Financier | Commitments |
---|---|
IDA Credit | 23.00 |
P106605
Closed
Tsuyoshi Fukao
Ministry of Economy and Finance
September 16, 2008
(as of board presentation)
August 5, 2010
December 30, 2010
US$ 23.00 million
Ministry of Education, Youth and Sport
2011
US$ 23.00 million
C
August 15, 2023
September 30, 2017
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 23.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 23.00 |
IBRD + IDA Commitment | 23.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 23.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Aug 1, 2022 | IDA-47960 | Loan Repay | 62,213.93 |
Aug 1, 2022 | IDA-47960 | Loan Repay | 39,549.54 |
Aug 1, 2022 | IDA-47960 | Int Charges | 37,075.38 |
Aug 1, 2022 | IDA-47960 | Int Charges | 37,075.38 |
Feb 1, 2022 | IDA-47960 | Int Charges | 39,527.65 |
Feb 1, 2022 | IDA-47960 | Int Charges | 39,527.65 |
Feb 1, 2022 | IDA-47960 | Loan Repay | 65,964.85 |
Feb 1, 2022 | IDA-47960 | Loan Repay | 1,726.70 |
Feb 1, 2022 | IDA-47960 | Loan Repay | 39,866.69 |
Feb 1, 2023 | IDA-47960 | Loan Repay | 2,559.14 |
Feb 1, 2023 | IDA-47960 | Loan Repay | 64,422.11 |
Feb 1, 2023 | IDA-47960 | Loan Repay | 37,005.46 |
Feb 1, 2023 | IDA-47960 | Int Charges | 34,224.98 |
Feb 1, 2023 | IDA-47960 | Int Charges | 34,224.98 |
Aug 1, 2023 | IDA-47960 | Int Charges | 3,182.17 |
Aug 1, 2023 | IDA-47960 | Int Charges | 3,182.17 |
Aug 1, 2023 | IDA-47960 | Loan Repay | 103,076.52 |
Aug 1, 2023 | IDA-47960 | Int Charges | 35,682.60 |
Aug 1, 2023 | IDA-47960 | Int Charges | 35,682.60 |
Feb 1, 2024 | IDA-47960 | Int Charges | 1,030.04 |
Feb 1, 2024 | IDA-47960 | Int Charges | 1,030.04 |
Feb 1, 2024 | IDA-47960 | Loan Repay | 102,244.81 |
Feb 1, 2024 | IDA-47960 | Int Charges | 36,041.28 |
Feb 1, 2024 | IDA-47960 | Int Charges | 36,041.28 |
Aug 1, 2024 | IDA-47960 | Loan Repay | 352.25 |
Aug 1, 2024 | IDA-47960 | Int Charges | 35,348.61 |
Aug 1, 2024 | IDA-47960 | Int Charges | 35,348.61 |
Aug 1, 2024 | IDA-47960 | Loan Repay | 101,645.58 |
Aug 5, 2010 | IDA-47960 | Loan Commitment | 11,500,000.00 |
Aug 5, 2010 | IDA-H6070 | Loan Commitment | 11,500,000.00 |
Aug 1, 2015 | IDA-47960 | Int Charges | 21,390.64 |
Jul 30, 2015 | IDA-H6070 | Loan Disb | 57,775.85 |
Jul 30, 2015 | IDA-47960 | Loan Disb | 81,592.10 |
Jul 30, 2015 | IDA-H6070 | Loan Disb | 483,025.30 |
May 28, 2015 | IDA-47960 | Loan Disb | 231,908.36 |
May 28, 2015 | IDA-H6070 | Loan Disb | 79,487.90 |
Jul 30, 2015 | IDA-47960 | Loan Disb | 87,227.24 |
Oct 16, 2015 | IDA-47960 | Loan Disb | 343,515.06 |
Oct 16, 2015 | IDA-47960 | Loan Disb | 121,313.06 |
Oct 16, 2015 | IDA-47960 | Loan Disb | 102,532.69 |
Oct 16, 2015 | IDA-47960 | Loan Disb | 85,552.13 |
Oct 20, 2015 | IDA-H6070 | Loan Disb | 597.49 |
Oct 15, 2015 | IDA-H6070 | Loan Disb | 134,208.45 |
Feb 1, 2016 | IDA-47960 | Int Charges | 102.80 |
Feb 1, 2016 | IDA-47960 | Int Charges | 102.80 |
Feb 1, 2016 | IDA-47960 | Int Charges | 25,267.59 |
Feb 1, 2016 | IDA-47960 | Int Charges | 25,267.59 |
Jun 21, 2016 | IDA-47960 | Loan Disb | 451,985.56 |
May 31, 2016 | IDA-47960 | Loan Disb | 1,946,021.90 |
Sep 6, 2016 | IDA-47960 | Loan Disb | 295,334.22 |
Feb 1, 2017 | IDA-47960 | Int Charges | 35,385.54 |
Feb 1, 2017 | IDA-47960 | Int Charges | 35,385.54 |
Feb 1, 2017 | IDA-47960 | Int Charges | 242.05 |
Feb 1, 2017 | IDA-47960 | Int Charges | 242.05 |
Aug 1, 2016 | IDA-47960 | Int Charges | 73.02 |
Aug 1, 2016 | IDA-47960 | Int Charges | 73.02 |
Aug 1, 2016 | IDA-47960 | Int Charges | 29,285.09 |
Aug 1, 2016 | IDA-47960 | Int Charges | 29,285.09 |
Jan 4, 2017 | IDA-47960 | Loan Disb | 591,495.00 |
Apr 5, 2017 | IDA-47960 | Loan Disb | 535,401.70 |
Aug 1, 2017 | IDA-47960 | Int Charges | 40,023.15 |
Aug 1, 2017 | IDA-47960 | Int Charges | 613.99 |
Aug 1, 2017 | IDA-47960 | Int Charges | 613.99 |
Aug 1, 2017 | IDA-47960 | Int Charges | 40,023.15 |
Jul 27, 2017 | IDA-47960 | Loan Disb | 351.52 |
Feb 5, 2018 | IDA-47960 | Loan Disb | -227,016.25 |
Feb 5, 2018 | IDA-47960 | Loan Cancel | 227,016.25 |
Feb 6, 2018 | IDA-H6070 | Loan Cancel | 200,360.44 |
Feb 5, 2018 | IDA-H6070 | Loan Disb | -200,774.48 |
Feb 1, 2018 | IDA-47960 | Int Charges | 821.07 |
Feb 1, 2018 | IDA-47960 | Int Charges | 821.07 |
Feb 1, 2018 | IDA-47960 | Int Charges | 41,739.83 |
Feb 1, 2018 | IDA-47960 | Int Charges | 41,739.83 |
Aug 1, 2018 | IDA-47960 | Int Charges | 40,500.86 |
Aug 1, 2018 | IDA-47960 | Int Charges | 40,500.86 |
Aug 1, 2018 | IDA-47960 | Int Charges | 1,066.34 |
Aug 1, 2018 | IDA-47960 | Int Charges | 1,066.34 |
Feb 1, 2019 | IDA-47960 | Int Charges | 429.86 |
Feb 1, 2019 | IDA-47960 | Int Charges | 429.86 |
Feb 1, 2019 | IDA-47960 | Int Charges | 39,479.45 |
Feb 1, 2019 | IDA-47960 | Int Charges | 39,479.45 |
Aug 1, 2019 | IDA-47960 | Int Charges | 39,516.92 |
Aug 1, 2019 | IDA-47960 | Int Charges | 39,516.92 |
Aug 1, 2019 | IDA-47960 | Int Charges | 430.09 |
Aug 1, 2019 | IDA-47960 | Int Charges | 430.09 |
Feb 1, 2020 | IDA-47960 | Int Charges | 39,378.24 |
Feb 1, 2020 | IDA-47960 | Int Charges | 39,378.24 |
Feb 1, 2020 | IDA-47960 | Int Charges | 233.04 |
Feb 1, 2020 | IDA-47960 | Int Charges | 233.04 |
Aug 1, 2020 | IDA-47960 | Int Charges | 119.91 |
Aug 1, 2020 | IDA-47960 | Int Charges | 119.91 |
Aug 1, 2020 | IDA-47960 | Int Charges | 39,560.12 |
Aug 1, 2020 | IDA-47960 | Int Charges | 39,560.12 |
Feb 1, 2021 | IDA-47960 | Int Charges | 40,506.37 |
Feb 1, 2021 | IDA-47960 | Int Charges | 40,506.37 |
Feb 1, 2021 | IDA-47960 | Int Charges | 1,231.75 |
Feb 1, 2021 | IDA-47960 | Int Charges | 1,231.75 |
Feb 1, 2021 | IDA-47960 | Loan Repay | 108,714.70 |
Feb 1, 2021 | IDA-47960 | Loan Repay | 1,947.29 |
Aug 1, 2021 | IDA-47960 | Int Charges | 985.27 |
Aug 1, 2021 | IDA-47960 | Int Charges | 985.27 |
Aug 1, 2021 | IDA-47960 | Loan Repay | 41,286.74 |
Aug 1, 2021 | IDA-47960 | Loan Repay | 68,642.01 |
Aug 1, 2021 | IDA-47960 | Int Charges | 0.01 |
Aug 1, 2021 | IDA-47960 | Int Charges | 0.01 |
Aug 1, 2021 | IDA-47960 | Int Charges | 40,811.07 |
Aug 1, 2021 | IDA-47960 | Int Charges | 40,811.07 |
Aug 1, 2022 | IDA-47960 | Loan Repay | 162.04 |
Oct 9, 2014 | IDA-47960 | Loan Disb | 138,042.00 |
Oct 9, 2014 | IDA-H6070 | Loan Disb | 149,495.27 |
Oct 9, 2014 | IDA-47960 | Loan Disb | 103,282.50 |
Dec 23, 2014 | IDA-47960 | Loan Disb | 64,069.93 |
Dec 23, 2014 | IDA-H6070 | Loan Disb | 103,449.65 |
Oct 9, 2014 | IDA-H6070 | Loan Disb | 314,156.00 |
Dec 1, 2014 | IDA-H6070 | Loan Disb | 560,185.00 |
Dec 1, 2014 | IDA-47960 | Loan Disb | 85,237.52 |
Jul 8, 2013 | IDA-H6070 | Loan Disb | 208,302.05 |
Jul 9, 2013 | IDA-H6070 | Loan Disb | 405,924.06 |
Jul 9, 2013 | IDA-47960 | Loan Disb | 88,771.81 |
Jul 8, 2013 | IDA-47960 | Loan Disb | 109,837.77 |
Aug 23, 2013 | IDA-47960 | Loan Disb | 36,915.11 |
Aug 23, 2013 | IDA-H6070 | Loan Disb | 254,452.47 |
Aug 23, 2013 | IDA-47960 | Loan Disb | 160,677.27 |
Aug 23, 2013 | IDA-H6070 | Loan Disb | 362,784.20 |
Nov 7, 2013 | IDA-H6070 | Loan Disb | 640,121.90 |
Aug 1, 2013 | IDA-47960 | Int Charges | 10,465.75 |
Aug 1, 2013 | IDA-47960 | Int Charges | 10,465.75 |
Aug 1, 2013 | IDA-47960 | Int Charges | 475.93 |
Aug 1, 2013 | IDA-47960 | Int Charges | 475.93 |
Feb 25, 2014 | IDA-H6070 | Loan Disb | 166,935.69 |
Feb 25, 2014 | IDA-47960 | Loan Disb | 121,411.47 |
Feb 25, 2014 | IDA-47960 | Loan Disb | 178,049.84 |
Feb 25, 2014 | IDA-H6070 | Loan Disb | 1,000,000.00 |
Jan 24, 2014 | IDA-47960 | Loan Disb | 129,782.65 |
Jan 24, 2014 | IDA-H6070 | Loan Disb | 54,919.05 |
Feb 1, 2014 | IDA-47960 | Int Charges | 13,249.63 |
Nov 7, 2013 | IDA-47960 | Loan Disb | 150,408.42 |
Feb 1, 2014 | IDA-47960 | Int Charges | 234.98 |
Feb 1, 2014 | IDA-47960 | Int Charges | 234.98 |
Feb 1, 2014 | IDA-47960 | Int Charges | 13,249.63 |
Dec 6, 2013 | IDA-47960 | Loan Disb | 94,288.49 |
Dec 6, 2013 | IDA-H6070 | Loan Disb | 507,680.00 |
Sep 25, 2013 | IDA-47960 | Loan Disb | 82,004.39 |
Sep 25, 2013 | IDA-H6070 | Loan Disb | 283,019.00 |
May 16, 2014 | IDA-47960 | Loan Disb | 58,542.81 |
May 16, 2014 | IDA-H6070 | Loan Disb | 329,025.47 |
Apr 17, 2014 | IDA-47960 | Loan Disb | 35,892.60 |
Apr 17, 2014 | IDA-H6070 | Loan Disb | 5,800.35 |
Jun 17, 2014 | IDA-47960 | Loan Disb | 1,000,000.00 |
Jun 17, 2014 | IDA-H6070 | Loan Disb | 1,000,000.00 |
Jun 19, 2014 | IDA-47960 | Loan Disb | 95,029.89 |
Jun 19, 2014 | IDA-H6070 | Loan Disb | 320,458.00 |
Mar 18, 2015 | IDA-H6070 | Loan Disb | 300,377.44 |
Mar 18, 2015 | IDA-47960 | Loan Disb | 128,342.16 |
Aug 1, 2014 | IDA-47960 | Int Charges | 117.45 |
Aug 1, 2014 | IDA-47960 | Int Charges | 117.45 |
Aug 1, 2014 | IDA-47960 | Int Charges | 15,761.28 |
Aug 1, 2014 | IDA-47960 | Int Charges | 15,761.28 |
Jul 31, 2014 | IDA-H6070 | Loan Disb | 722,266.00 |
Jul 31, 2014 | IDA-47960 | Loan Disb | 139,341.22 |
Apr 9, 2015 | IDA-47960 | Loan Disb | 320,984.50 |
Apr 9, 2015 | IDA-H6070 | Loan Disb | 37,197.18 |
Apr 9, 2015 | IDA-H6070 | Loan Disb | 697,816.40 |
Apr 9, 2015 | IDA-47960 | Loan Disb | 233,449.45 |
Feb 9, 2015 | IDA-47960 | Int Charges | 827.73 |
Feb 9, 2015 | IDA-47960 | Int Charges | 827.73 |
Feb 9, 2015 | IDA-47960 | Int Charges | 19,645.85 |
Feb 9, 2015 | IDA-47960 | Int Charges | 19,645.85 |
Aug 1, 2015 | IDA-47960 | Int Charges | 627.21 |
Aug 1, 2015 | IDA-47960 | Int Charges | 627.21 |
Aug 1, 2015 | IDA-47960 | Int Charges | 21,390.64 |
Name | Review | Date |
---|---|---|
Progress towards achievement of PDO | Satisfactory | 2017-05-11 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2017-05-11 |
Monitoring and Evaluation | Moderately Satisfactory | 2017-05-11 |
Procurement | Moderately Satisfactory | 2017-05-11 |
Financial Management | Moderately Satisfactory | 2017-05-11 |
Project Management | Moderately Satisfactory | 2017-05-11 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 03-28-2018 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | |
Bank Performance | Substantial |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 08-22-2018 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | Not Rated | N/a |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
40 percent of HEIs supported under Components 1 and 2 showing an increased aggregate score against a modified subset of ACC accreditation criteria. | Value | 0.00 | 40.00 | 46.00 |
Date | January 3, 2011 | September 30, 2017 | September 30, 2017 | |
Comment |
An average annual retention rate of 95 percent of project-supported scholarship recipients | Value | 0.00 | 95.00 | 96.00 |
Date | January 3, 2011 | September 30, 2017 | September 30, 2017 | |
Comment |
50 percent of Sub-projects approved under the first round of proposals completed by the Closing Date, and 70 percent of Sub-projects approved under the second round completed by the Closing Date. | Value | 0.00 | 70.00 | 100.00 |
Date | January 3, 2011 | September 30, 2017 | September 30, 2017 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Number of staff (MoEYS and HEI) who participate in training courses which improved their professional competencies; fields related to: HE quality, management, assessment, and accreditation; English; o | Value | 0.00 | 1500.00 | 7395.00 |
Date | January 3, 2011 | September 30, 2017 | September 30, 2017 | |
Comment |
Number of staff of (MoEYS and HEI) who were conferred with a Master or Doctor Degree in academic specialty, educational management or related fields | Value | 0.00 | 54.00 | 79.00 |
Date | January 3, 2011 | September 30, 2017 | September 30, 2017 | |
Comment |
Number and percentage of HEI academic staff in participating institutions completing training in research methodologies and design | Value | 0.00 | 180.00 | 579.00 |
Date | December 31, 2011 | September 30, 2017 | September 30, 2017 | |
Comment |
Number and percentage of eligible HEIs submitting proposals to RGMC competing for funds | Value | 0.00 | 70.00 | 72.00 |
Date | January 3, 2011 | September 30, 2017 | September 30, 2017 | |
Comment |
Number and percentage of complete research projects (competitively selected) funded by the project | Value | 0.00 | 100.00 | 100.00 |
Date | January 3, 2011 | September 30, 2017 | September 30, 2017 | |
Comment |
Within RGMC/DHE, number and percentage of proposals awarded after review and evaluation in accordance with project processing timeline | Value | 0.00 | 47.00 | 47.00 |
Date | January 3, 2011 | September 30, 2017 | September 30, 2017 | |
Comment |
Pass rate of retained scholarship recipients at each grade categorized by: female; rural; poor (not cumulative rate) | Value | 0.00 | 80.00 | 100.00 |
Date | January 3, 2011 | September 30, 2017 | September 30, 2017 | |
Comment |
Drop out rate of scholarship recipients categorized by: female; rural; poor | Value | 0.00 | 19.00 | 16.00 |
Date | January 3, 2011 | September 30, 2017 | September 30, 2017 | |
Comment |
Completion rate of scholarship recipients, categorized by: female; rural; poor | Value | 0.00 | 67.00 | 85.00 |
Date | January 3, 2011 | September 30, 2017 | September 30, 2017 | |
Comment |
Higher Education Governance & Finance Policy Paper adopted by the MoEYS | Value | No | Yes | Yes |
Date | December 31, 2010 | September 30, 2017 | September 30, 2017 | |
Comment |
Higher Education Vision and Strategy 2030 adopted by the MoEYS | Value | No | Yes | Yes |
Date | December 31, 2010 | September 30, 2017 | September 30, 2017 | |
Comment |
HEMIS developed and piloted with at-least 4 HEIs | Value | No | Yes | Yes |
Date | December 31, 2010 | September 30, 2017 | September 30, 2017 | |
Comment |