Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 20.00 |
P101170
Closed
Henry Forero Ramirez
Ministry of Economy and Public Finance
January 10, 2007
(as of board presentation)
May 29, 2007
February 15, 2008
US$ 20.00 million
Chief of Cabinet Office (Jefatura de Gabinete de Ministros),Chief of Cabinet Office (Jefatura de Gabinete de Ministros),Chief of Cabinet Office (Jefatura de Gabinete de Ministros),Chief of Cabinet Office (Jefatura de Gabinete de Ministros)
2007
US$ 20.00 million
C
October 1, 2014
December 31, 2014
BANK APPROVED
Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 20.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | 20.00 |
IDA Commitment | N/A |
IBRD + IDA Commitment | 20.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 20.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Jan 1, 2020 | IBRD-74490 | Loan Repay | 59,878.65 |
Jan 1, 2020 | IBRD-74490 | Int Charges | 18,306.92 |
Jan 1, 2020 | IBRD-74490 | Int Charges | 0.01 |
Jan 1, 2020 | IBRD-74490 | Int Charges | 25,664.10 |
Jan 1, 2020 | IBRD-74490 | Int Charges | 15,907.62 |
Jul 1, 2019 | IBRD-74490 | Loan Repay | 249,772.05 |
Jul 1, 2019 | IBRD-74490 | Int Charges | 0.01 |
Jul 1, 2019 | IBRD-74490 | Int Charges | 27,408.30 |
Jul 1, 2019 | IBRD-74490 | Int Charges | 30,796.86 |
Jul 1, 2019 | IBRD-74490 | Int Charges | 19,088.70 |
Jul 1, 2019 | IBRD-74490 | Loan Repay | 291,223.20 |
Jul 1, 2019 | IBRD-74490 | Loan Repay | 327,939.38 |
Jul 1, 2019 | IBRD-74490 | Loan Repay | 77,293.86 |
Jan 1, 2019 | IBRD-74490 | Int Charges | 28,651.70 |
Jan 1, 2019 | IBRD-74490 | Int Charges | 35,929.74 |
Jan 1, 2019 | IBRD-74490 | Int Charges | 22,269.84 |
Jan 1, 2019 | IBRD-74490 | Loan Repay | 291,223.20 |
Jan 1, 2019 | IBRD-74490 | Loan Repay | 249,772.05 |
Jan 1, 2019 | IBRD-74490 | Loan Repay | 318,381.94 |
Jan 1, 2019 | IBRD-74490 | Loan Repay | 86,851.28 |
Jan 1, 2018 | IBRD-74490 | Loan Repay | 249,772.05 |
Jan 1, 2018 | IBRD-74490 | Loan Repay | 307,633.12 |
Jan 1, 2018 | IBRD-74490 | Loan Repay | 97,600.10 |
Jul 1, 2018 | IBRD-74490 | Int Charges | 24,480.43 |
Jul 1, 2018 | IBRD-74490 | Int Charges | 41,062.50 |
Jul 1, 2018 | IBRD-74490 | Int Charges | 25,450.86 |
Jul 1, 2018 | IBRD-74490 | Loan Repay | 291,223.20 |
Jul 1, 2018 | IBRD-74490 | Loan Repay | 249,772.05 |
Jul 1, 2018 | IBRD-74490 | Loan Repay | 314,239.44 |
Jul 1, 2018 | IBRD-74490 | Loan Repay | 90,993.79 |
Jan 1, 2022 | IBRD-74490 | Loan Repay | 3,183.30 |
Jan 1, 2022 | IBRD-74490 | Int Charges | 610.07 |
Jan 1, 2022 | IBRD-74490 | Int Charges | 610.06 |
Jan 1, 2022 | IBRD-74490 | Int Charges | 0.01 |
Jan 1, 2022 | IBRD-74490 | Int Charges | 4,522.75 |
Jan 1, 2022 | IBRD-74490 | Loan Repay | 135,375.00 |
Jan 1, 2022 | IBRD-74490 | Loan Repay | 114,397.20 |
Jan 1, 2022 | IBRD-74490 | Loan Repay | 610.09 |
Jan 1, 2021 | IBRD-74490 | Int Charges | 15,398.46 |
Jan 1, 2021 | IBRD-74490 | Int Charges | 9,545.46 |
Jan 1, 2021 | IBRD-74490 | Loan Repay | 291,223.20 |
Jan 1, 2021 | IBRD-74490 | Loan Repay | 86,297.89 |
Jan 1, 2021 | IBRD-74490 | Loan Repay | 2,768.23 |
Jan 1, 2021 | IBRD-74490 | Loan Repay | 15,398.47 |
Jul 1, 2021 | IBRD-74490 | Loan Repay | 1,493.22 |
Jul 1, 2021 | IBRD-74490 | Int Charges | 1,493.22 |
Jul 1, 2021 | IBRD-74490 | Int Charges | 10,265.64 |
Jul 1, 2021 | IBRD-74490 | Int Charges | 6,364.38 |
Jul 1, 2021 | IBRD-74490 | Loan Repay | 273,099.94 |
Jul 1, 2021 | IBRD-74490 | Loan Repay | 10,265.64 |
Jul 1, 2021 | IBRD-74490 | Loan Repay | 249,772.05 |
Jul 1, 2021 | IBRD-74490 | Loan Repay | 18,123.24 |
Jul 1, 2021 | IBRD-74490 | Loan Repay | 249,772.05 |
Jul 1, 2021 | IBRD-74490 | Loan Repay | 137,337.95 |
Jul 1, 2021 | IBRD-74490 | Loan Repay | 6,364.38 |
Jan 1, 2021 | IBRD-74490 | Loan Repay | 153,928.69 |
Jan 1, 2021 | IBRD-74490 | Loan Repay | 137,294.48 |
Jan 1, 2021 | IBRD-74490 | Loan Repay | 9,545.46 |
Jan 1, 2021 | IBRD-74490 | Loan Repay | 249,772.05 |
Jan 1, 2021 | IBRD-74490 | Int Charges | 2,768.24 |
Jul 1, 2020 | IBRD-74490 | Int Charges | -0.01 |
Jul 1, 2020 | IBRD-74490 | Int Charges | 12,719.49 |
Jul 1, 2020 | IBRD-74490 | Int Charges | 20,531.28 |
Jul 1, 2020 | IBRD-74490 | Int Charges | 12,726.54 |
Jul 1, 2020 | IBRD-74490 | Loan Repay | 291,223.20 |
Jul 1, 2020 | IBRD-74490 | Loan Repay | 249,772.05 |
Jul 1, 2020 | IBRD-74490 | Loan Repay | 359,255.90 |
Jul 1, 2020 | IBRD-74490 | Loan Repay | 45,977.31 |
Jul 1, 2020 | IBRD-74490 | Int Charges | 0.01 |
Jan 1, 2020 | IBRD-74490 | Loan Repay | 291,223.20 |
Jan 1, 2020 | IBRD-74490 | Loan Repay | 249,772.05 |
Jan 1, 2020 | IBRD-74490 | Loan Repay | 345,354.60 |
May 29, 2007 | IBRD-74490 | Loan Commitment | 20,000,000.00 |
Jul 1, 2022 | IBRD-74490 | Int Charges | 0.01 |
Jul 1, 2022 | IBRD-74490 | Int Charges | 0.01 |
Jan 1, 2022 | IBRD-74490 | Int Charges | 3,183.30 |
Jan 1, 2022 | IBRD-74490 | Loan Repay | 291,119.00 |
Jan 1, 2022 | IBRD-74490 | Loan Repay | 110,603.81 |
Jan 1, 2022 | IBRD-74490 | Loan Repay | 291,118.97 |
Nov 6, 2013 | IBRD-74490 | Loan Disb | 448,059.84 |
Jan 1, 2018 | IBRD-74490 | Int Charges | 22,772.78 |
Jan 1, 2018 | IBRD-74490 | Int Charges | 46,195.38 |
Jan 1, 2018 | IBRD-74490 | Int Charges | 28,631.94 |
Jan 1, 2018 | IBRD-74490 | Loan Repay | 291,223.20 |
Jan 1, 2017 | IBRD-74490 | Int Charges | 56,461.02 |
Jan 1, 2017 | IBRD-74490 | Int Charges | 34,994.10 |
Jan 1, 2017 | IBRD-74490 | Int Charges | 18,992.32 |
Jul 1, 2017 | IBRD-74490 | Loan Repay | 291,223.20 |
Jul 1, 2017 | IBRD-74490 | Loan Repay | 249,772.05 |
Jul 1, 2017 | IBRD-74490 | Loan Repay | 405,233.22 |
Jul 1, 2017 | IBRD-74490 | Int Charges | 22,987.20 |
Jul 1, 2017 | IBRD-74490 | Int Charges | 51,328.14 |
Jul 1, 2017 | IBRD-74490 | Int Charges | 31,813.08 |
Jan 1, 2017 | IBRD-74490 | Loan Repay | 291,223.20 |
Jan 1, 2017 | IBRD-74490 | Loan Repay | 249,772.05 |
Jan 1, 2017 | IBRD-74490 | Loan Repay | 405,233.22 |
Jul 1, 2016 | IBRD-74490 | Int Charges | 19,257.04 |
Jul 1, 2016 | IBRD-74490 | Int Charges | 61,593.78 |
Jul 1, 2016 | IBRD-74490 | Int Charges | 38,175.18 |
Jul 1, 2016 | IBRD-74490 | Loan Repay | 291,223.20 |
Jul 1, 2016 | IBRD-74490 | Loan Repay | 249,772.05 |
Jul 1, 2016 | IBRD-74490 | Loan Repay | 286,207.22 |
Jul 1, 2016 | IBRD-74490 | Loan Repay | 119,026.00 |
Jul 1, 2015 | IBRD-74490 | Int Charges | 44,537.34 |
Jul 1, 2015 | IBRD-74490 | Loan Repay | 249,772.05 |
Jul 1, 2015 | IBRD-74490 | Loan Repay | 405,233.22 |
May 4, 2015 | IBRD-74490 | Loan Disb | -1,147,156.10 |
Jan 1, 2016 | IBRD-74490 | Int Charges | 0.01 |
Jan 1, 2016 | IBRD-74490 | Int Charges | 739.85 |
Jan 1, 2016 | IBRD-74490 | Int Charges | 570.29 |
Jan 1, 2016 | IBRD-74490 | Int Charges | -0.01 |
Jan 1, 2016 | IBRD-74490 | Loan Repay | 120,123.93 |
Jan 1, 2016 | IBRD-74490 | Int Charges | 12,041.07 |
Jan 1, 2016 | IBRD-74490 | Int Charges | 66,726.60 |
Jan 1, 2016 | IBRD-74490 | Int Charges | 41,356.26 |
Jan 1, 2016 | IBRD-74490 | Loan Repay | 291,223.20 |
Jan 1, 2016 | IBRD-74490 | Loan Repay | 249,772.05 |
Jan 1, 2016 | IBRD-74490 | Loan Repay | 285,109.30 |
Jul 1, 2013 | IBRD-74490 | Int Charges | 11,999.55 |
Jul 1, 2013 | IBRD-74490 | Int Charges | 92,390.64 |
Jul 1, 2013 | IBRD-74490 | Int Charges | 57,261.72 |
Jul 1, 2013 | IBRD-74490 | Loan Repay | 174,844.06 |
Jul 1, 2013 | IBRD-74490 | Loan Repay | 249,772.05 |
Jul 1, 2013 | IBRD-74490 | Loan Repay | 243,458.44 |
Jul 1, 2013 | IBRD-74490 | Int Charges | 122.89 |
Jul 1, 2013 | IBRD-74490 | Loan Repay | 161,774.80 |
Jul 3, 2013 | IBRD-74490 | Loan Disb | 652,070.80 |
Jul 1, 2013 | IBRD-74490 | Int Charges | 131.27 |
Jul 1, 2013 | IBRD-74490 | Int Charges | 4,374.29 |
Jul 1, 2013 | IBRD-74490 | Int Charges | 43.98 |
Jan 1, 2014 | IBRD-74490 | Int Charges | 50,812.74 |
Jan 1, 2014 | IBRD-74490 | Int Charges | 3,267.84 |
Jan 1, 2014 | IBRD-74490 | Loan Repay | 227,687.20 |
Jan 1, 2014 | IBRD-74490 | Loan Repay | 249,772.05 |
Jan 1, 2015 | IBRD-74490 | Loan Repay | 141,105.64 |
May 4, 2015 | IBRD-74490 | Loan Cancel | 1,607,164.50 |
Jul 1, 2015 | IBRD-74490 | Int Charges | 0.01 |
Jul 1, 2015 | IBRD-74490 | Int Charges | 387.54 |
Jul 1, 2015 | IBRD-74490 | Int Charges | 15,165.50 |
Jul 1, 2015 | IBRD-74490 | Int Charges | -0.01 |
Jul 1, 2015 | IBRD-74490 | Loan Repay | 739.85 |
Jul 1, 2015 | IBRD-74490 | Loan Repay | 378,728.53 |
Jul 1, 2015 | IBRD-74490 | Int Charges | 71,859.42 |
Jul 1, 2014 | IBRD-74490 | Int Charges | 171.85 |
Jul 1, 2014 | IBRD-74490 | Int Charges | 295.12 |
Jul 1, 2014 | IBRD-74490 | Int Charges | 2,575.78 |
Jul 1, 2014 | IBRD-74490 | Int Charges | 295.12 |
Jul 1, 2014 | IBRD-74490 | Int Charges | 12,343.72 |
Jul 1, 2014 | IBRD-74490 | Int Charges | 82,125.06 |
Jul 1, 2014 | IBRD-74490 | Int Charges | 50,899.50 |
Jul 1, 2014 | IBRD-74490 | Loan Repay | 255,690.95 |
Jul 1, 2014 | IBRD-74490 | Loan Repay | 249,772.05 |
Jul 1, 2014 | IBRD-74490 | Loan Repay | 405,233.22 |
Jul 17, 2014 | IBRD-74490 | Loan Disb | 1,855,733.80 |
Jan 1, 2015 | IBRD-74490 | Int Charges | 16,394.92 |
Jan 1, 2015 | IBRD-74490 | Int Charges | 76,992.24 |
Jan 1, 2015 | IBRD-74490 | Int Charges | 47,718.48 |
Jan 1, 2015 | IBRD-74490 | Int Charges | 783.11 |
Jan 1, 2015 | IBRD-74490 | Loan Repay | 379,468.38 |
Jan 1, 2015 | IBRD-74490 | Loan Repay | 249,772.05 |
Jan 1, 2015 | IBRD-74490 | Loan Repay | 264,127.60 |
Jan 1, 2014 | IBRD-74490 | Loan Repay | 401,965.38 |
Jan 1, 2014 | IBRD-74490 | Loan Repay | 3,267.84 |
Jan 1, 2014 | IBRD-74490 | Int Charges | 52.36 |
Jan 1, 2014 | IBRD-74490 | Int Charges | 109.05 |
Jan 1, 2014 | IBRD-74490 | Int Charges | 3,320.20 |
Jan 1, 2014 | IBRD-74490 | Int Charges | 13,233.38 |
Jan 1, 2014 | IBRD-74490 | Int Charges | 87,257.88 |
Name | Review | Date |
---|---|---|
Financial Management | Satisfactory | 2014-12-24 |
Monitoring and Evaluation | Satisfactory | 2014-12-24 |
Progress towards achievement of PDO | Moderately Satisfactory | 2014-12-24 |
Procurement | Moderately Satisfactory | 2014-12-24 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2014-12-24 |
Counterpart Funding | Satisfactory | 2014-12-24 |
Project Management | Moderately Satisfactory | 2014-12-24 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 06-17-2015 |
---|---|
Outcomes | |
Risk to Development Outcome | Substantial |
Bank Performance | |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 01-19-2016 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | Moderate | N/a |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | Moderately Satisfactory | N/a |
Government Performance | Moderately Unsatisfactory | N/a |
Implementing Agency | Moderately Satisfactory | N/a |
Icr Quality | Satisfactory | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Number of FOI requests submitted by electronic means (INFO.AR) [out of the total number of requests per year] | Value | Baseline: 0 (INFO.AR will be developed throughout | Achieved. The Decree stipulates that requests for | 70 percent |
Date | May 29, 2007 | June 4, 2014 | December 31, 2014 | |
Comment |
CCO functional and organizational assessment done, agreed upon, and consensus for its partial implementation generated | Value | Comprehensive CCO functional and organizational as | Achieved. The tasks associated with the integrate | Operational guidelines harmonized and synchronized |
Date | May 29, 2007 | June 4, 2014 | December 31, 2014 | |
Comment |
The e-Government Services Platform provides services such as interoperability, data and security standards and digital certificatesand signature | Value | Conceptual design finalized | The platform is ready and functioning. 57 agencie | 6 G2C services implemented and operational10 new |
Date | May 29, 2007 | June 4, 2014 | December 31, 2014 | |
Comment |
The SISEG report is taken into account during the budget process of the agencies monitored | Value | None | Achieved. SISEG reports are used by the Ministry | the proposed budget of at least four agencies cite |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Satisfaction rate on services provided by agencies subscribing the Citizens# Charter Program (as measured by annual percents increases in selected agencies satisfaction indexes) | Value | 0.00 | 70.00 | 90.00 |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Percentage of civilian central government personnel incorporated in SINFO ensuring that information is updated automatically; personnel data that appear in both SINFO and LUPI systems are consistent | Value | 25.00 | 80.00 | 90.00 |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Increase in the base of suppliers and number of supplier participating in procurement processes | Value | 18000.00 | 35256.00 | 30000.00 |
Date | December 10, 2014 | December 31, 2014 | ||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
The current single-window portal is enhanced and provides integrated and, some, transactional services | Value | Number of single window proceedings analyzed or im | Development of the EDAP is currently underway, whi | 6 transactional service, based on at least 2 agenc |
Date | December 10, 2014 | December 31, 2014 | ||
Comment |
Number of domestic businesses reached by the innovation strategy | Value | Achieved. | 20 businesses | |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
The IPA has developed and implemented a methodology for a systematic and comparable assessment of sectors and clusters. | Value | Achieved. | 7 (cumulative) sector/cluster assessment undertake | |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
The jurisdictional module of the SIG and the module to follow up the Congress Agenda are installed and operational. | Value | Piloted in INDEC and the Ministry of Labor | Achieved. SIG Metas is now installed in 18 jurisdi | Includes all programs of six ministries or agencie |
Date | December 10, 2014 | December 31, 2014 | ||
Comment |
Agreement among CCO, MECON, and the authorities managing the main public programs to establish guidelines for the use and implementation of systems for RBM and M&E, including generation of information | Value | Acheived. Pilot in ARN finalized and report on les | Report on lessons learned from pilot. | |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Design and implementation of the IT system | Value | Achieved. | New IT system operational | |
Date | December 10, 2014 | December 31, 2014 | ||
Comment |
Development, implementation and impact of the assets management module | Value | Achieved. All of the lessons learned are applied | Efficiency gains measured as a percentage of insti | |
Date | May 29, 2007 | June 4, 2014 | December 31, 2014 | |
Comment |
Participation mechanisms have been established and used regularly | Value | Achieved. Participation mechanisms used regularly | Used regularly | |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Communication strategies defined; communication plans adopted; and communication tools, mechanisms used regularly | Value | Achieved. | Communicational plans adopted (16 months) and used | |
Date | May 29, 2007 | June 4, 2014 | December 31, 2014 | |
Comment |
CCO functional and organizational assessment done, agreed and consensus for its partial implementation generated | Value | None | Achieved. The tasks associated with the integrate | Operational guidelines are standardized and formul |
Date | May 29, 2007 | June 4, 2014 | December 31, 2014 | |
Comment |
Percentage of federal agencies customized and connected to electronic platform (INFO.AR). | Value | 0 | 90 percent of the federal administration (APN) is | 100 percent of the federal administration |
Date | May 29, 2007 | June 4, 2014 | December 31, 2014 | |
Comment |
Civilian central government posts with full job description & career path [increase in thousands] | Value | Posts satisfying these criteria as of July 30, 200 | 40 | 60 |
Date | May 29, 2007 | June 4, 2014 | December 31, 2014 | |
Comment |
SECOP used by all national administration | Value | 5 percent | 70 percent | 100 percent |
Date | May 29, 2007 | June 4, 2014 | December 31, 2014 | |
Comment |
A plan and model for citizen-centric single-window portal and the portal for proceedings finalized, visits to portals and % increase in satisfaction rates of users, as measured by satisfaction survey | Value | Existing national portal and proceedings portal | Achieved. In 2014, the portal has received 3,202,3 | Pilots are expanded and assessed to design the fin |
Date | May 29, 2007 | December 10, 2014 | December 31, 2014 | |
Comment |
Quick-gains programs studies done and implementation strategy developed | Value | 0.00 | 0.00 | 0.00 |
Date | June 4, 2014 | |||
Comment |
The E-government Unified Services Platform implemented and in operation | Value | No platform | Achieved. | Platform in operation |
Date | June 4, 2014 | December 31, 2013 | ||
Comment |
Reduction of number of days in responding to access to information | Value | Achieved. The Decree 1172/2003 provides 10 days to | 60% | |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Guidelines for ISO 9001 certification designed and disseminated among agencies | Value | 0 | Achieved. | 20% |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Percent increase of users understanding quality standards, goal, and indicators adopted by CCP agencies measured through annual surveys | Value | 75%. | 70% | |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Quality management of INAP training, certified by ISO norms | Value | Achieved. | Accreditation by INAP of third parties training pr | |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Percentage of federal government staff trained through the PROCAE. | Value | 1 percent (2.000 employees) | Achieved. 136,706 employees trained. | 30 percent (60.000 employees) |
Date | December 10, 2014 | December 31, 2014 | ||
Comment |
Percentage of technical and professional staff in ONEP and the personnel offices in ministries and agencies trained in new technologies and employment regimes | Value | 10 | 70 | 85 |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Civilian central government posts with full job description & career path [increase in thousands] | Value | By 2008 120.000 in 45 profiles | 40 | 60 |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Procurement plans advertised publicly annually | Value | 5 percent | 100% | 100% |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
New modalities introduced in national system by agency | Value | 0 | 5 percent of national purchases use the new modali | 10 percent of procurement units in federal adminis |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
SECOP used by all national administration | Value | 5% | 70% | 100% |
Date | June 4, 2014 | December 31, 2011 | ||
Comment |
A plan and model for a citizen-centric single-window portal and the portal for proceedings are finalized, visits to the portals andpercent increase in satisfaction rates of users | Value | Existing national portal and proceedings portal | Achieved. In 2014, the portal has received 3,202,3 | Pilots are expanded and assessed to design the fin |
Date | December 10, 2014 | December 31, 2014 | ||
Comment |
A security data center for small agencies is implemented and 15 agencies are now using the center as the main data center for critical systems. | Value | Achieved. The new data center for government is f | Center is fully operational and it is evaluated | |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Ministries with strategic planning processes that enable the application of a system of results-based management | Value | 0.00 | 6.00 | 6.00 |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Elaboration of a diagnosis of RBM programs executed during the first SMP, development of the conceptual model and methodological framework of an integrated results-based management system for the APN | Value | Achieved. | Report on lessons learned from pilot. | |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Institutional performance indicators of the agencies that represent 50% of public expenditure in the National Public Administration, incorporated into the M&E system and monitored | Value | 0.00 | 75.00 | 50.00 |
Date | December 10, 2014 | December 31, 2014 | ||
Comment |
Ad hoc reports are prepared by SISEG for each budget reallocation of JGM when they affect the budget appropriations of the agenciesthat are being monitored | Value | None | Achieved. | Reports are prepared by SISEG for each budget real |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |
Stakeholder analysis to assess support to project activities | Value | None | Achieved. | Report on implementation of lessons learned |
Date | June 4, 2014 | December 31, 2014 | ||
Comment |