Acre Social and Economic Inclusion and Sustainable Development Project - PROACRE

Abstract*

The Acre Social and Economic Inclusion and Sustainable Development Project for Brazil development objective is to contribute to the Government of Acre's efforts to promote social and economic inclusion of the poorest/most disadvantaged populations living in both urban and isolated/remote rural areas of the state. There are five components to the project. The first component of the project is basic services for isolated communities. This component...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The objective of the Project is to contribute to the Borrower's efforts to promote social and economic inclusion of its rural and urban poor, including its poorest and most disadvantaged population living in isolated areas in the Borrower's territory.

Key Details

Project Details

  • P107146

  • Closed

  • Johannes Jansen , Luis Alvestegui Justiniano

  • STATE OF ACRE

  • Brazil

  • May 6, 2008

  • (as of board presentation)

    December 18, 2008

  • January 30, 2009

  • US$ 150.00 million

  • Secretaria de Estado de Planejamento e Gestão - SEPLAG

  • Latin America and Caribbean

  • 2009

  • US$ 120.00 million

  • A

  • Not Applicable

  • December 31, 2021

  • BANK APPROVED

  • November 3, 2022

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 120.00
Borrower/Recipient 30.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 120.00
IDA Commitment N/A
IBRD + IDA Commitment 120.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 150.00

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Apr 15, 2024 IBRD-76250 Loan Repay 2,509,696.50
Jun 15, 2024 IBRD-84420 Int Charges 13,651.86
Jun 15, 2024 IBRD-84420 Int Charges 2,161,918.80
Jun 15, 2024 IBRD-84420 Loan Repay 2,145,496.00
Sep 29, 2014 IBRD-84420 Loan Commitment 150,000,000.00
Dec 18, 2008 IBRD-76250 Loan Commitment 120,000,000.00
Jun 15, 2023 IBRD-84420 Int Charges 93,351.17
Jun 15, 2023 IBRD-84420 Int Charges 1,886,812.20
Jun 15, 2023 IBRD-84420 Loan Repay 165,332.45
Jun 15, 2023 IBRD-84420 Loan Repay 1,980,163.50
Oct 15, 2023 IBRD-76250 Loan Repay 2,509,696.50
Oct 15, 2023 IBRD-76250 Int Charges 2,088,701.80
Dec 15, 2023 IBRD-84420 Int Charges 37,654.27
Dec 15, 2023 IBRD-84420 Int Charges 2,102,513.50
Dec 15, 2023 IBRD-84420 Loan Repay 2,145,496.00
Apr 15, 2024 IBRD-76250 Int Charges 2,168,454.50
Sep 16, 2021 IBRD-84420 Loan Cancel 50,000,000.00
Oct 15, 2022 IBRD-76250 Loan Repay 2,509,696.50
Oct 15, 2022 IBRD-76250 Int Charges 851,426.70
Dec 15, 2021 IBRD-84420 Loan Repay 300,897.88
Apr 15, 2023 IBRD-76250 Int Charges 1,880,461.40
Apr 15, 2023 IBRD-76250 Loan Repay 2,509,696.50
Dec 15, 2022 IBRD-84420 Int Charges 1,320,473.50
Dec 15, 2022 IBRD-84420 Loan Repay 825,022.44
Dec 15, 2022 IBRD-84420 Loan Repay 1,320,473.50
Apr 15, 2022 IBRD-76250 Int Charges 346,574.03
Apr 15, 2022 IBRD-76250 Loan Repay 2,509,696.50
Aug 5, 2022 IBRD-84420 Loan Disb -1,079,736.00
Aug 5, 2022 IBRD-84420 Loan Disb -31,098.32
Dec 15, 2021 IBRD-84420 Int Charges 300,897.88
Dec 15, 2021 IBRD-84420 Loan Repay 1,877,267.90
Aug 5, 2022 IBRD-84420 Loan Cancel 15,254,618.00
Jun 15, 2021 IBRD-84420 Loan Repay 2,035,189.00
Jun 15, 2021 IBRD-84420 Int Charges 323,623.84
Apr 15, 2021 IBRD-76250 Int Charges 406,226.34
Apr 15, 2021 IBRD-76250 Loan Repay 2,509,696.50
Jun 15, 2018 IBRD-84420 Int Charges 10,056.32
Jun 15, 2018 IBRD-84420 Int Charges 557,631.75
Oct 15, 2016 IBRD-76250 Loan Repay 2,781,010.00
Dec 30, 2016 IBRD-76250 Loan Cancel 3,150,844.50
Jul 19, 2016 IBRD-84420 Loan Disb 582,301.50
Dec 15, 2016 IBRD-84420 Int Charges 18,781.44
Dec 15, 2016 IBRD-84420 Int Charges 105,123.21
May 12, 2017 IBRD-84420 Loan Disb 15,000,000.00
Jun 26, 2017 IBRD-84420 Int Charges 476.00
Jun 26, 2017 IBRD-84420 Int Charges 152,400.23
Apr 15, 2017 IBRD-76250 Int Charges 1,130,862.80
Apr 15, 2017 IBRD-76250 Loan Repay 2,781,010.00
Sep 22, 2017 IBRD-76250 Loan Cancel 6,700,279.50
Oct 15, 2017 IBRD-76250 Int Charges 1,182,150.90
Oct 15, 2017 IBRD-76250 Loan Repay 2,781,010.00
Sep 22, 2017 IBRD-76250 Loan Disb -6,700,279.50
Apr 15, 2015 IBRD-76250 Int Charges 556,435.00
Oct 15, 2015 IBRD-76250 Int Charges 689,020.50
Mar 24, 2016 IBRD-84420 Loan Disb 375,000.00
Mar 24, 2016 IBRD-84420 Fee Charges 375,000.00
Apr 25, 2016 IBRD-84420 Loan Disb 9,000,000.00
Jul 18, 2016 IBRD-84420 Loan Disb 1,758,346.90
Jul 18, 2016 IBRD-84420 Loan Disb 428,153.53
Apr 29, 2016 IBRD-84420 Loan Disb 658,521.20
Apr 15, 2016 IBRD-76250 Int Charges 754,358.70
Apr 15, 2016 IBRD-76250 Loan Repay 2,781,010.00
Oct 15, 2016 IBRD-76250 Int Charges 956,746.56
Jun 15, 2016 IBRD-84420 Int Charges 1,193.13
Aug 17, 2016 IBRD-84420 Loan Disb 3,609,370.50
Oct 26, 2016 IBRD-84420 Loan Disb 243,060.60
Nov 5, 2014 IBRD-76250 Loan Disb 7,134,289.50
Oct 15, 2014 IBRD-76250 Int Charges 488,175.88
Oct 15, 2013 IBRD-76250 Int Charges 9,796.33
Oct 15, 2013 IBRD-76250 Int Charges 542,924.56
Apr 15, 2014 IBRD-76250 Int Charges 503,658.12
Feb 12, 2015 IBRD-76250 Loan Disb 19,962,902.00
Sep 13, 2021 IBRD-84420 Loan Disb 5,143,048.00
Oct 15, 2021 IBRD-76250 Int Charges 383,829.72
Oct 15, 2021 IBRD-76250 Loan Repay 2,509,696.50
Jun 15, 2022 IBRD-84420 Int Charges 358,453.66
Jun 15, 2022 IBRD-84420 Loan Repay 1,819,712.10
Jun 15, 2022 IBRD-84420 Loan Repay 358,453.66
Apr 15, 2020 IBRD-76250 Int Charges 1,184,748.00
Apr 15, 2020 IBRD-76250 Loan Repay 2,509,696.50
Jun 15, 2020 IBRD-84420 Int Charges 827,948.44
Jun 15, 2020 IBRD-84420 Loan Repay 1,683,985.80
Oct 15, 2020 IBRD-76250 Int Charges 834,007.70
Oct 15, 2020 IBRD-76250 Loan Repay 2,509,696.50
Dec 15, 2020 IBRD-84420 Int Charges 50,595.83
Dec 15, 2020 IBRD-84420 Int Charges 397,103.12
Dec 15, 2020 IBRD-84420 Loan Repay 2,035,189.00
Apr 15, 2019 IBRD-76250 Int Charges 1,549,155.50
Apr 15, 2019 IBRD-76250 Loan Repay 2,509,696.50
Oct 15, 2019 IBRD-76250 Int Charges 1,509,951.60
Oct 15, 2019 IBRD-76250 Loan Repay 2,509,696.50
Dec 15, 2019 IBRD-84420 Int Charges 999,838.50
Dec 15, 2019 IBRD-84420 Loan Repay 1,683,985.80
Apr 21, 2020 IBRD-84420 Loan Disb 13,353,736.00
Nov 30, 2018 IBRD-84420 Loan Disb 9,571,188.00
Dec 27, 2018 IBRD-84420 Int Charges 889,602.56
Oct 15, 2018 IBRD-76250 Int Charges 1,416,783.10
Oct 15, 2018 IBRD-76250 Loan Repay 2,509,696.50
Oct 15, 2018 IBRD-76250 Int Charges 108,573.16
Jun 15, 2019 IBRD-84420 Int Charges 12,243.15
Jun 15, 2019 IBRD-84420 Int Charges 1,188,482.40
Nov 7, 2017 IBRD-84420 Loan Disb 888,689.20
Feb 15, 2018 IBRD-76250 Loan Cancel 3,614,187.50
Dec 15, 2017 IBRD-84420 Int Charges 25,641.66
Dec 15, 2017 IBRD-84420 Int Charges 316,995.97
Dec 5, 2017 IBRD-84420 Loan Disb 15,000,000.00
Feb 15, 2018 IBRD-76250 Loan Disb -3,614,187.50
Apr 15, 2018 IBRD-76250 Int Charges 1,124,190.60
Apr 15, 2018 IBRD-76250 Loan Repay 2,509,696.50
Apr 15, 2018 IBRD-76250 Int Charges 3,730.65
Jun 29, 2018 IBRD-84420 Loan Disb 10,244,800.00

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Overall Safeguards Rating Moderately Unsatisfactory 2021-06-30
Financial Management Moderately Satisfactory 2021-06-30
Monitoring and Evaluation Moderately Satisfactory 2021-06-30
Progress towards achievement of PDO Moderately Unsatisfactory 2021-06-30
Overall Implementation Progress (IP) Moderately Unsatisfactory 2021-06-30
Procurement Moderately Unsatisfactory 2021-06-30
Counterpart Funding Satisfactory 2021-06-30
Project Management Moderately Satisfactory 2021-06-30
Overall Safeguards Rating Moderately Unsatisfactory 2021-06-30

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 06-29-2022
OutcomesModerately Unsatisfactory
Risk to Development Outcome
Bank PerformanceModerately Satisfactory
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 06-12-2023PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingUnsatisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceUnsatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceN/a
Implementing AgencyN/a
Icr QualitySubstantialN/a
M&e QualityNegligibleN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Percentage of beneficiaries satisfied with support and extension services for productive inclusion activitiesValue0.0083.000.00
    DateDecember 31, 2015December 31, 2021December 31, 2021
    Comment
  • Increase the percentage of surviving newborns with low weight at birth in Acre’s hospitals from 90% to 96%Value90.0096.000.00
    DateJanuary 1, 2008January 30, 2015
    Comment
  • Increase the general ambulatory consultancies in excluded target population (CAU and CAP) from 7% to 67%Value7.0067.000.00
    DateJanuary 1, 2008January 30, 2015
    Comment
  • Increased population in isolated areas with improved urban environment from 0 in 2013 to 19,470 people in 2021Value0.0016401.000.00
    DateMarch 27, 2013December 31, 2021December 31, 2021
    Comment
  • 60% of beneficiaries satisfied with Project support and extension services for productive inclusion activitiesValue0.0060.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • People who received at least one of the services related to drinking water, sanitation or micro-drainageValue0.0016401.0019470.00
    DateDecember 31, 2013December 31, 2021December 31, 2021
    Comment
  • Improvements in the Basic Education Development Index (IDEB) of State schools for early fundamentaI education from 5.5 in 2015 to 6.4 in 2021Value3.805.506.40
    DateDecember 31, 2007January 22, 2020December 31, 2021
    Comment
  • Improvement of the Basic Education Development Index (IDEB) of of State schools for final fundamentaI education from 4.7 in 2015 to5.3 in 2021Value3.804.705.30
    DateDecember 31, 2007January 22, 2020December 31, 2021
    Comment
  • Reduction in Infant Mortality Rate from 17.29 in 2015 to 12.85 in 2021Value17.2917.8915.45
    DateDecember 31, 2015December 31, 2021December 31, 2021
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • 250 Demonstration Units receiving Project support operationalValue0.000.00250.00
    DateDecember 31, 2008June 6, 2019March 31, 2020
    Comment
  • Percentage of activities financed in the area of ??entrepreneurship development for excluded urban communities in operationValue0.0060.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • Better Project Management, Monitoring and Information SystemsValue25
    DateJanuary 1, 2014December 31, 2021
    Comment
  • 125 rural schools benefiting from the implementation of school subprojects.Value0.00125.000.00
    DateDecember 31, 2016December 31, 2021
    Comment
  • Number of people benefiting from river accessValue0.0020752.0020752.00
    DateDecember 31, 2013December 31, 2021December 31, 2021
    Comment
  • Number of 6th to 9th grade teachers and coordinators in urban state schools who received trainingValue0.001500.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • Assess 93,000 students in the 3rd, 5th and 9th grade of elementary school and students in the 3rd grade of high school based on writing skillsValue0.0093000.000.00
    DateJanuary 1, 2016December 31, 2021
    Comment
  • At least 60% of the productive subprojects financed by the project remain in operation at project closingValue0.0060.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • Kilometers of paved public roads with curbs constructedValue0.0034.2225.96
    DateDecember 31, 2013December 31, 2020December 31, 2021
    Comment
  • Number of high school teachers and coordinators in urban state schools who received trainingValue0.00800.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • Implement the Human Resources System and perform payroll auditing as people management instruments, increasing the efficiency of public spendingValueNo HR systemSystem in place
    DateJanuary 1, 2016December 31, 2021
    Comment
  • Maintain at least 95% satisfactory samples of PCCU collections, carried out by the Itinerant Health Program team.Value96.3195.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • Number of EJA (teaching youth and adults program) teachers and coordinators in elementary schools and high schools who received trainingValue0.00800.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • Increase from 2,025, in 2013, to 4,503, in 2021, the number of households with piped treated water.Value2025.004503.000.00
    DateJanuary 1, 2013December 31, 2021
    Comment
  • Number of Environmental Inspection operations (air, land and river) performed.Value0.0035.000.00
    DateDecember 31, 2019December 31, 2021
    Comment
  • Increase in data transfer capacity of Rio Branco public units connected to the networkValue0.1010.000.00
    DateDecember 31, 2019December 31, 2021
    Comment
  • Number of Integrated Environment Centers and Integrated Management Units strengthenedValue0.006.000.00
    DateJanuary 1, 2021December 31, 2021
    Comment
  • Improved micro-drainage services benefiting 19,470 urban inhabitants (urban population from the four municipalities)Value0.0019470.000.00
    DateMarch 31, 2016December 31, 2021
    Comment
  • Serve 20,000 students in urban areas with the Quero Ler read program; (cumulative goal)Value0.000.000.00
    DateDecember 31, 2015January 21, 2020
    Comment
  • Increased data processing capacity in the state's enterprise systems infrastructureValue8601.0093331.000.00
    DateDecember 31, 2019December 31, 2021
    Comment
  • Number of Indigenous Land Management Plans (PGTIs) developedValue0.0017.0029.00
    DateDecember 31, 2008December 31, 2021December 31, 2021
    Comment
  • Preschool care (4-5 years) for 2,000 children/year of Early Childhood in Rural Education (Asinha da Florestania)Value0.00276.001000.00
    DateDecember 31, 2015December 31, 2021December 31, 2021
    Comment
  • Number of high school students benefiting from full-time school studiesValue0.002800.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • Increased storage capacity for critical state data in a secure environmentValue40.0040.000.00
    DateDecember 31, 2019June 15, 2021
    Comment
  • Cumulative number of cultural spaces in the state established/renovatedValue0.009.006.00
    DateDecember 31, 2017December 31, 2021December 31, 2020
    Comment
  • Percentage of subprojects financed in the area of commercialization of agricultural and forestry products (IPCs, PRA and productionsubprojects) in operation at project closingValue0.0060.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • Schooling for 5,000 students/year (1st to 5th grade) in the Pathways of Field Education Program (Multigrade Classes).Value0.005000.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • Improved Project Management, Monitoring and Information SystemsValue2.005.000.00
    DateDecember 31, 2013December 31, 2021
    Comment
  • Net enrollment for 5,000 students/year (6th to 9th grade) - Programa Caminhos da educação do campo - elementary school final years (Asas da Florestania Program).Value0.005000.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • Percentage of complaints received that are answeredValue0.0080.000.00
    DateJanuary 22, 2020December 31, 2021
    Comment
  • Ratio of cervical cytopathological examinations in women aged 25-64 and the population of the same age groupValue0.580.750.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • 7,000 new children age 4 and 5 enrolled in ECD programs in COPsValue0.0014687.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • Ratio of screening mammograms performed on women aged 50 to 69 years and population of the same age groupValue0.060.400.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • Net enrollment for 6,000 High School Students/Year - Programa Caminhos da educação do campo - High School Program (Asas da Florestania Program)Value0.006000.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • Improve payroll auditing as instrument to increase the efficiency of public spendingValueNoNo
    DateDecember 31, 2008December 31, 2021
    Comment
  • 26,000 new students in fundamental schools (grades 1-4) and 8,800 new students in fundamental schools (grades 5-8) benefiting from the implementation of a GESTAR I and II-like methodologyValue0.0069120.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • 20,000 rural students participating in the Quero Ler Program.Value0.000.000.00
    DateDecember 31, 2015January 21, 2020
    Comment
  • Increase access to information and eservices offered by the GoAc in 30% of the target communities (CAPs and COPS) by 2014Value0.0030.000.00
    DateJanuary 1, 2008January 31, 2015
    Comment
  • 5,300 new students enrolled in secondary education programsValue0.005300.000.00
    DateDecember 31, 2008January 31, 2015
    Comment
  • 7,200 new children age 4 and 5 enrolled in ECD programs in urban ZAPsValue0.0012254.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • 1,600 youth and adults ages 15 - 35 have attended literacy programs and 3,000 youth and adults living in COPs benefiting from the provision of EJA 1st and 2nd segment programsValue0.009071.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • Training of at least 80% of staff at the central level of the participating Secretariats in programs for improving managerial capacityValue0.0080.000.00
    DateJanuary 1, 2008January 31, 2015
    Comment
  • 66,900 students of fundamental cycle (grades 1-4), 52,650 students of fundamental cycle (grades 5-8) and 35,000 students of secondary cycle benefiting from the implementation of a quality improvementValue0.00289274.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • Increase in the proportion of live births of mothers with seven or more prenatal consultations from 42.98% in 2015 to 65% in 2021.Value42.9843.0046.00
    DateDecember 31, 2015December 31, 2021December 31, 2021
    Comment
  • Reduction of neonatal mortality by place of residence from 11 in 2015 to 9 in 2021.Value11.003.000.00
    DateDecember 31, 2015November 30, 2020
    Comment
  • 134 schools benefiting from the implementation of school subprojectsValue0.00134.000.00
    DateJanuary 1, 2008January 31, 2015
    Comment
  • 8,500 youth and adults ages 15 - 35 have attended literacy programs and 12,200 youth and adults benefiting from the provision of EJA 1st and 2nd segment programs in urban ZAPsValue0.0025798.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • Adoption of Results Based Management at agreements in education in, at least, 40% of the SMEs by 2014Value0.0040.000.00
    DateJanuary 1, 2008January 31, 2015
    Comment
  • Refurbishment of 2 aerodrome runways meeting the standards of the National Civil Aviation Agency of Brazil (ANAC) in the municipalities of Marechal Thaumaturgo and Porto WalterValue0.002.000.00
    DateDecember 31, 2015December 31, 2021
    Comment
  • 11,200 students of fundamental cycle (grades 1-4), 7,000 students of fundamental cycle (grades 5-8) and 10,000 students of secondary cycle regularized in terms of age-grade distortionValue0.0027226.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • 200 Community Development Plans (CDPs) developed and being implementedValue0.00106.00200.00
    DateJanuary 1, 2008December 31, 2016December 31, 2014
    Comment
  • Quality Program for the Forestry Sector agreed with and joined by at least 30% of the State’s enterprisesValue0.0030.000.00
    DateJanuary 1, 2008January 31, 2015
    Comment
  • At least 15 Indigenous Land Management Plans developed and being implementedValue0.0015.000.00
    DateJanuary 1, 2008January 31, 2015
    Comment
  • Indigenous households served with domestic connection for water for human consumptionValue0.0059.000.00
    DateDecember 31, 2013December 31, 2021
    Comment
  • Increase in the percentage of pregnant women having at least 4 or more prenatal consultations in Rio Branco, Cruzeiro do Sul, and Sena Madureira from 40% in 2007 to 70% in last year of the projectValue40.0081.000.00
    DateDecember 31, 2007December 31, 2016
    Comment
  • At least 15 indigenous organizations (cooperatives and associations) implementing strategic planning and managementValue0.0018.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • Increase in the percentage of PSF coverage in Rio Branco, Cruzeiro do Sul and Sena Madureira from 42% in 2007 to 66% in 2014Value42.0066.000.00
    DateDecember 31, 2007December 31, 2015
    Comment
  • Urban households served with domestic connection for treated waterValue0.003800.004503.00
    DateDecember 31, 2013March 31, 2020December 31, 2021
    Comment
  • Implemented accountable and effective management system for project that tracks disbursements and resultsValueNoYes
    DateJanuary 1, 2008December 31, 2021
    Comment
  • Number of households with piped sanitation connectionsValue0.003310.003101.00
    DateDecember 31, 2013March 31, 2020December 31, 2021
    Comment
  • 25,000 families registered and cared for by the Social Assistance Reference Centers and other social and assistance services (housing, sanitation, health, education, job and income)Value0.0025000.000.00
    DateJanuary 1, 2008January 31, 2015
    Comment
  • Established social communication strategy with program participants, affected peoples and civil societyValueNoYes
    DateJanuary 1, 2008June 15, 2021
    Comment
  • Extension of public roads with underground rainwater networks or channels (microdrainage)Value0.007.950.00
    DateDecember 31, 2013December 31, 2021
    Comment
  • 4,000 skilled and capable people to work in the services sectors (IT, business management, etc.), civil works, industry (clothing and food), commerce, arts and handcrafts and othersValue0.004440.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • At least 70% of project implementation by governmental institutions in compliance with planned activities, budget and timeline, as verified by SIM (Integrated Management System)Value0.0070.000.00
    DateJanuary 1, 2008January 31, 2015
    Comment
  • Increase in the net enrollment ratio of fundamental education in urban areas from 93.1% in 2011 to 95% in 2017 from the implementation of a quality improvement packageValue93.1095.000.00
    DateDecember 31, 2011December 31, 2017
    Comment
  • Number of maternal deaths adequately administered by place of residenceValue11.0012.0010.00
    DateDecember 31, 2015December 31, 2021December 31, 2021
    Comment
  • At least 80% of the 34 IP communities receiving Project support receiving capacity building for strategic subproject planning and managementValue0.0080.000.00
    DateJanuary 1, 2014December 31, 2020
    Comment
  • Number of rural schools benefitting from the implementation of school subprojectsValue0.00839.00259.00
    DateDecember 31, 2013December 31, 2021December 31, 2021
    Comment
  • 15,000 new children age 4 and 5 enrolled in ECD programs in rural areas and 30,000 new students in fundamental schools (grades 1-4)have received basic education through Escola Ativa ProgramValue0.00104643.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • 14,400 new students in fundamental schools (grades 5-8) and 9,600 new students enrolled in secondary education have received basic education through Asas da Florestania ProgramValue0.0025915.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • 4,500 youth and adult ages 15 to 35 living in rural areas have attended literacy programs and 5,000 youth and adult benefiting fromthe provision of EJA 1st and 2nd segment programsValue0.0011686.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • Increase in percentage of medical consultations for pregnant women from excluded populations (CAU, CAP) per year from 5% to 50%Value5.0096.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment
  • Increase the percentage of people registered in PACS from 0 to 80%Value0.0080.000.00
    DateJanuary 1, 2008January 31, 2015
    Comment
  • 17,000 water filters (with chlorine treatment) distributedValue0.0017000.008550.00
    DateJanuary 1, 2008December 31, 2014December 31, 2010
    Comment
  • 200 sustainable family farming Demonstration Units (DUs) operationalValue0.00209.00200.00
    DateJanuary 1, 2008December 31, 2018March 31, 2020
    Comment
  • 100 Community Development Agents (CDAs) trained and on dutyValue0.0054.000.00
    DateJanuary 1, 2008December 31, 2016
    Comment