Bangladesh Disability and Children at Risk

Abstract*

The objective of the Disability and Children at Risk Project for Bangladesh is to expand the coverage, use, and quality of social care services for persons with disabilities and vulnerable children as a means of promoting equity and social inclusion. There are three components to the project. The first component is the expanding disability services, improving awareness, and building capacity. It will expand social and rehabilitation services for people...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

To expand coverage and improve quality of services for persons with disabilities and children at risk by strengthening and scaling up government service delivery systems.

Key Details

Project Details

  • P106332

  • Closed

  • Yoonyoung Cho , Ashiq Aziz

  • Economic Relations Division, Ministry of Finance

  • Bangladesh

  • October 23, 2007

  • (as of board presentation)

    July 1, 2008

  • January 22, 2009

  • US$ 35.00 million

  • Department of Social Services,Jatiyo Protibhondi Unnayan Foundation

  • South Asia

  • 2009

  • US$ 35.00 million

  • C

  • Not Applicable

  • June 30, 2016

  • BANK APPROVED

  • July 20, 2023

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Credit 35.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 35.00
IBRD + IDA Commitment 35.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 35.00

Summary Status of World Bank Financing (US$ Millions) as of April 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of April 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jul 27, 2014 IDA-44810 Loan Cancel 17,872.94
Jan 26, 2015 IDA-44810 Loan Disb 225,054.77
Aug 1, 2014 IDA-44810 Int Charges 122.30
Aug 1, 2014 IDA-44810 Int Charges 122.30
Feb 1, 2015 IDA-44810 Int Charges 522.27
Feb 1, 2015 IDA-44810 Int Charges 522.27
Feb 1, 2015 IDA-44810 Int Charges 23,426.01
Feb 1, 2015 IDA-44810 Int Charges 23,426.01
Aug 25, 2014 IDA-44810 Loan Disb 291,228.12
Mar 15, 2015 IDA-44810 Loan Cancel 38,399.19
Apr 9, 2015 IDA-44810 Loan Disb 17,681.23
May 14, 2015 IDA-44810 Loan Disb 220,806.44
May 6, 2015 IDA-44810 Loan Disb 257,197.31
Sep 1, 2015 IDA-44810 Loan Disb 44,172.24
Apr 29, 2015 IDA-44810 Loan Disb 82,125.33
Mar 30, 2015 IDA-44810 Loan Cancel 4,980,600.00
Aug 4, 2015 IDA-44810 Loan Disb 176,779.44
Jun 25, 2015 IDA-44810 Loan Disb 243,176.36
Aug 1, 2015 IDA-44810 Int Charges 888.56
Aug 1, 2015 IDA-44810 Int Charges 888.56
Aug 1, 2015 IDA-44810 Int Charges 26,892.52
Aug 1, 2015 IDA-44810 Int Charges 26,892.52
Aug 13, 2015 IDA-44810 Loan Disb 82,331.88
Aug 13, 2015 IDA-44810 Loan Disb 250,475.90
Apr 16, 2015 IDA-44810 Loan Disb 70,118.99
Aug 20, 2015 IDA-44810 Loan Disb 507,589.94
Oct 27, 2014 IDA-44810 Loan Disb 120,426.82
Oct 9, 2014 IDA-44810 Loan Disb 429,032.88
Feb 10, 2015 IDA-44810 Loan Disb 44,759.50
Feb 10, 2015 IDA-44810 Loan Disb 101,108.02
Nov 26, 2014 IDA-44810 Loan Disb 284,123.44
Jul 8, 2013 IDA-44810 Loan Disb 105,024.84
Aug 1, 2013 IDA-44810 Int Charges 10,544.67
Aug 1, 2013 IDA-44810 Int Charges 10,544.67
Aug 1, 2013 IDA-44810 Int Charges 46.86
Aug 1, 2013 IDA-44810 Int Charges 46.86
Oct 2, 2013 IDA-44810 Loan Disb 523,665.78
Jan 8, 2014 IDA-44810 Loan Disb 277,673.12
Feb 6, 2014 IDA-44810 Loan Disb 170,387.23
Feb 1, 2014 IDA-44810 Int Charges 619.95
Feb 1, 2014 IDA-44810 Int Charges 619.95
Feb 1, 2014 IDA-44810 Int Charges 15,582.87
Feb 1, 2014 IDA-44810 Int Charges 15,582.87
Feb 5, 2014 IDA-44810 Loan Disb 59,461.00
Feb 6, 2014 IDA-44810 Loan Disb 120,077.93
Dec 29, 2013 IDA-44810 Loan Cancel 8,807,697.00
May 6, 2014 IDA-44810 Loan Disb 171,639.19
Mar 18, 2014 IDA-44810 Loan Disb 318,417.90
Apr 15, 2014 IDA-44810 Loan Disb 1,609.37
Jun 26, 2014 IDA-44810 Loan Disb 102,010.32
Jun 4, 2014 IDA-44810 Loan Disb 145,587.81
Jun 4, 2014 IDA-44810 Loan Disb 178,350.50
Jun 9, 2014 IDA-44810 Loan Disb 40,575.59
Jun 11, 2014 IDA-44810 Loan Disb 182,236.58
Feb 23, 2015 IDA-44810 Loan Disb 85,932.41
Feb 23, 2015 IDA-44810 Loan Disb 13,499.24
Feb 1, 2018 IDA-44810 Int Charges 65,699.01
Feb 1, 2018 IDA-44810 Int Charges 65,699.01
Aug 1, 2018 IDA-44810 Int Charges 64,924.83
Aug 1, 2018 IDA-44810 Int Charges 64,924.83
Aug 1, 2018 IDA-44810 Int Charges 1,618.15
Aug 1, 2018 IDA-44810 Int Charges 1,618.15
Aug 1, 2018 IDA-44810 Loan Repay 176,234.38
Feb 1, 2019 IDA-44810 Loan Repay 2,510.67
Feb 1, 2019 IDA-44810 Int Charges 61,442.22
Feb 1, 2019 IDA-44810 Int Charges 61,442.22
Feb 1, 2022 IDA-44810 Int Charges 60,125.56
Feb 1, 2022 IDA-44810 Int Charges 60,125.56
Feb 1, 2022 IDA-44810 Loan Repay 2,730.23
Feb 1, 2023 IDA-44810 Loan Repay 4,045.61
Feb 1, 2023 IDA-44810 Loan Repay 162,632.70
Feb 1, 2023 IDA-44810 Int Charges 51,804.18
Feb 1, 2023 IDA-44810 Int Charges 51,804.18
Aug 1, 2023 IDA-44810 Int Charges 5,030.34
Dec 6, 2017 IDA-44810 Loan Cancel 312,550.88
Aug 1, 2019 IDA-44810 Int Charges 2,555.02
Aug 1, 2019 IDA-44810 Int Charges 2,555.02
Aug 1, 2019 IDA-44810 Loan Repay 172,030.42
Aug 1, 2019 IDA-44810 Int Charges -1,744.98
Aug 1, 2019 IDA-44810 Int Charges 1,744.98
Aug 1, 2019 IDA-44810 Int Charges 62,085.82
Aug 1, 2019 IDA-44810 Int Charges 62,085.82
Feb 1, 2020 IDA-44810 Loan Repay 1,380.65
Feb 1, 2020 IDA-44810 Loan Repay 168,431.33
Feb 1, 2020 IDA-44810 Int Charges 61,087.95
Feb 1, 2020 IDA-44810 Int Charges 61,087.95
Aug 1, 2020 IDA-44810 Int Charges 699.02
Aug 1, 2020 IDA-44810 Int Charges 699.02
Aug 1, 2020 IDA-44810 Loan Repay 174,266.48
Aug 1, 2020 IDA-44810 Int Charges 55,701.09
Aug 1, 2020 IDA-44810 Int Charges 55,701.09
Feb 1, 2021 IDA-44810 Loan Repay 177,377.95
Feb 1, 2021 IDA-44810 Int Charges 61,589.11
Feb 1, 2021 IDA-44810 Int Charges 61,589.11
Feb 1, 2021 IDA-44810 Int Charges 7,160.42
Feb 1, 2021 IDA-44810 Int Charges 7,160.42
Jun 13, 2017 IDA-44810 Loan Disb -102,562.66
Aug 1, 2017 IDA-44810 Int Charges 617.05
Aug 1, 2017 IDA-44810 Int Charges 617.05
Aug 1, 2017 IDA-44810 Int Charges 64,672.78
Aug 1, 2017 IDA-44810 Int Charges 64,672.78
Jun 13, 2017 IDA-44810 Loan Disb -6,830.30
Dec 6, 2017 IDA-44810 Loan Disb -53,595.17
Feb 1, 2018 IDA-44810 Int Charges 1,319.10
Feb 1, 2018 IDA-44810 Int Charges 1,319.10
Feb 1, 2019 IDA-44810 Loan Repay 173,139.66
Feb 18, 2016 IDA-44810 Loan Disb 12,101.92
Feb 18, 2016 IDA-44810 Loan Disb 43,312.09
Feb 18, 2016 IDA-44810 Loan Disb 261,260.33
Sep 28, 2016 IDA-44810 Loan Disb 129,502.10
Dec 6, 2016 IDA-44810 Loan Disb 128,942.90
Jul 11, 2016 IDA-44810 Loan Disb 84,358.10
Jun 23, 2016 IDA-44810 Loan Disb 174,478.48
Jun 23, 2016 IDA-44810 Loan Disb 124,603.13
Feb 1, 2017 IDA-44810 Int Charges 117.53
Feb 1, 2017 IDA-44810 Int Charges 117.53
Feb 1, 2017 IDA-44810 Int Charges 62,584.73
Feb 1, 2017 IDA-44810 Int Charges 62,584.73
Jan 31, 2017 IDA-44810 Loan Disb 111,453.70
Jan 31, 2017 IDA-44810 Loan Disb -111,453.70
Jul 13, 2016 IDA-44810 Loan Disb 108,699.53
Jun 22, 2016 IDA-44810 Loan Disb 73,462.58
Aug 1, 2016 IDA-44810 Int Charges 388.57
Aug 1, 2016 IDA-44810 Int Charges 388.57
Aug 1, 2016 IDA-44810 Int Charges 58,711.65
Aug 1, 2016 IDA-44810 Int Charges 58,711.65
Oct 26, 2016 IDA-44810 Loan Disb -92,486.12
Oct 26, 2016 IDA-44810 Loan Disb 92,486.12
Sep 14, 2015 IDA-44810 Loan Disb 182,983.69
Dec 14, 2015 IDA-44810 Loan Disb 21,535.31
Oct 27, 2015 IDA-44810 Loan Disb 395,517.94
Feb 8, 2016 IDA-44810 Loan Disb 108,324.75
Feb 8, 2016 IDA-44810 Loan Disb 372,084.00
Nov 18, 2015 IDA-44810 Loan Disb 25,464.73
Nov 30, 2015 IDA-44810 Loan Disb 217,115.19
Nov 30, 2015 IDA-44810 Loan Disb 189,314.38
Feb 8, 2016 IDA-44810 Loan Disb 15,261.34
Feb 1, 2016 IDA-44810 Int Charges 304.07
Feb 1, 2016 IDA-44810 Int Charges 304.07
Feb 1, 2016 IDA-44810 Int Charges 40,665.39
Feb 1, 2016 IDA-44810 Int Charges 40,665.39
Mar 15, 2016 IDA-44810 Loan Disb 5,052.17
Dec 21, 2015 IDA-44810 Loan Disb 156,388.89
Dec 21, 2015 IDA-44810 Loan Disb 140,400.66
Nov 3, 2015 IDA-44810 Loan Disb 669,046.50
Oct 8, 2015 IDA-44810 Loan Disb 1,600,200.00
Nov 3, 2015 IDA-44810 Loan Disb 295,420.88
Mar 2, 2016 IDA-44810 Loan Disb 204,491.27
Apr 21, 2016 IDA-44810 Loan Disb 777,399.50
Mar 23, 2016 IDA-44810 Loan Disb 122,399.01
Apr 26, 2016 IDA-44810 Loan Disb 318,877.56
Feb 24, 2016 IDA-44810 Loan Disb 75,761.27
May 3, 2016 IDA-44810 Loan Disb 337,833.88
Mar 14, 2016 IDA-44810 Loan Disb 718,926.70
Feb 25, 2016 IDA-44810 Loan Disb 177,799.98
Aug 1, 2014 IDA-44810 Int Charges 19,814.53
Aug 1, 2014 IDA-44810 Int Charges 19,814.53
Mar 23, 2015 IDA-44810 Loan Disb 73,443.89
Mar 23, 2015 IDA-44810 Loan Disb 65,233.59
Aug 1, 2023 IDA-44810 Int Charges 5,030.34
Aug 1, 2023 IDA-44810 Loan Repay 165,219.38
Aug 1, 2023 IDA-44810 Int Charges 54,120.10
Aug 1, 2023 IDA-44810 Int Charges 54,120.10
Feb 1, 2024 IDA-44810 Loan Repay 163,886.23
Feb 1, 2024 IDA-44810 Int Charges 1,628.22
Feb 1, 2024 IDA-44810 Int Charges 1,628.22
Feb 1, 2024 IDA-44810 Int Charges 54,697.05
Feb 1, 2024 IDA-44810 Int Charges 54,697.05
Aug 1, 2024 IDA-44810 Loan Repay 556.79
Aug 1, 2024 IDA-44810 Loan Repay 162,933.56
Aug 1, 2024 IDA-44810 Int Charges 53,599.18
Aug 1, 2024 IDA-44810 Int Charges 53,599.18
Jul 1, 2008 IDA-44810 Loan Commitment 35,000,000.00
Aug 1, 2021 IDA-44810 Int Charges 62,111.46
Aug 1, 2021 IDA-44810 Int Charges 1,591.21
Aug 1, 2021 IDA-44810 Int Charges 1,591.21
Aug 1, 2021 IDA-44810 Loan Repay 62,836.43
Aug 1, 2021 IDA-44810 Loan Repay 113,366.24
Aug 1, 2021 IDA-44810 Int Charges 62,111.46
Aug 1, 2022 IDA-44810 Loan Repay 163,118.28
Aug 1, 2022 IDA-44810 Int Charges 56,364.16
Aug 1, 2022 IDA-44810 Int Charges 56,364.16
Aug 1, 2022 IDA-44810 Loan Repay 256.15
Feb 1, 2022 IDA-44810 Loan Repay 169,672.81

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Satisfactory 2016-06-29
Monitoring and Evaluation Satisfactory 2016-06-29
Project Management Moderately Satisfactory 2016-06-29
Financial Management Moderately Satisfactory 2016-06-29
Procurement Moderately Satisfactory 2016-06-29
Overall Implementation Progress (IP) Moderately Satisfactory 2016-06-29

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 12-21-2016
Outcomes
Risk to Development OutcomeSubstantial
Bank Performance
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 09-28-2018PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeModestN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceModerately SatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualitySubstantialN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Number of persons with disabilities receiving services.Value8,168 served by 5 new disability service centers i370,464 (160,525 female and 209,939 male)100,000
    DateJune 24, 2011April 30, 2016June 30, 2016
    Comment
  • Number of children at risk receiving child protection services.ValueNo integrated services available for children-at- 6,193 (3,176 female and 3,017 male)3,000 children-at-risk served through ICPSCs
    DateJune 24, 2011April 30, 2016June 30, 2016
    Comment
  • Direct project beneficiariesValue8168.00376657.00103000.00
    DateJune 24, 2011April 30, 2016June 30, 2016
    Comment
  • Share of beneficiaries that report satisfaction with services received at disability service centers.Value54% of beneficiaries “fully satisfied” and 43% of 93.53% are satisfied70% of beneficiaries "fully satisfied"
    DateDecember 31, 2012June 1, 2016June 30, 2016
    Comment
  • Share of persons reporting greater awareness on related issues in communities where services have been provided.Value• Awareness regarding PWD: 12% aggregate awareness29.4% of interviewed individuals fully aware of go20% aware of key government programs for PWD and c
    DateDecember 31, 2012June 1, 2016June 30, 2016
    Comment
  • Performance of disability and children at risk programs regularly monitored and reviewed.ValueNot currently doneReports prepared in 2014 and 2016 & workshops heldAnnual conference held where monitoring reports an
    DateJune 24, 2011June 11, 2016June 30, 2016
    Comment
  • Share of DSC staff that attain a minimum score on a technical skills assessmentValue66.0060.0080.00
    DateJune 1, 2013June 1, 2016June 30, 2016
    Comment
  • Children at risk reintegrated.Value0.0070.0025.00
    DateJune 30, 2011May 31, 2016June 30, 2016
    Comment
  • Female beneficiariesValue0.0043.4040.00
    DateJune 24, 2011April 30, 2016June 30, 2016
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Disability Service Centers established and functional.Value05050
    DateJune 24, 2011June 1, 2016June 30, 2016
    Comment
  • ICPS centers established and functionalValue01111
    DateJune 24, 2011June 1, 2016June 30, 2016
    Comment
  • Assistive devices distributedValue0.003.4810.00
    DateJune 30, 2011June 1, 2016June 30, 2016
    Comment
  • Service transactions at the DSCs.Value15000.002409920.00500000.00
    DateJune 30, 2011April 30, 2016June 30, 2016
    Comment
  • Persons with disabilities receiving services via mobile outreach.Value0.0023.1010.00
    DateDecember 31, 2013April 30, 2016June 30, 2016
    Comment
  • Standards for children at risk developedValueNone currently availableCompleteComplete
    DateJune 1, 2016December 31, 2012
    Comment
  • Concerned government officials, DSC staff and other service providers trained on disability issues.Value030452000
    DateJune 24, 2011June 12, 2016June 30, 2016
    Comment
  • Concerned government officials, NGOs, ICPSC staff and service providers at all levels trained on child protection issues.Value05462500
    DateJune 24, 2011June 12, 2016June 30, 2016
    Comment
  • MIS development and implementationValueMIS not developed.MIS operational for DSCs and ICPSCsMIS operational for DSCs and ICPSCs.
    DateDecember 31, 2013June 1, 2016June 30, 2016
    Comment