Skip to Main Navigation

National Road Rehabilitation (Osh-Batken-Isfana)

Abstract*

The objectives of the National Road Rehabilitation (Osh-Isfana) Project for the Kyrgyz Republic are: (i) to contribute to the reduction of transport costs and travel time along the Osh-Batken-Isfana road corridor; and (ii) to improve road safety planning. There are three components to the project. The first component of the project is rehabilitation of a section of the Osh-Batken-Isfana road corridor. This component will finance the provision of works...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

To (i) contribute to the reduction of transport costs and travel time along the Osh-Batken-Isfana road corridor; and (ii) improve road safety planning and road asset management; and (iii) repair and rehabilitate road infrastructure in and around Osh and Jalal-Abad cities thereby creating temporary jobs.

Key Details

Project Details

  • P107608

  • Closed

  • Serdar Jepbarov

  • Ministry of Finance

  • Kyrgyz Republic

  • January 23, 2008

  • (as of board presentation)

    November 3, 2009

  • February 26, 2010

  • US$ 30.76 million

  • Ministry of Transport and Communication

  • Europe and Central Asia

  • 2010

  • US$ 25.00 million

  • B

  • March 11, 2021

  • December 31, 2014

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Borrower/Recipient 5.76
IDA Credit 25.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 25.00
IBRD + IDA Commitment 25.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 30.76

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jan 15, 2014 IDA-46580 Int Charges 41,529.52
Jan 15, 2014 IDA-48260 Int Charges 109.75
Jan 15, 2014 IDA-48260 Int Charges 109.75
Jan 15, 2014 IDA-48260 Int Charges 5,139.31
Jan 15, 2014 IDA-48260 Int Charges 5,139.31
Jan 15, 2014 IDA-46580 Int Charges 236.14
Nov 25, 2013 IDA-H7110 Loan Disb 115,897.12
Nov 20, 2013 IDA-H7110 Loan Disb 361,953.78
Oct 28, 2014 IDA-49750 Loan Disb 280,884.70
Jan 15, 2015 IDA-46580 Int Charges 106.67
Jan 15, 2015 IDA-46580 Int Charges 106.67
Jan 15, 2015 IDA-46580 Int Charges 43,166.53
Jan 15, 2015 IDA-46580 Int Charges 43,166.53
Dec 30, 2014 IDA-H7110 Loan Disb 221,158.66
Dec 16, 2014 IDA-H7110 Loan Disb 40,251.06
Dec 26, 2014 IDA-H7110 Loan Disb -1,328.53
Dec 24, 2014 IDA-48260 Loan Disb -11,135.81
Dec 23, 2014 IDA-H7110 Loan Disb 47,301.77
Oct 23, 2014 IDA-49750 Loan Disb 1,014,096.20
Sep 26, 2014 IDA-49750 Loan Disb 192,547.56
Nov 21, 2014 IDA-49750 Loan Disb 899,226.60
Nov 21, 2014 IDA-H7110 Loan Disb 244,386.22
Nov 27, 2014 IDA-46580 Loan Cancel 1,072,955.40
Jul 19, 2013 IDA-H7110 Loan Disb 299,839.90
Jul 15, 2013 IDA-48260 Int Charges 548.73
Jul 15, 2013 IDA-48260 Int Charges 3,511.96
Apr 30, 2015 IDA-48260 Loan Cancel 699,283.25
Apr 30, 2015 IDA-H7110 Loan Cancel 16,011.74
Apr 30, 2015 IDA-H7110 Loan Disb 20,064.00
Jan 15, 2016 IDA-49750 Int Charges 385.40
Jan 15, 2016 IDA-49750 Int Charges 385.40
Jan 15, 2016 IDA-46580 Int Charges 41,281.18
Jan 15, 2016 IDA-46580 Int Charges 41,281.18
Jan 15, 2016 IDA-48260 Int Charges 162.50
Jan 15, 2016 IDA-48260 Int Charges 162.50
Jan 15, 2016 IDA-48260 Int Charges 16,454.63
Jan 15, 2016 IDA-48260 Int Charges 16,454.63
Jan 15, 2016 IDA-49750 Int Charges 28,150.32
Jan 15, 2016 IDA-49750 Int Charges 28,150.32
Jan 15, 2016 IDA-46580 Int Charges 555.16
Jan 15, 2016 IDA-46580 Int Charges 555.16
Jan 15, 2015 IDA-49750 Int Charges 22.47
Jan 15, 2015 IDA-49750 Int Charges 22.47
Jul 31, 2014 IDA-H7110 Loan Disb 154,692.52
Jan 15, 2015 IDA-49750 Int Charges 21,495.68
Jan 15, 2015 IDA-49750 Int Charges 21,495.68
Mar 23, 2015 IDA-H7110 Loan Disb 160.31
Jul 15, 2020 IDA-49750 Int Charges 144.28
Jul 15, 2020 IDA-49750 Int Charges 144.28
Jan 15, 2021 IDA-46580 Int Charges 3,567.80
Jan 15, 2021 IDA-46580 Int Charges 3,567.80
Jul 16, 2019 IDA-48260 Int Charges 16,591.54
Jul 16, 2019 IDA-48260 Int Charges 16,591.54
Jul 16, 2019 IDA-49750 Int Charges 28,491.79
Jul 16, 2019 IDA-49750 Int Charges 28,491.79
Jul 16, 2019 IDA-46580 Int Charges 408.64
Jul 16, 2019 IDA-46580 Int Charges 408.64
Jul 16, 2019 IDA-46580 Int Charges 41,771.93
Jul 16, 2019 IDA-46580 Int Charges 41,771.93
Jul 16, 2019 IDA-49750 Int Charges 278.74
Jul 16, 2019 IDA-49750 Int Charges 278.74
Jul 16, 2019 IDA-48260 Int Charges 162.30
Jul 16, 2019 IDA-48260 Int Charges 162.30
Jan 15, 2020 IDA-48260 Int Charges 11.04
Jan 15, 2020 IDA-48260 Int Charges 11.04
Jan 15, 2023 IDA-49750 Loan Repay 1,617.47
Jan 15, 2023 IDA-48260 Loan Repay 939.32
Jan 15, 2023 IDA-48260 Loan Repay 42,247.45
Jan 15, 2023 IDA-48260 Int Charges 14,134.24
Jan 15, 2023 IDA-48260 Int Charges 14,134.24
Jan 15, 2023 IDA-46580 Loan Repay 2,351.88
Jan 15, 2023 IDA-46580 Loan Repay 106,378.18
Jan 15, 2023 IDA-46580 Int Charges 34,789.45
Jan 15, 2023 IDA-46580 Int Charges 34,789.45
Jul 15, 2023 IDA-48260 Int Charges 14,927.76
Jul 15, 2023 IDA-49750 Int Charges 2,444.21
Jul 15, 2023 IDA-49750 Int Charges 2,444.21
Jul 15, 2023 IDA-49750 Loan Repay 74,498.05
Jul 15, 2023 IDA-49750 Int Charges 25,911.55
Jul 15, 2023 IDA-49750 Int Charges 25,911.55
Jul 15, 2022 IDA-49750 Int Charges 208.31
Mar 19, 2014 IDA-46580 Loan Disb -58,088.00
Mar 14, 2014 IDA-46580 Loan Disb -7,020.05
May 29, 2014 IDA-H5200 Loan Disb 34,277.22
Mar 26, 2014 IDA-48260 Loan Disb 437,537.34
Jun 23, 2014 IDA-46580 Loan Disb 72,980.24
Jun 19, 2014 IDA-48260 Loan Disb 116,087.62
Dec 22, 2014 IDA-49750 Loan Disb 153,047.22
Jan 15, 2015 IDA-48260 Int Charges 7,162.15
Jan 15, 2015 IDA-48260 Int Charges 68.91
Jan 15, 2015 IDA-48260 Int Charges 68.91
Jan 15, 2015 IDA-48260 Int Charges 7,162.15
Dec 29, 2014 IDA-H7110 Loan Disb 60,952.57
Jul 21, 2014 IDA-49750 Loan Disb 377,801.38
Dec 22, 2014 IDA-48260 Loan Disb 149,158.61
Jul 15, 2014 IDA-48260 Int Charges 22.42
Jul 15, 2014 IDA-48260 Int Charges 6,586.59
Jul 15, 2014 IDA-48260 Int Charges 6,586.59
Jul 15, 2014 IDA-48260 Int Charges 22.42
Mar 19, 2015 IDA-H7110 Loan Disb 1,467.03
Dec 29, 2014 IDA-H5200 Loan Disb 733,673.44
Aug 27, 2014 IDA-49750 Loan Disb 250,754.92
Dec 18, 2013 IDA-49750 Loan Disb 564,253.56
Dec 18, 2013 IDA-49750 Loan Disb 513,576.50
Dec 18, 2013 IDA-49750 Loan Disb 53,866.64
Oct 9, 2013 IDA-H7110 Loan Disb 55,241.48
Jan 24, 2014 IDA-49750 Loan Disb 182,084.31
Jan 24, 2014 IDA-49750 Loan Disb 296,484.12
Jan 24, 2014 IDA-46580 Loan Disb 171,524.64
Jan 21, 2014 IDA-46580 Loan Disb 1,068,554.90
Jan 21, 2014 IDA-49750 Loan Disb 958,902.75
Jan 21, 2014 IDA-49750 Loan Disb 588,905.50
Oct 2, 2013 IDA-H5200 Loan Disb 357,285.22
Oct 2, 2013 IDA-48260 Loan Disb 252,296.05
Jan 15, 2014 IDA-46580 Int Charges 236.14
Jan 15, 2014 IDA-46580 Int Charges 41,529.52
Jul 15, 2017 IDA-48260 Int Charges 147.72
Jul 15, 2017 IDA-48260 Int Charges 147.72
Jul 15, 2017 IDA-46580 Int Charges 41,065.56
Jul 15, 2017 IDA-46580 Int Charges 41,065.56
Jul 15, 2013 IDA-48260 Int Charges 3,511.96
Jul 29, 2013 IDA-H7110 Loan Disb 146,344.75
Jul 15, 2013 IDA-48260 Int Charges 548.73
Dec 5, 2014 IDA-H7110 Loan Disb 49,109.13
Jul 15, 2013 IDA-46580 Int Charges 1,488.33
Jul 15, 2013 IDA-46580 Int Charges 1,488.33
Jul 15, 2013 IDA-46580 Int Charges 38,955.80
Jul 15, 2013 IDA-46580 Int Charges 38,955.80
Jul 16, 2013 IDA-H7110 Loan Disb 939,684.10
Jul 24, 2013 IDA-H7110 Loan Disb 456,501.97
Aug 22, 2014 IDA-49750 Loan Disb 843,468.94
Jul 15, 2014 IDA-46580 Int Charges 178.38
Jul 15, 2014 IDA-46580 Int Charges 178.38
Jul 15, 2014 IDA-46580 Int Charges 46,282.93
Jul 15, 2014 IDA-46580 Int Charges 46,282.93
Jul 15, 2014 IDA-49750 Int Charges 827.37
Jul 15, 2014 IDA-49750 Int Charges 827.37
Jul 15, 2014 IDA-49750 Int Charges 12,966.68
Jul 15, 2014 IDA-49750 Int Charges 12,966.68
Jul 24, 2014 IDA-49750 Loan Disb 114,092.40
Apr 14, 2015 IDA-48260 Loan Disb 504,560.06
Apr 9, 2015 IDA-48260 Loan Disb 1,350,000.00
Apr 9, 2015 IDA-H7110 Loan Disb 115,035.49
Apr 9, 2015 IDA-48260 Loan Disb 589,005.30
Apr 9, 2015 IDA-H5200 Loan Disb 234,465.66
Sep 23, 2014 IDA-49750 Loan Disb 672,917.94
Jul 15, 2015 IDA-49750 Int Charges 511.54
Jul 15, 2015 IDA-49750 Int Charges 511.54
Jul 15, 2015 IDA-49750 Int Charges 28,825.91
Jul 15, 2015 IDA-49750 Int Charges 28,825.91
Apr 24, 2015 IDA-H7110 Loan Disb 5,015.99
Apr 20, 2015 IDA-48260 Loan Disb 13,450.46
Jul 15, 2015 IDA-48260 Int Charges 118.08
Jul 15, 2015 IDA-46580 Int Charges 1,108.24
Jul 15, 2015 IDA-48260 Int Charges 118.08
Dec 20, 2013 IDA-49750 Loan Disb 17,151.07
Dec 20, 2013 IDA-49750 Loan Disb 179,657.66
Dec 20, 2013 IDA-49750 Loan Disb 163,522.16
Mar 27, 2014 IDA-H7110 Loan Disb 301,800.75
Jan 15, 2020 IDA-48260 Int Charges 16,497.52
Jan 15, 2020 IDA-48260 Int Charges 16,497.52
Jan 15, 2020 IDA-49750 Int Charges 18.95
Jan 15, 2020 IDA-49750 Int Charges 18.95
Jan 15, 2020 IDA-49750 Int Charges 28,330.30
Jan 15, 2020 IDA-49750 Int Charges 28,330.30
Jan 15, 2020 IDA-46580 Loan Repay 27.78
Jan 15, 2020 IDA-46580 Loan Repay 111,367.30
Jan 15, 2020 IDA-46580 Int Charges 41,002.56
Jan 15, 2020 IDA-46580 Int Charges 41,002.56
Jan 15, 2019 IDA-46580 Int Charges 804.39
Jan 15, 2019 IDA-46580 Int Charges 804.39
Jan 15, 2019 IDA-46580 Int Charges 40,975.11
Jan 15, 2019 IDA-46580 Int Charges 40,975.11
Jan 15, 2019 IDA-48260 Int Charges 319.50
Jan 15, 2019 IDA-48260 Int Charges 319.50
Jan 15, 2019 IDA-48260 Int Charges 16,275.05
Jan 15, 2019 IDA-48260 Int Charges 16,275.05
Jan 15, 2019 IDA-49750 Int Charges 548.65
Jan 15, 2019 IDA-49750 Int Charges 548.65
Jan 15, 2019 IDA-49750 Int Charges 27,948.27
Jan 15, 2019 IDA-49750 Int Charges 27,948.27
Jan 15, 2018 IDA-49750 Int Charges 427.45
Jan 15, 2018 IDA-49750 Int Charges 427.45
Jan 15, 2018 IDA-46580 Int Charges 626.67
Jan 15, 2018 IDA-46580 Int Charges 626.67
Jan 15, 2018 IDA-46580 Int Charges 42,716.30
Jan 15, 2018 IDA-46580 Int Charges 42,716.30
Jan 15, 2018 IDA-48260 Int Charges 248.92
Jan 15, 2018 IDA-48260 Int Charges 248.92
Jan 15, 2018 IDA-48260 Int Charges 16,966.64
Jan 15, 2018 IDA-48260 Int Charges 16,966.64
Jan 15, 2018 IDA-49750 Int Charges 29,135.91
Jan 15, 2018 IDA-49750 Int Charges 29,135.91
Jul 15, 2018 IDA-46580 Int Charges 42,393.93
Jul 15, 2018 IDA-46580 Int Charges 42,393.93
Jul 15, 2018 IDA-49750 Int Charges 28,916.04
Jul 15, 2018 IDA-49750 Int Charges 28,916.04
Jul 15, 2018 IDA-46580 Int Charges 600.56
Jan 15, 2024 IDA-46580 Int Charges 1,301.87
Jan 15, 2024 IDA-46580 Loan Repay 107,733.41
Jul 15, 2024 IDA-46580 Int Charges 36,092.91
Jul 15, 2024 IDA-49750 Int Charges 725.25
Jul 15, 2024 IDA-49750 Loan Repay 72,999.30
Jul 15, 2024 IDA-49750 Int Charges 25,437.02
Jul 15, 2024 IDA-49750 Int Charges 25,437.02
Jul 15, 2024 IDA-46580 Int Charges 1,054.48
Jul 15, 2024 IDA-46580 Int Charges 1,054.48
Jul 15, 2024 IDA-46580 Loan Repay 107,024.62
Jul 15, 2024 IDA-48260 Int Charges 421.17
Jul 15, 2024 IDA-48260 Int Charges 421.17
Jul 15, 2024 IDA-49750 Int Charges 725.25
Jul 15, 2024 IDA-48260 Loan Repay 42,509.38
Jul 15, 2024 IDA-48260 Int Charges 14,653.69
Jul 15, 2024 IDA-48260 Int Charges 14,653.69
Jul 15, 2024 IDA-46580 Int Charges 36,092.91
Jun 28, 2011 IDA-H7110 Loan Commitment 7,200,000.00
Nov 3, 2009 IDA-H5200 Loan Commitment 11,250,000.00
Sep 30, 2010 IDA-H6190 Loan Commitment 4,500,000.00
Jun 28, 2011 IDA-49750 Loan Commitment 8,800,000.00
Sep 30, 2010 IDA-48260 Loan Commitment 5,500,000.00
Nov 3, 2009 IDA-46580 Loan Commitment 13,750,000.00
Jul 15, 2023 IDA-48260 Int Charges 14,927.76
Jul 15, 2023 IDA-46580 Int Charges 3,553.90
Jul 15, 2023 IDA-46580 Int Charges 3,553.90
Jul 15, 2023 IDA-46580 Loan Repay 109,221.94
Jul 15, 2023 IDA-46580 Int Charges 36,771.26
Jul 15, 2023 IDA-46580 Int Charges 36,771.26
Jul 15, 2023 IDA-48260 Int Charges 1,419.40
Jul 15, 2023 IDA-48260 Int Charges 1,419.40
Jul 15, 2023 IDA-48260 Loan Repay 43,382.14
Jan 15, 2024 IDA-46580 Int Charges 36,106.59
Jan 15, 2024 IDA-46580 Int Charges 36,106.59
Jan 15, 2024 IDA-48260 Int Charges 14,659.84
Jan 15, 2024 IDA-48260 Int Charges 14,659.84
Jan 15, 2024 IDA-48260 Loan Repay 42,790.90
Jan 15, 2024 IDA-46580 Int Charges 1,301.87
Jan 15, 2023 IDA-49750 Loan Repay 72,545.08
Jan 15, 2023 IDA-49750 Int Charges 24,543.38
Jan 15, 2023 IDA-49750 Int Charges 24,543.38
Jul 15, 2018 IDA-46580 Int Charges 600.56
Jul 15, 2018 IDA-48260 Int Charges 238.53
Jul 15, 2018 IDA-48260 Int Charges 238.53
Jul 15, 2018 IDA-48260 Int Charges 16,838.60
Jul 15, 2018 IDA-48260 Int Charges 16,838.60
Jul 15, 2018 IDA-49750 Int Charges 409.63
Jul 15, 2018 IDA-49750 Int Charges 409.63
Jul 15, 2022 IDA-49750 Int Charges 208.31
Jul 15, 2022 IDA-48260 Int Charges 15,253.64
Jul 15, 2022 IDA-48260 Int Charges 15,253.64
Jul 15, 2022 IDA-46580 Int Charges 37,611.89
Jul 15, 2022 IDA-46580 Int Charges 37,611.89
Jul 15, 2022 IDA-46580 Int Charges 302.88
Jul 15, 2022 IDA-46580 Int Charges 302.88
Jul 15, 2022 IDA-46580 Loan Repay 105,577.21
Jul 15, 2022 IDA-48260 Int Charges 120.97
Jul 15, 2022 IDA-48260 Int Charges 120.97
Jul 15, 2022 IDA-48260 Loan Repay 41,934.48
Jan 15, 2022 IDA-48260 Int Charges 16,441.27
Jan 15, 2022 IDA-48260 Int Charges 16,441.27
Jan 15, 2022 IDA-48260 Loan Repay 629.06
Jan 15, 2022 IDA-48260 Loan Repay 44,463.04
Jan 15, 2022 IDA-46580 Loan Repay 1,575.48
Jan 15, 2022 IDA-49750 Int Charges 28,523.52
Jan 15, 2022 IDA-49750 Int Charges 28,523.52
Jan 15, 2022 IDA-49750 Loan Repay 1,072.07
Jan 15, 2022 IDA-46580 Loan Repay 111,951.60
Jan 15, 2022 IDA-46580 Int Charges 40,544.07
Jan 15, 2022 IDA-46580 Int Charges 40,544.07
Jul 15, 2022 IDA-49750 Loan Repay 72,012.05
Jul 15, 2022 IDA-49750 Int Charges 26,464.43
Jul 15, 2022 IDA-49750 Int Charges 26,464.43
Jan 15, 2022 IDA-49750 Loan Repay 76,362.43
Jan 15, 2021 IDA-46580 Loan Repay 116,147.75
Jan 15, 2021 IDA-48260 Int Charges 387.54
Jan 15, 2021 IDA-48260 Int Charges 387.54
Jan 15, 2021 IDA-48260 Loan Repay 46,133.02
Jan 15, 2021 IDA-49750 Int Charges 665.49
Jan 15, 2021 IDA-49750 Int Charges 665.49
Jan 15, 2021 IDA-49750 Int Charges 29,274.29
Jan 15, 2021 IDA-49750 Int Charges 29,274.29
Jan 15, 2021 IDA-46580 Int Charges 40,363.97
Jan 15, 2021 IDA-46580 Int Charges 40,363.97
Jan 15, 2021 IDA-48260 Int Charges 16,388.06
Jan 15, 2021 IDA-48260 Int Charges 16,388.06
Jul 15, 2021 IDA-48260 Int Charges 901.84
Jul 15, 2021 IDA-48260 Int Charges 901.84
Jul 15, 2021 IDA-48260 Loan Repay 45,626.33
Jul 15, 2021 IDA-49750 Loan Repay 78,351.90
Jul 15, 2021 IDA-49750 Int Charges 29,381.96
Jul 15, 2021 IDA-49750 Int Charges 29,381.96
Jul 15, 2021 IDA-46580 Int Charges 41,784.70
Jul 15, 2021 IDA-46580 Int Charges 2,294.84
Jul 15, 2021 IDA-46580 Int Charges 2,294.84
Jul 15, 2021 IDA-46580 Loan Repay 114,872.09
Jul 15, 2021 IDA-46580 Int Charges 41,784.70
Jul 15, 2021 IDA-48260 Int Charges 16,938.80
Jul 15, 2021 IDA-48260 Int Charges 16,938.80
Jul 15, 2021 IDA-49750 Int Charges 429.20
Jul 15, 2021 IDA-49750 Int Charges 429.20
Jul 15, 2020 IDA-46580 Int Charges 38,178.57
Jul 15, 2020 IDA-46580 Int Charges 38,178.57
Jul 15, 2020 IDA-46580 Int Charges 775.55
Jul 15, 2020 IDA-46580 Int Charges 775.55
Jul 15, 2020 IDA-46580 Loan Repay 112,114.35
Jul 15, 2020 IDA-49750 Int Charges 28,034.20
Jul 15, 2020 IDA-49750 Int Charges 28,034.20
Jul 15, 2020 IDA-48260 Int Charges 84.01
Jul 15, 2020 IDA-48260 Int Charges 84.01
Jul 15, 2020 IDA-48260 Int Charges 16,325.08
Jul 15, 2020 IDA-48260 Int Charges 16,325.08
Jan 15, 2024 IDA-48260 Int Charges 519.96
Jan 15, 2024 IDA-48260 Int Charges 519.96
Jan 15, 2024 IDA-49750 Int Charges 895.38
Jan 15, 2024 IDA-49750 Int Charges 895.38
Jan 15, 2024 IDA-49750 Loan Repay 73,482.75
Jan 15, 2024 IDA-49750 Int Charges 25,448.16
Jan 15, 2024 IDA-49750 Int Charges 25,448.16
Jul 15, 2017 IDA-48260 Int Charges 16,310.98
Jul 15, 2017 IDA-48260 Int Charges 16,310.98
Jul 15, 2017 IDA-46580 Int Charges 371.94
Jul 15, 2017 IDA-46580 Int Charges 371.94
Jul 15, 2017 IDA-49750 Int Charges 253.69
Jul 15, 2017 IDA-49750 Int Charges 253.69
Jul 15, 2017 IDA-49750 Int Charges 28,009.98
Jul 15, 2017 IDA-49750 Int Charges 28,009.98
Jan 15, 2017 IDA-48260 Int Charges 204.77
Jan 15, 2017 IDA-48260 Int Charges 204.77
Jan 15, 2017 IDA-49750 Int Charges 27,517.88
Jan 15, 2017 IDA-49750 Int Charges 27,517.88
Jan 15, 2017 IDA-49750 Int Charges 351.65
Jan 15, 2017 IDA-49750 Int Charges 351.65
Jan 15, 2017 IDA-48260 Int Charges 16,024.42
Jan 15, 2017 IDA-48260 Int Charges 16,024.42
Jan 15, 2017 IDA-46580 Int Charges 515.57
Jan 15, 2017 IDA-46580 Int Charges 515.57
Jan 15, 2017 IDA-46580 Int Charges 40,344.07
Jan 15, 2017 IDA-46580 Int Charges 40,344.07
Jul 15, 2016 IDA-46580 Int Charges 16.02
Jul 15, 2016 IDA-46580 Int Charges 16.02
Jul 15, 2016 IDA-46580 Int Charges 42,133.89
Jul 15, 2016 IDA-46580 Int Charges 42,133.89
Jul 15, 2016 IDA-49750 Int Charges 10.93
Jul 15, 2016 IDA-49750 Int Charges 10.93
Jul 15, 2016 IDA-49750 Int Charges 28,738.67
Jul 15, 2016 IDA-49750 Int Charges 28,738.67
Jul 15, 2016 IDA-48260 Int Charges 6.36
Jul 15, 2016 IDA-48260 Int Charges 6.36
Jul 15, 2016 IDA-48260 Int Charges 16,735.32
Jul 15, 2016 IDA-48260 Int Charges 16,735.32
Jul 15, 2015 IDA-48260 Int Charges 12,252.49
Jul 15, 2015 IDA-48260 Int Charges 12,252.49
Jul 15, 2015 IDA-46580 Int Charges 1,108.24
Jul 15, 2015 IDA-46580 Int Charges 41,153.55
Jul 15, 2015 IDA-46580 Int Charges 41,153.55
Apr 30, 2015 IDA-H5200 Loan Cancel 25,924.12
Apr 30, 2015 IDA-46580 Loan Cancel 5,135.46

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Procurement Moderately Satisfactory 2014-12-24
Project Management Satisfactory 2014-12-24
Counterpart Funding Satisfactory 2014-12-24
Overall Safeguards Rating Satisfactory 2014-12-24
Progress towards achievement of PDO Satisfactory 2014-12-24
Financial Management Satisfactory 2014-12-24
Monitoring and Evaluation Satisfactory 2014-12-24
Overall Implementation Progress (IP) Moderately Satisfactory 2014-12-24
Overall Safeguards Rating Satisfactory 2014-12-24

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 06-30-2015
OutcomesSubstantial
Risk to Development OutcomeSubstantial
Bank PerformanceSubstantial
Borrower PerformanceSubstantial
Government PerformanceSubstantial
Implementing AgencySubstantial

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 10-19-2015PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingSatisfactory N/a
Risk To Development OutcomeSignificantN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceModerately SatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualitySatisfactoryN/a
M&e QualitySubstantialN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Reduction in transport costs for road users, by car, along the project road section of the Osh-Batken-Isfana road corridor: Pulgon-Burgandy (32 km)Value0.300.250.27
    DateFebruary 22, 2010December 1, 2014December 31, 2014
    Comment
  • Reduction in transport costs for road users by car along the project road sections of the Osh-Batken-Isfana Road corridor - Nookat Pass (18km)Value0.290.270.27
    DateMay 2, 2011December 1, 2014December 31, 2014
    Comment
  • Reduction in travel time for road users by car along the project road sections of the Osh-Batken-Isfana Road corridor: Pulgon-Burgandy (32km)Value50.0025.0045.00
    DateFebruary 22, 2010December 1, 2014December 31, 2014
    Comment
  • Reduction in travel time for road users by car along the project road sections of the Osh-Batken-Isfana Road corridor: Nookat Pass (18km)Value18.0015.0015.00
    DateFebruary 22, 2010December 1, 2014December 31, 2014
    Comment
  • Proportional increase in traffic one year after project road section of the Osh-Batken-Isfana Road corridor has been improved or rehabilitated: Pulgon-Burgandy (32km)Value3047.004589.004570.00
    DateFebruary 22, 2010December 1, 2014December 31, 2014
    Comment
  • Proportional increase in traffic one year after project road section of the Osh-Batken-Isfana Road corridor has been improved or rehabilitated: Nookat Pass (18km)Value5910.006685.007200.00
    DateMay 2, 2011December 1, 2014December 31, 2014
    Comment
  • Proportional increase in the number of rural people along the OBI road corridor who live within 2 km of an all-season roadValue0.004.004.00
    DateFebruary 22, 2011December 1, 2014December 31, 2014
    Comment
  • National road safety program developed and launchedValueNoYesYes
    DateFebruary 22, 2010December 1, 2014December 31, 2014
    Comment
  • Road condition surveyed (roughness)ValueNoYesYes
    DateMay 2, 2011December 1, 2014December 31, 2014
    Comment
  • Number of person-months of employment createdValue0.005100.005000.00
    DateOctober 1, 2009December 1, 2014December 31, 2014
    Comment
  • Direct project beneficiariesValue22483.001270491.001000000.00
    DateFebruary 22, 2010December 1, 2014December 31, 2014
    Comment
  • Female beneficiariesValue10000.00508196.00500000.00
    DateFebruary 22, 2010December 1, 2014December 31, 2014
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Number of kilometers of roads rehabilitated along the Osh-Batken-Isfana road corridorValue0.0050.0050.00
    DateFebruary 22, 2010December 1, 2014December 31, 2014
    Comment
  • Number of kilometers of urban roads repaired within the city of OshValue0.00350.00350.00
    DateMay 2, 2012December 1, 2014December 31, 2014
    Comment
  • Number of kilometers of roads repaired in and around the greater Osh and Jalal-Abad city vicinitiesValue0.0015.5015.00
    DateMay 2, 2012December 1, 2014December 31, 2014
    Comment
  • Percentage of total classified road network in the project area in good and fair conditionValue30.0087.0070.00
    DateFebruary 22, 2010December 1, 2014December 31, 2014
    Comment
  • Road safety audit undertaken at pre-opening stage of project road sectionsValue0.0050.0050.00
    DateMay 2, 2011December 1, 2014December 31, 2014
    Comment
  • Pilot demonstration projects on road safety along the corridor developedValue0.002.002.00
    DateFebruary 22, 2010December 1, 2014December 31, 2014
    Comment
  • Collected road condition data transferred into road databaseValue0.001500.001500.00
    DateMay 2, 2011December 1, 2014December 31, 2014
    Comment