supporting technical staffing according to defined criteria | Value | No | Yes | Yes |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
Implementation of demonstrable ICZM pilot activities carried out | Value | No | Yes | Yes |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
Knowledge and planning base in integrated coastal zone management established according to defined criteria | Value | No | Yes | Yes |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
Institutional structure at National, and State level supportive of integrated coastal zone management established according to defined criteria | Value | No | Yes | Yes |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Kilometer of mainland coastline for which coastal sediment cell, hazard line and ecologically sensitive areas are mapped and delineated | Value | 0.00 | 5500.00 | 5500.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
Pilot investment projects in Gujarat ICZM | Value | 0.00 | 5.00 | 6.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
Skilled staff in ICZM planning and implementation in Odisha State | Value | 0.00 | 17.00 | 20.00 |
Date | June 15, 2015 | June 30, 2020 | December 29, 2017 | |
Comment |
Pilot investment projects in West Bengal | Value | 0.00 | 10.00 | 10.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
ICZM knowledge outputs generated by National Center for Sustainable Coastal Management | Value | 0.00 | 109.00 | 13.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
Area restored or re/afforested | Value | 0.00 | 19503.00 | 12000.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
Pilot investment projects in Odisha | Value | 0.00 | 9.00 | 10.00 |
Date | June 15, 2010 | September 26, 2019 | December 29, 2017 | |
Comment |
Skilled staff in ICZM planning and implementation in West Bengal State | Value | 0.00 | 8.00 | 15.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
Skilled staff in ICZM planning and implementation at National level | Value | 10.00 | 117.00 | 75.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
Coastline and freshwater under biodiversity protection (km) | Value | 0.00 | 196.00 | 400.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
ICZM plan for West Bengal Coast prepared using the designed participatory process, and submitted for approval by Government of WestBengal | Value | 0.00 | 1.00 | 1.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
Area re/afforested | Value | 0.00 | 16000.00 | 12000.00 |
Date | June 15, 2015 | June 30, 2020 | December 29, 2017 | |
Comment |
Plan for institutional structure at National, and State level supportive of integrated coastal zone management prepared and submitted to Government for approval | Value | No | No | Yes |
Date | June 15, 2010 | June 30, 2020 | December 15, 2015 | |
Comment |
Industrial and municipal waste disposal capacity created under the project | Value | 0.00 | 71.00 | 80.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
ICZM plan for Paradip-Dhamra and Gopalpur-Chilika prepared using the designed participatory process, and submitted to approval by Government of Odisha | Value | 0.00 | 1.00 | 1.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
’Skilled staff in ICZM planning and implementation in Gujarat State | Value | 0.00 | 15.00 | 20.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |
ICZM plan for Gulf of Kachchh prepared using the designed participatory process, and submitted for approval to Government of Gujarat | Value | 0.00 | 1.00 | 1.00 |
Date | June 15, 2010 | June 30, 2020 | December 29, 2017 | |
Comment |