Second Village Investment Project

Abstract*

The Second Village Investment Project for Kyrgyz Republic aims to alleviate rural poverty. It seeks to achieve this by empowering communities to improve access to social and economic infrastructure services, and employment opportunities. The project consists of the following components: 1. This component supports capacity building and promotes community empowerment. It comprises training and support to communities, local self-governments and community...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The objective of the Project is to assist the Recipient with: (a) improving governance and capacity at the local level; (b) strengthening the provision of, and access to, essential infrastructure services; and (c) supporting private group-owned small scale enterprise development.

Key Details

Project Details

  • P098949

  • Closed

  • Aly Rahim

  • N/A

  • Kyrgyz Republic

  • May 18, 2006

  • (as of board presentation)

    August 3, 2006

  • December 5, 2006

  • US$ 44.12 million

  • Community Development and Investment Agency (ARIS)

  • Europe and Central Asia

  • 2007

  • US$ 36.62 million

  • F

  • Not Applicable

  • October 31, 2014

  • BANK APPROVED

  • April 28, 2015

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Credit 8.00
IDA Grant 15.00
Borrower/Recipient 7.50
UK: British Department for International Development (DFID) 13.62

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 23.00
IBRD + IDA Commitment 23.00
Lending Instrument
Grant Amount 13.62
Total Project Cost** 44.12

Summary Status of World Bank Financing (US$ Millions) as of July 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of July 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jul 30, 2014 IDA-51980 Loan Disb 22,509.80
Jul 30, 2014 IDA-51980 Loan Disb 187,490.20
Mar 15, 2015 IDA-46570 Int Charges 498.28
Mar 15, 2015 IDA-46570 Int Charges 498.28
Mar 15, 2015 IDA-46570 Int Charges 14,410.36
Mar 15, 2015 IDA-46570 Int Charges 14,410.36
Jul 18, 2014 IDA-51980 Loan Disb 209,999.90
Sep 25, 2014 IDA-51980 Loan Disb 171,288.42
Aug 13, 2014 IDA-51980 Loan Disb 122,901.50
Feb 28, 2015 IDA-H8240 Loan Cancel 31.17
Feb 15, 2015 IDA-51980 Int Charges 524.12
Feb 15, 2015 IDA-51980 Int Charges 524.12
Feb 15, 2015 IDA-51980 Int Charges 7,214.87
Feb 15, 2015 IDA-51980 Int Charges 7,214.87
Aug 15, 2014 IDA-51980 Int Charges 1,908.84
Aug 15, 2014 IDA-51980 Int Charges 1,908.84
Jun 23, 2014 IDA-H8240 Loan Disb 17,828.38
Jun 25, 2014 IDA-51980 Loan Disb 200,264.90
Mar 15, 2014 IDA-46570 Int Charges 16,683.80
Mar 15, 2014 IDA-46570 Int Charges 223.74
Mar 15, 2014 IDA-46570 Int Charges 223.74
May 8, 2014 IDA-51980 Loan Disb 134,727.81
May 16, 2014 IDA-51980 Loan Disb 198,306.10
May 14, 2014 IDA-H8240 Loan Disb 324,559.40
Jun 16, 2014 IDA-51980 Loan Disb 151,227.33
Sep 15, 2013 IDA-46570 Int Charges 368.90
Sep 15, 2013 IDA-46570 Int Charges 368.90
Sep 15, 2013 IDA-46570 Int Charges 15,931.07
Sep 15, 2013 IDA-46570 Int Charges 15,931.07
Dec 13, 2013 IDA-H8240 Loan Disb 367,170.44
Feb 20, 2014 IDA-51980 Loan Disb 350,000.00
Dec 20, 2013 IDA-H8240 Loan Disb 128,527.52
Feb 19, 2014 IDA-H8240 Loan Disb 161,295.39
Mar 15, 2014 IDA-46570 Int Charges 16,683.80
Aug 15, 2016 IDA-51980 Int Charges 66.96
Aug 15, 2016 IDA-51980 Int Charges 66.96
Aug 15, 2016 IDA-51980 Int Charges 7,850.08
Aug 15, 2016 IDA-51980 Int Charges 7,850.08
Feb 15, 2016 IDA-51980 Int Charges 7,836.01
Jan 21, 2014 IDA-H8240 Loan Disb 491,747.16
Sep 10, 2013 IDA-H8240 Loan Disb 500,000.00
Dec 5, 2014 IDA-51980 Loan Disb 32,836.65
Oct 27, 2014 IDA-51980 Loan Disb 77,617.38
Oct 15, 2014 IDA-51980 Loan Disb 171,603.70
Nov 19, 2014 IDA-51980 Loan Disb 86,592.00
Aug 15, 2015 IDA-51980 Int Charges 7,644.57
Sep 15, 2014 IDA-46570 Int Charges 175.71
Sep 15, 2014 IDA-46570 Int Charges 175.71
Sep 15, 2014 IDA-46570 Int Charges 16,309.67
Sep 15, 2014 IDA-46570 Int Charges 16,309.67
Sep 3, 2014 IDA-51980 Loan Disb 170,000.00
Feb 15, 2016 IDA-51980 Int Charges 7,836.01
Feb 15, 2016 IDA-51980 Int Charges 4.27
Feb 15, 2016 IDA-51980 Int Charges 4.27
Sep 15, 2016 IDA-46570 Int Charges 112.36
Sep 15, 2016 IDA-46570 Int Charges 112.36
Sep 15, 2016 IDA-46570 Int Charges 15,158.37
Sep 15, 2016 IDA-46570 Int Charges 15,158.37
Mar 15, 2016 IDA-46570 Int Charges 15,045.09
Mar 15, 2016 IDA-46570 Int Charges 15,045.09
Mar 15, 2016 IDA-46570 Int Charges 138.40
Mar 15, 2016 IDA-46570 Int Charges 138.40
Sep 15, 2015 IDA-46570 Int Charges 615.85
Sep 15, 2015 IDA-46570 Int Charges 615.85
Sep 15, 2015 IDA-46570 Int Charges 14,583.27
Sep 15, 2015 IDA-46570 Int Charges 14,583.27
Aug 15, 2015 IDA-51980 Int Charges 250.90
Aug 15, 2015 IDA-51980 Int Charges 250.90
Aug 15, 2015 IDA-51980 Int Charges 7,644.57
Aug 15, 2018 IDA-51980 Int Charges 241.84
Aug 15, 2018 IDA-51980 Int Charges 241.84
Aug 15, 2018 IDA-51980 Int Charges 7,781.51
Aug 15, 2018 IDA-51980 Int Charges 7,781.51
Feb 15, 2018 IDA-51980 Int Charges 147.77
Feb 15, 2018 IDA-51980 Int Charges 147.77
Feb 15, 2018 IDA-51980 Int Charges 7,949.58
Feb 15, 2018 IDA-51980 Int Charges 7,949.58
Aug 15, 2017 IDA-51980 Int Charges 59.40
Aug 15, 2017 IDA-51980 Int Charges 59.40
Aug 15, 2017 IDA-51980 Int Charges 7,773.82
Aug 15, 2017 IDA-51980 Int Charges 7,773.82
Sep 15, 2017 IDA-46570 Int Charges 15,103.34
Mar 15, 2018 IDA-46570 Int Charges 15,578.15
Mar 15, 2018 IDA-46570 Int Charges 15,578.15
Sep 15, 2017 IDA-46570 Int Charges 15,103.34
Mar 15, 2018 IDA-46570 Int Charges 370.08
Mar 15, 2018 IDA-46570 Int Charges 370.08
Sep 15, 2017 IDA-46570 Int Charges 18.03
Sep 15, 2017 IDA-46570 Int Charges 18.03
Mar 15, 2017 IDA-46570 Int Charges 67.47
Mar 15, 2017 IDA-46570 Int Charges 67.47
Mar 15, 2017 IDA-46570 Int Charges 14,676.90
Mar 15, 2017 IDA-46570 Int Charges 14,676.90
Feb 15, 2017 IDA-51980 Int Charges 60.35
Feb 15, 2017 IDA-51980 Int Charges 60.35
Feb 15, 2017 IDA-51980 Int Charges 7,475.91
Feb 15, 2017 IDA-51980 Int Charges 7,475.91
Feb 15, 2020 IDA-51980 Int Charges 50.57
Feb 15, 2020 IDA-51980 Int Charges 50.57
Feb 15, 2020 IDA-51980 Int Charges 7,641.67
Feb 15, 2020 IDA-51980 Int Charges 7,641.67
Aug 15, 2019 IDA-51980 Int Charges 7,730.94
Aug 15, 2019 IDA-51980 Int Charges 7,730.94
Aug 15, 2019 IDA-51980 Int Charges 42.26
Aug 15, 2019 IDA-51980 Int Charges 42.26
Sep 15, 2019 IDA-46570 Int Charges 32.20
Sep 15, 2019 IDA-46570 Int Charges 32.20
Sep 15, 2019 IDA-46570 Int Charges 14,901.02
Sep 15, 2019 IDA-46570 Int Charges 14,901.02
Mar 15, 2019 IDA-46570 Int Charges 7.77
Mar 15, 2019 IDA-46570 Int Charges 7.77
Mar 15, 2019 IDA-46570 Int Charges 15,141.92
Mar 15, 2019 IDA-46570 Int Charges 15,141.92
Feb 15, 2019 IDA-51980 Int Charges 160.50
Feb 15, 2019 IDA-51980 Int Charges 160.50
Feb 15, 2019 IDA-51980 Int Charges 7,596.32
Feb 15, 2019 IDA-51980 Int Charges 7,596.32
Sep 15, 2018 IDA-46570 Int Charges 15,246.54
Sep 15, 2018 IDA-46570 Int Charges 15,246.54
Sep 15, 2018 IDA-46570 Int Charges 218.50
Sep 15, 2018 IDA-46570 Int Charges 218.50
Sep 15, 2021 IDA-46570 Loan Repay 40,872.50
Sep 15, 2021 IDA-46570 Int Charges 14,986.35
Sep 15, 2021 IDA-46570 Int Charges 14,986.35
Sep 15, 2021 IDA-46570 Loan Repay 481.50
Feb 15, 2021 IDA-51980 Int Charges 174.36
Feb 15, 2021 IDA-51980 Int Charges 8,088.30
Feb 15, 2021 IDA-51980 Int Charges 8,088.30
Mar 15, 2021 IDA-46570 Int Charges 15,224.03
Mar 15, 2021 IDA-46570 Int Charges 15,224.03
Mar 15, 2021 IDA-46570 Int Charges 1,052.99
Mar 15, 2021 IDA-46570 Int Charges 1,052.99
Feb 15, 2021 IDA-51980 Int Charges 174.36
Sep 15, 2020 IDA-46570 Loan Repay 131.59
Sep 15, 2020 IDA-46570 Loan Repay 40,950.97
Sep 15, 2020 IDA-46570 Int Charges 14,207.60
Sep 15, 2020 IDA-46570 Int Charges 14,207.60
Mar 15, 2021 IDA-46570 Loan Repay 41,425.92
Aug 15, 2020 IDA-51980 Int Charges 7,665.59
Aug 15, 2020 IDA-51980 Int Charges 7,665.59
Aug 15, 2020 IDA-51980 Int Charges 93.26
Aug 15, 2020 IDA-51980 Int Charges 93.26
Mar 15, 2020 IDA-46570 Loan Repay 125.83
Mar 15, 2020 IDA-46570 Loan Repay 39,840.81
Mar 15, 2020 IDA-46570 Int Charges 14,987.49
Mar 15, 2020 IDA-46570 Int Charges 14,987.49
Mar 15, 2023 IDA-46570 Int Charges 13,608.60
Sep 15, 2023 IDA-46570 Loan Repay 673.46
Aug 15, 2023 IDA-51980 Loan Repay 19,985.25
Aug 15, 2023 IDA-51980 Int Charges 7,419.48
Aug 15, 2023 IDA-51980 Int Charges 7,419.48
Feb 15, 2023 IDA-51980 Loan Repay 19,996.21
Feb 15, 2023 IDA-51980 Int Charges 7,387.26
Feb 15, 2023 IDA-51980 Int Charges 7,387.26
Sep 15, 2022 IDA-46570 Int Charges 13,378.00
Sep 15, 2022 IDA-46570 Int Charges 13,378.00
Sep 15, 2022 IDA-46570 Loan Repay 1,127.92
Sep 15, 2022 IDA-46570 Loan Repay 36,424.47
Aug 15, 2022 IDA-51980 Int Charges 22.79
Aug 15, 2022 IDA-51980 Int Charges 22.79
Aug 15, 2022 IDA-51980 Int Charges 7,427.19
Aug 15, 2022 IDA-51980 Int Charges 7,427.19
Feb 15, 2022 IDA-51980 Int Charges 106.07
Feb 15, 2022 IDA-51980 Int Charges 106.07
Feb 15, 2022 IDA-51980 Int Charges 7,749.47
Feb 15, 2022 IDA-51980 Int Charges 7,749.47
Mar 15, 2022 IDA-46570 Int Charges 54.32
Mar 15, 2022 IDA-46570 Int Charges 54.32
Mar 15, 2022 IDA-46570 Loan Repay 40,000.57
Mar 15, 2022 IDA-46570 Int Charges 14,400.21
Mar 15, 2022 IDA-46570 Int Charges 14,400.21
Aug 15, 2021 IDA-51980 Int Charges 15.69
Aug 15, 2021 IDA-51980 Int Charges 15.69
Aug 15, 2021 IDA-51980 Int Charges 7,989.47
Aug 15, 2021 IDA-51980 Int Charges 7,989.47
Nov 3, 2009 IDA-46570 Loan Commitment 4,400,000.00
Dec 20, 2012 IDA-51980 Loan Commitment 2,300,000.00
Aug 3, 2006 IDA-H2500 Loan Commitment 15,000,000.00
Dec 20, 2012 IDA-H8240 Loan Commitment 1,900,000.00
Nov 3, 2009 IDA-H5190 Loan Commitment 3,600,000.00
Feb 15, 2024 IDA-51980 Loan Repay 19,795.15
Mar 15, 2024 IDA-46570 Loan Repay 37,216.52
Mar 15, 2024 IDA-46570 Int Charges 0.01
Mar 15, 2024 IDA-46570 Int Charges 0.01
Mar 15, 2024 IDA-46570 Int Charges 13,322.66
Mar 15, 2024 IDA-46570 Int Charges 13,322.66
Feb 15, 2024 IDA-51980 Loan Repay 47.15
Mar 15, 2024 IDA-46570 Loan Repay 1,399.88
Feb 15, 2024 IDA-51980 Int Charges 7,292.05
Feb 15, 2024 IDA-51980 Int Charges 7,292.05
Aug 15, 2024 IDA-51980 Loan Repay 19,709.93
Aug 15, 2024 IDA-51980 Int Charges 6,874.99
Aug 15, 2024 IDA-51980 Int Charges 6,874.99
Aug 15, 2024 IDA-51980 Loan Repay 368.62
Aug 15, 2023 IDA-51980 Int Charges 134.99
Aug 15, 2023 IDA-51980 Int Charges 134.99
Sep 15, 2023 IDA-46570 Loan Repay 37,569.42
Sep 15, 2023 IDA-46570 Int Charges 13,337.16
Sep 15, 2023 IDA-46570 Int Charges 13,337.16
Feb 15, 2023 IDA-51980 Loan Repay 64.49
Mar 15, 2023 IDA-46570 Loan Repay 38,039.58
Mar 15, 2023 IDA-46570 Loan Repay 566.38
Mar 15, 2023 IDA-46570 Int Charges 13,608.60

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Counterpart Funding Satisfactory 2014-12-09
Overall Implementation Progress (IP) Satisfactory 2014-12-09
Overall Safeguards Rating Satisfactory 2014-12-09
Progress towards achievement of PDO Satisfactory 2014-12-09
Financial Management Highly Satisfactory 2014-12-09
Monitoring and Evaluation Satisfactory 2014-12-09
Overall Safeguards Rating Satisfactory 2014-12-09
Procurement Satisfactory 2014-12-09
Project Management Satisfactory 2014-12-09

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 04-28-2015
Outcomes
Risk to Development OutcomeSubstantial
Bank Performance
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 05-31-2016PROJECT PERFORMANCE ASSESSMENT REPORT: 02-16-2018
Outcome RatingSatisfactory Satisfactory
Risk To Development OutcomeModerateModest
Bank PerformanceModerately SatisfactorySatisfactory
Borrower PerformanceSatisfactorySatisfactory
Government PerformanceSatisfactoryNot Rated
Implementing AgencySatisfactorySatisfactory
Icr QualitySatisfactoryNot Rated
M&e QualitySubstantialNot Rated

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Villages with access to improved social and economic infrastructure (VIP 2 only).Value100016981500
    DateJanuary 1, 2007June 1, 2012December 31, 2012
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Number of aiyl okmotu officials and community members trained in budgeting and planning principles and procedures.Value200007093670000
    DateJanuary 1, 2007June 1, 2012December 31, 2012
    Comment
  • Number of aiyl okmotus and LICs publicizing community budgets and adopting other mechanisms for financial transparency.ValueAO: 35: LIC: 340.AO: 250; LIC 427AO: 250; LIC: 460.
    DateJanuary 1, 2007June 1, 2012December 31, 2012
    Comment
  • Number of aiyl keneshs, VICs and LICs conducting open public budgeting and planning meetings and community hearings.ValueAK: 35; LIC: 340; VIC: 1200.AK:300; LIC 460; VIC 1700AK: 300; LIC: 460; VIC: 1700.
    DateJanuary 1, 2007June 1, 2012December 31, 2012
    Comment
  • Number of financially viable micro-projects consistent with local development priorities.Value250059526000
    DateJanuary 1, 2007June 1, 2012December 31, 2012
    Comment
  • Number of direct beneficieries of improved communal infrastructure.ValueTotal: 8250002267852Total: 1850000
    DateJanuary 1, 2007June 1, 2012December 31, 2012
    Comment
  • Ratio of ARIS operating expenses to expenditures on village investments and capacity building (annual).Value9.5%4.1%9.5%
    DateJanuary 1, 2007June 1, 2012December 31, 2012
    Comment
  • Improved community water points constructed or rehabilitated under the projectValue0.00442.00259.00
    DateJanuary 1, 2004June 1, 2012December 31, 2012
    Comment
  • New piped household water connections that are resulting from the project interventionValue0.0093324.0013000.00
    DateJanuary 1, 2004June 1, 2012December 31, 2012
    Comment
  • Piped household water connections that are benefiting from rehabilitation works undertaken by the projectValue0.00684.00684.00
    DateJanuary 1, 2004November 1, 2011December 31, 2012
    Comment
  • Health facilities constructed, renovated, and/or equipped (number)Value0.00383.00246.00
    DateJanuary 1, 2004June 1, 2012December 31, 2012
    Comment
  • Roads rehabilitated, RuralValue0.00676.0070.00
    DateJanuary 1, 2004June 1, 2012December 31, 2012
    Comment
  • Direct project beneficiariesValue825000.002379181.001850000.00
    DateJanuary 1, 2007November 1, 2011December 31, 2012
    Comment
  • Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.Value0.004288.00800.00
    DateJanuary 1, 2007June 1, 2012December 31, 2012
    Comment
  • Participants in consultation activities during project implementation (number)Value0.00892932.000.00
    DateJanuary 1, 2007November 30, 2013
    Comment
  • Community contribution in the total project costs (percentage)Value0.0026.700.00
    DateJanuary 1, 2007June 1, 2013
    Comment
  • Participants in consultation activities during project implementation - femaleValue0.00431918.000.00
    DateJanuary 1, 2007November 30, 2013
    Comment
  • Total community contribution (US$)Value0.0013174000.000.00
    DateJanuary 1, 2007June 1, 2013
    Comment