P103160
Closed
Muhammad Malik , Lucian Pop, Amjad Khan
ISLAMIC REPUBLIC OF PAKISTAN
June 26, 2007
(as of board presentation)
June 18, 2009
August 4, 2009
US$ 2255.00 million
Benazir Income Support Program
2009
US$ 255.00 million
C
July 20, 2023
June 30, 2017
BANK APPROVED
Financier | Commitments |
---|---|
Borrower/Recipient | 2000.00 |
UK: British Department for International Development (DFID) | 105.00 |
IDA Credit | 150.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 150.00 |
IBRD + IDA Commitment | 150.00 |
Lending Instrument | |
---|---|
Grant Amount | 105.00 |
Total Project Cost** | 2255.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Jun 3, 2015 | IDA-45890 | Loan Disb | 2,000,000.00 |
Jun 17, 2015 | IDA-50420 | Loan Disb | 18,168,232.00 |
Jun 17, 2015 | IDA-50420 | Loan Disb | 9,084,116.00 |
Oct 15, 2015 | IDA-50420 | Int Charges | 17,138.84 |
Oct 15, 2015 | IDA-50420 | Int Charges | 17,138.84 |
Oct 15, 2015 | IDA-50420 | Int Charges | 262,785.16 |
Oct 15, 2015 | IDA-50420 | Int Charges | 262,785.16 |
Oct 15, 2015 | IDA-50420 | Int Charges | 459,022.28 |
Feb 2, 2016 | IDA-50420 | Loan Disb | 4,457,853.00 |
Dec 15, 2015 | IDA-45890 | Int Charges | 4,384.47 |
Jun 15, 2020 | IDA-45890 | Loan Repay | 672,613.06 |
Jun 15, 2020 | IDA-45890 | Int Charges | 191,130.81 |
Jun 15, 2020 | IDA-45890 | Int Charges | 191,130.81 |
Jun 15, 2020 | IDA-45890 | Int Charges | 8,440.16 |
Jun 15, 2020 | IDA-45890 | Int Charges | 8,440.16 |
Oct 15, 2020 | IDA-50420 | Loan Repay | 2,220.12 |
Oct 15, 2020 | IDA-50420 | Loan Repay | 2,249,930.50 |
Oct 15, 2020 | IDA-50420 | Int Charges | 452,733.50 |
Oct 15, 2020 | IDA-50420 | Int Charges | 452,733.50 |
Oct 15, 2020 | IDA-50420 | Int Charges | 750,046.25 |
Dec 15, 2020 | IDA-45890 | Loan Repay | 701,202.90 |
Dec 15, 2020 | IDA-45890 | Int Charges | 188,269.08 |
Dec 15, 2020 | IDA-45890 | Int Charges | 188,269.08 |
Dec 15, 2020 | IDA-45890 | Int Charges | 8,476.40 |
Dec 15, 2020 | IDA-45890 | Int Charges | 8,476.40 |
Jun 15, 2021 | IDA-45890 | Loan Repay | 701,783.10 |
Jun 15, 2021 | IDA-45890 | Int Charges | 195,873.62 |
Jun 15, 2021 | IDA-45890 | Int Charges | 195,873.62 |
Jun 15, 2021 | IDA-45890 | Int Charges | 16,846.64 |
Jun 15, 2021 | IDA-45890 | Int Charges | 16,846.64 |
Apr 15, 2021 | IDA-50420 | Int Charges | -0.01 |
Apr 15, 2021 | IDA-50420 | Int Charges | 4,564.16 |
Apr 15, 2021 | IDA-50420 | Loan Repay | 2,279,402.80 |
Apr 15, 2021 | IDA-50420 | Int Charges | 449,664.00 |
Apr 15, 2021 | IDA-50420 | Int Charges | 449,664.00 |
Apr 15, 2021 | IDA-50420 | Int Charges | 749,440.00 |
Apr 15, 2021 | IDA-50420 | Loan Repay | 0.01 |
Oct 15, 2021 | IDA-50420 | Loan Repay | 0.01 |
Oct 15, 2021 | IDA-50420 | Loan Repay | 2,223,102.20 |
Oct 15, 2021 | IDA-50420 | Int Charges | 435,953.50 |
Oct 15, 2021 | IDA-50420 | Int Charges | 435,953.50 |
Oct 15, 2021 | IDA-50420 | Int Charges | 726,589.20 |
Oct 15, 2021 | IDA-50420 | Loan Repay | 29,622.92 |
Apr 15, 2022 | IDA-50420 | Loan Repay | 20,488.51 |
Apr 15, 2022 | IDA-50420 | Loan Repay | 2,159,671.00 |
Apr 15, 2022 | IDA-50420 | Int Charges | 413,734.80 |
Apr 15, 2022 | IDA-50420 | Int Charges | 413,734.80 |
Apr 15, 2022 | IDA-50420 | Int Charges | 689,558.00 |
Jun 15, 2022 | IDA-45890 | Int Charges | 182,653.89 |
Dec 15, 2015 | IDA-45890 | Int Charges | 4,384.47 |
Dec 15, 2015 | IDA-45890 | Int Charges | 179,141.89 |
Dec 15, 2015 | IDA-45890 | Int Charges | 179,141.89 |
Dec 29, 2015 | IDA-45890 | Loan Disb | 1,238,574.00 |
Apr 15, 2016 | IDA-50420 | Int Charges | 7,452.34 |
Apr 15, 2016 | IDA-50420 | Int Charges | 327,069.80 |
Apr 15, 2016 | IDA-50420 | Int Charges | 327,069.80 |
Apr 15, 2016 | IDA-50420 | Int Charges | 525,110.20 |
Mar 29, 2016 | IDA-50420 | Loan Disb | 22,555,488.00 |
Jun 15, 2016 | IDA-45890 | Int Charges | 3,171.95 |
Jun 15, 2016 | IDA-45890 | Int Charges | 181,815.77 |
Oct 15, 2016 | IDA-50420 | Int Charges | 19,622.58 |
Oct 15, 2016 | IDA-50420 | Int Charges | 440,492.10 |
Oct 15, 2016 | IDA-50420 | Int Charges | 440,492.10 |
Oct 15, 2016 | IDA-50420 | Int Charges | 734,153.56 |
Jun 21, 2016 | IDA-50420 | Loan Disb | 14,654,779.00 |
Nov 3, 2016 | IDA-50420 | Loan Disb | 10,652,257.00 |
Jun 15, 2016 | IDA-45890 | Int Charges | 181,815.77 |
Jun 15, 2016 | IDA-45890 | Int Charges | 3,171.95 |
Sep 6, 2016 | IDA-45890 | Loan Disb | 7,034,373.50 |
Apr 15, 2017 | IDA-50420 | Int Charges | 488,691.94 |
Oct 15, 2017 | IDA-50420 | Loan Repay | 2,257,336.20 |
Oct 15, 2017 | IDA-50420 | Int Charges | 23,092.33 |
Dec 15, 2017 | IDA-45890 | Int Charges | 3,641.25 |
Dec 15, 2017 | IDA-45890 | Int Charges | 213,169.55 |
Dec 15, 2017 | IDA-45890 | Int Charges | 213,169.55 |
Dec 15, 2017 | IDA-45890 | Int Charges | 3,641.25 |
Apr 15, 2018 | IDA-50420 | Int Charges | 19,524.53 |
Apr 15, 2018 | IDA-50420 | Loan Repay | 2,320,599.80 |
Apr 15, 2018 | IDA-50420 | Int Charges | 510,004.53 |
Apr 15, 2018 | IDA-50420 | Int Charges | 510,004.53 |
Apr 15, 2018 | IDA-50420 | Int Charges | 850,007.56 |
Jun 15, 2018 | IDA-45890 | Int Charges | 108.85 |
Jun 15, 2018 | IDA-45890 | Int Charges | 108.85 |
Jun 15, 2018 | IDA-45890 | Int Charges | 212,606.94 |
Jun 15, 2018 | IDA-45890 | Int Charges | 212,606.94 |
Dec 15, 2018 | IDA-45890 | Int Charges | 6,538.03 |
Dec 15, 2018 | IDA-45890 | Int Charges | 6,538.03 |
Dec 15, 2018 | IDA-45890 | Int Charges | 199,977.72 |
Dec 15, 2018 | IDA-45890 | Int Charges | 199,977.72 |
Nov 5, 2018 | IDA-45890 | Loan Cancel | 1,648,758.90 |
Oct 15, 2018 | IDA-50420 | Int Charges | 766,619.25 |
Oct 15, 2018 | IDA-50420 | Loan Repay | 10,608.74 |
Oct 15, 2018 | IDA-50420 | Loan Repay | 2,219,730.80 |
Oct 15, 2018 | IDA-50420 | Int Charges | 481,804.00 |
Oct 15, 2018 | IDA-50420 | Int Charges | 481,804.00 |
Nov 5, 2018 | IDA-45890 | Loan Disb | -1,648,758.90 |
Apr 15, 2019 | IDA-50420 | Int Charges | 774,976.25 |
Apr 15, 2019 | IDA-50420 | Int Charges | 36,196.41 |
Apr 15, 2019 | IDA-50420 | Loan Repay | 2,218,628.20 |
Apr 15, 2019 | IDA-50420 | Int Charges | 470,954.22 |
Apr 15, 2019 | IDA-50420 | Int Charges | 470,954.22 |
Jun 15, 2019 | IDA-45890 | Int Charges | 4,210.14 |
Jun 15, 2019 | IDA-45890 | Int Charges | 4,210.14 |
Jun 15, 2019 | IDA-45890 | Int Charges | 198,155.98 |
Jun 15, 2019 | IDA-45890 | Int Charges | 198,155.98 |
Oct 15, 2019 | IDA-50420 | Loan Repay | 2,187,068.20 |
Oct 15, 2019 | IDA-50420 | Int Charges | 456,053.44 |
Oct 15, 2019 | IDA-50420 | Int Charges | 456,053.44 |
Jun 15, 2022 | IDA-45890 | Int Charges | 182,653.89 |
Jun 15, 2022 | IDA-45890 | Loan Repay | 9,684.25 |
Jun 15, 2022 | IDA-45890 | Loan Repay | 639,751.75 |
Dec 15, 2021 | IDA-45890 | Int Charges | 194,083.70 |
Dec 15, 2021 | IDA-45890 | Int Charges | 194,083.70 |
Dec 15, 2021 | IDA-45890 | Int Charges | 6,565.86 |
Dec 15, 2021 | IDA-45890 | Int Charges | 6,565.86 |
Dec 15, 2021 | IDA-45890 | Loan Repay | 680,995.44 |
Oct 15, 2022 | IDA-50420 | Int Charges | 631,460.20 |
Oct 15, 2022 | IDA-50420 | Loan Repay | 82,759.15 |
Oct 15, 2022 | IDA-50420 | Loan Repay | 1,953,960.40 |
Oct 15, 2022 | IDA-50420 | Int Charges | 378,876.10 |
Oct 15, 2022 | IDA-50420 | Int Charges | 378,876.10 |
Dec 15, 2022 | IDA-45890 | Loan Repay | 21,604.77 |
Dec 15, 2022 | IDA-45890 | Loan Repay | 627,338.75 |
Dec 15, 2022 | IDA-45890 | Int Charges | 146,249.52 |
Dec 15, 2022 | IDA-45890 | Int Charges | 146,249.52 |
Apr 15, 2023 | IDA-50420 | Int Charges | 393,948.94 |
Apr 15, 2023 | IDA-50420 | Int Charges | 393,948.94 |
Sep 7, 2016 | IDA-45890 | Loan Disb | 1,870.87 |
Dec 15, 2016 | IDA-45890 | Int Charges | 77.75 |
Dec 15, 2016 | IDA-45890 | Int Charges | 190,588.22 |
Dec 15, 2016 | IDA-45890 | Int Charges | 190,588.22 |
Dec 15, 2016 | IDA-45890 | Int Charges | 77.75 |
Apr 15, 2017 | IDA-50420 | Int Charges | 792,311.25 |
Apr 15, 2017 | IDA-50420 | Loan Repay | 14,665.88 |
Oct 15, 2017 | IDA-50420 | Int Charges | 822,075.25 |
Oct 15, 2017 | IDA-50420 | Int Charges | 504,640.56 |
Oct 15, 2017 | IDA-50420 | Int Charges | 504,640.56 |
Oct 15, 2017 | IDA-50420 | Int Charges | -49.63 |
Oct 15, 2017 | IDA-50420 | Int Charges | 49.63 |
Jun 15, 2017 | IDA-45890 | Int Charges | 5,530.22 |
Jun 15, 2017 | IDA-45890 | Int Charges | 5,530.22 |
Jun 15, 2017 | IDA-45890 | Int Charges | 199,277.22 |
Jun 15, 2017 | IDA-45890 | Int Charges | 199,277.22 |
Jun 21, 2016 | IDA-50420 | Loan Disb | 14,666,980.00 |
Jun 21, 2016 | IDA-50420 | Loan Disb | -14,654,779.00 |
Apr 15, 2017 | IDA-50420 | Loan Repay | 2,153,032.50 |
Apr 15, 2017 | IDA-50420 | Int Charges | 488,691.94 |
Oct 15, 2019 | IDA-50420 | Int Charges | 760,089.06 |
Oct 15, 2019 | IDA-50420 | Int Charges | 9,806.05 |
Dec 15, 2019 | IDA-45890 | Loan Repay | 1,050.34 |
Dec 15, 2019 | IDA-45890 | Loan Repay | 673,874.10 |
Dec 15, 2019 | IDA-45890 | Int Charges | 194,008.14 |
Oct 15, 2014 | IDA-50420 | Int Charges | 221,181.50 |
Oct 15, 2014 | IDA-50420 | Int Charges | 221,181.50 |
Oct 15, 2014 | IDA-50420 | Int Charges | 368,635.80 |
Oct 15, 2014 | IDA-50420 | Int Charges | 1,492.58 |
Oct 15, 2013 | IDA-50420 | Int Charges | 16,361.41 |
Oct 15, 2013 | IDA-50420 | Int Charges | 207,415.55 |
Oct 15, 2013 | IDA-50420 | Int Charges | 207,415.55 |
Oct 15, 2013 | IDA-50420 | Int Charges | 341,274.60 |
Dec 15, 2013 | IDA-45890 | Int Charges | 2,136.99 |
Dec 15, 2013 | IDA-45890 | Int Charges | 2,136.99 |
Dec 15, 2013 | IDA-45890 | Int Charges | 188,422.34 |
Dec 15, 2013 | IDA-45890 | Int Charges | 188,422.34 |
Apr 15, 2014 | IDA-50420 | Int Charges | 378,874.16 |
Apr 15, 2014 | IDA-50420 | Int Charges | 4,470.03 |
Apr 15, 2014 | IDA-50420 | Int Charges | 228,258.50 |
Apr 15, 2014 | IDA-50420 | Int Charges | 228,258.50 |
Dec 15, 2014 | IDA-45890 | Int Charges | 178,926.25 |
Dec 15, 2014 | IDA-45890 | Int Charges | 178,926.25 |
Jun 15, 2014 | IDA-45890 | Int Charges | 189,603.25 |
Jun 15, 2014 | IDA-45890 | Int Charges | 978.73 |
Jun 15, 2014 | IDA-45890 | Int Charges | 978.73 |
Jun 15, 2014 | IDA-45890 | Int Charges | 189,603.25 |
Jun 18, 2014 | IDA-50420 | Loan Disb | 985,817.60 |
Dec 15, 2014 | IDA-45890 | Int Charges | 1,054.71 |
Dec 15, 2014 | IDA-45890 | Int Charges | 1,054.71 |
Jun 15, 2015 | IDA-45890 | Int Charges | 2,826.45 |
Jun 15, 2015 | IDA-45890 | Int Charges | 2,826.45 |
Jun 15, 2015 | IDA-45890 | Int Charges | 166,220.60 |
Jun 15, 2015 | IDA-45890 | Int Charges | 166,220.60 |
Apr 15, 2015 | IDA-50420 | Int Charges | 17,810.93 |
Apr 15, 2015 | IDA-50420 | Int Charges | 17,810.93 |
Apr 15, 2015 | IDA-50420 | Int Charges | 187,874.69 |
Apr 15, 2015 | IDA-50420 | Int Charges | 187,874.69 |
Apr 15, 2015 | IDA-50420 | Int Charges | 342,809.34 |
Apr 15, 2023 | IDA-50420 | Int Charges | 615,775.25 |
Apr 15, 2023 | IDA-50420 | Loan Repay | 104,767.16 |
Apr 15, 2023 | IDA-50420 | Loan Repay | 2,056,548.90 |
Jun 15, 2023 | IDA-45890 | Loan Repay | 650,806.25 |
Jun 15, 2023 | IDA-45890 | Int Charges | 178,158.20 |
Jun 15, 2023 | IDA-45890 | Int Charges | 178,158.20 |
Jun 15, 2023 | IDA-45890 | Int Charges | 33,929.42 |
Jun 15, 2023 | IDA-45890 | Int Charges | 33,929.42 |
Oct 15, 2023 | IDA-50420 | Int Charges | 39,460.69 |
Oct 15, 2023 | IDA-50420 | Loan Repay | 2,090,042.90 |
Oct 15, 2023 | IDA-50420 | Int Charges | 373,120.16 |
Oct 15, 2023 | IDA-50420 | Int Charges | 373,120.16 |
Oct 15, 2023 | IDA-50420 | Int Charges | 621,866.94 |
Dec 15, 2023 | IDA-45890 | Loan Repay | 640,905.06 |
Dec 15, 2023 | IDA-45890 | Int Charges | 157,411.20 |
Dec 15, 2023 | IDA-45890 | Int Charges | 157,411.20 |
Dec 15, 2023 | IDA-45890 | Loan Repay | 12,904.97 |
Apr 15, 2024 | IDA-50420 | Loan Repay | 2,046,832.90 |
Apr 15, 2024 | IDA-50420 | Int Charges | 367,081.12 |
Apr 15, 2024 | IDA-50420 | Int Charges | 367,081.12 |
Apr 15, 2024 | IDA-50420 | Loan Repay | 53,501.23 |
Apr 15, 2024 | IDA-50420 | Int Charges | 611,801.90 |
Jun 15, 2024 | IDA-45890 | Loan Repay | 642,511.60 |
Jun 15, 2024 | IDA-45890 | Int Charges | 170,279.06 |
Jun 15, 2024 | IDA-45890 | Int Charges | 170,279.06 |
Jun 15, 2024 | IDA-45890 | Int Charges | 18,787.13 |
Jun 15, 2024 | IDA-45890 | Int Charges | 18,787.13 |
Mar 6, 2012 | IDA-50420 | Loan Commitment | 150,000,000.00 |
Jun 18, 2009 | IDA-45890 | Loan Commitment | 60,000,000.00 |
Dec 15, 2019 | IDA-45890 | Int Charges | 194,008.14 |
Apr 15, 2020 | IDA-50420 | Int Charges | 744,176.40 |
Apr 15, 2020 | IDA-50420 | Loan Repay | 2,171,381.50 |
Apr 15, 2020 | IDA-50420 | Int Charges | 446,505.80 |
Apr 15, 2020 | IDA-50420 | Int Charges | 446,505.80 |
Apr 15, 2020 | IDA-50420 | Loan Repay | 9,113.13 |
Name | Review | Date |
---|---|---|
Progress towards achievement of PDO | Highly Satisfactory | 2017-06-08 |
Procurement | Satisfactory | 2017-06-08 |
Financial Management | Satisfactory | 2017-06-08 |
Monitoring and Evaluation | Satisfactory | 2017-06-08 |
Overall Implementation Progress (IP) | Satisfactory | 2017-06-08 |
Project Management | Satisfactory | 2017-06-08 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 12-28-2017 |
---|---|
Outcomes | |
Risk to Development Outcome | Highly Satisfactory |
Bank Performance | |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 06-22-2018 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Satisfactory | N/a |
Risk To Development Outcome | Substantial | N/a |
Bank Performance | Satisfactory | N/a |
Borrower Performance | Satisfactory | N/a |
Government Performance | Satisfactory | N/a |
Implementing Agency | Satisfactory | N/a |
Icr Quality | Modest | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Revised. Percentage of disbursed cash transfers received by beneficiaries in bottom quintiles 1 and 2 | Value | 46.00 | 75.00 | 70.00 |
Date | August 4, 2009 | August 31, 2016 | June 30, 2017 | |
Comment |
Number of households to which the poverty scorecard has been applied. | Value | 0.00 | 27360000.00 | 27000000.00 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Revised. Percentage of participating tehsils in which beneficiary lists are publicly available at the respective BISP tehsil offices | Value | 0.00 | 100.00 | 90.00 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Percentage of beneficiaries satisfied with program implementation | Value | 0.00 | 97.00 | 70.00 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Integrated Monitoring System for Federal and Provincial Social Protection Programs established and used for policy dialogue | Value | Not Established | Established | Monitoring system for policy dialogue used |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Number of Paid BISP beneficiaries (Basic Cash Transfer) eligible under the Poverty Scorecard (million) | Value | 2.00 | 5.60 | 5.20 |
Date | August 4, 2011 | April 30, 2017 | June 30, 2017 | |
Comment |
Number of children attending school under the Waseela-e-Taleem program. | Value | 0.00 | 1300000.00 | 500000.00 |
Date | August 4, 2011 | April 30, 2017 | June 30, 2017 | |
Comment |
Core indicator. Program Beneficiaries (estimated number of family members: 5) | Value | 10000000.00 | 28500000.00 | 26000000.00 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Percentage of Districts covered by targeting process; | Value | 5.00 | 99.50 | 90.00 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Number of female beneficiaries that receive payments (millions) | Value | 2.00 | 5.60 | 5.20 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Number of Signed MOUs with Provinces/Regions regarding collaboration for Waseela-e-Taleem | Value | 0.00 | 6.00 | 6.00 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Percentage of grievance redressal claims acted upon within 3 months of application | Value | 0.00 | 99.00 | 70.00 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
BISP stratified communication campaign for Waseela-e-Taleem is fialized and rolled out | Value | n/a | Information campaign has been rolled out in all di | Campaign rolling out in all targeted districts |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Revised. Percentage of planned BISP positions that are filled in headquarters and tehsil offices that are open. | Value | 0.00 | 94.00 | 80.00 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Revised. Number of reports publicized on BISP website which disseminate the results of impact, process and spot check evaluations | Value | 0.00 | 38.00 | 12.00 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Number of pilots implemented for exit strategies | Value | 0.00 | 2.00 | 2.00 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Revised. Regular spot checks and follow up actions on the findings | Value | 0.00 | 8.00 | 2.00 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Percentage of payments to BISP beneficiaries made through technology based mechanisms | Value | 0.00 | 97.00 | 70.00 |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |
Mapping of federal and provincial social protection programs completed | Value | n/a | National Social Protection Framework has been appr | Mapping report available |
Date | August 4, 2009 | April 30, 2017 | June 30, 2017 | |
Comment |