Financier | Commitments |
---|---|
Borrower/Recipient | 179.00 |
International Bank for Reconstruction and Development | 117.70 |
P101928
Closed
Carlos Bortman
REPUBLIC OF KAZAKHSTAN
October 17, 2006
(as of board presentation)
January 15, 2008
December 15, 2008
US$ 296.70 million
Ministry of Health (MoH)
2008
US$ 117.70 million
C
March 28, 2024
June 30, 2017
BANK APPROVED
Financier | Commitments |
---|---|
Borrower/Recipient | 179.00 |
International Bank for Reconstruction and Development | 117.70 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | 117.70 |
IDA Commitment | N/A |
IBRD + IDA Commitment | 117.70 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 296.70 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Oct 15, 2013 | IBRD-48830 | Loan Disb | 218,094.50 |
Oct 15, 2013 | IBRD-48830 | Loan Disb | 298,788.00 |
Oct 15, 2013 | IBRD-48830 | Loan Disb | 858,017.60 |
Jan 15, 2014 | IBRD-48830 | Int Charges | 104,650.56 |
Jan 15, 2014 | IBRD-48830 | Loan Repay | 5,885,000.00 |
Jan 15, 2014 | IBRD-48830 | Int Charges | 504.84 |
Jan 15, 2017 | IBRD-48830 | Int Charges | 174,618.95 |
Jan 26, 2017 | IBRD-48830 | Loan Disb | 10,000.00 |
Jan 15, 2017 | IBRD-48830 | Loan Repay | 5,883,201.00 |
Dec 22, 2016 | IBRD-48830 | Loan Disb | 2,959,217.00 |
Oct 20, 2015 | IBRD-48830 | Loan Disb | 520,000.00 |
Sep 14, 2015 | IBRD-48830 | Loan Disb | 133,088.75 |
Sep 14, 2015 | IBRD-48830 | Loan Disb | 139,749.06 |
Dec 18, 2015 | IBRD-48830 | Loan Disb | 367,126.00 |
Dec 18, 2015 | IBRD-48830 | Loan Disb | 89,042.88 |
Dec 18, 2015 | IBRD-48830 | Loan Disb | 45,329.12 |
Dec 16, 2015 | IBRD-48830 | Loan Disb | 174,046.30 |
Oct 2, 2015 | IBRD-48830 | Loan Disb | 374,317.56 |
Dec 11, 2015 | IBRD-48830 | Loan Disb | 60,372.91 |
Dec 11, 2015 | IBRD-48830 | Loan Disb | 342,076.12 |
Feb 3, 2016 | IBRD-48830 | Loan Disb | 75,930.37 |
Dec 4, 2015 | IBRD-48830 | Loan Disb | 647,799.80 |
Dec 4, 2015 | IBRD-48830 | Loan Disb | 399,749.06 |
Nov 30, 2015 | IBRD-48830 | Loan Disb | 106,128.80 |
Jan 15, 2016 | IBRD-48830 | Int Charges | 214.34 |
Jan 15, 2016 | IBRD-48830 | Int Charges | 103,664.17 |
Jan 15, 2016 | IBRD-48830 | Loan Repay | 5,883,201.00 |
Dec 14, 2016 | IBRD-48830 | Loan Disb | 3,916,805.20 |
Jul 26, 2016 | IBRD-48830 | Loan Disb | 13,000.00 |
Jul 15, 2016 | IBRD-48830 | Int Charges | 1,393.32 |
Jul 15, 2016 | IBRD-48830 | Int Charges | 158,792.72 |
Jul 15, 2016 | IBRD-48830 | Loan Repay | 5,883,201.00 |
Jul 15, 2016 | IBRD-48830 | Loan Disb | 383,205.03 |
Oct 24, 2016 | IBRD-48830 | Loan Disb | 60,000.00 |
May 31, 2016 | IBRD-48830 | Loan Disb | 31,000.00 |
Dec 21, 2016 | IBRD-48830 | Loan Disb | 420,865.60 |
Nov 28, 2016 | IBRD-48830 | Loan Disb | 105,216.40 |
Jul 15, 2015 | IBRD-48830 | Int Charges | 881.85 |
Jul 15, 2015 | IBRD-48830 | Int Charges | 86,675.77 |
Jul 15, 2015 | IBRD-48830 | Loan Repay | 5,885,000.00 |
Aug 28, 2015 | IBRD-48830 | Loan Disb | 74,533.43 |
Jul 8, 2015 | IBRD-48830 | Loan Disb | 809,749.75 |
Jul 8, 2015 | IBRD-48830 | Loan Disb | 357,208.06 |
Aug 28, 2015 | IBRD-48830 | Loan Disb | 260,000.00 |
Jul 16, 2015 | IBRD-48830 | Loan Disb | 410,491.30 |
Jul 30, 2015 | IBRD-48830 | Loan Disb | 129,429.92 |
Jul 22, 2015 | IBRD-48830 | Loan Cancel | 26,983.07 |
May 13, 2015 | IBRD-48830 | Loan Disb | 149,908.45 |
Apr 17, 2015 | IBRD-48830 | Loan Disb | 282,300.50 |
Apr 17, 2015 | IBRD-48830 | Loan Disb | 159,706.50 |
Aug 12, 2015 | IBRD-48830 | Loan Disb | 149,908.47 |
Aug 25, 2015 | IBRD-48830 | Loan Disb | 120,689.10 |
Apr 27, 2015 | IBRD-48830 | Loan Disb | 273,660.88 |
Jun 23, 2015 | IBRD-48830 | Loan Disb | 79,596.60 |
Jun 23, 2015 | IBRD-48830 | Loan Disb | 101,608.80 |
Apr 30, 2015 | IBRD-48830 | Loan Disb | 126,566.20 |
Sep 29, 2015 | IBRD-48830 | Loan Disb | 390,000.00 |
Dec 11, 2013 | IBRD-48830 | Loan Disb | 982,224.56 |
Apr 1, 2014 | IBRD-48830 | Loan Disb | 370,513.70 |
Mar 27, 2014 | IBRD-48830 | Loan Disb | 134,324.72 |
May 23, 2014 | IBRD-48830 | Loan Disb | 254,250.06 |
Jun 30, 2014 | IBRD-48830 | Loan Disb | 282,241.84 |
Jun 30, 2014 | IBRD-48830 | Loan Disb | 647,799.80 |
Jun 23, 2014 | IBRD-48830 | Loan Disb | 135,478.40 |
Jun 2, 2014 | IBRD-48830 | Loan Disb | 323,899.90 |
Jun 30, 2014 | IBRD-48830 | Loan Disb | 74,954.23 |
Jul 15, 2014 | IBRD-48830 | Int Charges | 85,033.69 |
Jul 15, 2014 | IBRD-48830 | Loan Repay | 5,885,000.00 |
Jul 15, 2014 | IBRD-48830 | Int Charges | 975.04 |
Dec 12, 2014 | IBRD-48830 | Loan Disb | 124,923.72 |
Jan 15, 2008 | IBRD-48830 | Loan Commitment | 117,700,000.00 |
Jan 15, 2023 | IBRD-48830 | Int Charges | 12,117.69 |
Jan 15, 2023 | IBRD-48830 | Int Charges | 99,368.59 |
Jan 15, 2023 | IBRD-48830 | Loan Repay | 5,338,699.00 |
Aug 15, 2023 | IBRD-48830 | Int Charges | 7,018.75 |
Jan 15, 2022 | IBRD-48830 | Int Charges | 39,292.84 |
Jan 15, 2022 | IBRD-48830 | Loan Repay | 5,338,699.00 |
Jul 15, 2022 | IBRD-48830 | Int Charges | 39,663.92 |
Jul 15, 2022 | IBRD-48830 | Loan Repay | 5,338,699.00 |
Jul 15, 2021 | IBRD-48830 | Int Charges | 61,199.30 |
Jul 15, 2021 | IBRD-48830 | Loan Repay | 5,338,699.00 |
Jul 15, 2020 | IBRD-48830 | Loan Repay | 5,338,699.00 |
Jul 15, 2020 | IBRD-48830 | Int Charges | 348,172.12 |
Jan 15, 2021 | IBRD-48830 | Int Charges | 87,317.38 |
Jan 15, 2021 | IBRD-48830 | Loan Repay | 5,338,699.00 |
Jul 15, 2019 | IBRD-48830 | Int Charges | 682,709.20 |
Jul 15, 2019 | IBRD-48830 | Loan Repay | 5,371,339.50 |
Aug 6, 2019 | IBRD-48830 | Loan Disb | -195,844.00 |
Jan 15, 2020 | IBRD-48830 | Int Charges | 478,233.20 |
Jan 15, 2020 | IBRD-48830 | Loan Repay | 5,371,339.50 |
Aug 6, 2019 | IBRD-48830 | Loan Cancel | 195,844.00 |
Jul 15, 2018 | IBRD-48830 | Int Charges | 577,926.30 |
Jul 15, 2018 | IBRD-48830 | Loan Repay | 5,371,339.50 |
Jan 15, 2019 | IBRD-48830 | Int Charges | 691,828.56 |
Jan 15, 2019 | IBRD-48830 | Loan Repay | 5,371,339.50 |
May 25, 2017 | IBRD-48830 | Loan Disb | 379,946.78 |
Jun 28, 2017 | IBRD-48830 | Loan Disb | 173,208.06 |
May 17, 2017 | IBRD-48830 | Loan Disb | 1,222,990.00 |
Jul 10, 2017 | IBRD-48830 | Loan Disb | 324,800.00 |
Apr 11, 2017 | IBRD-48830 | Loan Disb | 682,107.90 |
Feb 23, 2017 | IBRD-48830 | Loan Disb | 2,456,742.50 |
Jul 11, 2017 | IBRD-48830 | Loan Disb | 2,492,885.20 |
Apr 11, 2017 | IBRD-48830 | Loan Disb | 47,892.00 |
Jun 30, 2017 | IBRD-48830 | Loan Disb | 994,000.00 |
Jun 30, 2017 | IBRD-48830 | Loan Disb | 388,689.00 |
Apr 4, 2017 | IBRD-48830 | Loan Disb | 406,840.90 |
Sep 12, 2017 | IBRD-48830 | Loan Disb | 537,946.75 |
Feb 22, 2017 | IBRD-48830 | Loan Disb | 65,000.00 |
Jul 15, 2017 | IBRD-48830 | Loan Repay | 5,883,201.00 |
Oct 17, 2017 | IBRD-48830 | Loan Disb | 425,351.72 |
Jul 15, 2017 | IBRD-48830 | Int Charges | 36,245.11 |
Jul 15, 2017 | IBRD-48830 | Int Charges | 407,944.34 |
Oct 30, 2017 | IBRD-48830 | Loan Disb | 240,352.00 |
Aug 30, 2017 | IBRD-48830 | Loan Disb | 5,694,828.50 |
Oct 30, 2017 | IBRD-48830 | Loan Disb | -143,550.25 |
Dec 18, 2014 | IBRD-48830 | Loan Disb | 342,076.06 |
Dec 18, 2014 | IBRD-48830 | Loan Disb | 397,720.00 |
Dec 18, 2014 | IBRD-48830 | Loan Disb | 87,172.80 |
Sep 25, 2014 | IBRD-48830 | Loan Disb | 351,644.00 |
Jan 15, 2015 | IBRD-48830 | Loan Repay | 5,885,000.00 |
Sep 11, 2014 | IBRD-48830 | Loan Disb | 195,000.00 |
Mar 27, 2015 | IBRD-48830 | Loan Disb | 120,689.10 |
Jan 15, 2015 | IBRD-48830 | Int Charges | 517.70 |
Jan 15, 2015 | IBRD-48830 | Int Charges | 83,092.90 |
Sep 23, 2014 | IBRD-48830 | Loan Disb | 199,890.00 |
Jun 18, 2015 | IBRD-48830 | Loan Disb | 133,088.75 |
Dec 15, 2014 | IBRD-48830 | Loan Disb | 195,000.00 |
Dec 15, 2014 | IBRD-48830 | Loan Disb | 106,471.00 |
Dec 15, 2014 | IBRD-48830 | Loan Disb | 809,749.75 |
Dec 19, 2014 | IBRD-48830 | Loan Disb | 304,425.10 |
Jul 10, 2013 | IBRD-48830 | Loan Disb | 449,872.50 |
Jul 15, 2013 | IBRD-48830 | Int Charges | 3,769.44 |
Jul 15, 2013 | IBRD-48830 | Int Charges | 128,612.78 |
Jul 15, 2013 | IBRD-48830 | Loan Repay | 5,885,000.00 |
Dec 9, 2014 | IBRD-48830 | Loan Disb | 101,608.80 |
Aug 28, 2013 | IBRD-48830 | Loan Disb | 260,758.02 |
Aug 21, 2013 | IBRD-48830 | Loan Disb | 99,596.00 |
Feb 25, 2014 | IBRD-48830 | Loan Disb | 192,905.75 |
Dec 16, 2013 | IBRD-48830 | Loan Disb | 192,905.75 |
Nov 26, 2013 | IBRD-48830 | Loan Disb | 215,117.25 |
Dec 16, 2013 | IBRD-48830 | Loan Disb | 134,810.00 |
Oct 15, 2013 | IBRD-48830 | Loan Disb | 254,527.40 |
Dec 16, 2013 | IBRD-48830 | Loan Disb | 179,949.00 |
Dec 19, 2013 | IBRD-48830 | Loan Disb | 137,936.00 |
Dec 18, 2013 | IBRD-48830 | Loan Disb | 177,968.10 |
Dec 19, 2013 | IBRD-48830 | Loan Disb | 134,324.73 |
Dec 19, 2013 | IBRD-48830 | Loan Disb | 73,500.00 |
Oct 31, 2017 | IBRD-48830 | Loan Cancel | 5,118,617.00 |
Jan 15, 2018 | IBRD-48830 | Int Charges | 5,530.51 |
Jan 15, 2018 | IBRD-48830 | Int Charges | 504,532.28 |
Jan 15, 2018 | IBRD-48830 | Loan Repay | 5,883,201.00 |
Dec 21, 2016 | IBRD-48830 | Loan Disb | 351,000.00 |
Dec 13, 2016 | IBRD-48830 | Loan Disb | 401,790.75 |
Nov 16, 2016 | IBRD-48830 | Loan Disb | 144,215.00 |
Nov 29, 2016 | IBRD-48830 | Loan Disb | 15,667,221.00 |
Jun 17, 2016 | IBRD-48830 | Loan Disb | 40,000.00 |
Jun 17, 2016 | IBRD-48830 | Loan Disb | 3,472,000.00 |
Dec 21, 2016 | IBRD-48830 | Loan Disb | 305,948.40 |
Nov 28, 2016 | IBRD-48830 | Loan Disb | 76,487.10 |
Nov 16, 2016 | IBRD-48830 | Loan Disb | 1,607,163.00 |
Nov 16, 2016 | IBRD-48830 | Loan Disb | 117,000.00 |
Aug 16, 2016 | IBRD-48830 | Loan Disb | 25,000.00 |
Dec 8, 2016 | IBRD-48830 | Loan Disb | 72,180.80 |
Sep 27, 2016 | IBRD-48830 | Loan Disb | 144,215.00 |
Sep 27, 2016 | IBRD-48830 | Loan Disb | 30,000.00 |
Jan 15, 2017 | IBRD-48830 | Int Charges | 2,853.42 |
Name | Review | Date |
---|---|---|
Progress towards achievement of PDO | Moderately Satisfactory | 2017-06-14 |
Monitoring and Evaluation | Moderately Satisfactory | 2017-06-14 |
Financial Management | Satisfactory | 2017-06-14 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2017-06-14 |
Counterpart Funding | Satisfactory | 2017-06-14 |
Project Management | Satisfactory | 2017-06-14 |
Procurement | Moderately Satisfactory | 2017-06-14 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 12-28-2017 |
---|---|
Outcomes | |
Risk to Development Outcome | Substantial |
Bank Performance | |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 04-26-2018 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | Not Rated | N/a |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Increased funding for Primary Health Care | Value | 16.00 | 30.00 | 36.30 |
Date | December 31, 2011 | June 30, 2017 | December 31, 2016 | |
Comment |
Improved financial risk protection as defined by reduced share of household health spending in total health expenditures | Value | 32.90 | 30.00 | 35.30 |
Date | December 31, 2010 | June 30, 2017 | December 31, 2016 | |
Comment |
Master plans for capital investments, developed based on international best practice, used as a basis for capital investment allocations in at least 4 oblasts | Value | 0.00 | 4.00 | 16.00 |
Date | December 31, 2011 | June 30, 2017 | December 31, 2016 | |
Comment |
At least two evidence-based disease management programs, which include incentives for health care providers and patients, developedand endorsed by the Ministry of Health | Value | 0.00 | 2.00 | 3.00 |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Number of public health facilities accredited by national accreditation body in accordance with international standards | Value | 20.00 | 40.00 | 746.00 |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
ICT standards, which conform with international standards and include interoperability standards, are endorsed by Health ICT Regulatory Body and published | Value | No standards | 20 | 20 |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Legal and regulatory documents related to post-processing food standards revised in accordance with international standards | Value | Recommendations on revision of 26 food safety norm | HACCP system implementation in food industry expan | Pilot implementation of HACCP system completed at |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Project work plans, procurement plans, and budget produced and approved on an annual basis as described in the Project Operational Manual | Value | Yes | Yes | Yes |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Functional ICT standards in line with major international functional standards developed by Health ICT Regulatory Body | Value | No functional ICT standards | 5 functional ICT standards | 5 functional standards developed and approved: ele |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Health personnel receiving training (number) | Value | 10720.00 | 63066.00 | 95546.00 |
Date | December 31, 2011 | June 30, 2017 | December 31, 2016 | |
Comment |
Health facilities constructed, renovated, and/or equipped (number) | Value | 160.00 | 2058.00 | 336.00 |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Increased capacity for health policy analysis (as measured by number of national analytical reports produced annually) | Value | 0.00 | 4.00 | 7.00 |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
NHA reports produced annually, disaggregated by national and sub-national levels, and disseminated among key stakeholders | Value | Yes | Yes | Yes |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Oblast-level health network master plans endorsed for at least 4 oblasts | Value | 0.00 | 4.00 | 16.00 |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Evidence-based incentives for providers in disease management programs implemented | Value | No evidence-based incentives for providers | Optimized set of evidence-based incentives and pay | Evidence-based incentives for providers have not b |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
New network planning tools and new facility standards formally adopted by the Ministry of Health | Value | New hospital planning tools and standards develope | New tools and standards for planning hospitals, la | New tools and standards for planning hospitals, la |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Master plans for capital investments developed for 16 regions based on international best practice | Value | 5.00 | 16.00 | 16.00 |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Incentives introduced, including revision of co-payments, for patients to comply with diseases management programs | Value | No incentives for patients | Optimized set of incentives for patients implement | Incentives for patients have not been implemented |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Criteria, procedures and standards for accreditation of health facilities developed, adopted and implemented in line with international practice | Value | Health facility accreditation standards developed | Accreditation criteria, procedures and standards r | National accreditation standards for inpatient car |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Evidence-based CPGs for selected disease management programs developed | Value | No CPGs for disease management programs | CPGs for disease management programs implemented | CPGs for three diseases (arterial hypertension, di |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Increase in share of voluntary blood donations by 2015 | Value | 83.00 | 88.00 | 92.00 |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Decrease in absolute number of paid donations by 2015 | Value | 38800.00 | 33400.00 | 20467.00 |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Criteria, procedures and standards for accreditation of basic medical education programs developed, adopted and implemented in linewith international practice | Value | No educational programs accredited | Educational programs for “General Medicine” of two | National institutional accreditation was received |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
IT-infrastructure for deployment of UHMIS in selected oblasts developed by the Ministry of Health | Value | IT infrastructure developed in 140 health organiza | IT infrastructure developed in 2,000 health organi | Akmola: 140 health facilitiesKaraganda: 150 healt |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |
Drug price reference system for drugs included in the National Formulary Book developed and adopted by the Ministry of Health | Value | Ceiling prices for drugs set | Reference drug prices refined based on implementat | Price-setting rules for drugs and medical supplies |
Date | December 31, 2011 | June 30, 2017 | June 9, 2017 | |
Comment |