Dropped GH-Takoradi 2 (FY06)

Development Objective

This project will convert an existing power plant in Takoradi, Ghana from single-cycle to combined cycle, enabling the waste heat from two generators to produce steam to generate another 110 MW turbine. The result will be converting the plant from 220 MW to 330 MW, providing additional electricity for the same amount of fossil fuel input. The project will help Ghana meet its growing energy needs, which can only be met by adding fossil fuel plants. Currently, this waste heat is not being used, but this project will install an additional 110 MW heat recovery steam generator, which will utilize the waste heat to product steam, turn a turbine and provide additional power with no additional fuel input. The current generators can use oil or gas but is currently using light crude oil from Nigeria.

Key Details

Project Details

  • P098663

  • Dropped

  • Karan Capoor

  • N/A

  • Ghana

  • July 27, 2006

  • (as of board presentation)

    December 30, 2005

  • N/A

  • US$ 0.00 million

  • N/A

  • Not Applicable

  • N/A

  • December 19, 2024

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment N/A
IBRD + IDA Commitment N/A
Lending Instrument
Grant Amount N/A
Total Project Cost** N/A

Summary Status of World Bank Financing (US$ Millions) as of June 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of June 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)

Footnotes

Ratings

IMPLEMENTATION RATINGS

No data available.

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

No data available.