Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 16.00 |
P107407
Closed
Harriet Nannyonjo
Government of Jamaica
April 6, 2009
(as of board presentation)
November 24, 2009
May 26, 2010
US$ 16.00 million
Ministry of Education
2010
US$ 16.00 million
C
Not Applicable
March 31, 2015
BANK APPROVED
September 28, 2021
Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 16.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | 16.00 |
IDA Commitment | N/A |
IBRD + IDA Commitment | 16.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 16.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Nov 15, 2020 | IBRD-78150 | Loan Repay | 60,452.00 |
Nov 15, 2020 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2020 | IBRD-78150 | Loan Repay | 33,926.42 |
Nov 15, 2020 | IBRD-78150 | Loan Repay | 83,300.00 |
Nov 15, 2020 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2021 | IBRD-78150 | Int Charges | 6,509.23 |
May 15, 2021 | IBRD-78150 | Int Charges | 1,162.19 |
May 15, 2021 | IBRD-78150 | Loan Repay | 60,452.00 |
May 15, 2021 | IBRD-78150 | Int Charges | 7,298.36 |
May 15, 2021 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2021 | IBRD-78150 | Loan Repay | 33,926.42 |
May 15, 2021 | IBRD-78150 | Loan Repay | 83,300.00 |
May 15, 2021 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2021 | IBRD-78150 | Loan Repay | 50,983.17 |
May 15, 2021 | IBRD-78150 | Loan Repay | 19,040.00 |
May 15, 2021 | IBRD-78150 | Loan Repay | 34,954.82 |
May 15, 2021 | IBRD-78150 | Loan Repay | 42,085.33 |
May 15, 2021 | IBRD-78150 | Loan Repay | 7,335.26 |
May 15, 2021 | IBRD-78150 | Int Charges | 2,963.11 |
May 15, 2021 | IBRD-78150 | Int Charges | 4,479.75 |
May 15, 2021 | IBRD-78150 | Int Charges | 11,313.26 |
May 15, 2021 | IBRD-78150 | Int Charges | 3,322.11 |
May 15, 2021 | IBRD-78150 | Int Charges | 7,308.70 |
May 15, 2021 | IBRD-78150 | Int Charges | 2,801.28 |
May 15, 2021 | IBRD-78150 | Int Charges | 5,274.58 |
Nov 15, 2021 | IBRD-78150 | Int Charges | 6,900.12 |
Nov 15, 2021 | IBRD-78150 | Int Charges | 2,804.16 |
Nov 15, 2021 | IBRD-78150 | Int Charges | 4,246.96 |
Nov 15, 2021 | IBRD-78150 | Int Charges | 10,734.20 |
Nov 15, 2021 | IBRD-78150 | Int Charges | 3,154.49 |
May 15, 2019 | IBRD-78150 | Loan Repay | 83,300.00 |
May 15, 2019 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2019 | IBRD-78150 | Loan Repay | 50,983.17 |
May 15, 2019 | IBRD-78150 | Int Charges | 14,838.73 |
May 15, 2019 | IBRD-78150 | Int Charges | 22,295.17 |
May 15, 2019 | IBRD-78150 | Int Charges | 56,144.63 |
May 15, 2019 | IBRD-78150 | Int Charges | 16,442.19 |
May 15, 2019 | IBRD-78150 | Int Charges | 36,080.36 |
Nov 15, 2017 | IBRD-78150 | Int Charges | 7,728.00 |
Feb 13, 2015 | IBRD-78150 | Loan Disb | 1,146,300.00 |
May 6, 2015 | IBRD-78150 | Loan Disb | 47,845.50 |
May 15, 2015 | IBRD-78150 | Int Charges | 2,572.34 |
May 15, 2015 | IBRD-78150 | Int Charges | 8,045.45 |
May 15, 2015 | IBRD-78150 | Int Charges | 6,785.27 |
May 15, 2015 | IBRD-78150 | Int Charges | 2,534.00 |
May 15, 2015 | IBRD-78150 | Int Charges | 4,652.07 |
Jun 9, 2015 | IBRD-78150 | Loan Disb | 116,000.00 |
May 15, 2015 | IBRD-78150 | Int Charges | 3,167.50 |
May 15, 2015 | IBRD-78150 | Int Charges | 4,515.20 |
May 15, 2015 | IBRD-78150 | Int Charges | 11,086.25 |
May 15, 2015 | IBRD-78150 | Int Charges | 3,167.50 |
Jul 14, 2015 | IBRD-78150 | Loan Disb | 95,691.00 |
May 15, 2015 | IBRD-78150 | Loan Disb | 1,768,291.50 |
May 15, 2015 | IBRD-78150 | Loan Disb | -1,768,291.50 |
Jul 30, 2015 | IBRD-78150 | Loan Disb | 95,688.00 |
Aug 20, 2015 | IBRD-78150 | Loan Disb | -712.20 |
Nov 15, 2015 | IBRD-78150 | Int Charges | 134.81 |
Nov 15, 2015 | IBRD-78150 | Int Charges | 937.40 |
Nov 15, 2015 | IBRD-78150 | Int Charges | 9,606.84 |
Jun 4, 2015 | IBRD-78150 | Loan Disb | 47,845.50 |
Apr 7, 2015 | IBRD-78150 | Loan Disb | 191,382.00 |
Nov 15, 2015 | IBRD-78150 | Int Charges | 3,782.22 |
Nov 15, 2015 | IBRD-78150 | Int Charges | 5,391.49 |
Nov 15, 2015 | IBRD-78150 | Int Charges | 13,237.78 |
Nov 15, 2015 | IBRD-78150 | Int Charges | 3,782.22 |
Nov 15, 2015 | IBRD-78150 | Int Charges | 8,102.09 |
Nov 15, 2015 | IBRD-78150 | Int Charges | 3,025.78 |
Nov 15, 2015 | IBRD-78150 | Int Charges | 5,554.92 |
Nov 15, 2015 | IBRD-78150 | Int Charges | 6,688.05 |
Sep 15, 2015 | IBRD-78150 | Loan Disb | -46,307.83 |
Nov 15, 2015 | IBRD-78150 | Loan Disb | -308,204.47 |
Nov 15, 2015 | IBRD-78150 | Loan Disb | 308,204.47 |
Sep 18, 2015 | IBRD-78150 | Loan Cancel | 47,184.03 |
Nov 15, 2014 | IBRD-78150 | Int Charges | 784.00 |
Nov 15, 2014 | IBRD-78150 | Int Charges | 2,816.21 |
Nov 15, 2014 | IBRD-78150 | Int Charges | 7,659.50 |
May 15, 2019 | IBRD-78150 | Int Charges | 13,474.44 |
May 15, 2019 | IBRD-78150 | Int Charges | 24,737.23 |
May 15, 2019 | IBRD-78150 | Int Charges | 36,672.17 |
Nov 15, 2019 | IBRD-78150 | Loan Repay | 60,452.00 |
Nov 15, 2019 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2019 | IBRD-78150 | Loan Repay | 33,926.42 |
Nov 15, 2019 | IBRD-78150 | Loan Repay | 83,300.00 |
Nov 15, 2019 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2019 | IBRD-78150 | Loan Repay | 50,983.17 |
Nov 15, 2019 | IBRD-78150 | Loan Repay | 19,040.00 |
Nov 15, 2019 | IBRD-78150 | Int Charges | 33,431.90 |
Nov 15, 2019 | IBRD-78150 | Int Charges | 13,538.06 |
Nov 15, 2019 | IBRD-78150 | Int Charges | 20,369.83 |
Nov 15, 2019 | IBRD-78150 | Int Charges | 51,329.91 |
Nov 15, 2019 | IBRD-78150 | Int Charges | 15,041.58 |
Nov 15, 2019 | IBRD-78150 | Int Charges | 33,026.51 |
Nov 15, 2019 | IBRD-78150 | Int Charges | 12,634.67 |
Nov 15, 2019 | IBRD-78150 | Int Charges | 23,195.52 |
Nov 15, 2019 | IBRD-78150 | Int Charges | 27,927.22 |
Nov 15, 2019 | IBRD-78150 | Int Charges | 4,867.58 |
May 15, 2020 | IBRD-78150 | Loan Repay | 83,300.00 |
May 15, 2020 | IBRD-78150 | Int Charges | 38,583.94 |
May 15, 2020 | IBRD-78150 | Loan Repay | 50,983.17 |
May 15, 2020 | IBRD-78150 | Loan Repay | 19,040.00 |
May 15, 2020 | IBRD-78150 | Loan Repay | 34,954.82 |
May 15, 2020 | IBRD-78150 | Int Charges | 25,054.76 |
May 15, 2020 | IBRD-78150 | Int Charges | 10,154.05 |
May 15, 2020 | IBRD-78150 | Int Charges | 15,301.10 |
May 15, 2020 | IBRD-78150 | Int Charges | 11,313.94 |
May 15, 2020 | IBRD-78150 | Int Charges | 24,857.38 |
May 15, 2020 | IBRD-78150 | Int Charges | 9,515.13 |
May 15, 2020 | IBRD-78150 | Int Charges | 17,894.36 |
May 15, 2020 | IBRD-78150 | Int Charges | 21,544.67 |
May 15, 2020 | IBRD-78150 | Int Charges | 3,755.13 |
Nov 15, 2017 | IBRD-78150 | Int Charges | 14,187.55 |
Nov 15, 2017 | IBRD-78150 | Int Charges | 13,770.14 |
Nov 15, 2017 | IBRD-78150 | Int Charges | 17,081.67 |
Nov 15, 2017 | IBRD-78150 | Int Charges | 2,977.24 |
Nov 15, 2017 | IBRD-78150 | Loan Repay | 60,452.00 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 50,577.06 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 19,460.40 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 36,776.88 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 8,158.42 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 45,543.61 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 754.24 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 167.07 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 49,072.29 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 20,034.89 |
Nov 15, 2023 | IBRD-78150 | Loan Repay | 33,926.42 |
May 15, 2023 | IBRD-78150 | Loan Repay | 33,926.42 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 1,014.66 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 413.73 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 630.41 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 1,597.77 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 470.77 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 1,038.98 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 399.43 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 933.31 |
Nov 15, 2023 | IBRD-78150 | Loan Repay | 60,452.00 |
Nov 15, 2023 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 77,630.73 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 22,895.32 |
Nov 15, 2021 | IBRD-78150 | Loan Repay | 60,452.00 |
Nov 15, 2021 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2021 | IBRD-78150 | Loan Repay | 33,926.42 |
Nov 15, 2021 | IBRD-78150 | Loan Repay | 83,300.00 |
Nov 15, 2021 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2014 | IBRD-78150 | Int Charges | 3,015.56 |
Nov 15, 2014 | IBRD-78150 | Int Charges | 4,298.60 |
Nov 15, 2014 | IBRD-78150 | Int Charges | 10,554.44 |
Nov 15, 2014 | IBRD-78150 | Int Charges | 3,015.56 |
Nov 15, 2014 | IBRD-78150 | Int Charges | 6,459.76 |
Nov 15, 2014 | IBRD-78150 | Int Charges | 2,412.44 |
Nov 15, 2014 | IBRD-78150 | Loan Disb | -1,468,690.00 |
Nov 15, 2014 | IBRD-78150 | Loan Disb | 1,468,690.00 |
Dec 9, 2014 | IBRD-78150 | Loan Disb | 191,382.00 |
Nov 15, 2013 | IBRD-78150 | Loan Disb | -2,142,150.00 |
Nov 15, 2013 | IBRD-78150 | Loan Disb | 2,142,150.00 |
Oct 31, 2013 | IBRD-78150 | Loan Disb | 1,142,150.00 |
Nov 15, 2013 | IBRD-78150 | Int Charges | 1,119.16 |
Nov 15, 2013 | IBRD-78150 | Int Charges | 2,760.01 |
Nov 15, 2013 | IBRD-78150 | Int Charges | 8,957.73 |
Nov 15, 2013 | IBRD-78150 | Int Charges | 3,526.67 |
Nov 15, 2013 | IBRD-78150 | Int Charges | 5,027.18 |
Nov 15, 2013 | IBRD-78150 | Int Charges | 12,343.33 |
Nov 15, 2013 | IBRD-78150 | Int Charges | 3,526.67 |
Mar 20, 2014 | IBRD-78150 | Loan Disb | 800,000.00 |
May 15, 2014 | IBRD-78150 | Int Charges | 328.37 |
May 15, 2014 | IBRD-78150 | Loan Disb | -800,000.00 |
May 15, 2014 | IBRD-78150 | Loan Disb | 800,000.00 |
May 15, 2014 | IBRD-78150 | Int Charges | 3,167.50 |
May 15, 2014 | IBRD-78150 | Int Charges | 4,515.19 |
May 15, 2014 | IBRD-78150 | Int Charges | 11,086.25 |
May 15, 2014 | IBRD-78150 | Int Charges | 3,167.50 |
May 15, 2014 | IBRD-78150 | Int Charges | 6,785.28 |
May 15, 2014 | IBRD-78150 | Int Charges | 8,045.45 |
Jul 21, 2014 | IBRD-78150 | Loan Disb | 1,468,690.00 |
Mar 10, 2015 | IBRD-78150 | Loan Disb | 191,382.00 |
Nov 15, 2023 | IBRD-78150 | Loan Repay | 83,300.00 |
Nov 15, 2023 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2023 | IBRD-78150 | Loan Repay | 50,983.17 |
Nov 15, 2023 | IBRD-78150 | Loan Repay | 19,040.00 |
Nov 15, 2023 | IBRD-78150 | Loan Repay | 34,954.82 |
Nov 15, 2023 | IBRD-78150 | Loan Repay | 42,085.33 |
Nov 15, 2023 | IBRD-78150 | Loan Repay | 7,335.26 |
Nov 15, 2023 | IBRD-78150 | Int Charges | 30,598.08 |
May 15, 2024 | IBRD-78150 | Int Charges | 53.53 |
May 15, 2024 | IBRD-78150 | Int Charges | 50,022.74 |
May 15, 2024 | IBRD-78150 | Int Charges | 20,450.95 |
May 15, 2024 | IBRD-78150 | Int Charges | 31,310.55 |
May 15, 2024 | IBRD-78150 | Int Charges | 79,526.62 |
May 15, 2024 | IBRD-78150 | Int Charges | 23,478.85 |
May 15, 2024 | IBRD-78150 | Int Charges | 51,916.80 |
May 15, 2024 | IBRD-78150 | Int Charges | 19,994.24 |
May 15, 2016 | IBRD-78150 | Int Charges | 7,053.79 |
May 15, 2016 | IBRD-78150 | Int Charges | 8,492.72 |
May 15, 2016 | IBRD-78150 | Int Charges | 1,480.24 |
May 15, 2016 | IBRD-78150 | Loan Repay | 60,452.00 |
May 15, 2016 | IBRD-78150 | Int Charges | 58.08 |
May 15, 2016 | IBRD-78150 | Int Charges | 12,140.97 |
May 15, 2016 | IBRD-78150 | Int Charges | 4,802.78 |
May 15, 2016 | IBRD-78150 | Int Charges | 6,846.28 |
May 15, 2016 | IBRD-78150 | Int Charges | 16,809.72 |
May 15, 2016 | IBRD-78150 | Int Charges | 4,802.78 |
May 15, 2016 | IBRD-78150 | Int Charges | 10,288.28 |
Nov 15, 2016 | IBRD-78150 | Int Charges | 14,014.43 |
Nov 15, 2016 | IBRD-78150 | Int Charges | 16,221.74 |
Nov 15, 2016 | IBRD-78150 | Int Charges | 6,542.22 |
Nov 15, 2016 | IBRD-78150 | Int Charges | 9,325.81 |
Nov 15, 2016 | IBRD-78150 | Int Charges | 22,897.78 |
Nov 15, 2016 | IBRD-78150 | Int Charges | 6,542.22 |
Nov 15, 2016 | IBRD-78150 | Int Charges | 5,233.78 |
Nov 15, 2016 | IBRD-78150 | Int Charges | 9,608.48 |
Nov 15, 2016 | IBRD-78150 | Int Charges | 11,568.56 |
Nov 15, 2016 | IBRD-78150 | Int Charges | 2,016.34 |
Nov 15, 2016 | IBRD-78150 | Loan Repay | 60,452.00 |
Nov 15, 2016 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2017 | IBRD-78150 | Int Charges | 12,331.70 |
May 15, 2017 | IBRD-78150 | Int Charges | 20,311.68 |
May 15, 2017 | IBRD-78150 | Int Charges | 8,196.57 |
May 15, 2017 | IBRD-78150 | Int Charges | 11,968.88 |
May 15, 2017 | IBRD-78150 | Int Charges | 29,387.36 |
May 15, 2017 | IBRD-78150 | Int Charges | 8,396.39 |
May 15, 2017 | IBRD-78150 | Int Charges | 17,986.32 |
May 15, 2017 | IBRD-78150 | Int Charges | 6,717.11 |
May 15, 2017 | IBRD-78150 | Int Charges | 14,847.26 |
May 15, 2017 | IBRD-78150 | Int Charges | 2,587.81 |
May 15, 2017 | IBRD-78150 | Loan Repay | 60,452.00 |
May 15, 2017 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2017 | IBRD-78150 | Int Charges | 22,784.48 |
Nov 15, 2017 | IBRD-78150 | Int Charges | 33,810.00 |
Nov 15, 2017 | IBRD-78150 | Int Charges | 9,660.00 |
Nov 15, 2017 | IBRD-78150 | Int Charges | 20,693.18 |
May 15, 2024 | IBRD-78150 | Int Charges | 37,818.43 |
May 15, 2024 | IBRD-78150 | Int Charges | 46,871.65 |
May 15, 2024 | IBRD-78150 | Int Charges | 8,402.78 |
May 15, 2024 | IBRD-78150 | Int Charges | 322.04 |
May 15, 2024 | IBRD-78150 | Int Charges | 200.80 |
May 15, 2024 | IBRD-78150 | Int Charges | 509.44 |
May 15, 2024 | IBRD-78150 | Int Charges | 150.26 |
May 15, 2024 | IBRD-78150 | Int Charges | 331.91 |
May 15, 2024 | IBRD-78150 | Int Charges | 127.71 |
May 15, 2024 | IBRD-78150 | Int Charges | 241.34 |
May 15, 2024 | IBRD-78150 | Int Charges | 298.89 |
May 15, 2024 | IBRD-78150 | Loan Repay | 60,452.00 |
May 15, 2024 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2024 | IBRD-78150 | Loan Repay | 33,926.42 |
May 15, 2024 | IBRD-78150 | Loan Repay | 83,300.00 |
May 15, 2024 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2024 | IBRD-78150 | Loan Repay | 50,983.17 |
May 15, 2024 | IBRD-78150 | Loan Repay | 19,040.00 |
May 15, 2024 | IBRD-78150 | Loan Repay | 34,954.82 |
May 15, 2024 | IBRD-78150 | Loan Repay | 42,085.33 |
May 15, 2024 | IBRD-78150 | Loan Repay | 7,335.26 |
May 15, 2024 | IBRD-78150 | Int Charges | 131.48 |
Nov 24, 2009 | IBRD-78150 | Loan Commitment | 16,000,000.00 |
Nov 15, 2022 | IBRD-78150 | Loan Repay | 33,926.42 |
Nov 15, 2022 | IBRD-78150 | Loan Repay | 83,300.00 |
Nov 15, 2022 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2022 | IBRD-78150 | Loan Repay | 50,983.17 |
Nov 15, 2022 | IBRD-78150 | Loan Repay | 19,040.00 |
Nov 15, 2022 | IBRD-78150 | Loan Repay | 34,954.82 |
Nov 15, 2022 | IBRD-78150 | Loan Repay | 42,085.33 |
Nov 15, 2022 | IBRD-78150 | Loan Repay | 7,335.26 |
Nov 15, 2022 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2023 | IBRD-78150 | Int Charges | 2,460.21 |
May 15, 2023 | IBRD-78150 | Int Charges | 1,001.97 |
May 15, 2023 | IBRD-78150 | Int Charges | 1,523.45 |
May 15, 2023 | IBRD-78150 | Int Charges | 3,857.38 |
May 15, 2023 | IBRD-78150 | Int Charges | 1,135.48 |
May 15, 2023 | IBRD-78150 | Int Charges | 2,503.89 |
May 15, 2023 | IBRD-78150 | Int Charges | 961.80 |
May 15, 2023 | IBRD-78150 | Int Charges | 1,814.76 |
May 15, 2023 | IBRD-78150 | Int Charges | 2,243.99 |
May 15, 2023 | IBRD-78150 | Int Charges | 31,281.41 |
May 15, 2023 | IBRD-78150 | Int Charges | 38,708.28 |
May 15, 2023 | IBRD-78150 | Int Charges | 6,928.91 |
May 15, 2023 | IBRD-78150 | Loan Repay | 60,452.00 |
May 15, 2023 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2023 | IBRD-78150 | Int Charges | 401.40 |
May 15, 2023 | IBRD-78150 | Int Charges | 42,082.68 |
May 15, 2023 | IBRD-78150 | Int Charges | 66,266.94 |
May 15, 2023 | IBRD-78150 | Int Charges | 19,524.77 |
May 15, 2023 | IBRD-78150 | Int Charges | 43,091.77 |
May 15, 2023 | IBRD-78150 | Int Charges | 16,566.03 |
May 15, 2023 | IBRD-78150 | Int Charges | 17,159.34 |
May 15, 2023 | IBRD-78150 | Int Charges | 26,146.25 |
May 15, 2023 | IBRD-78150 | Loan Repay | 83,300.00 |
May 15, 2023 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2023 | IBRD-78150 | Loan Repay | 50,983.17 |
May 15, 2023 | IBRD-78150 | Loan Repay | 19,040.00 |
May 15, 2023 | IBRD-78150 | Loan Repay | 34,954.82 |
May 15, 2023 | IBRD-78150 | Loan Repay | 42,085.33 |
May 15, 2023 | IBRD-78150 | Loan Repay | 7,335.26 |
Nov 15, 2021 | IBRD-78150 | Int Charges | 6,945.04 |
Nov 15, 2021 | IBRD-78150 | Int Charges | 2,663.74 |
Nov 15, 2021 | IBRD-78150 | Int Charges | 1,107.20 |
Nov 15, 2021 | IBRD-78150 | Int Charges | 5,018.87 |
Nov 15, 2021 | IBRD-78150 | Int Charges | 6,197.54 |
May 15, 2022 | IBRD-78150 | Loan Repay | 83,300.00 |
May 15, 2022 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2022 | IBRD-78150 | Int Charges | 5,077.77 |
May 15, 2022 | IBRD-78150 | Int Charges | 6,274.40 |
May 15, 2022 | IBRD-78150 | Int Charges | 1,121.63 |
May 15, 2022 | IBRD-78150 | Loan Repay | 60,452.00 |
May 15, 2022 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2022 | IBRD-78150 | Loan Repay | 33,926.42 |
Nov 15, 2021 | IBRD-78150 | Loan Repay | 50,983.17 |
Nov 15, 2021 | IBRD-78150 | Loan Repay | 19,040.00 |
Nov 15, 2021 | IBRD-78150 | Loan Repay | 34,954.82 |
Nov 15, 2021 | IBRD-78150 | Loan Repay | 42,085.33 |
Nov 15, 2021 | IBRD-78150 | Loan Repay | 7,335.26 |
May 15, 2022 | IBRD-78150 | Loan Repay | 50,983.17 |
May 15, 2022 | IBRD-78150 | Loan Repay | 19,040.00 |
Nov 15, 2017 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2017 | IBRD-78150 | Loan Repay | 33,926.42 |
Nov 15, 2017 | IBRD-78150 | Int Charges | 9,200.18 |
May 15, 2018 | IBRD-78150 | Int Charges | 36,602.23 |
May 15, 2018 | IBRD-78150 | Int Charges | 10,457.77 |
May 15, 2018 | IBRD-78150 | Int Charges | 22,402.13 |
May 15, 2018 | IBRD-78150 | Int Charges | 8,366.23 |
May 15, 2018 | IBRD-78150 | Int Charges | 15,359.24 |
May 15, 2018 | IBRD-78150 | Int Charges | 18,492.41 |
May 15, 2018 | IBRD-78150 | Int Charges | 3,223.14 |
May 15, 2018 | IBRD-78150 | Loan Repay | 60,452.00 |
Nov 15, 2018 | IBRD-78150 | Int Charges | 32,736.80 |
Nov 15, 2018 | IBRD-78150 | Loan Repay | 33,926.42 |
Nov 15, 2018 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2018 | IBRD-78150 | Int Charges | 34,197.63 |
Nov 15, 2018 | IBRD-78150 | Int Charges | 20,747.55 |
Nov 15, 2018 | IBRD-78150 | Int Charges | 13,827.36 |
Nov 15, 2018 | IBRD-78150 | Int Charges | 52,214.75 |
Nov 15, 2018 | IBRD-78150 | Int Charges | 15,282.22 |
May 15, 2018 | IBRD-78150 | Int Charges | 24,033.98 |
May 15, 2018 | IBRD-78150 | Int Charges | 9,711.09 |
May 15, 2018 | IBRD-78150 | Int Charges | 14,552.55 |
May 15, 2018 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2018 | IBRD-78150 | Loan Repay | 33,926.42 |
May 15, 2018 | IBRD-78150 | Loan Repay | 83,300.00 |
Nov 15, 2018 | IBRD-78150 | Int Charges | 22,444.86 |
Nov 15, 2018 | IBRD-78150 | Int Charges | 27,023.42 |
Nov 15, 2018 | IBRD-78150 | Int Charges | 4,710.04 |
Nov 15, 2018 | IBRD-78150 | Loan Repay | 60,452.00 |
Nov 15, 2018 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2018 | IBRD-78150 | Int Charges | 12,225.78 |
Nov 15, 2018 | IBRD-78150 | Loan Repay | 83,300.00 |
May 15, 2019 | IBRD-78150 | Int Charges | 29,783.43 |
May 15, 2019 | IBRD-78150 | Int Charges | 5,191.08 |
May 15, 2019 | IBRD-78150 | Loan Repay | 60,452.00 |
May 15, 2019 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2019 | IBRD-78150 | Loan Repay | 33,926.42 |
May 15, 2016 | IBRD-78150 | Int Charges | 3,842.22 |
May 15, 2022 | IBRD-78150 | Loan Repay | 34,954.82 |
May 15, 2022 | IBRD-78150 | Loan Repay | 42,085.33 |
May 15, 2022 | IBRD-78150 | Loan Repay | 7,335.26 |
May 15, 2022 | IBRD-78150 | Int Charges | 6,933.70 |
May 15, 2022 | IBRD-78150 | Int Charges | 4,280.18 |
May 15, 2022 | IBRD-78150 | Int Charges | 2,820.75 |
May 15, 2022 | IBRD-78150 | Int Charges | 10,827.50 |
May 15, 2022 | IBRD-78150 | Int Charges | 3,184.51 |
May 15, 2022 | IBRD-78150 | Int Charges | 7,016.50 |
May 15, 2022 | IBRD-78150 | Int Charges | 2,693.12 |
Nov 15, 2022 | IBRD-78150 | Loan Repay | 60,452.00 |
Nov 15, 2022 | IBRD-78150 | Int Charges | 12,068.46 |
Nov 15, 2022 | IBRD-78150 | Int Charges | 10,222.41 |
Nov 15, 2022 | IBRD-78150 | Int Charges | 19,288.02 |
Nov 15, 2022 | IBRD-78150 | Int Charges | 23,850.00 |
Nov 15, 2022 | IBRD-78150 | Int Charges | 4,266.26 |
Nov 15, 2022 | IBRD-78150 | Int Charges | 26,148.21 |
Nov 15, 2022 | IBRD-78150 | Int Charges | 10,649.36 |
Nov 15, 2022 | IBRD-78150 | Int Charges | 16,191.91 |
Nov 15, 2022 | IBRD-78150 | Int Charges | 40,997.91 |
Nov 15, 2022 | IBRD-78150 | Int Charges | 26,612.46 |
May 15, 2020 | IBRD-78150 | Loan Repay | 60,452.00 |
May 15, 2020 | IBRD-78150 | Loan Repay | 23,800.00 |
May 15, 2020 | IBRD-78150 | Loan Repay | 33,926.42 |
May 15, 2020 | IBRD-78150 | Loan Repay | 23,800.00 |
Nov 15, 2020 | IBRD-78150 | Loan Repay | 19,040.00 |
Nov 15, 2020 | IBRD-78150 | Loan Repay | 34,954.82 |
Nov 15, 2020 | IBRD-78150 | Loan Repay | 42,085.33 |
Nov 15, 2020 | IBRD-78150 | Int Charges | 11,935.66 |
Nov 15, 2020 | IBRD-78150 | Int Charges | 4,841.40 |
Nov 15, 2020 | IBRD-78150 | Int Charges | 7,307.09 |
Nov 15, 2020 | IBRD-78150 | Loan Repay | 50,983.17 |
Nov 15, 2020 | IBRD-78150 | Int Charges | 18,439.33 |
Nov 15, 2020 | IBRD-78150 | Int Charges | 5,410.71 |
Nov 15, 2020 | IBRD-78150 | Int Charges | 11,895.42 |
Nov 15, 2020 | IBRD-78150 | Int Charges | 4,556.26 |
Nov 15, 2020 | IBRD-78150 | Int Charges | 8,573.74 |
Nov 15, 2020 | IBRD-78150 | Int Charges | 10,574.36 |
Nov 15, 2020 | IBRD-78150 | Int Charges | 1,843.07 |
Name | Review | Date |
---|---|---|
Overall Implementation Progress (IP) | Satisfactory | 2015-03-30 |
Procurement | Satisfactory | 2015-03-30 |
Progress towards achievement of PDO | Satisfactory | 2015-03-30 |
Financial Management | Satisfactory | 2015-03-30 |
Monitoring and Evaluation | Satisfactory | 2015-03-30 |
Project Management | Satisfactory | 2015-03-30 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 09-30-2015 |
---|---|
Outcomes | |
Risk to Development Outcome | Substantial |
Bank Performance | |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 04-20-2016 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Satisfactory | N/a |
Risk To Development Outcome | Modest | N/a |
Bank Performance | Satisfactory | N/a |
Borrower Performance | Satisfactory | N/a |
Government Performance | Satisfactory | N/a |
Implementing Agency | Satisfactory | N/a |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Percentage of school principals certified | Value | 0.00 | 60.00 | 35.00 |
Date | March 2, 2015 | March 31, 2015 | ||
Comment |
% of schools inspected that prepare and implement School Improvement Plans reflecting recommendations made in NEI school inspections | Value | 0.00 | 90.00 | 90.00 |
Date | March 2, 2015 | March 31, 2015 | ||
Comment |
% of teachers registered | Value | 0.00 | 95.00 | 95.00 |
Date | March 2, 2015 | March 31, 2015 | ||
Comment |
NET has provided project management services/oversight to at least ten school construction projects | Value | 0.00 | 19.00 | 10.00 |
Date | March 2, 2015 | March 31, 2015 | ||
Comment |
Percentage of Central Ministry positions filled based on new functional profiles | Value | 0.00 | 20.00 | 10.00 |
Date | March 2, 2015 | March 31, 2015 | ||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Number of inspectors trained | Value | 0.00 | 357.00 | 290.00 |
Date | November 24, 2009 | March 2, 2015 | March 31, 2015 | |
Comment |
Percentage of schools inspected and inspection reports published | Value | 0.00 | 93.00 | 80.00 |
Date | November 24, 2009 | March 2, 2015 | March 31, 2015 | |
Comment |
Professional development mechanism in operation (Quality Education Circles) | Value | 0.00 | 63.00 | 63.00 |
Date | November 24, 2009 | March 2, 2015 | March 31, 2015 | |
Comment |
Number of education leaders trained under the National College for Educational Leadership (NCEL) | Value | 0.00 | 618.00 | 500.00 |
Date | November 24, 2009 | March 2, 2015 | March 31, 2015 | |
Comment |
Number of school board members trained | Value | 0.00 | 3461.00 | 1500.00 |
Date | November 24, 2009 | March 2, 2015 | March 31, 2015 | |
Comment |
School Improvement Officers receiving specialist training in regions | Value | 0 | All 7 Regions | All 7 Regions |
Date | November 24, 2009 | March 2, 2015 | March 31, 2015 | |
Comment |
Number of stakeholder meetings carried out on the ESTP | Value | 0.00 | 55.00 | 55.00 |
Date | November 24, 2009 | March 2, 2015 | March 31, 2015 | |
Comment |
Number of process evaluations carried out | Value | 0.00 | 3.00 | 3.00 |
Date | November 24, 2009 | March 2, 2015 | March 31, 2015 | |
Comment |
Number of CM and DSS staff trained in new functions | Value | 0.00 | 435.00 | 180.00 |
Date | November 30, 2011 | March 2, 2015 | March 31, 2015 | |
Comment |
Number of staff consutlations and sensitization meetings carried out | Value | 0.00 | 30.00 | 27.00 |
Date | November 24, 2009 | March 2, 2015 | March 31, 2015 | |
Comment |
Number of summative evaluations carried out | Value | 0.00 | 1.00 | 1.00 |
Date | November 24, 2009 | March 2, 2015 | March 31, 2015 | |
Comment |
NET operating structure approved by the NET Board | Value | No | Yes | Yes |
Date | March 2, 2015 | March 31, 2015 | ||
Comment |
CM Functional Profiles Approved | Value | No | Yes | Yes |
Date | March 2, 2015 | March 31, 2015 | ||
Comment |
Local / international marketing campaign on NET launched | Value | No | Yes | Yes |
Date | March 2, 2015 | March 31, 2015 | ||
Comment |
NET’s financial system is in place to receive endowments | Value | No | Yes | Yes |
Date | March 2, 2015 | March 31, 2015 | ||
Comment |
% of teaching cohort trained through the QECs | Value | 0.00 | 95.00 | 85.00 |
Date | March 2, 2015 | March 31, 2015 | ||
Comment |