Financier | Commitments |
---|---|
IDA Credit | 38.00 |
P110099
Closed
Yoro Sidibe
Economics Affairs Division, Government of Pakistan
March 18, 2008
(as of board presentation)
June 26, 2008
September 22, 2008
US$ 38.00 million
Indus River System Authority (IRSA),Water and Power Development Authority (WAPDA),Project Management and Policy Implementation Unit (PMPIU),Ministry of Water and Power, Government of Pakistan
2008
US$ 38.00 million
B
June 29, 2022
June 30, 2021
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 38.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 38.00 |
IBRD + IDA Commitment | 38.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 38.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Mar 15, 2015 | IDA-44370 | Int Charges | 106,881.76 |
Sep 2, 2014 | IDA-44370 | Loan Disb | 2,297,000.00 |
Aug 18, 2015 | IDA-44370 | Loan Disb | 540,000.00 |
May 8, 2015 | IDA-44370 | Loan Disb | 637,929.00 |
Jun 15, 2015 | IDA-44370 | Loan Disb | 983,641.44 |
Nov 19, 2015 | IDA-44370 | Loan Disb | 100,141.00 |
May 23, 2014 | IDA-44370 | Loan Disb | 1,300,000.00 |
Jun 18, 2014 | IDA-44370 | Loan Disb | 432,022.70 |
Sep 15, 2014 | IDA-44370 | Int Charges | 109,358.85 |
Sep 15, 2014 | IDA-44370 | Int Charges | 109,358.85 |
Sep 15, 2014 | IDA-44370 | Int Charges | 1,093.55 |
Sep 15, 2014 | IDA-44370 | Int Charges | 1,093.55 |
Jun 16, 2015 | IDA-44370 | Loan Disb | 129,215.61 |
Mar 15, 2015 | IDA-44370 | Int Charges | 2,703.46 |
Sep 15, 2013 | IDA-44370 | Int Charges | 1,870.75 |
Sep 15, 2013 | IDA-44370 | Int Charges | 1,870.75 |
Sep 15, 2013 | IDA-44370 | Int Charges | 88,341.74 |
Sep 15, 2013 | IDA-44370 | Int Charges | 88,341.74 |
Dec 5, 2013 | IDA-44370 | Loan Disb | 270,889.56 |
Dec 5, 2013 | IDA-44370 | Loan Disb | 103,789.24 |
Dec 2, 2013 | IDA-44370 | Loan Disb | 2,000,000.00 |
Mar 15, 2014 | IDA-44370 | Int Charges | 1,620.72 |
Mar 15, 2014 | IDA-44370 | Int Charges | 1,620.72 |
Mar 15, 2014 | IDA-44370 | Int Charges | 103,598.89 |
Mar 15, 2014 | IDA-44370 | Int Charges | 103,598.89 |
Aug 27, 2013 | IDA-44370 | Loan Disb | 1,000,000.00 |
Nov 27, 2017 | IDA-57600 | Loan Disb | 678,000.00 |
Sep 15, 2017 | IDA-57600 | Int Charges | 6,852.03 |
Sep 15, 2017 | IDA-57600 | Int Charges | 6,852.03 |
Sep 15, 2017 | IDA-57600 | Int Charges | 10,973.72 |
Sep 15, 2017 | IDA-44370 | Int Charges | 141.80 |
Sep 15, 2017 | IDA-44370 | Int Charges | 141.80 |
Mar 15, 2018 | IDA-57600 | Int Charges | 455.56 |
Mar 15, 2018 | IDA-57600 | Int Charges | 13,932.88 |
Feb 23, 2017 | IDA-57600 | Loan Disb | 624,440.00 |
Sep 15, 2017 | IDA-57600 | Int Charges | 788.72 |
Mar 15, 2017 | IDA-57600 | Int Charges | 874.15 |
Mar 15, 2017 | IDA-57600 | Int Charges | 6,655.88 |
Sep 15, 2016 | IDA-44370 | Int Charges | 120,469.78 |
Sep 15, 2016 | IDA-44370 | Int Charges | 120,469.78 |
Sep 15, 2016 | IDA-57600 | Int Charges | 1,470.26 |
May 5, 2016 | IDA-57600 | Loan Disb | 424,076.00 |
May 24, 2016 | IDA-44370 | Loan Disb | 61,533.18 |
Aug 23, 2016 | IDA-57600 | Loan Disb | 734,000.00 |
Oct 11, 2016 | IDA-44370 | Loan Disb | -408,186.10 |
Oct 11, 2016 | IDA-44370 | Loan Cancel | 872,251.90 |
Mar 15, 2017 | IDA-57600 | Int Charges | 4,442.09 |
Mar 15, 2017 | IDA-57600 | Int Charges | 4,442.09 |
Mar 15, 2017 | IDA-44370 | Int Charges | 536.20 |
Mar 15, 2017 | IDA-44370 | Int Charges | 536.20 |
Mar 15, 2017 | IDA-44370 | Int Charges | 115,449.67 |
Mar 15, 2017 | IDA-44370 | Int Charges | 115,449.67 |
Sep 15, 2015 | IDA-44370 | Int Charges | 4,526.79 |
Sep 15, 2015 | IDA-44370 | Int Charges | 4,526.79 |
Sep 15, 2015 | IDA-44370 | Int Charges | 110,944.36 |
Sep 15, 2015 | IDA-44370 | Int Charges | 110,944.36 |
Mar 15, 2016 | IDA-44370 | Int Charges | 119,293.84 |
Mar 15, 2016 | IDA-44370 | Int Charges | 119,293.84 |
Mar 15, 2016 | IDA-44370 | Int Charges | 1,353.98 |
Mar 15, 2016 | IDA-44370 | Int Charges | 1,353.98 |
Sep 15, 2016 | IDA-57600 | Int Charges | 1,470.26 |
Sep 15, 2016 | IDA-57600 | Int Charges | 1,543.42 |
Sep 15, 2016 | IDA-44370 | Int Charges | 892.78 |
Sep 15, 2016 | IDA-44370 | Int Charges | 892.78 |
Mar 15, 2015 | IDA-44370 | Int Charges | 2,703.46 |
Mar 15, 2015 | IDA-44370 | Int Charges | 106,881.76 |
Mar 15, 2020 | IDA-57600 | Int Charges | 19,004.47 |
Mar 15, 2020 | IDA-57600 | Int Charges | 19,004.47 |
Mar 15, 2020 | IDA-57600 | Int Charges | 28,605.87 |
Mar 15, 2020 | IDA-44370 | Loan Repay | 4,256.14 |
Mar 15, 2020 | IDA-57600 | Int Charges | 305.70 |
Jan 16, 2020 | IDA-57600 | Loan Disb | 910,000.00 |
Jun 24, 2020 | IDA-57600 | Loan Disb | 21,918.92 |
Mar 15, 2019 | IDA-44370 | Int Charges | 261.62 |
Mar 15, 2019 | IDA-44370 | Int Charges | 261.62 |
Mar 15, 2019 | IDA-57600 | Int Charges | 16,211.48 |
Mar 15, 2019 | IDA-57600 | Int Charges | 12.98 |
Mar 15, 2019 | IDA-57600 | Int Charges | 9,726.92 |
Mar 15, 2019 | IDA-57600 | Int Charges | 9,726.92 |
Mar 15, 2019 | IDA-44370 | Int Charges | 117,398.75 |
Mar 15, 2019 | IDA-44370 | Int Charges | 117,398.75 |
Mar 15, 2019 | IDA-44370 | Loan Repay | 396,282.72 |
Sep 15, 2019 | IDA-44370 | Int Charges | 114,315.17 |
Sep 15, 2019 | IDA-44370 | Int Charges | 114,315.17 |
May 30, 2019 | IDA-57600 | Loan Disb | 151,323.36 |
Jun 13, 2019 | IDA-57600 | Loan Disb | 231,330.00 |
Sep 15, 2019 | IDA-57600 | Int Charges | 55.17 |
Sep 15, 2019 | IDA-57600 | Int Charges | 55.17 |
Sep 15, 2019 | IDA-57600 | Int Charges | 10,509.09 |
Sep 15, 2019 | IDA-57600 | Int Charges | 10,509.09 |
Sep 15, 2019 | IDA-57600 | Int Charges | 17,302.49 |
Sep 3, 2019 | IDA-57600 | Loan Disb | 800,000.00 |
Sep 15, 2018 | IDA-44370 | Int Charges | 119,504.09 |
Sep 15, 2018 | IDA-44370 | Int Charges | 119,504.09 |
Jun 1, 2018 | IDA-57600 | Loan Disb | 144,772.33 |
Mar 15, 2021 | IDA-44370 | Int Charges | 114,345.82 |
Mar 15, 2021 | IDA-44370 | Int Charges | 114,345.82 |
Mar 15, 2021 | IDA-57600 | Int Charges | 41,671.60 |
Mar 15, 2021 | IDA-57600 | Int Charges | 1,290.65 |
Mar 15, 2021 | IDA-57600 | Loan Repay | 164,192.48 |
Mar 15, 2021 | IDA-57600 | Int Charges | 25,002.97 |
Mar 15, 2021 | IDA-57600 | Int Charges | 25,002.97 |
Mar 11, 2021 | IDA-57600 | Loan Disb | 470,000.00 |
Jun 30, 2021 | IDA-57600 | Loan Disb | 65,187.65 |
Oct 4, 2019 | IDA-57600 | Loan Disb | 1,100,000.00 |
Sep 15, 2019 | IDA-44370 | Loan Repay | 1,092.59 |
Sep 15, 2019 | IDA-44370 | Loan Repay | 389,728.44 |
Mar 16, 2020 | IDA-57600 | Loan Cancel | 25,000,000.00 |
Mar 9, 2020 | IDA-57600 | Loan Disb | 636,700.00 |
Mar 15, 2020 | IDA-44370 | Loan Repay | 387,985.10 |
Mar 15, 2020 | IDA-44370 | Int Charges | 113,259.64 |
Mar 15, 2020 | IDA-44370 | Int Charges | 113,259.64 |
Jun 26, 2008 | IDA-44370 | Loan Commitment | 38,000,000.00 |
Sep 15, 2023 | IDA-44370 | Loan Repay | 6,187.90 |
Mar 15, 2024 | IDA-44370 | Int Charges | 98,063.55 |
Mar 15, 2024 | IDA-44370 | Int Charges | 98,063.55 |
Mar 15, 2024 | IDA-57600 | Int Charges | 38,106.16 |
Mar 15, 2024 | IDA-44370 | Loan Repay | 366,129.53 |
Mar 15, 2024 | IDA-57600 | Int Charges | 22,863.68 |
Mar 15, 2024 | IDA-57600 | Loan Repay | 106,984.42 |
Mar 15, 2024 | IDA-57600 | Int Charges | 22,863.68 |
Mar 15, 2024 | IDA-57600 | Loan Repay | 4,669.71 |
Mar 15, 2024 | IDA-44370 | Loan Repay | 12,860.17 |
Dec 21, 2015 | IDA-57600 | Loan Commitment | 34,950,000.00 |
Sep 15, 2022 | IDA-57600 | Loan Repay | 47,579.34 |
Sep 15, 2022 | IDA-57600 | Loan Repay | 60,998.34 |
Sep 15, 2022 | IDA-57600 | Int Charges | 23,455.22 |
Sep 15, 2022 | IDA-57600 | Int Charges | 23,455.22 |
Sep 15, 2022 | IDA-57600 | Int Charges | 39,092.06 |
Sep 15, 2022 | IDA-44370 | Loan Repay | 358,179.60 |
Sep 15, 2022 | IDA-44370 | Int Charges | 99,507.75 |
Sep 15, 2022 | IDA-44370 | Int Charges | 99,507.75 |
Sep 15, 2022 | IDA-44370 | Loan Repay | 10,367.68 |
Mar 15, 2023 | IDA-57600 | Loan Repay | 1,902.99 |
Mar 15, 2023 | IDA-57600 | Loan Repay | 109,720.95 |
Mar 15, 2023 | IDA-57600 | Int Charges | 23,694.74 |
Mar 15, 2023 | IDA-57600 | Int Charges | 23,694.74 |
Mar 15, 2023 | IDA-57600 | Int Charges | 39,491.21 |
Mar 15, 2023 | IDA-44370 | Loan Repay | 5,204.99 |
Mar 15, 2023 | IDA-44370 | Loan Repay | 373,682.25 |
Mar 15, 2023 | IDA-44370 | Int Charges | 100,878.73 |
Mar 15, 2023 | IDA-44370 | Int Charges | 100,878.73 |
Sep 15, 2023 | IDA-44370 | Loan Repay | 369,135.97 |
Sep 15, 2023 | IDA-44370 | Int Charges | 98,522.52 |
Sep 15, 2023 | IDA-44370 | Int Charges | 98,522.52 |
Sep 15, 2023 | IDA-57600 | Loan Repay | 108,319.49 |
Sep 15, 2023 | IDA-57600 | Int Charges | 23,057.21 |
Sep 15, 2023 | IDA-57600 | Int Charges | 23,057.21 |
Sep 15, 2023 | IDA-57600 | Int Charges | 38,428.71 |
Sep 15, 2023 | IDA-57600 | Loan Repay | 2,254.66 |
Jun 25, 2021 | IDA-57600 | Loan Disb | 156,825.31 |
Sep 15, 2021 | IDA-44370 | Loan Repay | 4,427.54 |
Sep 15, 2021 | IDA-44370 | Loan Repay | 401,429.53 |
Sep 15, 2021 | IDA-44370 | Int Charges | 112,109.05 |
Sep 15, 2021 | IDA-44370 | Int Charges | 112,109.05 |
Sep 15, 2021 | IDA-57600 | Int Charges | 26,424.17 |
Sep 15, 2021 | IDA-57600 | Int Charges | 26,424.17 |
Sep 15, 2021 | IDA-57600 | Int Charges | 43,806.88 |
Sep 15, 2018 | IDA-57600 | Int Charges | 9,572.33 |
Sep 15, 2018 | IDA-57600 | Int Charges | 15,940.79 |
Sep 15, 2018 | IDA-57600 | Int Charges | 314.33 |
Sep 15, 2018 | IDA-57600 | Int Charges | 9,572.33 |
Sep 15, 2018 | IDA-44370 | Loan Repay | 399,225.62 |
Sep 15, 2018 | IDA-44370 | Int Charges | 1,715.50 |
Sep 15, 2018 | IDA-44370 | Int Charges | 1,715.50 |
Mar 15, 2018 | IDA-44370 | Int Charges | 2,905.64 |
Mar 15, 2018 | IDA-44370 | Int Charges | 2,905.64 |
Mar 15, 2018 | IDA-44370 | Int Charges | 122,309.85 |
Mar 15, 2018 | IDA-44370 | Int Charges | 122,309.85 |
Sep 15, 2017 | IDA-44370 | Int Charges | 118,581.62 |
Sep 15, 2017 | IDA-44370 | Int Charges | 118,581.62 |
Mar 15, 2018 | IDA-57600 | Int Charges | 8,555.14 |
Mar 15, 2018 | IDA-57600 | Int Charges | 8,555.14 |
Sep 15, 2021 | IDA-57600 | Loan Repay | 1,832.17 |
Sep 15, 2021 | IDA-57600 | Loan Repay | 162,075.25 |
Mar 15, 2022 | IDA-57600 | Int Charges | 225.75 |
Mar 15, 2022 | IDA-57600 | Loan Repay | 115,656.27 |
Mar 15, 2022 | IDA-57600 | Int Charges | 25,418.10 |
Mar 15, 2022 | IDA-57600 | Int Charges | 25,418.10 |
Mar 15, 2022 | IDA-57600 | Int Charges | 42,363.50 |
Mar 15, 2022 | IDA-44370 | Loan Repay | 392,574.22 |
Mar 15, 2022 | IDA-44370 | Int Charges | 107,467.16 |
Mar 15, 2022 | IDA-44370 | Int Charges | 107,467.16 |
Mar 15, 2022 | IDA-44370 | Int Charges | 499.41 |
Mar 15, 2022 | IDA-44370 | Int Charges | 499.41 |
Dec 31, 2021 | IDA-57600 | Loan Cancel | 2,550,344.80 |
Sep 15, 2020 | IDA-44370 | Int Charges | 105,306.05 |
Sep 15, 2020 | IDA-44370 | Int Charges | 105,306.05 |
Sep 15, 2020 | IDA-57600 | Int Charges | 3,153.89 |
Sep 15, 2020 | IDA-57600 | Int Charges | 24,710.69 |
Sep 15, 2020 | IDA-57600 | Int Charges | 24,710.69 |
Sep 15, 2020 | IDA-57600 | Int Charges | 39,904.52 |
Sep 15, 2020 | IDA-44370 | Loan Repay | 1,210.41 |
Sep 15, 2020 | IDA-44370 | Loan Repay | 401,982.72 |
Mar 15, 2021 | IDA-44370 | Int Charges | 9,684.27 |
Mar 15, 2021 | IDA-44370 | Int Charges | 9,684.27 |
Mar 15, 2021 | IDA-44370 | Loan Repay | 406,562.90 |
Name | Review | Date |
---|---|---|
Project Management | Moderately Satisfactory | 2021-03-30 |
Monitoring and Evaluation | Unsatisfactory | 2021-03-30 |
Progress towards achievement of PDO | Moderately Unsatisfactory | 2021-03-30 |
Procurement | Moderately Satisfactory | 2021-03-30 |
Financial Management | Moderately Satisfactory | 2021-03-30 |
Overall Implementation Progress (IP) | Moderately Unsatisfactory | 2021-03-30 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 06-29-2022 |
---|---|
Outcomes | |
Risk to Development Outcome | Substantial |
Bank Performance | |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 12-23-2022 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Unsatisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Moderately Unsatisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | Moderately Satisfactory | N/a |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Number of investments informed by WCAP outputs/activities approved for detailed design/implementation. | Value | 0.00 | 2.00 | 3.00 |
Date | July 15, 2008 | June 30, 2021 | June 30, 2021 | |
Comment |
Number of modern tools operationalized and used for decision making | Value | 2.00 | 8.00 | 13.00 |
Date | July 22, 2008 | June 30, 2021 | June 30, 2021 | |
Comment |
Direct Project Beneficiaries (number), of which female (%) | Value | 200 (1%) | 250 (1%) | |
Date | January 31, 2016 | June 30, 2021 | ||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Studies for investment planning developed | Value | 0.00 | 7.00 | 8.00 |
Date | July 16, 2008 | June 30, 2021 | June 30, 2021 | |
Comment | Feasibility study for a large hydropower project completed. |
Sediment management studies and flushing tests for the Tarbela Reservoir carried out. | Value | Initial sediment studies are now outdated and requ | Completed | Sediment management studies and flushing tests for |
Date | August 26, 2008 | November 26, 2014 | November 29, 2013 | |
Comment |
No. of labs and facilities for water resources management established and/or upgraded | Value | 0.00 | 2.00 | 4.00 |
Date | July 15, 2008 | June 30, 2021 | June 30, 2021 | |
Comment |
No. of decision support tools and models for water resources management established and/or upgraded | Value | 0.00 | 6.00 | 7.00 |
Date | July 15, 2008 | June 30, 2021 | June 30, 2021 | |
Comment |
Number of Federal and Provincial government staff trained in water policy, planning and management | Value | 0.00 | 80.00 | 90.00 |
Date | July 15, 2008 | June 30, 2021 | June 30, 2021 | |
Comment |
Telemetry stations upgraded | Value | 80.00 | 80.00 | 90.00 |
Date | July 15, 2008 | June 30, 2021 | June 30, 2021 | |
Comment |
Number of strategic assessments for improved WRM carried out | Value | 0.00 | 0.00 | 15.00 |
Date | September 22, 2008 | June 30, 2021 | June 30, 2021 | |
Comment |
Water balance and flow data made accessible publically | Value | No | Yes | Yes |
Date | July 15, 2008 | June 30, 2021 | June 30, 2021 | |
Comment |
Assessments carried out for improved operations of hydraulic infrastructure | Value | 0.00 | 0.00 | 1.00 |
Date | September 25, 2008 | June 30, 2021 | June 30, 2021 | |
Comment |